CN204078692U - High-tension coil shell production facilities feed arrangement - Google Patents

High-tension coil shell production facilities feed arrangement Download PDF

Info

Publication number
CN204078692U
CN204078692U CN201420539416.6U CN201420539416U CN204078692U CN 204078692 U CN204078692 U CN 204078692U CN 201420539416 U CN201420539416 U CN 201420539416U CN 204078692 U CN204078692 U CN 204078692U
Authority
CN
China
Prior art keywords
coil shell
tension coil
production facilities
feed arrangement
raw material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420539416.6U
Other languages
Chinese (zh)
Inventor
董叶根
蒋凯华
梁朱勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAIYAN AIJIAN AUTOMOBILE ELECTRIC APPLIANCE Co Ltd
Original Assignee
HAIYAN AIJIAN AUTOMOBILE ELECTRIC APPLIANCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIYAN AIJIAN AUTOMOBILE ELECTRIC APPLIANCE Co Ltd filed Critical HAIYAN AIJIAN AUTOMOBILE ELECTRIC APPLIANCE Co Ltd
Priority to CN201420539416.6U priority Critical patent/CN204078692U/en
Application granted granted Critical
Publication of CN204078692U publication Critical patent/CN204078692U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides high-tension coil shell production facilities feed arrangement, comprise the feed arrangement being located at high-tension coil shell production facilities feed end, described feed arrangement comprise the permanent seat be fixed on fire coil shell production facilities, be located on permanent seat for set-point fire coil shell make raw material inhibiting device, be located at the propelling unit that permanent seat coordinates with inhibiting device.Can realize automatic feeding, structure is simple, and easy and simple to handle, labour intensity is low, safety of operation, and work efficiency is high, and can remind the deficiency of material timely and effectively, can avoid machine dry running by actv..

