CN206053279U - Tool type scaffold unit and tool type scaffold - Google Patents

Tool type scaffold unit and tool type scaffold Download PDF

Info

Publication number
CN206053279U
CN206053279U CN201620380692.1U CN201620380692U CN206053279U CN 206053279 U CN206053279 U CN 206053279U CN 201620380692 U CN201620380692 U CN 201620380692U CN 206053279 U CN206053279 U CN 206053279U
Authority
CN
China
Prior art keywords
scaffold
tool
board
tool type
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620380692.1U
Other languages
Chinese (zh)
Inventor
王小磊
张双刚
沈登峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Rentaiiron Hengchang Technology Development Co Ltd
Original Assignee
Hubei Rentaiiron Hengchang Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Rentaiiron Hengchang Technology Development Co Ltd filed Critical Hubei Rentaiiron Hengchang Technology Development Co Ltd
Priority to CN201620380692.1U priority Critical patent/CN206053279U/en
Application granted granted Critical
Publication of CN206053279U publication Critical patent/CN206053279U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Details Of Indoor Wiring (AREA)

Abstract

本实用新型公开了一种工具式脚手架单元及工具式脚手架,工具式脚手架单元包括立杆、脚手板、三角撑和防护网,所述立杆为与地面垂直方向平行设置,分为内外两组,内组包括两根内立杆,外组包括两根外立杆,两相邻的内外立杆之间设置有多个可拆卸的三角撑,多个脚手板水平方向平行设置在两组立杆之间,所述防护网设置在两外立杆之间,所述外立杆上设置有多个网架连接件,其特征在于,该脚手架单元还包括设置在底部脚手板上的水平桁架,所述水平桁架固定安装在两内立杆的底部靠近外立杆的一侧,所述水平桁架的长度与脚手板的长度一致,所述脚手板左右两侧面上设有备用横向连接构造孔。本实用新型构造简单,工厂预制生产,互换性强,安装方便。

The utility model discloses a tool-type scaffolding unit and a tool-type scaffolding. The tool-type scaffolding unit includes a vertical rod, a scaffolding board, a triangle brace and a protective net. The vertical rod is arranged parallel to the vertical direction of the ground and is divided into two groups of inner and outer parts. , the inner group includes two inner uprights, the outer group includes two outer uprights, a plurality of detachable triangular braces are arranged between two adjacent inner and outer uprights, and a plurality of scaffolding boards are arranged horizontally on two sets of uprights. Between the poles, the protective net is arranged between two outer poles, and a plurality of network frame connectors are arranged on the outer poles. It is characterized in that the scaffold unit also includes a horizontal truss arranged on the bottom scaffolding board , the horizontal truss is fixedly installed on the bottom of the two inner poles close to the side of the outer pole, the length of the horizontal truss is consistent with the length of the scaffold board, and the left and right sides of the scaffold board are provided with spare transverse connection structural holes . The utility model has the advantages of simple structure, prefabricated production, strong interchangeability and convenient installation.

Description

工具式脚手架单元及工具式脚手架Tool scaffold unit and tool scaffold

技术领域technical field

本实用新型涉及一种建筑施工用脚手架,尤其涉及一种工具式脚手架单元及工具式脚手架。The utility model relates to a scaffold for building construction, in particular to a tool-type scaffold unit and a tool-type scaffold.

背景技术Background technique

脚手架是建筑施工、装饰工程和维修工程中经常使用的一种施工防护装备,主要提供作业通道和安全防护。常见的传统的脚手架是使用钢管扣件进行现场搭设的,这种钢管扣件搭设的脚手架不仅费时费力,机械化水平低,而且质量把控不一,对搭设工人的技能要求较高。现阶段我国城市建设规模高速发展,国家城镇化建设步伐加大加快,高层和超高层建筑大量涌现,而在高层和超高层建筑现场搭设钢管扣件脚手架是高空危险作业,存在较大的安全风险。Scaffolding is a kind of construction protection equipment often used in building construction, decoration engineering and maintenance engineering, mainly to provide working access and safety protection. Common traditional scaffolding is erected on-site using steel pipe fasteners. The scaffolding erected by such steel pipe fasteners is not only time-consuming and laborious, but also has a low level of mechanization, and the quality control is inconsistent, which requires higher skills for the erection workers. At this stage, the scale of urban construction in my country is developing rapidly, the pace of national urbanization is accelerating, and a large number of high-rise and super high-rise buildings are emerging. However, erecting steel pipe fastener scaffolding on the site of high-rise and super high-rise buildings is a dangerous operation at high altitude, and there is a greater safety risk. .

