CN204081516U CN201420485558.9U CN201420485558U CN204081516U CN 204081516 U CN204081516 U CN 204081516U CN 201420485558 U CN201420485558 U CN 201420485558U CN 204081516 U CN204081516 U CN 204081516U
Authority
CN
China
Prior art keywords
grouting
bracket
adjustable
pedestal
standard apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420485558.9U
Other languages
Chinese (zh)
Inventor
陈炬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HONGYANG CONSTRUCTION GROUP CO Ltd
Original Assignee
HONGYANG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HONGYANG CONSTRUCTION GROUP CO Ltd filed Critical HONGYANG CONSTRUCTION GROUP CO Ltd
Priority to CN201420485558.9U priority Critical patent/CN204081516U/en
Application granted granted Critical
Publication of CN204081516U publication Critical patent/CN204081516U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of adjustable, plane track standard apparatus building grouting, it comprises pedestal, sleeve pipe and bracket, and described pedestal has the chassis be arranged in parallel, and described chassis is provided with the socket part vertically arranged; Described sleeve pipe is the hollow tube of predetermined dimension length, is provided with at least one axial screw at sleeve upper end; The forked support that described bracket has stud and links in stud upper end; The upright transplanting of described sleeve pipe on the socket part of pedestal, and makes bracket be locked on the screw of sleeve upper end with stud, and namely forming bracket can adjust calibrated altitude arbitrarily, and can obtain the building grouting plane of benchmark for putting steel pipe.

