CN204097324U - A kind of divided glass chip select device - Google Patents

A kind of divided glass chip select device Download PDF

Info

Publication number
CN204097324U
CN204097324U CN201420511693.6U CN201420511693U CN204097324U CN 204097324 U CN204097324 U CN 204097324U CN 201420511693 U CN201420511693 U CN 201420511693U CN 204097324 U CN204097324 U CN 204097324U
Authority
CN
China
Prior art keywords
roller
way
lift
support
chip select
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420511693.6U
Other languages
Chinese (zh)
Inventor
周经培
戚淑梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINHUANGDAO GLASS INDUSTRY RESEARCH AND DESIGN INST
Original Assignee
QINHUANGDAO GLASS INDUSTRY RESEARCH AND DESIGN INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINHUANGDAO GLASS INDUSTRY RESEARCH AND DESIGN INST filed Critical QINHUANGDAO GLASS INDUSTRY RESEARCH AND DESIGN INST
Priority to CN201420511693.6U priority Critical patent/CN204097324U/en
Application granted granted Critical
Publication of CN204097324U publication Critical patent/CN204097324U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/50Glass production, e.g. reusing waste heat during processing or shaping
    • Y02P40/57Improving the yield, e-g- reduction of reject rates

Landscapes

  • Rolls And Other Rotary Bodies (AREA)

Abstract

The utility model discloses a kind of divided glass chip select device.This device comprises suspension roller-way, transmission rig, lift and Controlling System; This suspension roller-way establishes six groups, and parallel each other and interval is placed; Often to hang roller-way length all affixed perpendicular to the support top end on ground by bent axle and this end to one end for group, grow to the unsettled one-tenth cantilever end of the other end; All slide rail is housed at the lower surface of suspension roller-way near cantilever end place; Transmission rig establishes six groups, is contained in often group respectively and hangs roller-way and connect with bent axle and hold; Lift establishes six groups, is single cylinder lift, hangs roller-way and is connected with often organizing respectively; Controlling System is connected with six groups of lifts by total source of the gas; Its efficiency is high with the chip select of lower glass plate to utilize this device can carry out six, and glass breakage rate is low, is widely used, and is convenient to promote.

