CN204097887U - Bridge rotating a complete set of equipment - Google Patents
Bridge rotating a complete set of equipment Download PDFInfo
- Publication number
- CN204097887U CN204097887U CN201420561158.1U CN201420561158U CN204097887U CN 204097887 U CN204097887 U CN 204097887U CN 201420561158 U CN201420561158 U CN 201420561158U CN 204097887 U CN204097887 U CN 204097887U
- Authority
- CN
- China
- Prior art keywords
- bridge
- bridge pier
- drag cable
- pier shaft
- complete set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 238000004080 punching Methods 0.000 claims abstract description 18
- 238000009960 carding Methods 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 7
- 230000001360 synchronised effect Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bridge rotating a complete set of equipment, the bottom surface of girder is provided with bridge pier shaft, the bottom of bridge pier shaft by ball pivot and basis hinged, bridge pier with it symmetry is wound with two groups of drag cables, the exit of drag cable is connected with punching jack, punching jack is fixed on the counter-force seat at basic top, and the position that bridge pier is wound around drag cable is with it provided with drag cable carding apparatus.The inner stating drag cable is anchored at the inside of bridge pier shaft by ground tackle.The part that drag cable is positioned at the outer wall of bridge pier shaft inside is separated by bellows and bridge pier shaft.By the boundling to steel strand, combing, make the every root steel strand uniform force in bridge construction by swing in steel wire bundle, synchronous by punching jack process thread, thus realize the operation of turning of bridge, improve turn speed and efficiency.
Description
Technical field
The utility model relates to a kind of Bridge Rotation Construction Technique equipment, particularly relates to a kind of bridge rotating a complete set of equipment.
Background technology
At present, the rotator construction of domestic large bridge, many employing large-tonnage Rotary ball hinges, utilize in ball pivot and pier shaft binding site pre-buried steel strand bundle, and being wound around pier shaft, steel wire bundle provides power by the punching jack that symmetrical frame on counter-force seat is vertical for turning, and realizes the body twist of bridge.
Because steel wire bundle mutually covers superposition in pre-buried and winding process, cause Internal and external cycle steel strand length there are differences, in the process of turning, often occur that outer ring steel strand loosen, the situation that inner ring tension of steel strand increases.
Summary of the invention
The purpose of this utility model is to provide a kind of bridge rotating a complete set of equipment that can realize the work of Bridge Rotation Construction Technique equipment collaboration.
The purpose of this utility model is achieved through the following technical solutions:
Bridge rotating a complete set of equipment of the present utility model, the bottom surface of girder is provided with bridge pier shaft, the bottom of described bridge pier shaft by ball pivot and basis hinged, described bridge pier with it symmetry is wound with two groups of drag cables, the exit of described drag cable is connected with punching jack, described punching jack is fixed on the counter-force seat at basic top, and the position that described bridge pier is wound around drag cable is with it provided with drag cable carding apparatus.
The technical scheme provided as can be seen from above-mentioned the utility model, the bridge rotating a complete set of equipment that the utility model embodiment provides, a kind of the complete sets of equipment that large heavy girder can be provided to turn, this a complete set of equipment is by the boundling to steel wire bundle, combing, make the every root steel strand uniform force in bridge construction by swing in steel wire bundle, synchronous by punching jack process thread, thus realize the operation of turning of bridge, improve turn speed and efficiency.
Accompanying drawing explanation
The facade structures schematic diagram of the bridge rotating a complete set of equipment that Fig. 1 provides for the utility model embodiment;
The plane structure schematic diagram of the bridge rotating a complete set of equipment that Fig. 2 provides for the utility model embodiment.
In figure:
1, bottom plane of main girder, 2, top, basis outline line, 3, bellows, 4, beam body cast center line, 5, drag cable carding apparatus, 6, drag cable A, 7, punching jack, 8, ground tackle, 9, to turn back rest body center line in place, 10, drag cable B, 11, counter-force seat, 12, ball pivot.
Detailed description of the invention
To be described in further detail the utility model embodiment below.
Bridge rotating a complete set of equipment of the present utility model, its preferably detailed description of the invention be:
The bottom surface of girder is provided with bridge pier shaft, the bottom of described bridge pier shaft by ball pivot and basis hinged, described bridge pier with it symmetry is wound with two groups of drag cables, the exit of described drag cable is connected with punching jack, described punching jack is fixed on the counter-force seat at basic top, and the position that described bridge pier is wound around drag cable is with it provided with drag cable carding apparatus.
The inner of described drag cable is anchored at the inside of described bridge pier shaft by ground tackle.
The outer wall that described drag cable is positioned at the part of described bridge pier shaft inside is separated by bellows and described bridge pier shaft.
Described drag cable is steel wire bundle.
Bridge rotating a complete set of equipment of the present utility model, a kind of the complete sets of equipment that large heavy girder can be provided to turn, this a complete set of equipment is by the boundling to steel wire bundle, combing, make the every root steel strand uniform force in bridge construction by swing in steel wire bundle, synchronous by punching jack process thread, thus realize the operation of turning of bridge, improve turn speed and efficiency.
Specific embodiment:
As shown in Figure 1 and Figure 2, this bridge rotating a complete set of equipment comprises A group, B group two restraints the parts such as steel strand drag cable, ground tackle, bellows, drag cable carding apparatus, punching jacking equipment.