Description

High-tension coil shell production facilities feed arrangement
Technical field
The utility model relates to mechanical field, is specifically related to high-tension coil shell production facilities feed arrangement.
Background technology
The high-tension coil of driving engine provides high potential for the light-up plug to driving engine, obtains comprehensively universal in present auto trade, and when production fire coil shell, still generally use now and manually carry out punching press and be made, in the process made, inefficiency, cost is high, labor intensity is high, and, during by manually carrying out being transported on punching machine, more dangerous, safety factor is low, stamping forming time, also easily produce potential safety hazard.
Summary of the invention
Technical problem to be solved in the utility model is to provide high-tension coil shell production facilities feed arrangement, automatic feeding can be realized, structure is simple, easy and simple to handle, labour intensity is low, safety of operation, and work efficiency is high, and the deficiency of material can be reminded timely and effectively, machine dry running can be avoided by actv..
For solving above-mentioned existing technical matters, the utility model adopts following scheme: high-tension coil shell production facilities feed arrangement, comprise the feed arrangement being located at high-tension coil shell production facilities feed end, described feed arrangement comprise the permanent seat be fixed on fire coil shell production facilities, be located on permanent seat for set-point fire coil shell make raw material inhibiting device, be located at the propelling unit that permanent seat coordinates with inhibiting device.
As preferably, described inhibiting device comprises blowing plate, four position-limited levers be located on blowing plate, described blowing plate is provided with one and makes with high-tension coil shell the blanking hole that raw material mates, described four position-limited lever uniform ring are located at blanking hole surrounding, described position-limited lever bottom inside and blanking hole tangent, described blowing plate is fixed on permanent seat by four strut bars.Structure is simple, safety of operation, in real work, high-tension coil shell makes raw material and is positioned between four position-limited levers, making raw material by four position-limited levers to high-tension coil shell carries out spacing, be placed on after on blowing plate when high-tension coil shell makes raw material, several pieces of high-tension coil shells of bottommost make raw material and are positioned at blanking hole, and by position-limited lever bottom inside and blanking hole tangent, then actv. ensures after nethermost one piece of high-tension coil shell making raw material is conveyed to processing, high-tension coil shell above makes raw material and can supplement timely and effectively, high-tension coil shell makes raw material in the process moved down, there will not be the phenomenon by blowing plate is shelved to occur, make the conveying of high-tension coil shell making raw material more fast smooth and easy, and four position-limited levers also can carry out spacing to high-tension coil shell making raw material by actv., prevent from high-tension coil shell from making raw material to drop from blowing plate, make placement more steadily safety.
As preferably, described position-limited lever is provided with the first inductor making raw material height for inductive ignition coil case.In the process of processing, when being placed on the position that the making of the high-tension coil shell on inhibiting device raw material height is responded to lower than the first inductor, due to the first inductor cannot sense that high-tension coil shell makes the existing of raw material time, first inductor sends signal to controller, can be reported to the police to alarm device by controller, find that high-tension coil shell makes the deficiency of raw material timely with person easy to use.
As preferably, described propelling unit comprise be located at blowing plate lower end and coordinate with blowing plate delivery sheet, be located at inhibiting device side for promoting the propulsion cylinder of delivery sheet movement, described delivery sheet is provided with the chute feeder that a diameter is greater than blanking hole, and described permanent seat is provided with the symmetrical slide rail of two of sliding delivery sheet.Described delivery sheet is slided by slide rail, during real work, delivery sheet and blowing plate adopt the mode of transition fit to be connected, high-tension coil shell is made raw material and is supported by delivery sheet, wherein the degree of depth of chute feeder and high-tension coil shell make the consistency of thickness of raw material, the size of chute feeder makes raw material slightly larger than high-tension coil shell, when inhibiting device there being high-tension coil shell make raw material, one piece of high-tension coil shell making raw material bottommost is positioned at chute feeder, by controlling propulsion cylinder, delivery sheet is moved forward along slide rail, the high-tension coil shell making raw material being positioned at chute feeder is fed forward by chute feeder and carries out processing to high-tension coil shell production facilities, after high-tension coil shell making raw material is conveyed to processing, control it by propulsion cylinder again and return to original position, thus realize repeating conveying, and the size of chute feeder is greater than blanking hole, high-tension coil shell then can be made to make raw material more convenient when entering chute feeder, there will not be high-tension coil shell to make raw material and cannot enter phenomenon generation in blanking groove, in the process that the high-tension coil shell making raw material of bottommost is transferred away, remaining high-tension coil shell is made raw material and can be supported by delivery sheet.