Description

A kind of divided glass chip select device
Technical field
The utility model belongs to glass production field, relates to the device of a kind of flat glass production line cold junction chip select.
Background technology
Existing glass production line cold junction chip select roller-way, majority can only realize two panels chip select, and the motor reducer that lift adopts is propulsion source, Frequent Accidents.Along with development of world economy and social industrial requirement constantly increase, more and more stricter to the requirement of energy consumption, Main Means is become for reducing energy consumption increase melting furnaces fusing tonnage, in order to reduce construction capital input, constantly increase glass ribbon wide plate and become floatation glass production line main flow, float glass raw sheet width is more and more wider, in order to meet the need of market, require that glass ribbon is laterally divided into multi-disc, meet multi items, cat and dog production requirement, also will be divided into different grades according to the different qualities of glass simultaneously.In recent years, along with the lifting of scientific and technological level, flat glass production line adopts the production technology of multi-disc chip select to have to develop on a large scale very much, but the chip select burst of two sheet glass also needs to be modified, and three or more chip select bursts need innovation.
No matter current floatation glass production line is the device of two panels or the chip select of three, although its structure is different; Usually have several as follows: one is that the rotating shaft of landing gear and first roller are set to one, and power is also passed to other rollers by first roller by roller turn, generally adopts chain gear; This structure can keep roller-way when being elevated, and the Up Highway UHW of glass working direction roller is not elevated; But roller-way, when being elevated, can change the tensile force of driving chain wheel, so that causing the velocity of rotation of roller unstable, causing the glass of movement on roller-way that irrational skew or displacement occur; Two is outside roller-way, establish external suspension, roller-way rotating shaft and first roller is separated, peripheral hardware transmission shaft in transmission, and this structure solves roller jiggly problem of transmission in landing gear lifting process; But landing gear is in lifting process, the Up Highway UHW hanging the first roller of roller-way can be caused to raise or landing, sometimes higher than the Up Highway UHW of normal roller-way, sometimes lower than the Up Highway UHW of normal roller, cause the acceleration or deceleration of sheet glass on roller-way thus, the glass on roller-way also can be made to produce relative displacement.Three are, divided glass is come, and when suspension roller-way its speed when landing gear rises at the same time or lands is asynchronous, the glass on roller-way also can be made to produce relative movement; Four is that transmission power source is all long at equipment both sides lift transmitting range, and transmission accuracy is inaccurate.Exactly because have relatively sliding between glass and transport roller way, cause the lower surface of glass to be scratched, reduce quality product; Or, after glass generation relative movement, glass vanning location is affected, causes glass chip uneven, had a strong impact on surface quality and the vanning quality of glass finished-product.
Utility model content
In order to solve the defect existed in above-mentioned prior art, the purpose of this utility model is to provide and a kind ofly realizes the level height that landing gear does not change roller-way first roller Up Highway UHW in lifting process, and landing gear is in lifting process middle roller transmission uniform and stable, can realize the device of the automatic chip select of multi-disc sheet glass.
To achieve these goals, the utility model adopts following technical scheme:
The automatic chip select device of a kind of multi-disc sheet glass, includes and hangs roller-way, lift, transmission rig, buffer gear, support and basic platform; Described extension roller-way, lift, transmission rig, buffer gear and support are supporting is one group of unit, and this device is provided with organizes unit more, and each group unit parallel side-by-side is installed on described basic platform.
The automatic chip select device of described multi-disc sheet glass is provided with six groups of unit, and six to hang roller-way parallel and arrange with the cylinder unit interval of lift side by side; Often group hangs one end of roller-way and vertical support and connection of being fixed on ground, and the other end hanging roller-way is unsettled; Lift correspondence is provided with six groups, and six groups of lifts hang roller-way with six groups corresponding connecting hangs roller-way by jack-up or fall in order to drive respectively.
Wherein, often organize lift and be provided with cylinder block, cylinder, connecting rod, bearing support, rotating shaft, strap cam support bar, slide rail and safty shield; Wherein cylinder and cylinder block are riveted fixing, and head and connecting rod one end of cylinder piston are hinged, and the other end and the rotating shaft of connecting rod are welded as a whole.
Wherein, respective cylinder is stretched into by respective rotating shaft below the suspension roller-way that docks with it, is supported, position relative with rotating shaft on device foundation platform is equipped with the bearing support fixing this rotating shaft by device foundation platform; Have strap cam support bar at the middle part of rotating shaft by spline joint, the top of strap cam support bar is corresponding with being fixed on the sled position hung bottom roller-way, and this cam coordinates with slide rail.
Wherein, often group hang roller-way be equipped with little axle, bearing support, web, rectangular beam, first roller, rectangular frame, support rollers bearing support, conventional roller, rubber wheel), roller core shaft, transmission install web and install web; Wherein: rectangular frame horizontal positioned, is connected by bent axle with bracing frame; Form bent axle by little axle, web and rectangular beam, rectangular beam welds with one end of the web at two ends, and the two pleurosternal the other ends weld little axle, and little axle penetrates in the hole that web processes in advance, and after welding two little axles are concentric; Little axle is connected with bearing support again, and bearing support is connected with bracing frame by bolt and nut; Longitudinal side of rectangular frame is welded with motor, step-down gear and transmission and installs web, has gap in the middle of rectangular frame, has the transmission shaft bearing of its upper and lower surface vertical to install web in intermediate gap along rectangular frame horizontal welding; Rectangular frame is fixedly connected with by screw thread with support rollers bearing support; The upper surface vertical welding of the rectangular beam of rectangular frame one end and bent axle forms the support frame hanging roller-way; Rectangular frame longeron is welded with transmission and installs web near the outside of bent axle one end, web is installed in transmission has stiffening plate to be connected with rectangular frame lower surface; Relative with threaded hole correspondence position and interval is equipped with some to support rollers bearing support on the upper surface of both sides, rectangular frame gap, some rollers are contained on support rollers bearing support respectively, first roller be arranged on through be fixed on weld with bent axle rectangular frame on, all the other are conventional roller; Roller core shaft is equipped with at the two ends of every root roller, and roller core axle bed is located on bearing support, and roller core shaft is concentric with height with the medullary ray of the little axle on bent axle, ensures that the rubber wheel Up Highway UHW height location fixing with first roller roll centre axle is constant.
Wherein, transmission rig is provided with the motor, step-down gear, synchronous pulley, Timing Belt, transmission axis, axis gear, the roll shaft gear be connected with roller, the bearing support of fixed conveyor axis, the shaft coupling of connection for transmission axis and the safety shield cap that contact by action.
Wherein, buffer gear is positioned at the below of rectangular frame cantilever end; Pool of buffer locating device comprises a support bar and a rubber pad; Wherein, support bar is vertically mounted on the device foundation platform that is fixedly mounted with ground.
Wherein, support and formed by rectangle section longitudinal beam, diagonal ligament beam and upper and lower Plate Welding, upper steel plate is back up pad, and in order to the bearing support of fixing suspension roller-way bent axle, lower steel plate is the web plate of linking device basic platform pre-embedded steel slab.
Described lift is provided with six groups altogether, and each group is the lifting that single cylinder lift controls to hang separately roller-way, lays respectively at the below hanging roller-way separately; The single cylinder lift be connected with suspension roller-way is positioned at the side hanging roller-way separately, is connected by an one rotating shaft; Rotating shaft is across the below at respective suspension roller-way; Cylinder seat, cylinder, connecting rod, rotating shaft fixed bearing block, rotating shaft, strap cam support bar is provided with in single cylinder lift.
