CN204098482U - The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar - Google Patents

The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar Download PDF

Info

Publication number
CN204098482U
CN204098482U CN201420443056.XU CN201420443056U CN204098482U CN 204098482 U CN204098482 U CN 204098482U CN 201420443056 U CN201420443056 U CN 201420443056U CN 204098482 U CN204098482 U CN 204098482U
Authority
CN
China
Prior art keywords
arch
arch bar
topotype
cement
dividing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420443056.XU
Other languages
Chinese (zh)
Inventor
姚和祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420443056.XU priority Critical patent/CN204098482U/en
Application granted granted Critical
Publication of CN204098482U publication Critical patent/CN204098482U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses the prefabricated fixed form combined steel mould of a kind of steel concrete arch bar, comprise cement topotype, cement topotype is arranged on upper in two groups of arch bar supporting components on cement topotype both sides by stone bolt, be arranged between two groups of arch bar supporting components for connecting both some joists and connecting rod by bolt, be arranged on the some arch bed dies on joist, be arranged on cement topotype and joist with Nei Ka and the interior side form fastened outward and outer side mold; Described arch bar supporting component is bolted forms by encircleing head, arch body and vault; Between adjacent arch bed die, dividing plate is installed.The utility model makes fast, and expense is low, makes fast 2-3 doubly than original template; Adopt and combine and use bolton, assemble fast 3-4 doubly, form removal only needs half an hour; Prefabricated efficiency is high, and efficiency improves 2-3 doubly, and while the construction period shortens, template number drops into and reduces; Operative is convenient, and arch bar quality is good, and template can Long-Time Service, and arch bar cost declines more than 30%.

