CN204112731U - For the mould that the flange in floor preformed hole and this hole is constructed simultaneously - Google Patents

For the mould that the flange in floor preformed hole and this hole is constructed simultaneously Download PDF

Info

Publication number
CN204112731U
CN204112731U CN201420556829.5U CN201420556829U CN204112731U CN 204112731 U CN204112731 U CN 204112731U CN 201420556829 U CN201420556829 U CN 201420556829U CN 204112731 U CN204112731 U CN 204112731U
Authority
CN
China
Prior art keywords
interior pipe
outer tube
hole
flange
preformed hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420556829.5U
Other languages
Chinese (zh)
Inventor
王泳文
张阔
杨莹莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201420556829.5U priority Critical patent/CN204112731U/en
Application granted granted Critical
Publication of CN204112731U publication Critical patent/CN204112731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the mould that the flange for floor preformed hole and this hole is constructed simultaneously, this mould comprises interior pipe and outer tube, the top of interior pipe flushes with the top of outer tube, and interior pipe and outer concentric tube, length difference between interior pipe and outer tube and the consistency of thickness of concrete floor, and the length of interior pipe is greater than the length of outer tube, interior pipe is connected by support with the top of outer tube, simple to operate when using this die casting preformed hole and flange, convenient, less investment, cost is low, effective, and make the flange one-shot forming of concrete floor preformed hole and this preformed hole.

Description

For the mould that the flange in floor preformed hole and this hole is constructed simultaneously
Technical field
The utility model relates to preformed hole and the flange technology thereof of concrete floor, particularly for mould that floor preformed hole and this hole flanging are constructed simultaneously.
Background technology
In the middle of industrial construction, for ensureing that Pipe installing passes through floor, need circular pipe reserving hole be set on concrete floor; Meanwhile, because industrial chemical device ring guaranteed request avoids floor sewage along pipeline stream, therefore floor prepared hole all establishes flange usually.
The most diameter of industrial pipeline is less, then preformed hole and flange are also smaller, and the general separately construction of minor diameter reserving hole, flange construction, formwork is very difficult, shaping poor.
Utility model content
Technical problem to be solved in the utility model is to provide the mould of simultaneously constructing for floor preformed hole and this hole flanging, and this mould can ensure that concrete floor preformed hole and this preformed hole flange are constructed simultaneously, one-shot forming.
For achieving the above object, the utility model provides following technical scheme: the mould that the flange for floor preformed hole and this hole is constructed simultaneously, comprise interior pipe and outer tube, the described top of interior pipe flushes with the top of outer tube, and interior pipe and outer concentric tube, length difference between described interior pipe and outer tube and the consistency of thickness of concrete floor, and the length of interior pipe is greater than the length of outer tube, and described interior pipe is connected by support with the top of outer tube.
Preferably, interior pipe is made up of the arc plate that some height, width, thickness are all consistent, described outer tube is also made up of the arc plate that some height, width, thickness are all consistent, each arc plate is fixed by first meter of word support by the bottom of described interior pipe, the bottom of outer tube is fixed by the arc plate of stirrup by various piece, the top of interior pipe connects the top of outer tube by second meter of word support, and each arc plate of interior pipe, outer tube is fixed by described second meter of word support respectively.
Adopt technique scheme, when fluid concrete floor preformed hole, directly by the gap location of pouring concrete at interior pipe and outer tube, this mould is simple, convenient when implementing, less investment, cost are low, effective, and make the flange one-shot forming of concrete floor preformed hole and this preformed hole.
Interior pipe is made up of the arc plate that some height, width, thickness are all consistent, described outer tube is also made up of the arc plate that some height, width, thickness are all consistent, each arc plate is fixed by first meter of word support by the bottom of described interior pipe, the bottom of outer tube is fixed by the arc plate of stirrup by various piece, the top of interior pipe connects the top of outer tube by second meter of word support, and each arc plate of interior pipe, outer tube is fixed by described second meter of word support respectively, is convenient to form removal after construction.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Wherein, 1. first meter of word supports pipe 3. outer tube 4. stirrup 5. second meters of words in 2. and supports 6. banking pin 7. concrete floor bed dies.
Detailed description of the invention
Below in conjunction with accompanying drawing, by the description to embodiment, the utility model is described further:
As shown in Figure 1, the mould that the flange that the utility model is used for floor preformed hole and this hole is constructed simultaneously, comprise interior pipe 2 and outer tube 3, the top of interior pipe 2 flushes with the top of outer tube 3, and interior pipe 2 is concentric with outer tube 3, length difference between interior pipe 2 and outer tube 3 and the consistency of thickness of concrete floor, and the length of interior pipe 2 is greater than the length of outer tube 3, interior pipe 2 is by some height, width, the arc plate formation that thickness is all consistent, outer tube 3 is also by some height, width, the arc plate formation that thickness is all consistent, each arc plate is fixed by spot welding first meter of word support 1 by the bottom of interior pipe 2, the bottom of outer tube 3 is fixed by the arc plate of stirrup 4 by various piece, the top that the top of interior pipe 2 connects outer tube 3 by spot welding second meter of word support 5 is connected with outer tube 3, and described second meter of word support 5 is respectively by interior pipe 2, each arc plate of outer tube 3 is fixed.
Interior pipe 2 is by some height, width, the arc plate formation that thickness is all consistent, outer tube 3 is also by some height, width, the arc plate formation that thickness is all consistent, each arc plate is fixed by spot welding first meter of word support 1 by the bottom of interior pipe 2, the bottom of outer tube 3 is fixed by the arc plate of stirrup 4 by various piece, the top of interior pipe 2 connects the top of outer tube 3 by spot welding second meter of word support 5, second meter of word support 5 is respectively by interior pipe 2, each arc plate of outer tube 3 is fixed, after construction completes during form removal, remove first, two meters of word supports 1, 5 and stirrup 4 after, be convenient in general, outer tube 2, 3 slowly remove, avoid the flange damaging reserving hole and this preformed hole during form removal.
Adopt technique scheme, when fluid concrete floor preformed hole, directly by pouring concrete at the gap location of interior pipe 2 with outer tube 3, water the flange thickness outpoured and be clearance distance between interior pipe 2 and outer tube 3, this mould is simple, convenient when implementing, less investment, cost are low, effective, and make the flange one-shot forming of concrete floor preformed hole and this preformed hole.
The mould that the flange that the utility model is used for floor preformed hole and this hole is constructed simultaneously can be reused, cost-saving.
Interior pipe 2 of the present utility model in use, is fixed on the preformed hole position of concrete floor bed die 7 by the utility model, and evenly fixes 10 banking pins 6 in concrete floor bed die 7 and interior pipe 2 contact position along interior pipe 2 outer ring, prevents the utility model from offseting.
Above-described is only preferred embodiment of the present utility model; it should be pointed out that for the person of ordinary skill of the art, under the prerequisite not departing from the utility model creation design; can also make some distortion and improvement, these all belong to protection domain of the present utility model.

