- CN204057649U CN204057649U CN201420214613.0U CN201420214613U CN204057649U CN 204057649 U CN204057649 U CN 204057649U CN 201420214613 U CN201420214613 U CN 201420214613U CN 204057649 U CN204057649 U CN 204057649U
- Authority
- CN
- China
- Prior art keywords
- pipe link
- bar
- cross members
- steel rope
- base cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model relates to a kind of lifting basket for building, comprise top cross-bar and base cross members, connected by head rod between top cross-bar, connected by the second pipe link between base cross members, between top cross-bar and base cross members, correspondence arranges the 3rd pipe link, 3rd pipe link two ends arrange chute, base cross members both ends correspondence arranges fixed plate, fixed plate and bending-type lever hinged, bending-type lever comprises power rail and drag strut, and the bottom of drag strut is fixedly connected with contiguous 3rd pipe link bottom by screw rod; Wherein, in two base cross members, the top of power rail is fixedly connected with the two ends of the first steel rope; Power rail top in another base cross members is fixedly connected with the two ends of the second steel rope, and arrange steel pipe between the first steel rope and the second steel rope, steel pipe connects Lift hook by steel rope; Top cross-bar two ends arrange pulley.The utility model structure is simple, and without the need to manually, time saving and energy saving, work efficiency is high, safe and reliable, long service life.
Description
Technical field
The utility model relates to a kind of hoisting frame, is specifically related to a kind of lifting basket for building.
Background technology
In building engineering, need frequent building block, brick etc. to be carried out handling, current method of operation is for be manually placed on preprepared lifting basket by building block, brick etc., be suspended on hook with steel rope again, lifting basket is held up by least two people again, lift again, manually unload again after reaching position.The lifting time is long, and efficiency is low, and service life is short, and cost is high.
Utility model content
The purpose of this utility model provides a kind of lifting basket for building, and structure is simple, is easy to operation, and without the need to manually, the lifting time is short, and efficiency is high, safe and reliable, and long service life, and cost is low.
A kind of lifting basket for building of the utility model, comprise top cross-bar and base cross members, connected by head rod between top cross-bar, connected by the second pipe link between base cross members, between top cross-bar and base cross members, correspondence arranges the 3rd pipe link, 3rd pipe link two ends arrange chute, base cross members both ends correspondence arranges fixed plate, fixed plate and bending-type lever hinged, bending-type lever comprises power rail and drag strut, and the bottom of drag strut is fixedly connected with contiguous 3rd pipe link bottom by screw rod; Wherein, in two base cross members, the top of power rail is fixedly connected with the two ends of the first steel rope; Power rail top in another base cross members is fixedly connected with the two ends of the second steel rope, and arrange steel pipe between the first steel rope and the second steel rope, steel pipe connects Lift hook by steel rope; Top cross-bar two ends arrange pulley.
Steel rope between steel pipe and power rail top walks around pulley.Actv. protection steel rope, increases the life-span of steel rope.
Top cross-bar and the middle correspondence of base cross members arrange strut bar.
The bottom of strut bar arranges locating dowel pin.With locating dowel pin, bending-type lever is pressed onto bottom before use to strut, making lifting basket that enough spaces can be had to be inserted in needs hanging belt article.
Support bar top arranges fastening disk, and fastening disk is connected with the 3rd pipe link of both sides by steel rope.Material is clamped by lifting basket top.
Power rail and drag strut point of connection are fulcrum, fulcrum and fixed plate hinged.
The end of top cross-bar and base cross members all arranges barrier sheet.Barrier sheet prevents from the 3rd pipe link from outwards sliding coming off further.
Arrange oblique reinforced rib in the rectangular box that head rod, the second pipe link and the 3rd pipe link surround, the bottom of the 3rd pipe link is fixed by screw rod and catch.Material can better be fixed by baffle plate, and prevents because material is under pressure too large squeezed broken.And effectively prevent material from dropping, bring potential safety hazard.
Bottom the rectangular box that head rod, the second pipe link and the 3rd pipe link surround, plank is set.
Base cross members arranges hook, by mounting the safe end or safety net.When needs upper air installing, hook mounts the safe end.The further safety ensureing lifting basket, what prevent from mincing drops.
Power rail and drag strut are that integral type is arranged, the angle between power rail and drag strut preferably 150 degree.
Top cross-bar, base cross members, head rod, the second pipe link and the 3rd pipe link surround a cube structure jointly.
In lifting basket, the setting of lever can make lifting basket automatically be fastened by material clamp, without the need to manpower, greatly saves human cost.
Lifting step: say that bending-type lever is pressed onto strut bar bottom, fix with locating dowel pin, lifting basket is directly anchored to and lays bricks or on the article such as common brick, tangle Lift hook with hoisting machine, slowly pull-up, steel rope pulls on power rail and carries, power rail drives drag strut, drag strut pulls the 3rd pipe link to weigh along bottom will to lay bricks to middle shrinkage or the article clip such as common brick fastens, and material top is also clamped by steel rope and fastening disk by the 3rd pipe link, finally by the bottom of safety or safety net hang over hook and go up.
Compared with prior art, the utility model has following beneficial effect:
The utility model is simple and reasonable, is easy to operation, without the need to manually, time saving and energy saving, and the lifting time is short, and work efficiency is high, safe and reliable, and long service life, saves cost.
Accompanying drawing explanation
The block diagram of Fig. 1, lifting basket;
The left view of Fig. 2, lifting basket;
In figure, 1, top cross-bar, 2, head rod, 3, oblique reinforced rib, 4, the 3rd pipe link, 5, plank, the 6, second pipe link, 7, barrier sheet, 8, link up with, 9, base cross members, 10, strut bar, 11, locating dowel pin, 12, power rail, 13, fixed plate, 14, baffle plate, 15, screw rod, 16, drag strut, 17-1, the first steel rope, 17-2, the second steel rope, 18, pulley, 19, fastening disk, 20, Lift hook, 21, steel pipe, 22, chute.
Detailed description of the invention
Below in conjunction with embodiment, the utility model is further described.
Embodiment
As shown in Figure 1-2, a kind of lifting basket for building, comprise top cross-bar 1 and base cross members 9, connected by head rod 2 between top cross-bar 1, connected by the second pipe link 6 between base cross members 9, between top cross-bar 1 and base cross members 9, correspondence arranges the 3rd pipe link 4,3rd pipe link 4 two ends arrange chute 22, base cross members 9 both ends correspondence arranges fixed plate 13, fixed plate 13 is hinged with bending-type lever, bending-type lever comprises power rail 12 and drag strut 16, and the bottom of drag strut 16 is fixedly connected with contiguous 3rd pipe link 4 bottom by screw rod 15; Wherein, in two base cross members 9, the top of power rail 12 is fixedly connected with the two ends of the first steel rope 17-1; Power rail 12 top in another base cross members 9 is fixedly connected with the two ends of the second steel rope 17-2, arranges steel pipe 21 between the first steel rope 17-1 and the second steel rope 17-2, and steel pipe 21 connects Lift hook 20 by steel rope; Top cross-bar 1 two ends arrange pulley 18.
Top cross-bar 1 and the middle correspondence of base cross members 9 arrange strut bar 10.
The bottom of strut bar 10 arranges locating dowel pin 11.
Strut bar 10 top arranges fastening disk 19, and fastening disk 19 is connected with the 3rd pipe link 4 of both sides by steel rope.
Power rail 12 and drag strut 16 point of connection are fulcrum, fulcrum and fixed plate 13 hinged.
The end of top cross-bar 1 and base cross members 9 all arranges barrier sheet 7.
The bottom arranging oblique reinforced rib the 3, three pipe link 4 in the rectangular box that head rod 2, second pipe link 6 and the 3rd pipe link 4 surround is fixed by screw rod and catch 14.
Bottom the rectangular box that head rod 2, second pipe link 6 and the 3rd pipe link 4 surround, plank 5 is set.
Base cross members 9 arranging hook 8, mounting the safe end or safety net by linking up with 8.
Lifting step: say that bending-type lever is pressed onto strut bar 10 bottom, fix with locating dowel pin 11, lifting basket is directly anchored to and lays bricks or on the article such as common brick, Lift hook 20 is tangled with hoisting machine, slowly pull-up, steel rope pulls on power rail 12 and carries, power rail 12 drives drag strut 16, drag strut 16 pulls the 3rd pipe link 4 to weigh along bottom will to lay bricks to middle shrinkage or the article clip such as common brick fastens, material top is also clamped by steel rope and fastening disk 19 by the 3rd pipe link 4, finally will hang at the bottom of safety on hook 8.