Owing to adopting technique scheme, the utility model beneficial effect is as follows: the air control unit 1) by establishing in housing automatically control many groups or wherein certain group hang the transmission rig of roller-way and lift action, glass on same production line is selected separation by its grade difference, complete six with the chip select of lower-glass simultaneously, by qualified vanning, underproof glass enters in crusher through the plate that falls and processes; Automatic chip select or the burst of glassy product can be realized, can enhance productivity; Reduce the breakage rate of glass, improve the quality product of glass.2) often group suspension roller-way structure is the same, and material is the same.Weight is the same, and lift structure is the same, reduces external force to the discordance of the impact of the speed of rising and falling; 3) because with often to organize, 4 groups of first rollers hanging roller-ways hang that the cranked bent axle of band that roller-way length connects respectively to 2 support, top of one end is concentric to be arranged, ensure that the synchronous of roller-way lift, improper displacement between avoiding because of the asynchronous sheet glass caused, the breakage that the improper displacement between reducing because of sheet glass causes; 4) due to the gears meshing rotating through gear on transmission axis and roller two ends of roller, some roller synchronization are driven to move in the same way, avoid and drive the transmission of some rollers unstable with chain drive rotating shaft merely in prior art and driving chain is ruptured, finally cause the problem of stop production to overhaul to occur; 5) by rectangular frame length to the welding edges of 2 longerons of one end on bent axle, the crank protruded upward by this crankshaft two end is again packed in support top end with on the bearing support of bearing by the little axle welded with it, overcome female money on the transition roller that causes because of external rotating shaft and exceed the public Up Highway UHW of horizontal roller, cause the improper acceleration or deceleration of sheet glass, thus cause the defect that the phenomenon of glass sideslip or skew working direction occurs; Decrease lower glass surface to scratch, or direction of motion departs from former track, causes colliding or sideslip and improper relative movement in the opposite direction of glass.Efficiently solve sheet glass and roller, block pattern row pattern between sheet glass and sheet glass, the surface quality and the vanning that improve formed glass are neat.5) applied range, is applicable to the chip select of the sheet glass such as float glass, horizontal drawing and calendering and the plate that falls, is conducive to applying.
Accompanying drawing explanation
Fig. 1 is the side-looking structural representation of single unit system.
Fig. 2 is Fig. 1 vertical view.
Fig. 3 is the A direction view of Fig. 1.
Fig. 4 is the B direction view of Fig. 1.
Fig. 5 is the longitudinal sectional view of Fig. 1 roller-way drive mechanism.
Fig. 6 is pneumatic control original paper and the cylinder connection structure schematic diagram of Controlling System.
Fig. 7 is electric-control board figure.
Fig. 8 is Fig. 3 partial enlarged drawing.
Fig. 9 is crank parts figure.
Figure 10 is leg part figure; A width, B width are that edge supports (symmetrical each one), and C width, D width are intermediate strut.
Figure 11 is single suspension roller-way installation plan.
Embodiment
The utility model is flat glass production line, mainly the cold junction of floatation glass production line, provides a kind of device of multi-disc chip select.
Below by way of accompanying drawing, this technical solution of the utility model is described in further detail.
As shown in Figure 1, the device of the automatic chip select of this multi-disc sheet glass is provided with and hangs roller-way 1, lift 2, transmission rig 3, buffer gear 4, support 5, basic platform 6; Form around each several part below and be interconnected detailed description:
support 5
Shown in composition graphs 3, Figure 10, wherein, supporting 5 is be welded (see A width and C width) by rectangle shaped steel vertical beam 51, diagonal ligament beam 52 and upper and lower steel plate 53,54, upper steel plate 53 is back up pad, in order to the bearing support 12 of fixing suspension roller-way 1 bent axle 11 (Fig. 9), lower steel plate 54 is the web plate of linking device basic platform 6 pre-embedded steel slab; Be provided with five intermediate strut 5 and two lateral support 5.The edge being positioned at dual-side symmetry supports 5 side elevational views as shown in A width, and its vertical view is as shown in B width, and its side can hang, and hangs side and has diagonal ligament 52 along the direction hanging roller-way; Five middle intermediate strut 5 side elevational views are as shown in C width, its vertical view is as shown in D width, for both sides can hang, hang both sides and have diagonal ligament 52 along the direction hanging roller-way, the bottom supporting 5 is bolted by the built-in fitting of lower steel plate 54 with ground base platform 6.
hang roller-way 1 and lift 2
Wherein, hang roller-way 1 and be provided with six groups (see A, B, C, D, E, F in Fig. 2), parallel and arrange with the cylinder unit interval of lift 2 side by side; As shown in Figure 1, the one end hanging roller-way 1 is connected with vertical support 5 of being fixed on ground, and the other end hanging roller-way 1 is unsettled; The device foundation platform 6 affixed with ground is provided with at the lower square tube of free end; Lift 2 is provided with six groups (see Fig. 2, Fig. 4), and six groups of lifts 2 hang roller-way 1 with six groups corresponding connecting hangs roller-way 1 by jack-up or fall in order to drive respectively, glass are sent into respectively upper strata station or lower floor's station; Often organize lift 2A-2F (see Fig. 4) and be provided with cylinder block 21, cylinder 22, connecting rod 23, bearing support 24, rotating shaft 25, strap cam support bar 26, slide rail 27 and safty shield 28; Wherein, the cylinder block 21 of each group of lift lays respectively at the corresponding side hanging roller-way 1, cylinder 22 is connected with Equipment Foundations 6 by the cylinder block 21 of one end, cylinder 22 the other end is connected with connecting rod 23, connecting rod connection rotating shaft 25, rotating shaft is connected with strap cam support bar 26, and the cam of the union lever of strap cam contacts with slide rail 27, slide rail is fixed on the framework bottom hanging roller-way 1, and rotating shaft 25 is by bearing support 24 fixture basic platform 6; Cylinder 22 and the cylinder block 21 often organized are riveted fixing, head and connecting rod 23 one end of cylinder piston are hinged, the other end and the rotating shaft 25 of connecting rod 23 are welded as a whole, respective cylinder 22 stretches into below the suspension roller-way 1 that docks with it by respective rotating shaft 25, supported by device foundation platform 6, position relative with rotating shaft 25 on device foundation platform 6 is equipped with the bearing support 24 fixing this rotating shaft 25; Have a strap cam support bar 26 at the middle part of rotating shaft 25 by spline joint, the top of strap cam support bar 26 is corresponding with being fixed on slide rail 27 position hung bottom roller-way 1, and this cam coordinates with slide rail.Along with the to-and-fro movement of cylinder 22, promote through connecting rod 23 or pull rotating shaft 25 to rotate; The rotation of rotating shaft 25 drives strap cam support bar 26 to change and the contact position hanging slide rail 27 bottom roller-way 1, strap cam support bar 26 is in the promotion of connecting rod 23 or be subjected to displacement under pulling, suspension roller-way 1 is by jack-up or fall, and completes the elevating function hanging roller-way 1.
As Figure 1-Figure 11, six groups are hung roller-way 1 and are respectively suspension roller-way A, hang roller-way B, hang roller-way C, hang roller-way D, hang roller-way E and suspension roller-way F (see Fig. 2), six groups of length hanging roller-way A, B, C, D, E and F are identical, are 2000mm ~ 4500mm; Width is also identical, is 500mm ~ 650mm; The spacing hung between roller-way is identical, is 320 ~ 360mm.
See Fig. 8, Fig. 9, Figure 11, often group hangs roller-way and is equipped with little axle 11, bearing support 12, web 13, rectangular beam 14, first roller 15, rectangular frame 16, support rollers bearing support 17, conventional roller 18, rubber wheel 19, roller core shaft 110, transmission installation web 111 and installation web 112; Wherein:
Rectangular frame 16 horizontal positioned, be connected with the rectangular beam 14 (see Fig. 9) of bracing frame 5 by bent axle, concrete mode of connection is: form bent axle by little axle 11, web 13 and rectangular beam, namely rectangular beam 14 welds with one end of the web 13 at two ends, the other end of two coxostermums 13 welds little axle 11, little axle penetrates in the hole that web processes in advance, and after welding two little axles are concentric; Little axle 11 is connected with bearing support 12 again, and bearing support 12 is connected with bracing frame 5 by bolt and nut;
Rectangular frame 16 is by a rectangle steel (250 × 150, wall thickness 8mm) process, this rectangle steel upper surface is processed, and centre has the gap of wide 100-130mm, be welded with motor reducer along the longitudinal direction of rectangular frame 16 and the side of longeron and web 111 is installed, have the transmission shaft bearing of its upper and lower surface vertical that web 112 (see Fig. 8, Figure 11) is installed in intermediate gap along rectangular frame 16 horizontal welding; The surface of rectangular frame 16 both sides is symmetrical and interval is processed with threaded hole, for installing with support rollers bearing support 17; The concrete structure of bent axle is, the rectangular beam 14 of bent axle is by 200mm × 100mm, the rectangle steel of wall thickness 8mm processes, the two ends of rectangular shaft respectively with the atresia one end vertical welding by thickness being two webs 13 that steel plate that 15mm-30mm is thick processes, after welding, two webs are parallel, and ensure that the machining hole of the opposite side of web is concentric, then little axle 11 inserts one end keyhole welding of web 13, ensures that both sides little axle 11 is coaxial; To the upper surface vertical welding of rectangular frame 16 one end of roller-way 1 and the rectangular shaft 14 of bent axle be hung, form the support frame (Fig. 8) hanging roller-way; Support frame length is identical, and width is 300mm-650mm.