1, A group, B group steel strand drag cable:
Standard component, for being wound around pier shaft, provides rotatory force.
2, ground tackle:
Standard component, at ball pivot and pier shaft binding site anchoring steel strand.
3, bellows:
Standard component, steel strand boundling at random.
4, drag cable carding apparatus:
Workpiece, combing steel wire bundle, makes every root steel strand wound in parallel in pier shaft.
5, punching jack:
Standard component, provides required drive of turning.
Operating principle of the present utility model is:
Punching jack provides power for turning, and apply pulling force by punching jack pair steel wire bundle, steel strand pull pier shaft, and integral bridge is rotated, thus realize Bridge Rotation Construction Technique object.The pulling force that punching jack produces passes to bridge pier shaft to be turned by steel wire bundle.Pull bridge pier shaft to rotate by the steel strand being wound around pier shaft, thus drive whole bridge to complete body twist.By steel strand carding equipment, make steel wire bundle thread synchronization when stressed.
The above; be only the utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the change that can expect easily or replacement, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.
Claims (4)
1. a bridge rotating a complete set of equipment, the bottom surface of girder is provided with bridge pier shaft, the bottom of described bridge pier shaft by ball pivot and basis hinged, it is characterized in that, described bridge pier with it symmetry is wound with two groups of drag cables, the exit of described drag cable is connected with punching jack, and described punching jack is fixed on the counter-force seat at basic top, and the position that described bridge pier is wound around drag cable is with it provided with drag cable carding apparatus.
2. bridge rotating a complete set of equipment according to claim 1, is characterized in that, the inner of described drag cable is anchored at the inside of described bridge pier shaft by ground tackle.
3. bridge rotating a complete set of equipment according to claim 2, is characterized in that, the part that described drag cable is positioned at the outer wall of described bridge pier shaft inside is separated by bellows and described bridge pier shaft.
4. the bridge rotating a complete set of equipment according to claim 1,2 or 3, is characterized in that, described drag cable is steel wire bundle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420561158.1U CN204097887U (en) | 2014-09-26 | 2014-09-26 | Bridge rotating a complete set of equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420561158.1U CN204097887U (en) | 2014-09-26 | 2014-09-26 | Bridge rotating a complete set of equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204097887U true CN204097887U (en) | 2015-01-14 |
Family
ID=52266330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420561158.1U Expired - Lifetime CN204097887U (en) | 2014-09-26 | 2014-09-26 | Bridge rotating a complete set of equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204097887U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105648926A (en) * | 2015-12-31 | 2016-06-08 | 中铁二十局集团有限公司 | Swivel construction method for large span continuous beam which spans existing station |
CN110468737A (en) * | 2019-08-14 | 2019-11-19 | 中铁武汉勘察设计研究院有限公司 | A kind of bridge rotating system that pulley structure is set |
-
2014
- 2014-09-26 CN CN201420561158.1U patent/CN204097887U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105648926A (en) * | 2015-12-31 | 2016-06-08 | 中铁二十局集团有限公司 | Swivel construction method for large span continuous beam which spans existing station |
CN105648926B (en) * | 2015-12-31 | 2018-08-10 | 中铁二十局集团有限公司 | Large-Span Continuous girder span building up station rotation swivel construction method |
CN110468737A (en) * | 2019-08-14 | 2019-11-19 | 中铁武汉勘察设计研究院有限公司 | A kind of bridge rotating system that pulley structure is set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203879092U (en) | Telegraph pole lifting device | |
CN204097887U (en) | Bridge rotating a complete set of equipment | |
CN103850890A (en) | Anti-twist cable structure inside tower barrel of wind generating set | |
CN102761077A (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
CN203822554U (en) | Cable over-twisting preventing structure inside tower of wind turbine generating set | |
CN202575785U (en) | Portal crane and four-connecting-rod system thereof | |
CN203403450U (en) | Universal rotating anchor rope device of electric shovel | |
CN203382424U (en) | Portable man-capstan for maintenance of distribution network | |
RU2525495C1 (en) | Tower crane | |
CN202840363U (en) | Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit | |
CN202414963U (en) | Novel rotating hanger | |
CN105470857B (en) | A kind of cable release-resistant falls lifting device | |
CN201907924U (en) | Spreading wing-type winding drum lifting device | |
CN203962860U (en) | A kind of gaily decorated basket clamping bolt with self-locking device | |
CN203875137U (en) | Winding device | |
CN203582359U (en) | Stereoscopic energy relieving machine for steel wire ropes | |
CN103754706A (en) | Overhead line grounding line and cable winding device | |
CN203939815U (en) | Be used in the suspension centre fixing device on emergency first-aid repair tower | |
CN106608596A (en) | Outdoor equipment lifting device | |
CN205087839U (en) | Hoist engine and support device | |
CN206553082U (en) | A kind of adjustable for height crane | |
CN203652951U (en) | Guide ground wire and cable coiling device of overhead line | |
CN204096887U (en) | Oil pumping machine crank lifting is with rotary device | |
CN202766141U (en) | Simple and easy cantilever lifting tool | |
CN204223936U (en) | A kind of vertical take up link gear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20150114 |