CN204125840U - Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam - Google Patents

Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam Download PDF

Info

Publication number
CN204125840U
CN204125840U CN201420487412.8U CN201420487412U CN204125840U CN 204125840 U CN204125840 U CN 204125840U CN 201420487412 U CN201420487412 U CN 201420487412U CN 204125840 U CN204125840 U CN 204125840U
Authority
CN
China
Prior art keywords
mould bases
main tank
top surface
nose girder
mobile formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420487412.8U
Other languages
Chinese (zh)
Inventor
谭祥国
张乐亲
何开伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Tonglian Road And Bridge Machinery Technical Co ltd
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 4th Engineering Co Ltd
Original Assignee
WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL CO Ltd
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL CO Ltd, China Railway Erju Co Ltd filed Critical WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL CO Ltd
Priority to CN201420487412.8U priority Critical patent/CN204125840U/en
Application granted granted Critical
Publication of CN204125840U publication Critical patent/CN204125840U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to bridging apparatus field, and particularly a kind of mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam; It comprises: main tank beam, and its quantity equals 2, is all installed between two adjacent bridge piers; Mould bases crossbeam, level is installed on main tank back portion, vertical with main tank beam; Side form hangs curved beam, and the center line all for mould bases crossbeam vertical direction on single mould bases crossbeam is symmetrically arranged with 2 side forms and hangs curved beam, and it is all to camber; Die sinking cylinder system, side form hangs curved beam and along mould bases cross beam movement, can be driven by this die sinking cylinder system; Goal of the invention of the present utility model is to provide a kind of change to install across regulating easily, being convenient to two nose girder mobile formwork bridge fabrication machines that the mould bases transverse beam system manufacturing, optimize main tank beam stress state is placed in main tank top surface of the beam.