Description

The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar
Technical field
The utility model relates to a kind of steel concrete arch bar prefabricated component mould, particularly relates to the prefabricated fixed form combined steel mould of a kind of steel concrete arch bar.
Background technology
Steel concrete arch bar is mainly used in the formula material depot that builds a house, and be assembled into roof system by the prefabricated arch bar of polylith, its span mainly contains five kinds, 12 meters, 15 meters, 18 meters, 21 meters, 24 meters, arch bar by upper and lower trough slab, dividing plate, reinforcing pull rod, suspension hook forms, once water the type of being pounded, because span is large, plate node is many, for special-shaped prefabricated units, difficulty of construction is larger.Its prefabrication system mainly adopts two kinds of formwork structures: one is full wooden form; Two is that arch adopts wooden model (some pieces of compositions), the on-the-spot system of buckleing of steel pipe bearing support, is steel wood hybrid template; The shortcoming that above-mentioned two kinds of templates exist is: 1, the template construct time is long, and consume artificial, quantity of material is large, and cost is too high, accounts for arch bar cost more than 40%; 2, prefabricated efficiency is low, waters that to smash striking time long; 3, template is short for application life, and difficulty of construction is large, and prefabricated speed is slow, and the construction period is long, is the prefabricated difficult problem of arch bar.
Utility model content
The purpose of this utility model is to solve Problems existing in current techniques, and provide a kind of and make simple and fast, cheap, prefabricated efficiency is high, waters that to smash striking time short, long service life, the prefabricated fixed form combined steel mould of steel concrete arch bar of easy construction.
For achieving the above object, the technological means that the utility model adopts is: the prefabricated fixed form combined steel mould of a kind of steel concrete arch bar, comprise cement topotype, cement topotype is arranged on upper in two groups of arch bar supporting components on cement topotype both sides by stone bolt, be arranged between two groups of arch bar supporting components for connecting both some joists and connecting rod by bolt, be arranged on the some arch bed dies on joist, be arranged on cement topotype and joist with Nei Ka and the interior side form fastened outward and outer side mold; Described arch bar supporting component is bolted forms by encircleing head, arch body and vault; Between adjacent arch bed die, dividing plate is installed.
Further, fixed by chock between described dividing plate and connecting rod.
Further, disturbing concrete layer between described interior side form and outer side mold.
Further, between the dividing plate of described arch head and arch body and dividing plate, the mode of dividing plate symmetry is provided with support bar, between the dividing plate of described vault and dividing plate, is provided with support bar in an interleaved manner.
The beneficial effects of the utility model are: make fast, expense is low, makes 21 or 24 meters of span templates, 6 people (pincers worker 2 people electric welder 1 people, general work 3 people) 6-8 hour, make fast 2-3 doubly than original template; Adopt and combine and use bolton, assemble and only need one hour, doubly, form removal only needs half an hour to fast 3-4, and the concrete after unclamping bolt template and pouring into a mould automatically disengages; Prefabricated efficiency is high, at temperature 5 ° of more than C, can prefabricated 10-15 block by high-early (strength) cement 30 days a set of templates, and efficiency improves 2-3 doubly, and while the construction period shortens, template number drops into and reduces; Operative is convenient, and arch bar quality is good, and template can Long-Time Service, and arch bar cost declines more than 30%.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is front view of the present utility model;
Fig. 2 is the drawing in side sectional elevation of the utility model front view;
Fig. 3 is the longitudinal plan of the utility model front view.
In figure: 1, cement topotype, 2, arch bar supporting component, 3, joist, 4, connecting rod, 5, arch bed die, 6, interior side form, 7, outer side mold, 8, bolt, 9, dividing plate, 10, chock, 11, layer of concrete, 12, support bar, 21, arch head, 22, arch body, 23, vault.
Detailed description of the invention
The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar as shown in Figure 1, 2, 3, comprise cement topotype 1, cement topotype is arranged on upper in two groups of arch bar supporting components 2 on cement topotype both sides by stone bolt, be arranged between two groups of arch bar supporting components for connecting both some joists 3 and connecting rod 4 by bolt, be arranged on the some arch bed dies 5 on joist, be arranged on cement topotype 1 and joist 3 with Nei Ka and the interior side form 6 fastened outward and outer side mold 7; Described arch bar supporting component 2 is connected to form by bolt 8 by arch 21, arch body 22 and vault 23; Between adjacent arch bed die 5, dividing plate 9 is installed.
Fixed by chock 10 between described dividing plate 9 and connecting rod 4.
Disturbing concrete layer 11 between described interior side form 6 and outer side mold 7.
Between the dividing plate of described arch 21 and arch body 22 and dividing plate, the mode of dividing plate symmetry is provided with support bar 12, between the dividing plate of described vault 23 and dividing plate, is provided with support bar 12 in an interleaved manner.
Arch bar supporting component 2 adopts steel design, for bearing arch bed die, the weight and watering of joist smashes whole pressure that construction produces, and conveniently transport, place, arch bar supporting component 2 is divided into by some parts of arch 21, arch body 22 and vault 23, its hogging body 22 and vault 23 can be divided into some pieces respectively again, and connected by bolt 8 between each piece, can conveniently install like this, transport, place, carrying, dismounting all very convenient again.
Prefabricated arch template die plate assembling flow path: according to figure paper size cement topotype inking bucket snap the line → the both sides of cement topotype arch bar supporting component → assemble on arch bar supporting component joist → put arch bed die → fixed connecting rod → installations dividing plate → timber wedge stationary barrier → fixing upper and lower plates outboard template on joist is installed and locate with wild card → water smash lower board concrete → lay in lower plate cheek board also with in fasten → water and smash lower plate dual-side concrete → water and smash arch board concrete → put inner side edge mould, inside fastening → water and smash both sides concrete → maintenance → loosen and take off sieve bolt, template and concrete arch bar depart from voluntarily → and template transports to and stacks field and carry out maintenance to use again.
By above-mentioned steps, can complete punching block assembling easily, operative is convenient, and arch bar quality is good, and template can Long-Time Service, and arch bar cost declines more than 30%; Make fast, expense is low, 21-24 rice cross-module plate processed 6 people (pincers worker 2 people electric welder 1 people, general work 3 people) 6-8 hour, makes fast 2-3 doubly than original template; Adopt full combination sieve bolt fastening, assembling only needs one hour, and doubly, form removal only needs half an hour to fast 3-4, unclamps dynamic in sieve bolt template and concrete the disengaging; Prefabricated efficiency is high, at temperature 5 ° of more than C, can prefabricated 10-15 block by high-early (strength) cement 30 days a set of templates, and improve 2-3 doubly, the construction period shortens template number and reduces.
The embodiment of the present application is just for illustration of technical characteristic disclosed in the present application, and those skilled in the art, by simply replacing the change carried out, still belong to the scope that the application protects.