Claims (9)
1. a lifting basket for building, comprise top cross-bar (1) and base cross members (9), it is characterized in that, connected by head rod (2) between top cross-bar (1), connected by the second pipe link (6) between base cross members (9), between top cross-bar (1) and base cross members (9), correspondence arranges the 3rd pipe link (4), 3rd pipe link (4) two ends arrange chute (22), base cross members (9) both ends correspondence arranges fixed plate (13), fixed plate (13) is hinged with bending-type lever, bending-type lever comprises power rail (12) and drag strut (16), the bottom of drag strut (16) is fixedly connected with contiguous 3rd pipe link (4) bottom by screw rod (15), wherein, the top of two upper power rails (12) of base cross members (9) is fixedly connected with the two ends of the first steel rope (17-1), power rail (12) top in another base cross members (9) is fixedly connected with the two ends of the second steel rope (17-2), arrange steel pipe (21) between first steel rope (17-1) and the second steel rope (17-2), steel pipe (21) connects Lift hook (20) by steel rope, top cross-bar (1) two ends arrange pulley (18).
2. lifting basket for building according to claim 1, is characterized in that, top cross-bar (1) and the middle correspondence of base cross members (9) arrange strut bar (10).
3. lifting basket for building according to claim 2, is characterized in that, the bottom of strut bar (10) arranges locating dowel pin (11).
4. lifting basket for building according to claim 2, is characterized in that, strut bar (10) top arranges fastening disk (19), and fastening disk (19) is connected with the 3rd pipe link (4) of both sides by steel rope.
5. lifting basket for building according to claim 1, is characterized in that, power rail (12) and drag strut (16) point of connection are fulcrum, fulcrum and fixed plate (13) hinged.
6. lifting basket for building according to claim 1, is characterized in that, the end of top cross-bar (1) and base cross members (9) all arranges barrier sheet (7).
7. lifting basket for building according to claim 1, it is characterized in that, arrange oblique reinforced rib (3) in the rectangular box that head rod (2), the second pipe link (6) and the 3rd pipe link (4) surround, the bottom of the 3rd pipe link (4) is fixed by screw rod and catch (14).
8. lifting basket for building according to claim 1, is characterized in that, arranges plank (5) bottom the rectangular box that head rod (2), the second pipe link (6) and the 3rd pipe link (4) surround.
9. lifting basket for building according to claim 1, is characterized in that, base cross members (9) arranges hook (8), mounts the safe end or safety net by hook (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420214613.0U CN204057649U (en) | 2014-04-29 | 2014-04-29 | Lifting basket for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420214613.0U CN204057649U (en) | 2014-04-29 | 2014-04-29 | Lifting basket for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204057649U true CN204057649U (en) | 2014-12-31 |
Family
ID=52199205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420214613.0U Expired - Fee Related CN204057649U (en) | 2014-04-29 | 2014-04-29 | Lifting basket for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204057649U (en) |
-
2014
- 2014-04-29 CN CN201420214613.0U patent/CN204057649U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2912031Y (en) | Live replacing device for strain 4-string insulator string | |
CN201215876Y (en) | Assistant hanging rack for mounting top rack of electric pole | |
CN204057649U (en) | Lifting basket for building | |
CN203660422U (en) | 500 kV overhead ground wire lifting tool | |
CN205034948U (en) | Rack formula hanging beam device | |
CN202373909U (en) | Self-locking insulating hook | |
CN203333145U (en) | Self-separation type special lifting tool for cylinder-shaped proximate matter | |
CN211664541U (en) | Safety protection device for suspended transportation rope of high-rise building | |
CN203754232U (en) | Simple steel rail lifting tool | |
CN203820293U (en) | Outward expansion type simple and rapid clamping device for motor casing | |
CN202323725U (en) | Hanging basket device for bridge construction | |
CN201794060U (en) | Suspended down-the-hole steel gate | |
CN202575686U (en) | Self-tightening type lifting appliance | |
CN206680091U (en) | A kind of large-scale transport hoist | |
CN105060154A (en) | Suspension installation machine of suspended load type transformer | |
CN206328045U (en) | A kind of steel structure truss self adaptation hoisting structure | |
CN205901172U (en) | Nearly pole of transmission line overhauls corridor hanger device | |
CN204873471U (en) | Converter cast iron welt hoist device that insulates against heat | |
CN205442472U (en) | Cable suspension device is used in workshop | |
CN203889899U (en) | Lifting appliance for lifting steel components | |
CN202162373U (en) | Simple automatic lifting appliance | |
CN204858412U (en) | Distribution lines cable and wire tied in a bundle set up and pass through ware with sharp pole | |
CN204588440U (en) | A kind of color steel watt transport suspension bracket | |
CN204224090U (en) | A kind of hanging basket | |
CN204038871U (en) | Maize harvesting machine silo fast hoisting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20170429 |
|