Description

Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam
Technical field
The utility model relates to bridging apparatus field, and particularly a kind of mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam.
Background technology
the two nose girder mobile formwork bridge fabrication machine mould bases transverse beam system of traditional deck type is placed in the side of main tank beam, is connected with main bearing beam lateral bolster seat board bolt by bolt joint plate.This project organization is simple, it is light to conduct oneself with dignity, but manufacture complexity simultaneously, become across adjustment and Installation and Debugging difficulty larger.
Utility model content
For prior art Problems existing, goal of the invention of the present utility model is to provide a kind of change to be placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam across the mould bases transverse beam system regulating easily, be convenient to installation manufacture, the stress optimizing main tank beam, electric block service efficiency to improve.
To achieve these goals, the technical solution adopted in the utility model is:
Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines for main tank top surface of the beam, and it comprises:
Main tank beam, its quantity equals 2, is all installed between two adjacent bridge piers;
Mould bases crossbeam, level is installed on described main tank back portion, vertical with main tank beam;
Side form hangs curved beam, and the center line all for mould bases crossbeam vertical direction on single mould bases crossbeam is symmetrically arranged with 2 side forms and hangs curved beam, and it is all to described camber;
Die sinking cylinder system, described side form hangs curved beam and along described mould bases cross beam movement, can be driven by this die sinking cylinder system.
The utility model have employed the scheme that described main tank back portion arranges the mould bases transverse beam system vertical with main tank beam, described bridge fabrication machine is enable to be more convenient for becoming across adjustment, although the change of bridge fabrication machine is of little use across adjustment, but in installation, dismounting, become across time, also need the method for demounting bolt compared to existing technology, the utility model becomes easier across adjustment, and optimize the stress of main tank beam, make construction safer, mould bases transverse beam system is placed in main tank back portion simultaneously, mould bases crossbeam bottom increases for the electric block room for promotion vertically moved lifted, electric block service efficiency improves.
As preferred version of the present utility model, described mould bases crossbeam top is used for side form suspension curved beam slippage position and is equipped with corrosion resistant plate, is convenient to side form and hangs the movement of curved beam on mould bases crossbeam.
As preferred version of the present utility model, described mould bases crossbeam is provided with and can locks the Lock Part that described side form hangs curved beam, this Lock Part can be the block of Bolt to position, or Lock Part that is pneumatic, that surge.
As preferred version of the present utility model, described Lock Part is the block of Bolt to position, because the adjustment span that side form hangs curved beam is of little use, so select the block of Bolt to position, cost is relative to Lock Part that is pneumatic, that surge, and cost is lower.
As preferred version of the present utility model, described main tank beam is arranged between two adjacent bridge piers, and is parallel to each other, and is positioned at sustained height, scientific structure, facilitates the layout of mould bases crossbeam.
As preferred version of the present utility model, described mould bases transverse beam system is placed in 2 main tank back portions, and overhead traveling crane longeron can be installed in mould bases crossbeam bottom, and installs the electric block that can vertically move along overhead traveling crane longeron for lifting, convenient transport.
The beneficial effects of the utility model are:
1, also need the method for demounting bolt compared to existing technology, be convenient to the installation of mobile formwork bridge fabrication machine, dismounting, change across and transformation;
2, the design of mobile formwork bridge fabrication machine mould bases crossbeam is more convenient for the processing and manufacturing of parts;
3, mobile formwork bridge fabrication machine mould bases crossbeam puts the stress optimizing main tank beam, make construction safer;
4, mould bases transverse beam system is placed in main tank back portion, and mould bases crossbeam bottom increases for the electric block room for promotion vertically moved lifted, and electric block service efficiency improves.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is axonometric drawing of the present utility model.
Mark in figure: 1-mould bases crossbeam, 2-main tank beam, 3-side form hangs curved beam, and 4-wraps up cat ladder entirely, 5-electric block, 6-guardrail, 7-overhead traveling crane longeron.
Detailed description of the invention
Below in conjunction with embodiment and detailed description of the invention, the utility model is described in further detail.But this should be interpreted as that the scope of the above-mentioned theme of the utility model is only limitted to following embodiment, all technology realized based on summary of the invention of the present utility model all belong to scope of the present utility model.
embodiment 1
As Fig. 1-2, a kind of mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam, and it comprises:
Main tank beam 2, its quantity equals 2, is arranged between two adjacent bridge piers, and is parallel to each other, be positioned at sustained height;
Mould bases crossbeam 1, level is installed on described main tank beam 2 top, vertical with main tank beam 2, and vertical with the main stroke directions of bridge;
Side form hangs curved beam 3, and the center line all for mould bases crossbeam 1 vertical direction on single mould bases crossbeam 1 is symmetrically arranged with 2 side forms and hangs curved beam 3, and it is all to described camber;
Die sinking cylinder system, described side form hangs curved beam 3 and can move along described mould bases crossbeam 1, is driven by this die sinking cylinder system.
Described mould bases crossbeam 1 top is used for side form suspension curved beam 3 slippage position and is equipped with corrosion resistant plate, or alloy-steel plate.
Described mould bases crossbeam 1 is provided with and can locks the Lock Part that described side form hangs curved beam 3, described Lock Part is the block of Bolt to position, hang on curved beam 3 at described side form and be provided with corresponding slideway, after described side form hangs curved beam 3 slippage to precalculated position, curved beam 3 is hung to side form by adding Lock Part to realize the locking of mould bases crossbeam 1 length direction spacing.
Mould bases crossbeam 1 between described 2 main tank beam 2 tops is vertically arranged with 2 parallel overhead traveling crane longerons 7 below, mould bases crossbeam 1 bottom is fixedly hung on by U bolt, described overhead traveling crane longeron 7 is hung with electric block 5, wall scroll overhead traveling crane longeron 7 installs 1 electric block 5, because lifting space increases, improve the operating efficiency of electric block; Described main tank beam 2 is provided with full parcel cat ladder 4, its top extends to main tank beam 2 top, and bottom extends to bridge pier; the movement of convenient construction personnel; protect the construction safety of constructor, described mould bases crossbeam 1 top is provided with guardrail 6 simultaneously, the construction safety of same protection constructor.

Claims (6)

1. mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines for main tank top surface of the beam, and it comprises:
Main tank beam, its quantity equals 2, is all installed between two adjacent bridge piers;
Mould bases crossbeam, level is installed on described main tank back portion, vertical with main tank beam;
Side form hangs curved beam, and the center line all for mould bases crossbeam vertical direction on single mould bases crossbeam is symmetrically arranged with 2 side forms and hangs curved beam, and it is all to described camber;
Die sinking cylinder system, described side form hangs curved beam and along described mould bases cross beam movement, can be driven by this die sinking cylinder system.
2. mould bases transverse beam system according to claim 1 is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam, it is characterized in that, described mould bases crossbeam top is used for side form suspension curved beam slippage position and is equipped with corrosion resistant plate.
3. mould bases transverse beam system according to claim 2 is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam, it is characterized in that, described mould bases crossbeam is provided with and can locks the Lock Part that described side form hangs curved beam.
4. mould bases transverse beam system according to claim 3 is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam, it is characterized in that, described Lock Part is the block of Bolt to position.
5. mould bases transverse beam system according to claim 4 is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam, it is characterized in that, described main tank beam is arranged between two adjacent bridge piers, and is parallel to each other, and is positioned at sustained height.
6. mould bases transverse beam system according to claim 5 is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam, it is characterized in that, described mould bases transverse beam system is placed in 2 main tank back portions, overhead traveling crane longeron can be installed in mould bases crossbeam bottom, and installs the electric block that can vertically move along overhead traveling crane longeron for lifting.
CN201420487412.8U 2014-08-27 2014-08-27 Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam Active CN204125840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420487412.8U CN204125840U (en) 2014-08-27 2014-08-27 Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420487412.8U CN204125840U (en) 2014-08-27 2014-08-27 Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam

Publications (1)

Publication Number Publication Date
CN204125840U true CN204125840U (en) 2015-01-28

Family

ID=52382210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420487412.8U Active CN204125840U (en) 2014-08-27 2014-08-27 Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam

Country Status (1)

Country Link
CN (1) CN204125840U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988910A (en) * 2017-12-07 2018-05-04 中铁二十局集团第六工程有限公司 A kind of upstroke movable framework template overall pulling down method
CN109338894A (en) * 2018-11-22 2019-02-15 中铁十二局集团第工程有限公司 Mobile formwork pours width box girder construction method
WO2021026984A1 (en) * 2019-08-12 2021-02-18 山东恒堃机械有限公司 Rear crossbeam for downstroke self-launching movable support system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988910A (en) * 2017-12-07 2018-05-04 中铁二十局集团第六工程有限公司 A kind of upstroke movable framework template overall pulling down method
CN107988910B (en) * 2017-12-07 2019-03-01 中铁二十局集团第六工程有限公司 A kind of upstroke movable framework template overall pulling down method
CN109338894A (en) * 2018-11-22 2019-02-15 中铁十二局集团第工程有限公司 Mobile formwork pours width box girder construction method
CN109338894B (en) * 2018-11-22 2020-05-12 中铁十二局集团第一工程有限公司 Construction method for pouring wide and narrow box girder by movable formwork
WO2021026984A1 (en) * 2019-08-12 2021-02-18 山东恒堃机械有限公司 Rear crossbeam for downstroke self-launching movable support system

Similar Documents

Publication Publication Date Title
CN206486233U (en) A kind of installing engineering Special elevator
CN202945003U (en) Portal crane for mounting large-scale equipment
CN204125840U (en) Mould bases transverse beam system is placed in two nose girder mobile formwork bridge fabrication machines of main tank top surface of the beam
CN206624553U (en) Lifting component system
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN110104564A (en) A kind of bridge crane total coating process
CN103194977A (en) Placing method for girder guiding machine before first hole box girder erection by integrated transportation and erection type bridge girder erection machine
CN202989781U (en) Width widened cast-in-place box beam moving support
CN204959611U (en) A lifting device for highway construction bridge railing base template
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN204938642U (en) A kind of cable-stayed type material elevator
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN203430058U (en) Suspension type building framework beam steel bar frame hanger
CN204057720U (en) The multiple little template gig of wall of vertical
CN204126237U (en) A kind of elevator hoistway construction platform
CN202705932U (en) T-beam reinforced hanger frame structure
CN204002841U (en) A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction
CN202644416U (en) A simple lifting device for dismounting a bailey beam
CN209260563U (en) A kind of Bailey beam truss entirety transverse sliding device for cast-in-situ continuous beam
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN102587678B (en) Device for slipping node of steel structure
CN207209786U (en) The cast-in-place boom support monoblock type automatic disassembling device of falsework
CN204551271U (en) A kind of reinforcement type Hanging Basket
CN202358822U (en) Hoisting structure for oil field skid block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160106

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Patentee after: WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Patentee before: WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190424

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Co-patentee after: WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: WUHAN TONGLIAN ROAD AND BRIDGE MACHINERY TECHNICAL Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right