Description

The adjustable, plane track standard apparatus of building grouting
Technical field
The utility model relates to a kind of adjustable, plane track standard apparatus building grouting, espespecially one can be applicable in the work progresss such as ground is laid, base or floor grouting, and calibrated altitude of can providing convenience also reaches the adjustable, plane standard apparatus of grouting flatness.
Background technology
Existing ground is laid or the engineering such as floor level grouting, after usually template is fixing by workman, coordinate grouting car, make concrete pour grouting book office into ready mix concrete car, therefore grouting works cannot height directly after controlled grouting; And on the subsequent action of grouting, still need the machines such as operative's evener or use floating rule leveling, be carry out a grouting works, usually must coordinate the device for measuring height that grout injection location is given tacit consent to, in the hope of correct height, and benchmark when being provided as follow-up modification work.
Use some vertical tubes to be vertically fixed on the predetermined ground of grouting, this vertical tube is provided with an absolute altitude pointer, by so namely in order to indicated altitude, and as the benchmark of cement leveling work.Therefore, existing plane grouting device for measuring height, be difficult to allow workman in follow-up leveling work, make this cement obtain correct horizontal plane, namely its reason is the absolute altitude pointer of this some device for measuring height, is the benchmark of single-point instruction, therefore the leveling work between point and point, still likely there is the situation of elevation difference in its surface, if this is after theing cement solidifies, namely becomes the flaw in construction.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of adjustable, plane track standard apparatus building grouting, it makes design altitude line by setting spot height, then carrys out the concrete structure surface of complete design by each design altitude line; Can reach further and convenient demarcate arbitrarily grouting desired height, and the effect such as comprehensive plane of leveling work after grouting can be obtained.
For solving the problems of the technologies described above, the technical solution of the utility model is:
Build an adjustable, plane track standard apparatus for grouting, it comprises pedestal, sleeve pipe and bracket, and wherein said pedestal has the chassis be arranged in parallel, and described chassis is provided with the socket part vertically arranged; Described sleeve pipe is the hollow tube of predetermined dimension length, is provided with at least one axial screw at sleeve upper end; The forked support that described bracket has stud and links in stud upper end; The upright transplanting of described sleeve pipe on the socket part of pedestal, and makes bracket be locked on the screw of sleeve upper end with stud, and namely forming bracket can adjust calibrated altitude arbitrarily, and can obtain the building grouting plane of benchmark for putting steel pipe.
Compared with prior art, the utility model beneficial effect is as follows: be provided with at least one tubular socket part structure in upper end comprising pedestal, the sleeve pipe (this casing length size is standardized) of a selected scale lengths is uprightly plugged in socket part, and selected sleeve upper end is provided with at least one screw, be formed with the bracket of stud for the bottom that is spirally connected by screw, by forming adjustable, plane standard apparatus like this, conveniently set up separately to utilize some devices and be fixed on grouting predeterminedly (ground or template), and be the level of state with the common support steel pipe of some brackets, namely the comprehensive plane grouting construction benchmark being extended to face by line is obtained.
The utility model further improves as follows:
Further, around the chassis of described pedestal, chosen place is provided with some plumb posts, and is provided with vertical configuration perforation at each pillar.
Further, the socket part of described pedestal can be hollow tube-shape, is provided with some fins and is linked to chassis around it.
Further, described screw can be formed on column base, and makes column base transplanting in sleeve upper end.
Further, around described column base upper end, be provided with flange, described flange is in order to be cross-placed on sleeve upper end.
Accompanying drawing explanation
Fig. 1 is the stereogram of each component decomposing state of the utility model.
Fig. 2 is the stereogram of the utility model partial component assembled state.
Fig. 3 is the section three-dimensional map of each Component composition state of the utility model.
Fig. 4 is the schematic diagram that the utility model bracket can reverse adjustment height.
Fig. 5 is the schematic diagram of its another embodiment of column base of the utility model sleeve pipe.
Fig. 6 is the schematic diagram of its another embodiment of screw of the utility model sleeve pipe.
Fig. 7 is the reference diagram that the utility model distribution is set using state.
Fig. 8 is that the utility model is for the reference diagram putting steel pipe using state.
Wherein: 1. pedestal, 11. chassis, 12. socket parts, 13. pillars, 14. perforation, 15. fins, 2. sleeve pipe, 21. screws, 22. column bases, 23. flanges, 3. bracket, 31. studs, 32. supports, 40. steel pipes.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figures 1 and 2, the adjustable, plane track standard apparatus of the utility model building grouting, it comprises pedestal 1, sleeve pipe 2 and bracket 3.
The structure pedestal that pedestal 1 is integrated or assembled formation is formed.Pedestal 1 has chassis 11 and is arranged at least one upright hollow tube-shape socket part 12 on chassis 11.Chassis 11 surrounding chosen place can be provided with some plumb posts 13, and be provided with perforation 14 at each pillar 13, place for the fixation kit such as screw or iron nail, around hollow tube-shape socket part 12, be provided with some fins 15 again, to promote the firm effect of this socket part 12, avoid thrusting by cement.Sleeve pipe 2 is for manufacturing the hollow tube (its length coordinates general grouting highly to make) of predetermined dimension length in advance, one is provided with in axial screw 21 in sleeve pipe 2 upper end, for the bracket 3 being spirally connected following, the wherein forming mode of this screw 21, for column base 22 transplanting can be selected in sleeve pipe 2 upper end, and be provided with a described screw 21 (as shown in Figures 1 and 2) at this column base 22.Bracket 3 as support steel pipe 40 with obtain by line to the support body of the horizontal reference in face, there is in bottom a stud 31, and this stud 31 upper end is linked with the support 32 of a forked, and this support 32 can be semicircle, U-shaped or V-arrangement etc.As shown in Figure 3 and Figure 4, the upright transplanting of sleeve pipe 2 of designated length is on its socket part 12 of pedestal 1, and make a bracket 3 be locked on the screw 21 of sleeve pipe 2 upper end with its stud 31, namely the building grouting datum plane device that a kind of bracket 3 of the utility model can adjust arbitrarily calibrated altitude is formed, to provide engineerings such as being applied to ground laying, base or floor grouting, can for altitude datum and the leveling benchmark obtaining grouting.
As mentioned above, this sleeve pipe 2 of the utility model is provided with an axial screw 21 and assembles for bracket 3 and form adjustable height state.As shown in Figure 5, wherein this column base 22 can be embodied as the structure around upper end with a flange 23, and is provided with described at least one screw 21 at column base 22 end face, by planting in hollow sleeve 2 upper end like this, obtains simple and easy fixed bit function to utilize this flange 23.Secondly as shown in Figure 6, the utility model also can implement the structure that this hollow sleeve 2 upper end directly has a screw 21, if described bracket 3 also can be provided to assemble like this, adjusts height and the functions such as support steel pipe 40 to reach identical torsion.Like this, be everyly enough to form in sleeve pipe 2 upper end axial screw 21 form, the utility model all can be used enforcement, there is no limitation.
By the utility model provide building grouting adjustable, plane track standard apparatus, it is when practical application, some devices are selected by constructor, utilize pedestal 1 to be fixed on respectively ground or template (are in the milk predeterminedly) and are suitable distribution (as shown in Figure 7), if this, be assembled on pedestal 1 with the sleeve pipe 2 of selected scale lengths and described bracket 3, and each bracket 3 of torsion adjustment highly aligns, steel pipe 40 can be put on bracket 3, and then the altitude datum become when plane is in the milk, and datum plane when can become leveling work and other instruments (as shown in Figure 8) that bridge are provided.Due to, the utility model apparatus design, constructor is after putting steel pipe 40, if namely one steel pipe 40 obtains the datum plane of line, when putting steel pipe 40 parallel or staggered, can reach the benchmark in face further, therefore leveling work can be made certain, improving existing take point as the shortcoming of benchmark.And because putting for steel pipe 40, therefore track structure can be formed as further, to bridge uses for instruments such as eveners, or conveniently move for support grout pipe, therefore another function of existing grouting device for measuring height institute nothing can be reached.
The utility model standard apparatus and steel pipe 40 are after grouting, because selected sleeve pipe 2 length conforms to grouting height, therefore it is made to be the state imbedded in cement, and in the cement that directly indwelling has flattened in surface, therefore by becoming complementary structure like this, promoting this grouting and building thing intensity.
The utility model is not limited to above-mentioned concrete embodiment, and those of ordinary skill in the art is from above-mentioned design, and without performing creative labour, done all conversion, all drop within protection domain of the present utility model.