实用新型内容Utility model content

本实用新型的目的在于提供一种工具式脚手架单元及工具式脚手架,它构造简单,工厂预制生产,互换性强,安装方便。The purpose of the utility model is to provide a tool-type scaffold unit and a tool-type scaffold, which has a simple structure, is prefabricated in a factory, has strong interchangeability, and is easy to install.

本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:

一种工具式脚手架单元,该脚手架单元包括立杆、脚手板、三角撑和防护网,所述立杆为与地面垂直方向平行设置,分为内外两组,内组包括两根内立杆,外组包括两根外立杆,两相邻的内外立杆之间设置有多个可拆卸的三角撑,多个脚手板水平方向平行设置在两组立杆之间,所述防护网设置在两外立杆之间,所述外立杆上设置有多个网架连接件,该脚手架单元还包括设置在底部脚手板上的水平桁架,所述水平桁架固定安装在两内立杆的底部靠近外立杆的一侧,所述水平桁架的长度与脚手板的长度一致,所述脚手板左右两侧面上设有备用横向连接构造孔。A tool-type scaffolding unit, the scaffolding unit includes a pole, a scaffolding board, a triangular brace and a protective net, the pole is arranged in parallel with the vertical direction of the ground, and is divided into two groups, the inner group includes two inner poles, The outer group includes two outer poles, a plurality of detachable triangular braces are arranged between two adjacent inner and outer poles, and a plurality of scaffolding boards are horizontally arranged between the two sets of poles, and the protective net is arranged on Between the two outer poles, a plurality of network frame connectors are arranged on the outer poles, and the scaffold unit also includes a horizontal truss arranged on the bottom scaffolding plate, and the horizontal truss is fixedly installed on the bottom of the two inner poles Near the side of the outer pole, the length of the horizontal truss is consistent with the length of the scaffold board, and the left and right sides of the scaffold board are provided with spare transverse connection structural holes.

按上述技术方案,所述脚手板的内外两侧面均设有脚手板模数孔,所述水平桁架的内侧面设有水平桁架模数孔,所述内立杆和外立杆上设有与所述脚手板模数孔和水平桁架模数孔对应的配合孔。According to the above technical scheme, the inner and outer sides of the scaffold board are provided with scaffold board modulus holes, the inner side of the horizontal truss is provided with horizontal truss module holes, and the inner and outer rods are provided with The matching holes corresponding to the modular holes of the scaffold board and the horizontal truss modular holes.

按上述技术方案,所述脚手板为方形板状物,相邻两个脚手板之间的高度为每一个模数高度。According to the above technical solution, the scaffolding board is a square plate, and the height between two adjacent scaffolding boards is the height of each module.

按上述技术方案,所述防护网为设有边框的网状物,所述防护网通过网架连接件固定安装在外立杆上。According to the above technical solution, the protective net is a net with a frame, and the protective net is fixedly installed on the outer pole through the net frame connector.

按上述技术方案,所述防护网边框的水平尺寸与脚手板的长度一致。According to the above technical solution, the horizontal dimension of the frame of the protective net is consistent with the length of the scaffolding board.

按上述技术方案,所述脚手板内侧边缘铰接有活动翻板。According to the above technical solution, the inner edge of the scaffolding board is hinged with a movable flap.

相应的,本实用新型提供一种工具式脚手架,包括多个上述的工具式脚手架单元,多个工具式脚手架单元横向拼接的连接方式是,相邻两个工具式脚手架单元之间通过设置在脚手板的备用横向连接构造孔内的备用横向连接构造固定连接,其中一个工具式脚手架单元的防护网通过网架连接件安装在相邻的工具式脚手架单元的外立杆上;多个工具式脚手架单元纵向叠加的连接方式是,相邻两个工具式脚手架单元的内立杆之间、外立杆之间通过夹板螺栓固定,两种连接方式均保持防护网位于脚手架的同一侧。Correspondingly, the utility model provides a tool-type scaffolding, which includes a plurality of the above-mentioned tool-type scaffolding units. The spare horizontal connection structure in the hole of the hand plate is fixedly connected, and the protective net of one tool-type scaffolding unit is installed on the outer pole of the adjacent tool-type scaffolding unit through the grid connector; multiple tool-type scaffolding The connection method of unit longitudinal stacking is that the inner poles and outer poles of two adjacent tool-type scaffold units are fixed by splint bolts, and the two connection methods keep the protective net on the same side of the scaffold.

按上述技术方案,所述脚手架还包括导轨和吊装系统,所述导轨间隔地安装在内立杆上,所述导轨上配装有附墙支座,所述吊装系统配装在所述脚手架的下吊点上。According to the above technical solution, the scaffold also includes guide rails and a hoisting system, the guide rails are installed on the inner poles at intervals, the guide rails are equipped with wall-attached supports, and the hoisting system is installed on the scaffolding Hang on the point.

本实用新型,具有以下有益效果:本实用新型的工具式脚手架单元构造简单,工厂预制生产,互换性强,安装方便。The utility model has the following beneficial effects: the tool-type scaffolding unit of the utility model has a simple structure, is prefabricated in a factory, has strong interchangeability, and is easy to install.

附图说明Description of drawings

下面将结合附图及实施例对本实用新型作进一步说明,附图中:The utility model will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:

图1是本实用新型中工具式脚手架单元的结构示意图;Fig. 1 is the structural representation of tool type scaffolding unit in the utility model;

图2是本实用新型中工具式脚手架的结构示意图。Fig. 2 is a structural schematic diagram of the tool-type scaffolding in the utility model.

图中:1-内立杆;2-外立杆;3-脚手板;3.1-备用横向连接构造孔;3.2-脚手板模数孔;4-防护网;5-网架连接件;6-活动翻板;7-水平桁架;7.1-水平桁架模数孔;8-三角撑;9-导轨;10-下吊点。In the figure: 1-inner pole; 2-outer pole; 3-screw plate; 3.1-spare horizontal connection structure hole; 3.2-screw plate modulus hole; 4-protective net; 5-frame connector; 6- Movable flap; 7-horizontal truss; 7.1-horizontal truss module hole; 8-triangular brace; 9-guide rail; 10-hanging point.

具体实施方式detailed description

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

为了叙述的方便,将脚手架在工作状态下靠近建筑结构墙面的一侧定义为“内侧”,远离建筑结构墙面的一侧定义为“外侧”。For the convenience of description, the side of the scaffold close to the wall of the building structure in the working state is defined as "inside", and the side away from the wall of the building structure is defined as "outside".

在本实用新型的较佳实施例中,如图1所示,一种工具式脚手架单元,该脚手架单元包括立杆、脚手板3、三角撑8和防护网4,立杆为与地面垂直方向平行设置,分为内外两组,内组包括两根内立杆1,外组包括两根外立杆2,两相邻的内外立杆之间设置有多个可拆卸的三角撑8,多个脚手板3水平方向平行设置在两组立杆之间,防护网4设置在两外立杆2之间,外立杆2上设置有多个网架连接件5,该脚手架单元还包括设置在底部脚手板3上的水平桁架7,水平桁架7固定安装在两内立杆1的底部靠近外立杆的一侧,水平桁架7的长度与脚手板3的长度一致,脚手板3左右两侧面上设有备用横向连接构造孔3.1。In a preferred embodiment of the present utility model, as shown in Figure 1, a kind of tool type scaffolding unit, this scaffolding unit comprises pole, scaffold board 3, triangular brace 8 and protective net 4, and pole is perpendicular to the ground Arranged in parallel, divided into two groups of inner and outer, the inner group includes two inner uprights 1, the outer group includes two outer uprights 2, a plurality of detachable triangular braces 8 are arranged between two adjacent inner and outer uprights, and more A scaffolding board 3 is horizontally arranged between two groups of uprights in parallel, a protective net 4 is arranged between two outer uprights 2, and a plurality of grid connectors 5 are arranged on the outer uprights 2, and the scaffolding unit also includes a set The horizontal truss 7 on the bottom scaffold board 3, the horizontal truss 7 is fixedly installed on the bottom of the two inner poles 1 near the side of the outer pole, the length of the horizontal truss 7 is consistent with the length of the scaffold board 3, and the left and right sides of the scaffold board 3 A spare transverse connection structure hole 3.1 is provided on the side.

在本实用新型的优选实施例中,如图1所示,脚手板3的内外两侧面均设有脚手板模数孔3.2,水平桁架7的内侧面设有水平桁架模数孔7.1,内立杆和外立杆上设有与脚手板模数孔和水平桁架模数孔对应的配合孔。In a preferred embodiment of the present utility model, as shown in Figure 1 , both sides of the scaffold board 3 are provided with scaffold board modulus holes 3.2, and the inner side of the horizontal truss 7 is provided with a horizontal truss module hole 7.1. Cooperating holes corresponding to the modulus holes of the scaffold board and the modulus holes of the horizontal truss are provided on the pole and the outer pole.

在本实用新型的优选实施例中,如图1所示,脚手板3为方形板状物,相邻两个脚手板之间的高度为每一个模数高度。In a preferred embodiment of the present utility model, as shown in FIG. 1 , the scaffolding board 3 is a square plate, and the height between two adjacent scaffolding boards is the height of each module.

在本实用新型的优选实施例中,如图1所示,防护网4为设有边框的网状物,防护网4通过网架连接件5固定安装在外立杆2上,防护网边框的水平尺寸与脚手板的长度一致。In a preferred embodiment of the present utility model, as shown in Figure 1, the protective net 4 is a mesh with a frame, the protective net 4 is fixedly installed on the outer pole 2 through the grid connector 5, and the level of the protective net frame Dimensions correspond to the length of the scaffolding.

在本实用新型的优选实施例中,如图1所示,脚手板3内侧边缘铰接有活动翻板6。In a preferred embodiment of the present utility model, as shown in FIG. 1 , a movable flap 6 is hinged on the inner edge of the scaffolding board 3 .

如图2所示,一种工具式脚手架,包括多个上述的工具式脚手架单元,多个工具式脚手架单元横向拼接的连接方式是,相邻两个工具式脚手架单元之间通过设置在脚手板的备用横向连接构造孔内的备用横向连接构造固定连接,其中一个工具式脚手架单元的防护网通过网架连接件安装在相邻的工具式脚手架单元的外立杆上;多个工具式脚手架单元纵向叠加的连接方式是,相邻两个工具式脚手架单元的内立杆之间、外立杆之间通过夹板螺栓固定,两种连接方式均保持防护网位于脚手架的同一侧。As shown in Figure 2, a tool-type scaffolding includes a plurality of the above-mentioned tool-type scaffolding units. The spare horizontal connection structure in the hole of the spare horizontal connection structure is fixedly connected, and the protective net of one tool-type scaffolding unit is installed on the outer pole of the adjacent tool-type scaffolding unit through the grid connector; multiple tool-type scaffolding units The connection method of longitudinal superposition is that the inner poles and outer poles of two adjacent tool-type scaffold units are fixed by splint bolts, and the two connection methods keep the protective net on the same side of the scaffold.

在本实用新型的优选实施例中,如图2所示,脚手架还包括导轨9和吊装系统,导轨9间隔地安装在内立杆1上,导轨上配装有附墙支座,吊装系统配装在脚手架的下吊点10上。In a preferred embodiment of the present utility model, as shown in Figure 2, the scaffold also includes guide rails 9 and a hoisting system. Be contained on the hanging point 10 of scaffolding.

本实用新型在具体应用时,如图1所示,工具式脚手架单元包括内立杆1、外立杆2、脚手板3、三角撑8、防护网4和网架连接件5;特别设计的是,还设置有水平桁架7,水平桁架7与底部的脚手板3内侧固定,水平桁架7的长度与脚手板3长度相适应;内立杆1和外立杆2为柱状物,设置在工具式脚手架单元两侧两端,内立杆1和外立杆2与地面垂直方向平行设置,内立杆1底部与水平桁架7固定连接,内立杆1上部与对应的脚手板3内侧的脚手板模数孔3.2固定连接;外立杆2上下部位均与相应高度位置的脚手板3外侧的脚手板模数孔3.2固定连接;内立杆1和外立杆2间设置三角撑8连接固定;脚手板3为方形板状物,水平设置,每一个模数高度设置一层;防护网4为网状物,设有边框,立面布置,设置在架体单元外侧,通过网架连接件5与外立杆2固定,防护网4边框的水平尺寸与脚手板3长度相适应。When the utility model is in specific application, as shown in Figure 1, the tool-type scaffolding unit includes an inner pole 1, an outer pole 2, a scaffold board 3, a triangle brace 8, a protective net 4 and a grid connector 5; specially designed Yes, a horizontal truss 7 is also provided, and the horizontal truss 7 is fixed to the inner side of the scaffolding board 3 at the bottom, and the length of the horizontal truss 7 is adapted to the length of the scaffolding board 3; The two ends on both sides of the type scaffolding unit, the inner pole 1 and the outer pole 2 are arranged parallel to the vertical direction of the ground, the bottom of the inner pole 1 is fixedly connected with the horizontal truss 7, and the upper part of the inner pole 1 is connected to the foot on the inside of the corresponding scaffold board 3 The hand board module hole 3.2 is fixedly connected; the upper and lower parts of the outer pole 2 are fixedly connected with the scaffold board module hole 3.2 on the outside of the scaffold board 3 at the corresponding height position; a triangle brace 8 is set between the inner pole 1 and the outer pole 2 to connect and fix ; Scaffolding board 3 is a square plate, set horizontally, and each module height is set to one layer; protective net 4 is a net, with a frame, and the facade is arranged on the outside of the frame unit, through the grid connector 5 is fixed with outer pole 2, and the horizontal size of protective net 4 frame is adapted with scaffold board 3 lengths.

如图2所示,脚手板3两端设置有备用横向连接构造孔3.1,将工具式脚手架单元组合为工具式脚手架时,应用备用横向连接构造孔将相邻两单元的脚手板与脚手板固定连接、防护网4通过网架连接件5与外立杆2固定连接,同时保持各单元防护网4位于脚手架的同一侧。当将两个以上工具式脚手架单元组合为一个工具式脚手架时,各单元防护网4位于脚手架的同一侧,相邻单元同侧共用一根立杆,在一个工具式脚手架中同侧立杆的数量为“单元数+1”。As shown in Figure 2, the two ends of the scaffolding board 3 are provided with spare transverse connection structure holes 3.1. When the tool-type scaffolding units are combined into a tool-type scaffolding, the spare transverse connection structure holes should be used to fix the scaffolding boards of two adjacent units to the scaffolding boards. Connection, the protective net 4 is fixedly connected with the outer pole 2 through the network frame connector 5, and the protective net 4 of each unit is kept on the same side of the scaffold. When two or more tool-type scaffold units are combined into a tool-type scaffold, the protective nets 4 of each unit are located on the same side of the scaffold, and adjacent units share a vertical pole on the same side. The number of vertical poles on the same side in a tool-type scaffold It is "number of units + 1".

如图2所示,当将两个以上工具式脚手架单元组合为一个工具式脚手架时,内立杆1水平方向间隔地固定连接导轨9,导轨9上配装附墙支座(图中未列示),再通过下吊点10配装吊装系统组成工具式附着升降脚手架。As shown in Figure 2, when two or more tool-type scaffolding units are combined into a tool-type scaffolding, the inner vertical rod 1 is fixedly connected to the guide rail 9 at intervals in the horizontal direction, and the guide rail 9 is equipped with a wall support (not listed in the figure). shown), and then equipped with a hoisting system through the lowering point 10 to form a tool-type attached lifting scaffold.

工具式脚手架单元在理论上高度是不受限制的,只是在实际生产时,受所用材料长短、运输和安装的限制,只能生产有限层次的产品。当实际需要更多层次时可在现场纵向连接组合。脚手架单元纵向连接的方式,如图2所示,使用夹板螺栓将上下脚手架单元在内立杆1和外立杆2接头处固定连接,并保持防护网4位于脚手架的同一侧,纵向将脚手架单元连接成一体。The height of the tool-type scaffolding unit is unlimited in theory, but in actual production, limited by the length of materials used, transportation and installation, only limited levels of products can be produced. When more layers are actually needed, they can be combined vertically on site. The method of longitudinal connection of the scaffolding unit, as shown in Figure 2, uses splint bolts to fix the upper and lower scaffolding units at the joints of the inner pole 1 and the outer pole 2, and keeps the protective net 4 on the same side of the scaffolding, and longitudinally connects the scaffolding unit connected into one.

本实用新型工具式脚手架单元构造简单,工厂预制生产,互换性强,安装方便。The tool-type scaffold unit of the utility model has a simple structure, is prefabricated in a factory, has strong interchangeability, and is easy to install.

应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本实用新型所附权利要求的保护范围。It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should belong to the protection scope of the appended claims of the present utility model.

Claims (7)

1. a kind of tool type scaffold unit, the scaffold unit include vertical rod, scaffold board, trivet and protection network, described vertical Bar be arranged in parallel for direction perpendicular to the ground, is divided into inside and outside two groups, and interior group includes two interior vertical rods, and outer group includes that two are stood outward Bar, is provided with multiple dismountable trivets between two adjacent interior outer vertical rods, multiple scaffold board horizontal direction parallels are arranged on Between two groups of vertical rods, the protection network is arranged between two outer vertical rods, and multiple rack connectors are provided with the outer vertical rod, its It is characterised by, the scaffold unit also includes the horizontal truss being arranged on the scaffold board of bottom, the horizontal truss fixed installation Near the side of outer vertical rod, the length of the horizontal truss is consistent with the length of scaffold board, the foot for the bottom of vertical rod in two Palm left and right sides are provided with standby lateral connection construction hole, and inside and outside the scaffold board, face is equipped with scaffold board modulus Hole, the medial surface of the horizontal truss are provided with horizontal truss digital and analog hole, and the interior vertical rod and outer vertical rod are provided with and the foot handss Plate digital and analog hole and the corresponding mating holes of horizontal truss digital and analog hole.
2. tool type scaffold unit according to claim 1, it is characterised in that the scaffold board is square plate object, Height between two neighboring scaffold board is each modulus height.
3. tool type scaffold unit according to claim 1, it is characterised in that the protection network is the net for being provided with frame Shape thing, the protection network are fixedly mounted in outer vertical rod by rack connector.
4. tool type scaffold unit according to claim 3, it is characterised in that the horizontal size of the protection network frame It is consistent with the length of scaffold board.
5. tool type scaffold unit according to claim 1, it is characterised in that the scaffold board inside edge is hinged with Drop in leaf.
6. a kind of tool type scaffold, it is characterised in that including the tool type scaffold described in multiple any of the above claim Unit, the connected mode of multiple tool type scaffold unit transverse splicings are led between two neighboring tool type scaffold unit Cross the standby lateral connection construction being arranged in the standby lateral connection construction hole of scaffold board to be fixedly connected, one of tool-type The protection network of scaffold unit is arranged in the outer vertical rod of adjacent tool type scaffold unit by rack connector;Multiple works The connected mode of the longitudinal superposition of tool formula scaffold unit is, between the interior vertical rod of two neighboring tool type scaffold unit, outer vertical Fixed by clamping plate bolt between bar, two kinds of connected modes keep protection network to be located at the same side of scaffold.
7. tool type scaffold according to claim 6, it is characterised in that the scaffold also includes guide rail and lifting system System, the guide rail are periodically installed in interior vertical rod, and wall-attached supporting seat is fitted with the guide rail, and the Lift-on/Lift-off System is fitted in institute State on the lower suspension centre of scaffold.
CN201620380692.1U 2016-04-28 2016-04-28 Tool type scaffold unit and tool type scaffold Expired - Fee Related CN206053279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620380692.1U CN206053279U (en) 2016-04-28 2016-04-28 Tool type scaffold unit and tool type scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620380692.1U CN206053279U (en) 2016-04-28 2016-04-28 Tool type scaffold unit and tool type scaffold