Claims (4)

1. the prefabricated fixed form combined steel mould of steel concrete arch bar, it is characterized in that: comprise cement topotype (1), cement topotype is arranged on upper in two groups of arch bar supporting components (2) on cement topotype both sides by stone bolt, be arranged between two groups of arch bar supporting components for connecting both some joists (3) and connecting rod (4) by bolt, be arranged on the some arch bed dies (5) on joist, be arranged on the upper Nei Ka of cement topotype (1) and joist (3) and the interior side form (6) fastened and outer side mold (7) outward; Described arch bar supporting component (2) is connected to form by bolt (8) by arch head (21), arch body (22) and vault (23); Between adjacent arch bed die (5), dividing plate (9) is installed.
2. according to the prefabricated fixed form combined steel mould of steel concrete arch bar described in claim 1, it is characterized in that: fixed by chock (10) between described dividing plate (9) and connecting rod (4).
3. according to the prefabricated fixed form combined steel mould of steel concrete arch bar described in claim 1, it is characterized in that: disturbing concrete layer (11) between described interior side form (6) and outer side mold (7).
4. according to the prefabricated fixed form combined steel mould of steel concrete arch bar described in claim 1, it is characterized in that: between the dividing plate of described arch head (21) and arch body (22) and dividing plate, the mode of dividing plate symmetry is provided with support bar (12), between the dividing plate of described vault (23) and dividing plate, is provided with support bar (12) in an interleaved manner.
CN201420443056.XU 2014-08-07 2014-08-07 The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar Withdrawn - After Issue CN204098482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420443056.XU CN204098482U (en) 2014-08-07 2014-08-07 The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420443056.XU CN204098482U (en) 2014-08-07 2014-08-07 The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar

Publications (1)

Publication Number Publication Date
CN204098482U true CN204098482U (en) 2015-01-14

Family

ID=52266920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420443056.XU Withdrawn - After Issue CN204098482U (en) 2014-08-07 2014-08-07 The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar

Country Status (1)

Country Link
CN (1) CN204098482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264983A (en) * 2014-08-07 2015-01-07 姚和祥 Precasting and shaping combined steel mold of reinforced concrete arch board

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264983A (en) * 2014-08-07 2015-01-07 姚和祥 Precasting and shaping combined steel mold of reinforced concrete arch board

Similar Documents

Publication Publication Date Title
CN105926936B (en) Rectangular stiffened column assembled variable area template system and its construction method
CN101538831B (en) Post-poured hidden coping construction method for converting simply supported beams into continuous beams
CN206219997U (en) A kind of box crossbeam of bridge is reinforced and mounting structure
CN209907841U (en) Prefabricated high-strength concrete floor tile of assembled
CN204098482U (en) The prefabricated fixed form combined steel mould of a kind of steel concrete arch bar
CN206053279U (en) Tool type scaffold unit and tool type scaffold
CN103195200A (en) Steel bar truss buckle hanging type floor support plate
CN201573265U (en) Precast box girder inner formwork device of bridge beam
CN104264983B (en) A kind of prefabricated fixed form combined steel mould of steel concrete arch bar and assembling flow path thereof
CN202559241U (en) Universal displacement telescopic device
CN201943010U (en) Overhead cast-in-situ box girder support platform
CN203200982U (en) Steel bar truss buckling hanging type floor support plate
CN202064359U (en) Crossbeam wet-joint overhanging construction device
CN201883612U (en) Anchor device
CN204151723U (en) The construction equipment of anti-collision wall
CN205677237U (en) Square stiffened column assembled variable area template system
CN205063026U (en) Basement frame
CN205822770U (en) A kind of building shear wall shaped support
CN204212302U (en) A kind of hollowcore slab light pipe float Structure
CN105696453A (en) Steel-concrete composite beam
CN204000562U (en) The compound rigid frame bridge of a kind of vertical prestressing steel-concrete
CN208310369U (en) Self-resetting mild steel and damper linkage energy consumption wood joist
CN201437580U (en) Elevated box girder formwork supporting system
CN202668737U (en) Scattered mandrel for bridge construction
CN102433961A (en) Prefabricated beam structure construction member

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150114

Effective date of abandoning: 20160309

C25 Abandonment of patent right or utility model to avoid double patenting