Claims (2)

1. a mould of simultaneously constructing for the flange in floor preformed hole and this hole, comprise interior pipe (2) and outer tube (3), it is characterized in that: the top of described interior pipe (2) flushes with the top of outer tube (3), and interior pipe (2) is concentric with outer tube (3), length difference between described interior pipe (2) and outer tube (3) and the consistency of thickness of concrete floor, and the length of interior pipe (2) is greater than the length of outer tube (3), described interior pipe (2) is connected by support with the top of outer tube (3).
2. mould of simultaneously constructing for the flange in floor preformed hole and this hole according to claim 1, it is characterized in that: described interior pipe (2) is by some height, width, the arc plate formation that thickness is all consistent, described outer tube (3) is also by some height, width, the arc plate formation that thickness is all consistent, the bottom of described interior pipe (2) is supportted (1) by first meter of word and is fixed by each arc plate, the arc plate of various piece is fixed by stirrup (4) by the bottom of outer tube (3), the top of interior pipe (2) connects the top of outer tube (3) by second meter of word support (5), and described second meter of word support (5) is respectively by interior pipe (2), each arc plate of outer tube (3) is fixed.
CN201420556829.5U 2014-09-25 2014-09-25 For the mould that the flange in floor preformed hole and this hole is constructed simultaneously Active CN204112731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420556829.5U CN204112731U (en) 2014-09-25 2014-09-25 For the mould that the flange in floor preformed hole and this hole is constructed simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420556829.5U CN204112731U (en) 2014-09-25 2014-09-25 For the mould that the flange in floor preformed hole and this hole is constructed simultaneously

Publications (1)

Publication Number Publication Date
CN204112731U true CN204112731U (en) 2015-01-21

Family

ID=52330057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420556829.5U Active CN204112731U (en) 2014-09-25 2014-09-25 For the mould that the flange in floor preformed hole and this hole is constructed simultaneously

Country Status (1)

Country Link
CN (1) CN204112731U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258847A (en) * 2019-06-25 2019-09-20 上海市建筑科学研究院 The precast facade of rubber strip is fixed in bottom in advance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258847A (en) * 2019-06-25 2019-09-20 上海市建筑科学研究院 The precast facade of rubber strip is fixed in bottom in advance

Similar Documents

Publication Publication Date Title
CN104109999B (en) The construction method of bridge tower thwart beam
CN203891058U (en) Built-in foundation bolt positioning tool for fixed type tower crane foundation
CN103243905B (en) A kind of reducing arc formwork
CN204112731U (en) For the mould that the flange in floor preformed hole and this hole is constructed simultaneously
CN104328914B (en) The construction method that floor preformed hole and this hole flanging are constructed simultaneously
CN204040043U (en) Adjustable support supporting movable end
CN202913697U (en) Core model of reserved hole
CN202248862U (en) Pipe holder for plugging gap
CN203380228U (en) Inner support device for production of pressure steel pipe
CN205012560U (en) Modular steel casing pipe concrete column
CN205046826U (en) Support arrangement for extremely interior top platform on spherical tank
CN204283493U (en) The positioner of draining blind pipe between Tunnel and secondary lining
CN204356915U (en) The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN204370564U (en) Underfloor constructional column concrete pouring structure
CN204346173U (en) A kind of welding stock column cap
CN207862974U (en) The quick support shuttering system of city integrated piping lane construction
CN105000467A (en) Hoisting device
CN204122538U (en) A kind of bearing bending machine
CN105113776A (en) Supporting device and construction method for top platform in upper pole of spherical tank
CN204960303U (en) Cast -in -place structural position centre form strutting arrangement that turns over
CN204152515U (en) A kind of concrete sliding cement pipe snubber
CN204293903U (en) A kind of detachable spray nozzle device of butyl acrylate rectifying column condenser
CN204094063U (en) The anti-flexing arbor of big L/D ratio foundry goods
CN204198761U (en) There is the two iron mouth blast furnace of single casting house of bridge type iron runner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant