CN204089328U CN201420586991.1U CN201420586991U CN204089328U CN 204089328 U CN204089328 U CN 204089328U CN 201420586991 U CN201420586991 U CN 201420586991U CN 204089328 U CN204089328 U CN 204089328U
Authority
CN
China
Prior art keywords
section
transformer
low
hotel
transfer switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420586991.1U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanda Institute Of Hotel Design And Research Co ltd
Original Assignee
WANDA HOTEL DESIGN RESEARCH INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WANDA HOTEL DESIGN RESEARCH INSTITUTE Co Ltd filed Critical WANDA HOTEL DESIGN RESEARCH INSTITUTE Co Ltd
Priority to CN201420586991.1U priority Critical patent/CN204089328U/en
Application granted granted Critical
Publication of CN204089328U publication Critical patent/CN204089328U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a kind of device switched for hotel Nei Chaifa and civil power, its include be electrically connected with two-way high pressure city changed into switchhouse, for being connected low-voltage distribution cabinet and the diesel generating set of various load in hotel, four transformers with high pressure city electric connection are provided with in changed into switchhouse, two Manual Transfer Switch are provided with in low-voltage distribution cabinet, an automatic transfer switch, two groups of circuit breakers, connect the fire-fighting emergent bus section, busbar section of fire fighting burthen and connect I section, II section, IV section, V section low-voltage bus bar section of various load.

Description

For the device that hotel Nei Chaifa and civil power switch
Technical field
The utility model relates to a kind of switching device shifter, says more specifically, relates to a kind of bavin for hotel and sends out the switching device shifter with civil power.
Background technology
The power supply Normal practice of current hotel diesel engine generator does one section of diesel engine generator emergency bus section, for " security against fire type load " and " hotel's important leverage type load " two type loads are powered.But constantly perfect along with safety requirements, hotel's important leverage type load must separate with fire-fighting emergent load and uses bus section, busbar section, also will ensure fire fighting burthen and the power supply of hotel's important load in the equal dead electricity situation of municipal administration.But this object cannot be realized with current existing way.
Utility model content
Given this, the purpose of this utility model is to provide a kind of bavin for hotel to send out the switching device shifter with civil power, effectively can solve and power for " security against fire type load " and " hotel's important leverage type load " two type loads when the equal dead electricity of municipal administration.
Include with the device that civil power switches the changed into switchhouse be electrically connected with two-way high pressure city for hotel Nei Chaifa in the utility model, for connecting low-voltage distribution cabinet and the diesel generating set of various load in hotel, four transformers are set in described changed into switchhouse, be respectively transformer 1#, transformer 2#, transformer 3#, transformer 4#, wherein transformer 1# and transformer 2# is one group of spare transformer each other, transformer 3# and transformer 4# organizes spare transformer each other for another, described transformer 1# and transformer 3# is through the first high voltage bus section and the first high pressure city electric connection, described transformer 2# and transformer 4# is through the second high voltage bus section and the second high pressure city electric connection, two Manual Transfer Switch are provided with in described low-voltage distribution cabinet, an automatic transfer switch, two groups of circuit breakers, connect the fire-fighting emergent bus section, busbar section of fire fighting burthen and connect I section, II section, IV section, V section low-voltage bus bar section of various load, described I section, II section low-voltage bus bar section connects one group of circuit breaker respectively, described IV section, V section low-voltage bus bar section connects another group circuit breaker respectively, is respectively communicated with by low pressure bus connection switch between described I section, II section low-voltage bus bar section and between described IV section, V section low-voltage bus bar section, the output of described diesel generating set is connected with described automatic transfer switch, two Manual Transfer Switch respectively through three circuit breakers, described two Manual Transfer Switch connect the output of described transformer 1# and transformer 3# respectively, and described two groups of circuit breakers connect the output of the output of described Manual Transfer Switch and described transformer 3#, transformer 4# respectively.
High pressure bus connection switch is provided with between described first high voltage bus section and described second high voltage bus section.
Described II section or V section of low-voltage bus bar section are communicated with one end of described automatic transfer switch.
Described various load comprises first order load, two stage loads and important load.
Described fire fighting burthen connects described fire-fighting emergent bus section, busbar section and I section of low-voltage bus bar simultaneously.
Described first Manual Transfer Switch and the second Manual Transfer Switch are manual Double-throwing load switch.
The utility model is by arranging one section of fire-fighting emergent bus section, busbar section, only be responsible for fire-fighting emergent load to power, make the power supply of diesel generating set except meeting fire-fighting equipment and powering, can also when two road civil powers all have a power failure at ordinary times, according to needs and the ruuning situation of hotel management, Non-follow control its need the load of switching.
This way both met current specifications, in turn ensure that the operation of hotel's important load after municipal administration has a power failure.Operation management personnel, by manual mode, select the transmission line circuit of required power supply flexibly.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the device switched for hotel Nei Chaifa and civil power in the utility model.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the utility model is elaborated.
As shown in Figure 1, in the utility model for hotel Nei Chaifa and the device that civil power switches include be electrically connected with two-way high pressure city changed into switchhouse 10, for the low-voltage distribution cabinet 11 that is connected various load in hotel and the diesel generating set 12 be placed in this fry dried food ingredients motor house, wherein:
Four transformers are set in changed into switchhouse 10, be respectively transformer 1#, transformer 2#, transformer 3#, transformer 4#, wherein transformer 1# and transformer 2# is one group of spare transformer each other, transformer 3# and transformer 4# organizes spare transformer each other for another, transformer 1# is communicated with the first high pressure civil power (high pressure civil power 1#) through the first high voltage bus section 13 with transformer 3#, and transformer 2# is communicated with the second high pressure civil power (high pressure civil power 2#) through the second high voltage bus section 14 with transformer 4#.A high pressure bus connection switch 22 can be set between the first high voltage bus section 13 and the second high voltage bus section 14, make the first high voltage bus section 13 and the second high voltage bus section 14 in connected state.
Two Manual Transfer Switch are provided with in low-voltage distribution cabinet 11, be respectively the first Manual Transfer Switch 17 and the second Manual Transfer Switch 18, an automatic transfer switch 19, first group of circuit breaker 20, second group of circuit breaker 21, for connecting the fire-fighting emergent bus section, busbar section 15 of fire fighting burthen and connecting I section, II section, IV section, V section low-voltage bus bar section of various load.Namely I section, II section, IV section, V section low-voltage bus bar Duan Zhongjun is connected with first order load, two stage loads, important load etc.And in I section of low-voltage bus bar section, be connected with fire fighting burthen, an input of II section of low-voltage bus bar section connection automatic transfer switch 19 simultaneously.First group of circuit breaker 20 is in parallel by two circuit breakers 1DL, 2DL, and second group of circuit breaker 21 is in parallel by two circuit breakers 4DL, 5DL.
I section, II section low-voltage bus bar section connects second group of circuit breaker 21 respectively, IV section, V section low-voltage bus bar section connects first group of circuit breaker 20 respectively, low pressure bus connection switch 3DL and 6DL is respectively provided with between I section, II section low-voltage bus bar section and between IV section, V section low-voltage bus bar section, I section, II section low-voltage bus bar section is communicated with, and IV section, V section low-voltage bus bar section is communicated with.
The output of two Manual Transfer Switch 17,18 difference connection transformer 3# and transformer 1#, circuit breaker 5DL, 2DL difference connection transformer 4# in two groups of circuit breakers 20,21, the output of transformer 2#, another circuit breaker 4DL, 1DL connect the output of the first Manual Transfer Switch 17, second Manual Transfer Switch 18 respectively.
The output of diesel generating set connects three circuit breakers 7DL, 8DL and 9DL, wherein the output of circuit breaker 7DL, 8DL connects the first Manual Transfer Switch 17 and the second Manual Transfer Switch 18 respectively, the output of circuit breaker 9DL connects another input of automatic transfer switch 19, the output of automatic transfer switch 19 connects fire-fighting emergent bus 15, fire-fighting emergent bus 15 connects fire fighting burthen, can with I section of low-voltage bus bar section simultaneously for fire fighting burthen be powered.
The concrete implementation process of the device switched for hotel Nei Chaifa and civil power in the utility model is as follows:
First Manual Transfer Switch 17 and the second Manual Transfer Switch 18 are in normally off, and under normal circumstances, powered with electricity by the first high pressure civil power and the second high pressure civil power, diesel generating set 12 does not work.Low pressure bus connection switch 3DL, 6DL in low-voltage distribution cabinet 11 are off-state, and first group of circuit breaker, 20, second group of circuit breaker 21 and automatic transfer switch 19 are normal ON city electricity condition, power to fire fighting burthen.
When a road civil power dead electricity, when namely the first high pressure civil power or the second high pressure civil power have a road power-off, high pressure bus connection switch 22 can be connected, then consistent with normal work situation.
If high pressure bus connection switch 22 disconnects, then only have a road mains-supplied, two circuit breaker 1DL or 2DL only in two groups of circuit breakers 20,21,4DL or 5DL only have one in closure state, and low pressure bus connection switch 3DL, 6DL is closure state simultaneously simultaneously.Now diesel generating set 12 does not work, and another road city electricity condition of automatic transfer switch 19 normal ON, for fire fighting burthen is powered.
In two-way civil power dead electricity situation, diesel generating set 12 starts work automatically.Automatic transfer switch 19 is transformed into automatically is powered by diesel generating set 12, for all fire fighting burthen in hotel are powered.
First Manual Transfer Switch 17 and the second Manual Transfer Switch 18 are manual Double-throwing load switch, still remain on mains terminal, for diesel generating set available on-state, power supply trouble is determined whether but not fire conditions by hotel management associate, confirm without after the condition of a fire, manual cut-out hotel insignificant load, after making the place capacity of power supply be less than the capacity of diesel generating set 12, manual again the first Manual Transfer Switch 17 and the second Manual Transfer Switch 18 are switched to diesel generating set 12 power-feed section, are powered to important load by diesel generating set 12.
When any road municipal administration power up is powered, stop generator.
In two road civil power dead electricity, and again breaking out of fire when, cut off diesel generating set 12 feed 2 circuit breaker 7DL and 8DL to normal power supply I section, II section, IV section, V section low-voltage bus bar section; Circuit breaker 9DL closes, and makes diesel generating set 12 be only fire-fighting emergent bus section, busbar section 15 and powers, to ensure that fire fighting burthen is powered.
The foregoing is only the schematic embodiment of the utility model, and be not used to limit scope of the present utility model.Any those skilled in the art, the equivalent variations done under the prerequisite not departing from design of the present utility model and principle, amendment and combination, all should belong to the scope of the utility model protection.

Claims (6)

1. the device switched for hotel Nei Chaifa and civil power, include the changed into switchhouse be electrically connected with two-way high pressure city, for connecting low-voltage distribution cabinet and the diesel generating set of various load in hotel, it is characterized in that, four transformers are set in described changed into switchhouse, be respectively transformer 1#, transformer 2#, transformer 3#, transformer 4#, wherein transformer 1# and transformer 2# is one group of spare transformer each other, transformer 3# and transformer 4# organizes spare transformer each other for another, described transformer 1# and transformer 3# is through the first high voltage bus section and the first high pressure city electric connection, described transformer 2# and transformer 4# is through the second high voltage bus section and the second high pressure city electric connection, two Manual Transfer Switch are provided with in described low-voltage distribution cabinet, an automatic transfer switch, two groups of circuit breakers, connect the fire-fighting emergent bus section, busbar section of fire fighting burthen and connect I section, II section, IV section, V section low-voltage bus bar section of various load, described I section, II section low-voltage bus bar section connects one group of circuit breaker respectively, described IV section, V section low-voltage bus bar section connects another group circuit breaker respectively, is respectively communicated with by low pressure bus connection switch between described I section, II section low-voltage bus bar section and between described IV section, V section low-voltage bus bar section, the output of described diesel generating set is connected with described automatic transfer switch, two Manual Transfer Switch respectively through three circuit breakers, described two Manual Transfer Switch connect the output of described transformer 1# and transformer 3# respectively, and described two groups of circuit breakers connect the output of the output of described Manual Transfer Switch and described transformer 3#, transformer 4# respectively.
2. the device switched for hotel Nei Chaifa and civil power according to claim 1, is characterized in that, is provided with high pressure bus connection switch between described first high voltage bus section and described second high voltage bus section.
3. the device switched for hotel Nei Chaifa and civil power according to claim 1, is characterized in that, described II section or V section of low-voltage bus bar section are communicated with one end of described automatic transfer switch.
4. the device switched for hotel Nei Chaifa and civil power according to claim 1, is characterized in that, described various load comprises first order load, two stage loads and important load.
5. the device switched for hotel Nei Chaifa and civil power according to claim 1, is characterized in that, described fire fighting burthen connects described fire-fighting emergent bus section, busbar section and I section of low-voltage bus bar simultaneously.
6. the device switched for hotel Nei Chaifa and civil power according to claim 1, is characterized in that, described first Manual Transfer Switch and the second Manual Transfer Switch are manual Double-throwing load switch.
CN201420586991.1U 2014-10-11 2014-10-11 For the device that hotel Nei Chaifa and civil power switch Expired - Fee Related CN204089328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420586991.1U CN204089328U (en) 2014-10-11 2014-10-11 For the device that hotel Nei Chaifa and civil power switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420586991.1U CN204089328U (en) 2014-10-11 2014-10-11 For the device that hotel Nei Chaifa and civil power switch

Publications (1)

Publication Number Publication Date
CN204089328U true CN204089328U (en) 2015-01-07

Family

ID=52181999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420586991.1U Expired - Fee Related CN204089328U (en) 2014-10-11 2014-10-11 For the device that hotel Nei Chaifa and civil power switch

Country Status (1)

Country Link
CN (1) CN204089328U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104682552A (en) * 2015-03-13 2015-06-03 北京百度网讯科技有限公司 System and method for supplying power to data center
CN104882957A (en) * 2015-06-17 2015-09-02 中国热带农业科学院南亚热带作物研究所 Power supply system of agricultural production base
CN104917288A (en) * 2015-06-30 2015-09-16 遵义市产品质量检验检测院 Laboratory uninterrupted power supply system
CN108832618A (en) * 2018-05-24 2018-11-16 重庆卓创国际工程设计有限公司 Business distribution double power-supply system
CN108879771A (en) * 2018-07-16 2018-11-23 扬州市华东动力机械有限公司 A kind of marine wind electric field diesel emergency generating set control system and control method
CN109256849A (en) * 2018-11-13 2019-01-22 浙江杰地建筑设计有限公司 It is provided with the hotel's distribution system and its application method of diesel-driven generator
CN109687570A (en) * 2018-12-17 2019-04-26 国网北京市电力公司 One kind zero flashes low-voltage distribution system and operating method
CN110858714A (en) * 2018-08-24 2020-03-03 阿里巴巴集团控股有限公司 Power supply system and power supply method
CN112528371A (en) * 2020-12-09 2021-03-19 四川蓉信开工程设计有限公司 Electrical design method for water treatment project

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104682552B (en) * 2015-03-13 2018-10-16 北京百度网讯科技有限公司 System and method for powering for data center
CN104682552A (en) * 2015-03-13 2015-06-03 北京百度网讯科技有限公司 System and method for supplying power to data center
CN104882957A (en) * 2015-06-17 2015-09-02 中国热带农业科学院南亚热带作物研究所 Power supply system of agricultural production base
CN104917288A (en) * 2015-06-30 2015-09-16 遵义市产品质量检验检测院 Laboratory uninterrupted power supply system
CN108832618A (en) * 2018-05-24 2018-11-16 重庆卓创国际工程设计有限公司 Business distribution double power-supply system
CN108879771B (en) * 2018-07-16 2023-10-31 扬州市华东动力机械有限公司 Control system and control method for emergency diesel generator set of offshore wind farm
CN108879771A (en) * 2018-07-16 2018-11-23 扬州市华东动力机械有限公司 A kind of marine wind electric field diesel emergency generating set control system and control method
CN110858714B (en) * 2018-08-24 2024-04-19 阿里巴巴集团控股有限公司 Power supply system and power supply method
CN110858714A (en) * 2018-08-24 2020-03-03 阿里巴巴集团控股有限公司 Power supply system and power supply method
CN109256849A (en) * 2018-11-13 2019-01-22 浙江杰地建筑设计有限公司 It is provided with the hotel's distribution system and its application method of diesel-driven generator
CN109256849B (en) * 2018-11-13 2024-03-12 杰地设计集团有限公司 Hotel power distribution system provided with diesel generator and application method thereof
CN109687570B (en) * 2018-12-17 2021-03-02 国网北京市电力公司 Zero-flicker low-voltage power distribution system and operation method
CN109687570A (en) * 2018-12-17 2019-04-26 国网北京市电力公司 One kind zero flashes low-voltage distribution system and operating method
CN112528371A (en) * 2020-12-09 2021-03-19 四川蓉信开工程设计有限公司 Electrical design method for water treatment project

Similar Documents

Publication Publication Date Title
CN204089328U (en) For the device that hotel Nei Chaifa and civil power switch
CN105656065B (en) A kind of energy storage control system and method
CN104037936A (en) Economical operation control method for distribution transformers with spare power automatic switching function
CN103124103B (en) Electricity utilization system of 10KV station of converter station and mutual switching and reverse switching methods of electricity utilization system through spare power automatic switching
CN204316174U (en) A kind of intelligent double-power automatic change-over
CN207368745U (en) A kind of distribution box for ship of two-way automatic conversion power supply
CN203645325U (en) Double-circuit power supply intelligent communication controller
CN103647280A (en) Intelligent two-circuit feeding connection controller and control method
CN209170039U (en) A kind of automatic redundancy zero propagation switching system of two dc power supply
CN203071647U (en) Low-voltage switch cabinet automatic input and recovery device
CN104377805A (en) Communication station low-voltage distribution system
CN103887873A (en) Power supply standby device for transformer substation achieved based on PLC
CN203850642U (en) Five-prevention simulation screen with series switching special logic system
CN204886390U (en) High pressure dual power supply's wiring circuit
CN204314645U (en) A kind of low-voltage distribution system by screen break-make automaton
CN204376525U (en) A kind of emergency supply circuit
CN103887872A (en) UPS device
CN104734117B (en) A kind of breaker fail protection method of substation
CN202997690U (en) UPS device
CN205051432U (en) High pressure commercial power and generator automatic switching device
CN204794339U (en) System for electrified adoption is hauled oneself willingly into technique fully and is replaced 10kV transformer
CN203813507U (en) PLC-based power supply emergency switching device for transformer station
CN205753620U (en) Flameproof high-voltage switch cubicle controls and the automatic switch-over circuit of protection power supply
CN204216666U (en) A kind of long-range backup auto-activating device
CN103840546B (en) Electric power system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180205

Address after: 116011 No. 539 Changjiang Road, Xigang District, Liaoning, Dalian, China

Patentee after: DALIAN WANDA GROUP Co.,Ltd.

Address before: 100022 Building No. 12, No. 93, building No. 93, Jianguo Road, Beijing City, 22 floor 2601

Patentee before: WANDA INSTITUTE OF HOTEL DESIGN AND RESEARCH Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210617

Address after: 100022 2601, 22 / F, building 12, No. 93, Jianguo Road, Chaoyang District, Beijing

Patentee after: WANDA INSTITUTE OF HOTEL DESIGN AND RESEARCH Co.,Ltd.

Address before: 116011 No. 539 Changjiang Road, Xigang District, Dalian, Liaoning.

Patentee before: DALIAN WANDA GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107