Claims (5)

1. build an adjustable, plane track standard apparatus for grouting, it comprises pedestal, sleeve pipe and bracket, it is characterized in that: described pedestal has the chassis be arranged in parallel, and described chassis is provided with the socket part vertically arranged; Described sleeve pipe is the hollow tube of predetermined dimension length, is provided with at least one axial screw at sleeve upper end; The forked support that described bracket has stud and links in stud upper end; The upright transplanting of described sleeve pipe on the socket part of pedestal, and makes bracket be locked on the screw of sleeve upper end with stud, and namely forming bracket can adjust calibrated altitude arbitrarily, and can obtain the building grouting plane of benchmark for putting steel pipe.
2. the adjustable, plane track standard apparatus of building grouting as claimed in claim 1, is characterized in that: around the chassis of described pedestal, chosen place is provided with some plumb posts, and is provided with vertical configuration perforation at each pillar.
3. the adjustable, plane track standard apparatus of building grouting as claimed in claim 1, is characterized in that: the socket part of described pedestal can be hollow tube-shape, is provided with some fins and is linked to chassis around it.
4. the adjustable, plane track standard apparatus of building grouting as claimed in claim 1, is characterized in that: described screw can be formed on column base, and makes column base transplanting in sleeve upper end.
5. the adjustable, plane track standard apparatus of building grouting as claimed in claim 4, is characterized in that: be provided with flange around described column base upper end, described flange is in order to be cross-placed on sleeve upper end.
CN201420485558.9U 2014-08-26 2014-08-26 The adjustable, plane track standard apparatus of building grouting Expired - Fee Related CN204081516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420485558.9U CN204081516U (en) 2014-08-26 2014-08-26 The adjustable, plane track standard apparatus of building grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420485558.9U CN204081516U (en) 2014-08-26 2014-08-26 The adjustable, plane track standard apparatus of building grouting

Publications (1)

Publication Number Publication Date
CN204081516U true CN204081516U (en) 2015-01-07

Family

ID=52174249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420485558.9U Expired - Fee Related CN204081516U (en) 2014-08-26 2014-08-26 The adjustable, plane track standard apparatus of building grouting

Country Status (1)

Country Link
CN (1) CN204081516U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424740A (en) * 2019-07-12 2019-11-08 熊家奎 A kind of leveling unit and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424740A (en) * 2019-07-12 2019-11-08 熊家奎 A kind of leveling unit and method

Similar Documents

Publication Publication Date Title
CN205421311U (en) Rag bolt fixes a position mounting tool
CN204081516U (en) The adjustable, plane track standard apparatus of building grouting
CN201650319U (en) Angle installer for anchor bolt
CN108360582A (en) Construction drill-pouring pile center precise localizer
CN100507174C (en) Pre-embedded construction method for PVC casing pipe of prestressed hollow slab hanger rod
CN204040007U (en) Base-line method measures the aid of top, foundation ditch slope horizontal distortion
CN204531443U (en) A kind of floor bar arranging distance control tool
CN103575191B (en) The proving installation of foundation model test failure surface
CN107063178B (en) Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof
CN210831214U (en) Tripod for mapping engineering
CN205276335U (en) Nonmetal anti -floating anchor rod and concrete interface relative slippage testing arrangement
CN205078188U (en) Rig mount with adjustable
CN204988274U (en) Building laser grade rod
CN204027565U (en) A kind of mountain channel water depth measuring system
JP3193735U (en) Automatic level adjuster
CN203430034U (en) Fixing tool for locating pre-buried sleeve of cast-in-place slab
CN203132551U (en) Building wall type measuring-observing pillar
CN206847598U (en) Chi support frame is found in settlement observation
CN104747168B (en) A kind of method of direct measurement directional well engineering angular difference
CN204421887U (en) Building settlement measures structure
CN205713104U (en) Civil engineering basic mode side head part
CN205745678U (en) The construction positioner of embedding pipe fittings
CN104563095A (en) Novel enclosure system of soft-hard occlusion piles and construction method
CN204959586U (en) Channel device of soft base face declivity
CN104294850A (en) Auxiliary tool for masonry of round inspection well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20150826