Publications (1)

Publication Number Publication Date
CN206053279U true CN206053279U (en) 2017-03-29

Family

ID=58372854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620380692.1U Expired - Fee Related CN206053279U (en) 2016-04-28 2016-04-28 Tool type scaffold unit and tool type scaffold

Country Status (1)

Country Link
CN (1) CN206053279U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700610A (en) * 2019-09-23 2020-01-17 浙江中呈建设有限公司 Telescopic movable scaffold capable of preventing falling objects from high altitude and using method thereof
CN111395727A (en) * 2020-04-17 2020-07-10 广西可立德建材租赁有限公司 Outer protection system of attached lifting scaffold
CN111877729A (en) * 2020-07-21 2020-11-03 上海建工二建集团有限公司 Attached lifting scaffold
CN114961215A (en) * 2022-06-17 2022-08-30 贵州建工集团第一建筑工程有限责任公司 Construction method of overhanging scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700610A (en) * 2019-09-23 2020-01-17 浙江中呈建设有限公司 Telescopic movable scaffold capable of preventing falling objects from high altitude and using method thereof
CN110700610B (en) * 2019-09-23 2022-07-29 浙江中呈建设有限公司 Telescopic movable scaffold capable of preventing falling objects from high altitude and using method thereof
CN111395727A (en) * 2020-04-17 2020-07-10 广西可立德建材租赁有限公司 Outer protection system of attached lifting scaffold
CN111877729A (en) * 2020-07-21 2020-11-03 上海建工二建集团有限公司 Attached lifting scaffold
CN114961215A (en) * 2022-06-17 2022-08-30 贵州建工集团第一建筑工程有限责任公司 Construction method of overhanging scaffold

Similar Documents

Publication Publication Date Title
CN204126230U (en) Assembly scaffold unit
CN204715722U (en) A kind of all steel attachment type raise scaffold
CN206053279U (en) Tool type scaffold unit and tool type scaffold
CN207749908U (en) A kind of enclosure wall of full assembly lightweight steel construction
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN202577960U (en) A Suspended Outer Bearing Composite Steel Formwork Applied in Roller Compacted Concrete Construction
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN108952136B (en) Detachable integral hoisting protection frame mounting and dismounting method
CN206376507U (en) Prefabrication outrigger
CN206376514U (en) Tool climbing scaffold
CN218894375U (en) Outside upper portion protector of formwork support
CN102251679B (en) Construction method
CN207003972U (en) Movable construction operation platform
CN204754150U (en) Disc type node scaffolding
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN204876514U (en) Outer hanging scaffold system of assembled house
CN103821339B (en) Operation platform modular unit and operation platform thereof
CN210685313U (en) Safe convenient house steel connection structure
CN117090408A (en) Attached lifting protection shed and installation and lifting method thereof
CN111910905A (en) A vertical main frame of a lifting operation safety protection platform for high-rise building construction
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN105003074A (en) Commercial building construction system and construction method thereof
CN104675093B (en) Dish-type node type scaffold
CN204919608U (en) Underground station construction is with system of encorbelmenting
CN205330132U (en) Boat scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329