CN204041072U - Raw coal tubulose roadway conveying system is equipped - Google Patents

Raw coal tubulose roadway conveying system is equipped Download PDF

Info

Publication number
CN204041072U
CN204041072U CN201420482380.2U CN201420482380U CN204041072U CN 204041072 U CN204041072 U CN 204041072U CN 201420482380 U CN201420482380 U CN 201420482380U CN 204041072 U CN204041072 U CN 204041072U
Authority
CN
China
Prior art keywords
coal
self
foot end
conveyor
movable foot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420482380.2U
Other languages
Chinese (zh)
Inventor
胡坤
郭永存
李德永
王爽
彭洪洲
张勇杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201420482380.2U priority Critical patent/CN204041072U/en
Application granted granted Critical
Publication of CN204041072U publication Critical patent/CN204041072U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model discloses a kind of raw coal tubulose roadway conveying system equipment to be made up of drag conveyor, coal-winning machine, bridge conveyor, secondary breaker, self-movable foot end and scalable pipe conveyer; Along with the propelling of work plane, drag conveyor advances, bridge conveyor advances thereupon, such self-movable foot end can move forward thereupon, self-movable foot end reach promotes the contraction of scalable pipe conveyer and then realizes reach, whole like this transportation all can be carried out at work, achieves the continuous of transport.The utility model can realize continuity and the automation of Coal Transport; The utility model adopts secondary breaker to carry out fragmentation to coal simultaneously, then uses scalable pipe conveyer to transport, coal particles can be made like this to diminish, in transportation, dust reduces, and not easily drop, greatly improve the working environment in haulage way, achieve green transport.

Description

Raw coal tubulose roadway conveying system is equipped
Technical field
The utility model belongs to underground coal mine transportation equipment technical field, is specifically related to raw coal tubulose roadway conveying system equipment.
Background technology
At present, in long-armed mechanization comprehensive coal mining process, along with the propelling of mining, elevating conveyor advances, and the belt conveyor tail be attached thereto also will move respective distance.Like this, along with the propelling of fully-mechanized mining working, belt conveyor tail and middle frame need to shut down frequently and dismantle, and have had a strong impact on the output in operating efficiency under mine and colliery.
Meanwhile, in general fortune coal process, coal is mostly adopt elevating conveyor then to reprint common Leather Belt Conveyance through one-level crushing engine, and the coal particles so only through one-level crusher in crushing is comparatively large, is easily scattered.And common grooved conveyer transport easily produces dust, coal is also easily scattered, and causes certain potential safety hazard.
Summary of the invention
For above problem, the utility model provides a kind of raw coal tubulose roadway conveying system to equip, and the automatic transportation realizing coal in coal mining process transports with green.
For achieving the above object, the technical scheme that the utility model adopts is: raw coal tubulose roadway conveying system equipment is made up of drag conveyor, coal-winning machine, control centre, bridge conveyor, secondary breaker, self-movable foot end and scalable pipe conveyer.Described coal-winning machine is seated on drag conveyor fuselage, and coal-winning machine directly falls on drag conveyor from the coal rib is adopted, and then transports to bridge conveyor by scraper chain; Described bridge conveyor is positioned at the afterbody of drag conveyor, and one end is connected with drag conveyor, and the other end is connected with self-movable foot end, plays the effect of reprinting in centre; Described bridge conveyor is equipped with secondary breaker, and coal is being transported to self-movable foot end after two-stage crushing crusher machine; Described self-movable foot end one end is connected with bridge conveyor, and one end is connected with scalable pipe conveyer; Described scalable pipe conveyer one end is connected with self-movable foot end, and coal, to main haulage roadway, is transported to well head through this by one end.
Compared with prior art, the utility model has following advantage: the utility model can realize continuity and the automation of Coal Transport; The utility model adopts secondary breaker to carry out fragmentation to coal simultaneously, then uses scalable pipe conveyer to transport, coal particles can be made like this to diminish, in transportation, dust reduces, and not easily drop, greatly improve the working environment in haulage way, achieve green transport.
Accompanying drawing explanation
Fig. 1 is raw coal tubulose roadway conveying system equipment schematic diagram, comprises the scalable pipe conveyer of 1. drag conveyor 2. coal-winning machine 3. secondary breaker 4. bridge conveyor 5. self-movable foot end 6.;
Detailed description of the invention
Be below specific embodiment of the utility model and by reference to the accompanying drawings, the technical solution of the utility model be further described.
As shown in Figure 1, raw coal tubulose roadway conveying system equipment is made up of drag conveyor 1, coal-winning machine 2, secondary breaker 3, bridge conveyor 4, self-movable foot end 5 and scalable pipe conveyer 6.Described coal-winning machine 2 is seated on drag conveyor 1 fuselage, and coal-winning machine 2 directly falls on drag conveyor 1 from the coal rib is adopted, and then transports to bridge conveyor 4 by scraper chain; Described bridge conveyor 4 is positioned at the afterbody of drag conveyor 1, and one end is connected with drag conveyor 1, and the other end is connected with self-movable foot end 5, plays the effect of reprinting in centre; Described bridge conveyor 4 is equipped with secondary breaker 3, and coal is being transported to self-movable foot end 5 after secondary breaker 3 fragmentation; Described self-movable foot end 5 one end is connected with bridge conveyor 4, and one end is connected with scalable pipe conveyer 6; Described scalable pipe conveyer 6 one end is connected with self-movable foot end 5, and coal, to main haulage roadway, is transported to well head through this by one end.Along with the propelling of work plane, drag conveyor 1 advances, bridge conveyor 4 advances thereupon, such self-movable foot end 5 can move forward thereupon, self-movable foot end 5 reach promotes the contraction of scalable pipe conveyer 6 and then realizes reach, whole like this transportation all can be carried out at work, achieves the continuous of transport.