Bent axle shape is shown in Fig. 9, is the phase fitting of support 5 and rectangular frame 16; Rectangular frame 16 i.e. same one end of longeron be overlapped on the rectangular beam 14 of bent axle long to two ends above and concordantly with it to be welded and fixed.
The two ends of bent axle rectangular beam 14 have protruded upward and have connected web 13, and web 13 upper weld has the little axle 11 parallel with rectangular beam, and the little axle in both sides is concentric, and namely the upper end of the rectangular beam 14 of bent axle is welded with little axle 11 each via web 13; Be positioned at often group to hang two of both sides of roller-way 1 and support on 5 and be connected with bearing support 12, little axle 11 is connected with on bearing support 12, is fixed by bent axle, and framework 16 and bent axle are fixed, and are therefore also fixed one end of roller-way 1.
Be welded with transmission at rectangular frame 16 longeron often organizing suspension roller-way 1 separately near the outside of bent axle one end and install web 111, web 111 is installed in transmission has stiffening plate to be connected with rectangular frame 16 lower surface.Relative with threaded hole correspondence position and interval is equipped with some to support rollers bearing support 17 on the upper surface of both sides, rectangular frame 16 gap, some rollers are contained on support rollers bearing support 17 respectively, roller 15 headed by the roller being arranged on the rectangular longitudinal beam-ends that to connect with the rectangular beam 14 of bent axle, first roller 15 termination point casing is equipped with rubber wheel 19, all the other rollers are conventional roller 18, and the roller spacing of adjacent rollers is 300mm; Roller quantity is 11 ~ 16; Roller core shaft 110 is equipped with at the two ends of every root roller, and roller core shaft 110 is located on bearing support 17;
The roller core shaft 110 hanging roller-way 1 roller is arranged on rectangular frame 16 top through bearing support 17, and take off the precision work of axle steel for essence and form, the diameter that this essence takes off axle steel rider core is 40-45mm; Roller core and roller core shaft 110 are integrated, and essence takes off axle steel both sides roller roller core and roller axle 110 processes for same round steel, runs through the running roller of roller;
Roll shaft gear be contained in described essence take off axle steel rider core length to middle part, by with the gears meshing on transmission shaft 35 (see Figure 11), drive roller turn;
This essence take off axle steel rider core (comprises roller 15 and 18) equidistantly cover have some rubber wheels 19; This rubber wheel is made up of wheel hub and rubber ring, and wherein, wheel hub internal diameter and essence are taken off axle steel rider core diameter and coordinated, and hub outside diameter is 100mm, and hub thickness is 30-40mm, and rubber ring sleeve is on wheel hub; The rubber wheel 19 being positioned at two ends is fixed on this roller core shaft two ends; Support this essence and take off the bearing support 17 of axle steel rider core between this outer rubber wheel and second rubber wheel, be fixed on the upper surface of rectangular frame 16 liang of curb girders below bearing support 17;
Shown in composition graphs 2, first roller 15 is arranged on the bearing support 17 of the rectangular longitudinal beam both sides on the rectangular frame 16 that is overlapped on and welds with the rectangular beam 14 of bent axle, the first roller core shaft 110 of roller is concentric with height with the medullary ray of the little axle 11 on bent axle, hangs roller-way 1 like this and can ensure that when rising and falling the level height of the Up Highway UHW of the rubber wheel 19 on first roller 15 is constant.Often the medullary ray of the little axle 11 of group suspension roller-way 1 is all concentric.Ensure six groups hang roller-way (A, B, C, D, E, F) at the same time landing time all first rollers 15 on the Up Highway UHW height of rubber wheel 19 constant.Often group hang on roller-way conventional roller 18 on the structure of structure and first roller 15 and mounting means identical.See Figure 11.
transmission rig 3
Shown in composition graphs 3, wherein, transmission rig 3 is provided with six groups (3A-3F), is contained in six groups of suspension roller-ways 1 respectively and holds with connecting of support 5; The transmission rig 3 hanging roller-way is separately fixed on the installation web 111 and 112 (see Fig. 5) of rectangular frame 16 middle and lower part being positioned at support 5 side.
The corresponding transmission rig 3 respectively hanging roller-way 1 is contained in middle part separately respectively and hangs the back lower place of rectangular beam 14 inboardend of roller-way 1 and bent axle (being made up of little axle 11, web 13 and rectangular beam 14); Six groups of transmission rigs 3 are installed together with the rectangular frame 16 hanging roller-way separately, rise and fall together with suspension roller-way; Often group hangs roller-way 1 is all the motor 31 be oppositely arranged and step-down gear 32 (see Fig. 1 and Fig. 5) to be arranged on bolt to hang with edge on installation web 112 that roller-way 1 outer side rail welds, but position is different.
As shown in Figure 5, often organize transmission rig, be provided with motor 31, step-down gear 32, synchronous pulley 33, Timing Belt 34, transmission axis 35, axis gear 37, the roll shaft gear 36 be connected with roller, the bearing support 38 of fixed conveyor axis 35, the shaft coupling 310 of connection for transmission axis 35 and safety shield cap 39.Often group hangs the transmission rig 3 of roller-way 1, transmission is installed web 111 and is contained in the side-lower of this suspension roller-way rectangular frame 16 close to the rectangular beam 14 of bent axle, and motor 31 and step-down gear 32 are connected to by bolt and nut to be installed on web 111 with the transmission of rectangular frame longitudinal beam welding; Transmission axis 35 is divided into two sections, and every section to be fixed on the installation web 112 that is welded on longeron by two bearing supports, leading portion by middle part stretch to rectangular frame 16 long to cantilevered member, back segment stretches to rectangular beam 14 coupling end of rectangular frame 16 and bent axle by middle part; One end of transmission axis 35 is connected with Timing Belt 34, and the other end of Timing Belt 34 is socketed on the synchronous pulley 33 that is connected with motor 31 and step-down gear 32 output terminal; The other end of transmission axis 35 is concordant with cantilever one end of this suspension roller-way 1; Transmission axis 35 and transmission are installed web 111 and are fixed by bearing support 38; At the middle part of first roller 15 and ordinary roll 18, roll shaft gear 36 is housed, the gear on transmission axis 35 engages with the axis gear 36 be arranged in the middle part of roller, drives first roller 15 and conventional roller 18 to rotate; Leading portion transmission axis 35 is connected by shaft coupling 310 with back segment transmission axis 35; Rubber wheel 19 is arranged on the two ends of first roller 15 and conventional roller 18; Motor is regulated by frequency transformer equal controller, by the rotating speed regulating the rotating speed of motor to regulate roller, keeps the linear velocity of chip select roller and the synchronous of adjacent roller-way.Meanwhile, also six groups of rollers hanging roller-way can be allowed to rotate with identical speed sync by Controlling System, guarantee is synchronous with tandem docking roller line speed.
buffer gear 4
Often group hangs roller-way 1 all corresponding two groups of buffer gears 4 (see Fig. 1), and six groups are provided with 12 buffer gears altogether, and buffer gear 4 hangs buffering locator when roller-way 1 falls.Buffer gear 4 is positioned at the below of this rectangular longitudinal beam 16 cantilever end; Pool of buffer locating device comprises a support bar and a rubber pad; Wherein, support bar is vertically mounted on the device foundation platform 6 that is fixedly mounted with ground, and the channel-section steel of this device foundation platform 6 160mm × 65mm × 4.6mm is welded, and basic platform 6 lower surface is fixed by ground embedded board and ground; Each snubber assembly is one and forms with the supplemental support of described device foundation platform 6 vertical connection and the steel plate affixed at this supplemental support top and rubber plate; Described supplemental support is rectangle steel, and it is highly 150mm-360mm, and rectangle steel sectional dimension is 90mm × 60mm × 7mm; In an angle, this angle is consistent with the maximum angle that rectangular frame 16 falls for the rectangle steel of described steel plate and supplemental support, size at 5 °-8 ° (see Fig. 1), the length of described rubber plate be 140mm, wide for 60mm, thickness be 35mm.When the cantilever end of rectangular frame 16 longeron falls will put in place, its longeron first contacts with rubber plate, the surging force that this rectangular frame 16 of alleviation falls by the elasticity of rubber plate.
lift pneumatic control
As the lift 2 link position distribution plan in Fig. 1, Fig. 4.Lift 2 is provided with six groups altogether, and each group is single cylinder lift, lays respectively at the below hanging roller-way 1 separately; The single cylinder lift 2 be connected with suspension roller-way 1 hangs the side of roller-way separately, is connected by an one rotating shaft; Rotating shaft is across the below at respective suspension roller-way 1.
Wherein, cylinder seat 21, cylinder 22, connecting rod 23, rotating shaft fixed bearing block 24, rotating shaft 25, strap cam support bar 26 is provided with in single cylinder lift 2; Single cylinder lift 2 controls the lifting of hanging roller-way 1 separately;