As preferably, described delivery sheet comprises the mainboard be connected with propulsion cylinder, the subplate spliced with mainboard, described high-tension coil shell production facilities is provided with one and coordinates the second inductor making raw material for inductive ignition coil case with chute feeder, and described subplate is provided with a draw-in groove coordinated with the second inductor.Described second inductor adopts touching type induction device, when high-tension coil shell making raw material is brought by delivery sheet, second inductor just makes contact raw by draw-in groove and high-tension coil shell, when the second inductor senses that high-tension coil shell makes raw material, machine normally can carry out follow-up processing, when not having high-tension coil shell to make raw material in chute feeder, induction place on second inductor then just not with object contact, when not touching object in the regular hour, second inductor sends signal to controller, control propelling unit by controller to rerun, until the second inductor senses that high-tension coil shell makes after raw material, carry out follow-up processing again, can avoid machine in real work, occur the phenomenon of dry running by actv..
Beneficial effect:
The utility model adopts technique scheme to provide high-tension coil shell production facilities feed arrangement, high-tension coil shell is made raw material to be placed on inhibiting device, by inhibiting device, actv. carries out to it spacing fixing, then by propelling unit, the high-tension coil shell making raw material on inhibiting device is flowed to high-tension coil shell production facilities successively to process, thus realize in the process of complete automatic feeding, without the need to manually carrying in the process of feeding, fire coil shell making raw material only need be placed on inhibiting device and just can realize in the process of automatic transport by staff, structure is simple, easy and simple to handle, labour intensity is low, safety of operation, work efficiency is high, the deficiency of material can be reminded timely and effectively, machine dry running can be avoided by actv..
Accompanying drawing explanation
Fig. 1 is the mounting structure schematic diagram of the utility model and high-tension coil shell production facilities;
Fig. 2 is structural representation of the present utility model.
Detailed description of the invention
As depicted in figs. 1 and 2, high-tension coil shell production facilities feed arrangement, high-tension coil shell production facilities feed arrangement, comprise the feed arrangement 1 being located at high-tension coil shell production facilities 3 feed end, described feed arrangement 1 comprise the permanent seat 5 be fixed on fire coil shell production facilities 3, be located on permanent seat 5 for set-point fire coil shell make raw material inhibiting device 9, be located at the propelling unit 7 that permanent seat 5 coordinates with inhibiting device 9.Described inhibiting device 9 comprises blowing plate 14, four position-limited levers 12 be located on blowing plate 14, described blowing plate 14 is provided with one and makes with high-tension coil shell the blanking hole 11 that raw material mates, described four position-limited lever 12 uniform ring are located at blanking hole 11 surrounding, described position-limited lever 12 bottom inside and blanking hole 11 tangent, described blowing plate 14 is fixed on permanent seat 5 by four strut bars 15.Described position-limited lever 12 is provided with the first inductor 10 making raw material height for inductive ignition coil case.Described propelling unit 7 comprise be located at blowing plate 14 lower end and coordinate with blowing plate 14 delivery sheet 13, be located at inhibiting device 9 side for promoting the propulsion cylinder 4 of delivery sheet 13 movement, described delivery sheet 13 is provided with the chute feeder 13 that a diameter is greater than blanking hole 10, and described permanent seat 5 is provided with the symmetrical slide rail 6 of two of sliding delivery sheet 13.Described delivery sheet 13 comprises the mainboard 8 be connected with propulsion cylinder 4, the subplate 18 spliced with mainboard 8, described high-tension coil shell production facilities 3 is provided with one and coordinates the second inductor 2 making raw material for inductive ignition coil case with chute feeder 16, and described subplate 18 is provided with a draw-in groove 17 coordinated with the second inductor 2.
During real work, making raw material circular metal plate by needing the high-tension coil shell of processing is placed on blowing plate 14, by four position-limited levers 12, it is carried out to the restriction of position, due to position-limited lever 12 bottom inside and blanking hole 11 tangent, blanking hole 11 can be positioned at when high-tension coil shell makes several blocks of raw materials that raw material to be placed on after on blowing plate 14 bottom always, wherein one block of high-tension coil shell making raw material of bottommost is just positioned at the chute feeder 13 on delivery sheet 13, when feeding time, by propulsion cylinder 4 driven forward, make delivery sheet 13 along slide rail 6 forward slip, high-tension coil shell in chute feeder 13 is made raw material carry, when inlet casing 4 runs to foremost, second inductor 2 is just positioned at draw-in groove 17, induction point and the high-tension coil shell of the second inductor 2 make contact raw, then send a signal to high-tension coil shell production facilities 3 by the second inductor 2 and carry out follow-up processing, after the high-tension coil shell making raw material in chute feeder 13 is extracted, delivery sheet 13 is retracted original position and carries out Next conveying by propulsion cylinder 4, if when because high-tension coil shell makes that raw material does not obtain that actv. supplements, the chute feeder 13 of sky advances by propulsion cylinder 4, second inductor 2 senses that within the regular hour high-tension coil shell makes raw material, then follow-up processing can not run, simultaneously can by controller control propulsion cylinder 4 carry out return repeat export, until just can follow-up processing be carried out when the second inductor 2 senses the material in chute feeder 13, the present generation of high-tension coil shell production facilities 3 dry running can be avoided by actv., in the process exported, when the high-tension coil shell making raw material on inhibiting device 9 is less than certain quantity, first inductor 10 cannot sense that high-tension coil shell makes the existence of raw material, then can send signal to controller, reported to the police by controller, thus facilitate staff to supplement high-tension coil shell making raw material timely and effectively, structure is simple, easy and simple to handle, labour intensity is low, safety of operation, work efficiency is high, the deficiency of material can be reminded timely and effectively, machine dry running can be avoided by actv..
Specific embodiment described herein is only to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present utility model or surmount the scope that appended claims defines.

Claims (5)

1. high-tension coil shell production facilities feed arrangement, comprise the feed arrangement (1) being located at high-tension coil shell production facilities (3) feed end, it is characterized in that: described feed arrangement (1) comprises the permanent seat (5) be fixed on fire coil shell production facilities (3), be located on permanent seat (5) for set-point fire coil shell make raw material inhibiting device (9), be located at the upper propelling unit (7) coordinated with inhibiting device (9) of permanent seat (5).
2. high-tension coil shell production facilities feed arrangement according to claim 1, it is characterized in that: described inhibiting device (9) comprises blowing plate (14), be located at four position-limited levers (12) on blowing plate (14), described blowing plate (14) is provided with one and makes with high-tension coil shell the blanking hole (11) that raw material mates, described four position-limited lever (12) uniform ring are located at blanking hole (11) surrounding, described position-limited lever (12) bottom inside and blanking hole (11) tangent, described blowing plate (14) is fixed on permanent seat (5) by four strut bars (15).
3. high-tension coil shell production facilities feed arrangement according to claim 2, is characterized in that: described position-limited lever (12) is provided with the first inductor (10) making raw material height for inductive ignition coil case.
4. high-tension coil shell production facilities feed arrangement according to claim 2, it is characterized in that: described propelling unit (7) comprise be located at blowing plate (14) lower end and coordinate with blowing plate (14) delivery sheet (13), be located at inhibiting device (9) side for promoting the propulsion cylinder (4) of delivery sheet (13) movement, described delivery sheet (13) is provided with the chute feeder (13) that a diameter is greater than blanking hole (10), and described permanent seat (5) is provided with the symmetrical slide rail (6) of two of sliding delivery sheet (13).
5. high-tension coil shell production facilities feed arrangement according to claim 4, it is characterized in that: described delivery sheet (13) comprises the mainboard (8) be connected with propulsion cylinder (4), the subplate (18) spliced with mainboard (8), described high-tension coil shell production facilities (3) is provided with one and coordinates the second inductor (2) making raw material for inductive ignition coil case with chute feeder (16), and described subplate (18) is provided with a draw-in groove (17) coordinated with the second inductor (2).
CN201420539416.6U 2014-09-19 2014-09-19 High-tension coil shell production facilities feed arrangement Expired - Fee Related CN204078692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420539416.6U CN204078692U (en) 2014-09-19 2014-09-19 High-tension coil shell production facilities feed arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420539416.6U CN204078692U (en) 2014-09-19 2014-09-19 High-tension coil shell production facilities feed arrangement

Publications (1)

Publication Number Publication Date
CN204078692U true CN204078692U (en) 2015-01-07

Family

ID=52171431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420539416.6U Expired - Fee Related CN204078692U (en) 2014-09-19 2014-09-19 High-tension coil shell production facilities feed arrangement

Country Status (1)

Country Link
CN (1) CN204078692U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111390560A (en) * 2020-01-21 2020-07-10 杭州传智自动化科技有限公司 Full-automatic chain wheel tapping mechanism with thread detection function and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111390560A (en) * 2020-01-21 2020-07-10 杭州传智自动化科技有限公司 Full-automatic chain wheel tapping mechanism with thread detection function and using method thereof
CN111390560B (en) * 2020-01-21 2021-04-16 杭州传智自动化科技有限公司 Full-automatic chain wheel tapping mechanism with thread detection function and using method thereof

Similar Documents

Publication Publication Date Title
CN104308034B (en) Ignition coil shell automatic producing device
CN204035405U (en) Ignition coil shell automatic producing device
CN204817763U (en) Punch press automatic feed device
CN104139982A (en) Punching material collecting and disc arranging machine
CN204603120U (en) The feeding device of sheet material
CN109366125A (en) A kind of press bending apparatus of terminal
CN204896691U (en) Rod conveying equipment
CN203140906U (en) Automatic tapping machine
CN204078692U (en) High-tension coil shell production facilities feed arrangement
CN104150218B (en) A kind of automatic clamping and placing product device
CN204473252U (en) A kind of modified form bearing vanning is with automatically supplying case apparatus
CN203265382U (en) Production line for machining pipes
CN202963471U (en) Automatic feeding device for lathe
CN106898933A (en) A kind of preparation method with the U.S. rule inserted sheet of fuse and automatic riveting press
CN205110654U (en) Motor transmission gear swaging machine convenient to get and put blank
CN203269037U (en) Automatic blanking conveyer belt
CN203649180U (en) Air spring valve body riveting machine
CN203450796U (en) Automatic medicine bottle feeding device
CN202192169U (en) Punching equipment
CN205905459U (en) Full automatic feeding of hydraulic press
CN206451963U (en) It is a kind of to be used to prepare the automatic riveting press with fuse U.S. rule inserted sheet
CN201832873U (en) Automatic plate bending machine
CN205128695U (en) Bender feed mechanism
CN205771743U (en) A kind of clothes and toys produce by intelligence feeding system
CN204819762U (en) A automation equipment that is used for plastics product to cut mouth of a river

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20160919