As shown in Figure 6, for controlling the Pneumatic control circuit that lift runs, wherein, be provided with the speed control valve 601 be connected with the cylinder 22 in each lift, two-position-five-way solenoid valve 602, sourdine 603, straight joint 604, outside plug type right angle movable joint terminal conduit joint 605, outside plug type directintermination tube stub 606, outside plug type directintermination tube stub 607, all rubber hose 608, copper tube 609, sleeve type three-way pipe joint 610, tensimeter 611, air filtration combination 612, bite type cross pipe 613, bite type directintermination tube stub 614, outside plug type directintermination tube stub 615, stopping valve 616, total source of the gas 617.
Cylinder 22, speed-regulating valve 601, two-position-five-way solenoid valve 602, sound damper 603, tensimeter 611, air filter combination 612, stopping valve 616 are connected in series successively and connect total source of the gas 617; A total source of the gas 617 is shared in cylinder 22A, 22B, 22C, 22D, 22E, 22F parallel connection of six groups of single cylinder lifts.
Wherein, the input terminus of cylinder is connected with 2 speed-regulating valve 601 entrances respectively by the straight joint 604 be connected separately with output terminal; Outside plug type right angle movable joint middle-end tube stub 605 is equipped with in the outlet of speed-regulating valve 601, is connected with the two-position-five-way solenoid valve 602 that outside plug type directintermination end tube stub 606 is housed by all rubber hose 608; Sound damper 603 is contained in one end of this two-position-five-way solenoid valve 602; The other end of two-position-five-way solenoid valve 602 is equipped with outside plug type directintermination tube stub 607; This end combines 612 by copper tube 609 with tensimeter 611 and air filter that outside plug type directintermination tube stub 615 is housed and is connected in series, and the output terminal of air filter combination 612 is equipped with bite type directintermination tube stub 614; This bite type directintermination tube stub 614 is connected in series with stopping valve 616 by copper tube 609; The stopping valve 616 of 4 groups all and receive on bite type cross pipe 613 and be connected with its source of the gas 617;
Straight joint 604 used in this Pneumatic control circuit, its model is XT8-5PT1616-S G1 " * G1 "; Speed-regulating valve 601 used is (SMC) speed control valve; Outside plug type right angle movable joint middle-end tube stub 605 selects model to be JVVR-JH-Z25G1 " outside plug type right angle movable joint middle-end tube stub; All rubber hose 608 selects all rubber hose of diameter phi 25X3.5; Outside plug type directintermination end tube stub 606 selects model to be JVVR-Z25G1 " outside plug type directintermination end tube stub; Two-position-five-way solenoid valve 602 selects the magnetic valve of SMC company; Sound damper 603 selects model to be FXS2a-L25G1 " sound damper; This sound damper adopts thread connecting mode to be connected with the venting port of two-position-five-way solenoid valve 602; Model JVVR-Z25G1 ") outside plug type directintermination tube stub selected by outside plug type directintermination tube stub 607; Copper tube 609 selects the copper tube of diameter phi 25X3; Outside plug type directintermination tube stub 615 is identical with the model of outside plug type directintermination tube stub 607; The tensimeter of SMC (China) company limited selected by tensimeter 611; Air filter combination 612 selects the air filter of SMC (China) company limited to combine; Bite type directintermination tube stub 614 selects model to be JKY-25G1 "; SMC (China) company limited element selected by stopping valve 616.
The source of the gas trend of above-mentioned source of the gas control loop is: pipeline is out divided into three tunnels by source of the gas after bite type cross pipe 613, and then is divided into two-way separately, is connected respectively with six groups of cylinders.
Loop source of the gas trend is: source of the gas 617 outlet copper tube 609 connects stopping valve 616 through bite type directintermination tube stub, copper tube 609 is connect through outside plug type directintermination tube stub 615, through outside plug type directintermination tube stub 607, connect two-position-five-way solenoid valve 802 inlet mouth, outlet all rubber hose 608 connects; Be connected with speed control valve 601 air inlet/outlet through outside plug type right angle movable joint terminal conduit joint 605 again; Two-way, is connected with the import and export of cylinder 22A, 22B, 22C, 22D, 22E, 22F respectively altogether, and other end connection is connected to form loop with the import and export of corresponding two-position-five-way solenoid valve 602, connects by sound damper 603 in the air outlet of two-position-five-way solenoid valve 602.Each loop can be controlled separately by each loop, also can control with other loop synchronisation.
Fig. 7 is control panel figure, SA-controls to select automatically with manual, HL-power supply indicates, 7SB-burst device start SB1-controls to hang roller-way A and rises or fall, SB2-controls to hang roller-way B and rises or fall, SB3-controls to hang roller-way C and rises or fall, SB4-controls to hang roller-way D and rises or fall, SB5-controls to hang roller-way E and rises or fall, SB6-controls to hang roller-way F and rises or fall, SB7-controls to hang roller-way A, B, C, D, E, F rises simultaneously or falls, SB8-controls to hang roller-way A, B, C rises simultaneously or falls, SB9-controls to hang roller-way D, E, F rises simultaneously or falls, SB10-controls to hang roller-way A and B and rises simultaneously or fall, SB11-controls to hang roller-way C and D and rises simultaneously or fall, SB12-controls to hang roller-way E and F and rises simultaneously or fall.The field control under manual mode of this button, when being in auto state, can be controlled by control center automatically.
More than describe the formation of the utility model flat glass production line cold junction chip select device in detail.
Utilize this device to carry out the method for chip select or the plate that falls, its concrete operations are:
1) sheet glass exported by glass production line cold side outlet end being entered six groups by the first roller 15 of described suspension roller-way 1 respectively simultaneously hangs on roller-way;
2) motor 31 hanging the transmission rig 3 that roller-way 1 is connected with each group is opened, by the synchronous pulley 33 of synchronous pulley 33 on Timing Belt 34 connection for transmission axle on step-down gear 32 output shaft that is connected with motor 31, transmission axis 35 is driven to rotate, transmission axis 35 drives axis gear 37 to rotate, axis gear 37 and the gears meshing on the axle 110 of glass roll sub-connection, drive the roller 15 and 18 of conveying glass to rotate;
3) stopping valve 616 connecting lift described in the total source of the gas 617, six groups connected with lift 2 is all open-minded, and described cylinder 22 is all in initial state, and six groups are hung roller-way 1 one-tenth one plane; Chip select by the chip select to six sheet glass, three sheet glass, the chip select to two sheet glass, in the chip select of a sheet glass any one, trigger the two-position-five-way solenoid valve 602 that is connected with each cylinder 22 wire by different way, control the piston action of each cylinder 22; Cylinder piston makes stretching motion under source of the gas drives, described single cylinder lift 2 is driven to be in jack-up or falling state, by described lift 2, the lifting of rectangular frame described in six groups being completed reaching the sheet glass chip select of this suspended wall roller-way outlet or the plate that falls, entering Xia Dao workshop section.
1., when preferred to six sheet glass (glass is laterally six sheet glass), first open and hang roller-way A, hang roller-way B, hang roller-way C, hang roller-way D, hang roller-way E, hang the driving motor 3A that roller-way F connects separately, 3B, 3C, 3D, 3E, 3F, allow each group of first roller 15, conventional roller 18 all rotates, will with each lift 2A, 2B, 2C, 2D, 2E, each gas circuit stopping valve 616 that 2F pneumatic circuit is connected in series respectively is adjusted to opening state, regulate the speed control valve 601 of each pneumatic circuit, each lift rising or falling speed is allowed to be consistent, start two-position-five-way solenoid valve 602 and the Controlling System of different positions as requested, lift 2A, 2B, 2C, 2D, 2E, 2F cylinder is allowed to be in original state, namely often cylinder 22A, 22B, 22C, 22D, 22E, 22F piston of each self-corresponding lift of group suspension roller-way is in contraction schedule, and each strap cam support bar 26 of lift 2A, 2B, 2C, 2D, 2E, 2F is in jack-up state, whether the trip switch etc. detecting roller-way position is in opened condition.Controlling System is transferred to six chip select state of a controls, now suspension roller-way is divided into six groups by system, namely hangs roller-way suspension roller-way A, suspension roller-way B, suspension roller-way C, suspension roller-way D, hangs roller-way E, suspension roller-way F is respectively one group.Under standard state, six groups of roller-ways are horizontal, and glass is delivered directly to the gas docking rollgang of upper strata roller-way, at this moment hangs roller-way 1 and is equivalent to one section of common rollgang.When system need chip select or fall plate time, lift is with to hang roller-way 1 operating process as follows:
Chip select is needed when hanging the glass on roller-way 1A, the pneumatic element two-position-five-way solenoid valve 602 on the Pneumatic control circuit opened on corresponding lift 2A loop is triggered by Controlling System, corresponding cylinder 22A piston protracts, plush copper on the support 26A of the strap cam on the rotating shaft driving it to link glides, and drives suspension roller-way 1A tail end to fall to docking with other roller-way of lower floor or equipment entrance.After glass enters next roller-way or equipment entrance, the two-position-five-way solenoid valve 602 on this corresponding lift 2A Pneumatic control circuit is triggered again by Controlling System, cylinder piston shrinks, drive plush copper on the support 26A of strap cam up, send suspension roller-way back to original state, wait for the process of lower sheet glass.
Need chip select when hanging the glass on roller-way B, suspension roller-way C, suspension roller-way D, suspension roller-way E, suspension roller-way F, its process is same as described above, does not repeat them here.Hanging roller-way A to being distributed in, hanging roller-way B, hang roller-way C, hang roller-way D, hang roller-way E, hanging glass on roller-way F can chip select simultaneously, also can chip select separately.
2., when to three sheet glass (glass is transversely three sheet glass) chip select:
1) first open with suspension roller-way A, hang roller-way B, hang roller-way C, hang roller-way D, hang roller-way E, hang driving motor 3A, 3B, 3C, 3D, 3E, 3F that roller-way F is connected separately, first roller 15, conventional roller 18 is allowed all to rotate, opening state is adjusted to by with the gas circuit stopping valve 616 that lift 2A, 2B, 2C, 2D, 2E, 2F pneumatic circuit is connected in series respectively, regulate the speed control valve 601 of each pneumatic circuit, allow lift rising or falling speed be consistent; Start two-position-five-way solenoid valve 602 and the Controlling System of different positions as requested, lift 2A, 2B, 2C, 2D, 2E, 2F cylinder is allowed to be in original state, namely often the piston of cylinder 22A, 22B, 22C, 22D, 22E, 22F of each self-corresponding lift of group suspension roller-way is in contraction schedule, and the strap cam support bar 26 of lift 2A, 2B, 2C, 2D, 2E, 2F is in jack-up state; Whether detection control switch etc. is in opened condition.
2) Controlling System is transferred to three chip selects or the plate state of a control that falls, now suspension roller-way is divided into three groups by system, be one group as hung roller-way 1A and hanging roller-way 1B, hang roller-way 1C and hang that roller-way 1D two intermediate table is one group, to hang roller-way 1E and hang roller-way 1F be one group, totally three groups.Under standard state, three groups of roller-ways are horizontal, and glass is delivered directly to next roller-way of glass travelling belt, at this moment hang roller-way and are equivalent to one section of common rollgang.When system need chip select or fall plate time, lift is with to hang roller-way operating process as follows:
When chip select need be carried out to the sheet glass hung on roller-way 1A and suspension roller-way 1B on two roller-ways, first triggered the two-position-five-way solenoid valve 602 opened and hang roller-way 1A and hang on the Pneumatic control circuit of lift 2A and 2B corresponding to roller-way 1B by Controlling System simultaneously, the piston of cylinder 22A and 22B protracts, and corresponding rotating shaft 25A and 25B rotates that plush copper on support bar 26A and 26B of the strap cam on it is descending is in relaxed state, the plush copper on support bar 26A and 26B of strap cam is driven to be in falling state, drive and hang roller-way 1A and 1B synchronous same-speed whereabouts, stop when docking with next roller-way being positioned at lower floor, after this sheet glass is transported to next roller-way, triggered the two-position-five-way solenoid valve 602 on lift 2A and 2B Pneumatic control circuit again by Controlling System simultaneously, the piston retraction of cylinder 22A and 22B, the plush copper on support bar 26A and 26B of strap cam is driven to be in jack-up state, drive and hang roller-way 1A and the rising of 1B synchronous same-speed, suspension roller-way 1A and 1B is returned to horizontal zero position, wait for bottom sheet glass treatment.Namely lift 2A and 2B compiles is one group, and coordinate with suspension roller-way 1A and 1B respectively, both synchronously rise and fall, and complete the chip select of hanging roller-way 1A and hanging the sheet glass on roller-way 1B;
3) in the middle of, a sheet glass (namely hanging roller-way 1C and the sheet glass hung on roller-way 1D) is identical with the chip select process on the sheet glass hung on roller-way 1B with above-mentioned extension roller-way 1A with the chip select process of another sheet glass (namely hanging roller-way 1E and the sheet glass hung on roller-way 1F), repeats no more at this.Any a slice in three sheet glass, two panels or three can chip selects simultaneously, also can chip select separately.
3., when preferred to two sheet glass (namely glass is transversely two sheet glass).
1) identical with to the excellent time chosen freely of three sheet glass.
2) Controlling System is transferred to two panels chip select or the plate state of a control that falls, now suspension roller-way is divided into two groups by system, namely hanging roller-way 1A, hanging roller-way 1B and hang roller-way 1C is one group, and hanging roller-way 1D, hanging roller-way 1E and hang roller-way 1F is one group, totally two groups.Under standard state, two groups of roller-ways are horizontal, and glass is delivered directly to next roller-way of glass travelling belt, and at this moment roller-way is equivalent to one section of common rollgang.When system need chip select or fall plate time, lift is with to hang roller-way operating process as follows:
When need need chip select to the sheet glass hung on roller-way 1A, suspension roller-way 1B and suspension roller-way 1C, first triggered to open by Controlling System simultaneously and hang roller-way 1A, hang roller-way 1B and hang the two-position-five-way solenoid valve 602 on Pneumatic control circuit corresponding to roller-way 1C corresponding lift 2A, 2B and 2C, cylinder 22A, 22B and 22C piston protracts, and corresponding rotating shaft 25A, 25B and 25C to rotate on it that plush copper on support bar 26A, 26B and 26C of corresponding strap cam is descending is in relaxed state, drive the support bar 26A of strap cam, plush copper on 26B and 26C is in falling state, drive and hang roller-way 1A, 1B and 1C synchronous same-speed falls, stop when docking with next roller-way being positioned at lower floor, after glass being transported to next roller-way, triggered by Controlling System simultaneously and open lift 2A, two-position-five-way solenoid valve 602 on 2B and 2C Pneumatic control circuit, cylinder 22A, 22B and 22C piston retraction, drive the support bar 26A of strap cam, plush copper on 26B and 26C is in jack-up state, drive and hang roller-way 1A, 1B and 2C synchronous same-speed rises, roller-way 1A will be hung, 1B and 1C returns to horizontal zero position, wait for bottom sheet glass treatment.Namely lift 2A, 2B and 2C compiles is one group, and coordinate with suspension roller-way 1A, 1B and 1C respectively, two groups are are synchronously risen and fallen, and completes the chip select that side hangs roller-way 1A, hangs the sheet glass on roller-way 1B and suspension roller-way 1C;
3) opposite side one sheet glass (sheet glass namely hang roller-way 1D, hanging roller-way 1E and hang on roller-way 1F) chip select process and above-mentioned extension roller-way 1A, to hang roller-way 1B identical with the chip select process on the sheet glass hung on roller-way 1C, repeat no more at this.Any a slice in two sheet glass or two panels can chip selects simultaneously, also can chip select separately.
4., when preferred to a sheet glass (namely glass is transversely a sheet glass).
1) identical with to the excellent time chosen freely of three sheet glass.
2) Controlling System is transferred to a slice chip select state of a control, now suspension roller-way 1 is divided into one group by system, and it is overall for namely hanging roller-way 1A, hang roller-way 1B and hang roller-way 1C, hang roller-way 1D, hanging roller-way 1E and hang roller-way 1F.Under standard state, all roller-ways are horizontal, and glass is delivered directly to next roller-way, and at this moment roller-way is equivalent to one section of common rollgang.When system need chip select or fall plate time, lift is with to hang roller-way operating process as follows:
When need to suspension roller-way on a sheet glass chip select time, hang roller-way 1A, hang roller-way 1B, hang roller-way 1C, hang roller-way 1D, hang roller-way 1E, hang roller-way 1F synchronous operation, first triggered to open by Controlling System simultaneously and hang roller-way 1A, hang roller-way 1B, hang roller-way 1C, hang roller-way 1D, hang roller-way 1E, hang the lift 2A that roller-way 1F is corresponding, 2B, 2C, 2D, two-position-five-way solenoid valve 602 on the Pneumatic control circuit that 2E and 2F is corresponding, cylinder 22A, 22B, 22C, 22D, 22E, the piston of 22F protracts, corresponding rotating shaft 25A, 25B, 25C, 25D, 25E and 25F rotates the support bar 26A of strap cam corresponding on it, 26B, 26C, 26D, plush copper on 26E and 26F is descending is in relaxed state, drive the support bar 26A of strap cam, 26B, 26C, 26D, plush copper on 26E and 26F is in falling state, drive and hang roller-way 1A, 1B, 1C, 1D, 1E and 1F synchronous same-speed falls, stop when docking with lower floor roller-way, after glass being transported to lower floor's roller-way, trigger simultaneously and open lift 2A, 2B, 2C, 2D, two-position-five-way solenoid valve 602 on 2E and 2F Pneumatic control circuit, cylinder piston shrinks, drive the support bar 26A of strap cam, 26B, 26C, 26D, plush copper on 26E and 26F is in jack-up state, drive and hang roller-way 1A, 1B, 1C, 1D, 1E and 2F synchronous same-speed rises, roller-way 1A will be hung, 1B and 1C returns to horizontal zero position, wait for bottom sheet glass treatment.Namely S lift 2A, 2B, 2C, 2D, 2E and 2F compile is one group, coordinates respectively, jointly complete the chip select of a sheet glass with suspension roller-way 1A, 1B, 1C, 1D, 1E and 1F; Respectively hang roller-way afterwards and get back to original state, wait for next sheet glass process.
Under normal circumstances, roller-way is all in normal horizontal position, and chip select mechanism is now equivalent to one section of normal rollgang, and the glass of coming directly is delivered to vanning section, carries out vanning packing.When glass and upper strata rank are not inconsistent, upon receipt of the signals, roller-way lift starts action to roller-way, is docked by roller-way tail end roller-way with lower floor roller-way, and the corresponding interface docks, and completes chip select operation.

Claims (9)

1. the automatic chip select device of multi-disc sheet glass, includes and hangs roller-way (1), lift (2), transmission rig (3), buffer gear (4), supports (5) and basic platform (6); It is characterized in that, described extension roller-way, lift, transmission rig, buffer gear and support are supporting is one group of unit, and this device is provided with organizes unit more, and each group unit parallel side-by-side is installed on described basic platform.
2. the automatic chip select device of multi-disc sheet glass according to claim 1, is characterized in that, be provided with six groups of unit, and six to hang roller-way (1) parallel and arrange with the cylinder unit interval of lift (2) side by side; Often one end of group suspension roller-way is connected with vertical support (5) of being fixed on ground, and the other end hanging roller-way is unsettled; Lift correspondence is provided with six groups, and six groups of lifts hang roller-way with six groups corresponding connecting hangs roller-way by jack-up or fall in order to drive respectively.
3. the automatic chip select device of multi-disc sheet glass according to claim 2, it is characterized in that, often organize lift and be provided with cylinder block (21), cylinder (22), connecting rod (23), bearing support (24), rotating shaft (25), strap cam support bar (26), slide rail (27) and safty shield (28); Wherein cylinder and cylinder block are riveted fixing, and head and connecting rod one end of cylinder piston are hinged, and the other end and the rotating shaft of connecting rod are welded as a whole.
4. the automatic chip select device of multi-disc sheet glass according to claim 3, it is characterized in that, respective cylinder stretches into below the suspension roller-way that docks with it by respective rotating shaft, supported by device foundation platform, position relative with rotating shaft on device foundation platform is equipped with the bearing support fixing this rotating shaft; Have strap cam support bar at the middle part of rotating shaft by spline joint, the top of strap cam support bar is corresponding with being fixed on the sled position hung bottom roller-way, and this cam coordinates with slide rail.
5. the automatic chip select device of multi-disc sheet glass according to claim 1 or 2 or 3 or 4, it is characterized in that, often group hangs roller-way and is equipped with little axle (11), bearing support (12), web (13), rectangular beam (14), first roller (15), rectangular frame (16), support rollers bearing support (17), conventional roller (18), rubber wheel (19), roller core shaft (110), transmission installation web (111) and installation web (112); Wherein:
Rectangular frame horizontal positioned, is connected by bent axle with support (5); Form bent axle by little axle, web and rectangular beam, rectangular beam welds with one end of the web at two ends, and the two pleurosternal the other ends weld little axle, and little axle penetrates in the hole that web processes in advance, and after welding two little axles are concentric; Little axle is connected with bearing support again, and bearing support is connected with support (5) by bolt and nut;
Longitudinal side of rectangular frame is welded with motor (31), step-down gear (32) and transmission and installs web, have gap in the middle of rectangular frame, have the transmission shaft bearing of its upper and lower surface vertical that web is installed in intermediate gap along rectangular frame horizontal welding; Rectangular frame is fixedly connected with by screw thread with support rollers bearing support;
The upper surface vertical welding of the rectangular beam of rectangular frame one end and bent axle forms the support frame hanging roller-way;
Rectangular frame longeron is welded with transmission and installs web near the outside of bent axle one end, web is installed in transmission has stiffening plate to be connected with rectangular frame lower surface;
Relative with threaded hole correspondence position and interval is equipped with some to support rollers bearing support on the upper surface of both sides, rectangular frame gap, some rollers are contained on support rollers bearing support respectively, first roller be arranged on through be fixed on weld with bent axle rectangular frame on, all the other are conventional roller; Roller core shaft is equipped with at the two ends of every root roller, and roller core axle bed is located on bearing support, and roller core shaft is concentric with height with the medullary ray of the little axle on bent axle, ensures that the rubber wheel Up Highway UHW height location fixing with first roller roll centre axle is constant.
6. the automatic chip select device of multi-disc sheet glass according to claim 5, it is characterized in that, transmission rig is provided with motor (31), step-down gear (32), synchronous pulley (33), Timing Belt (34), transmission axis (35), axis gear (37), the roll shaft gear (36) be connected with roller, the bearing support (38) of fixed conveyor axis, the shaft coupling (310) of connection for transmission axis and safety shield cap (39).
7. the automatic chip select device of multi-disc sheet glass according to claim 6, it is characterized in that, buffer gear is positioned at the below of rectangular frame cantilever end; Pool of buffer locating device comprises a support bar and a rubber pad; Wherein, support bar is vertically mounted on the device foundation platform that is fixedly mounted with ground.
8. the automatic chip select device of multi-disc sheet glass according to claim 7, it is characterized in that, support and be welded by rectangle section longitudinal beam (51), diagonal ligament beam (52) and upper and lower steel plate (53,54), upper steel plate is back up pad, in order to the bearing support (12) of fixing suspension roller-way bent axle, lower steel plate is the web plate of linking device basic platform pre-embedded steel slab.
9. the automatic chip select device of multi-disc sheet glass according to claim 8, it is characterized in that, lift is provided with six groups altogether, and each group is the lifting that single cylinder lift controls to hang separately roller-way, lays respectively at the below hanging roller-way separately; The single cylinder lift be connected with suspension roller-way is positioned at the side hanging roller-way separately, is connected by an one rotating shaft; Rotating shaft is across the below at respective suspension roller-way; Cylinder seat (21), cylinder (22), connecting rod (23), rotating shaft fixed bearing block (24), rotating shaft (25), strap cam support bar (26) is provided with in single cylinder lift.
CN201420511693.6U 2014-09-05 2014-09-05 A kind of divided glass chip select device Withdrawn - After Issue CN204097324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420511693.6U CN204097324U (en) 2014-09-05 2014-09-05 A kind of divided glass chip select device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420511693.6U CN204097324U (en) 2014-09-05 2014-09-05 A kind of divided glass chip select device

Publications (1)

Publication Number Publication Date
CN204097324U true CN204097324U (en) 2015-01-14

Family

ID=52265769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420511693.6U Withdrawn - After Issue CN204097324U (en) 2014-09-05 2014-09-05 A kind of divided glass chip select device

Country Status (1)

Country Link
CN (1) CN204097324U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104176924A (en) * 2014-09-05 2014-12-03 秦皇岛玻璃工业研究设计院 Multiple glass plate selecting device and method for selecting multiple glass plates at cold end of plate glass production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104176924A (en) * 2014-09-05 2014-12-03 秦皇岛玻璃工业研究设计院 Multiple glass plate selecting device and method for selecting multiple glass plates at cold end of plate glass production line

Similar Documents

Publication Publication Date Title
CN105773827B (en) Prefabricated components solid production system
CN105197603B (en) Automatic flexible angle iron stacking system and method
CN103724000B (en) Method and device for sheet selection or plate falling at cold end of flat plate glass production line
CN105195961A (en) Pairing lengthening device for two-in-one pipeline
CN104176924B (en) A kind of divided glass chip select device and the method for flat glass production line cold end divided glass
CN203728729U (en) Sheet selecting or plate falling device of plate glass production line cold end
CN205111192U (en) Two connect long device of pipeline group butt joint
CN107138625A (en) A kind of die holder more changing device and its replacing options
CN206032715U (en) Heated board pile up neatly system and destacking feeding system
CN206966454U (en) A kind of die holder more changing device
CN201545509U (en) Automatic hanging-changing system
CN204097324U (en) A kind of divided glass chip select device
CN104723459B (en) A kind of concrete prefabricated sheet material production line is assembled with mould and provision for disengagement
CN203961229U (en) Automatic plastering machine
CN203582015U (en) Small brick stacking machine
CN205873162U (en) Portable pair roller conveyor
CN105195962A (en) Three-to-one pipeline assembly extension device
CN204503793U (en) Roll line cold bed stack pallet mechanism
CN208007933U (en) Multi-platform skin raft conveying hoister for amusement park
CN205111193U (en) Three connect long device of pipeline group butt joint
CN204237270U (en) Setting machine
CN111056038B (en) Equipment of unmanned aerial vehicle undercarriage
CN110902562B (en) Intelligent full-automatic paper processing equipment
CN209701626U (en) A kind of transmission of pipe longitudinal direction transports roller way system
CN206384484U (en) A kind of big slide plate cross sliding machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20150114

Effective date of abandoning: 20171114