Claims (1)

1. raw coal tubulose roadway conveying system equipment, it is characterized in that: comprise coal-winning machine, drag conveyor, bridge conveyor, secondary breaker, self-movable foot end and scalable pipe conveyer, described coal-winning machine rides on drag conveyor and works, described drag conveyor is arranged on longwall mining work plane, chain-drive section is connected with bridge conveyor, described bridge conveyor is arranged in gateway, waist is provided with secondary breaker, bridge conveyor chain-drive section is overlapped on self-movable foot end, described self-movable foot end is arranged in gateway, rear portion is connected with scalable pipe conveyer, described scalable pipe conveyer is positioned at gateway, fuselage extends to district coal bin.
CN201420482380.2U 2014-08-25 2014-08-25 Raw coal tubulose roadway conveying system is equipped Expired - Fee Related CN204041072U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420482380.2U CN204041072U (en) 2014-08-25 2014-08-25 Raw coal tubulose roadway conveying system is equipped

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420482380.2U CN204041072U (en) 2014-08-25 2014-08-25 Raw coal tubulose roadway conveying system is equipped

Publications (1)

Publication Number Publication Date
CN204041072U true CN204041072U (en) 2014-12-24

Family

ID=52241750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420482380.2U Expired - Fee Related CN204041072U (en) 2014-08-25 2014-08-25 Raw coal tubulose roadway conveying system is equipped

Country Status (1)

Country Link
CN (1) CN204041072U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196533A (en) * 2014-08-25 2014-12-10 安徽理工大学 Pipe-shaped raw coal gateway conveying system equipment and coal conveying method
CN105298498A (en) * 2015-11-02 2016-02-03 中国恩菲工程技术有限公司 Ore recovery, transportation and backfilling system and ore recovery, transportation and backfilling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196533A (en) * 2014-08-25 2014-12-10 安徽理工大学 Pipe-shaped raw coal gateway conveying system equipment and coal conveying method
CN105298498A (en) * 2015-11-02 2016-02-03 中国恩菲工程技术有限公司 Ore recovery, transportation and backfilling system and ore recovery, transportation and backfilling method

Similar Documents

Publication Publication Date Title
CN104033153A (en) Coal mine underground mining, dress and filling integral method
CN104653182B (en) A kind of coal-mining method that the bastard coal of coal seam containing thick dirt band point is adopted
CN104061016B (en) A kind of girdle five drill auger miner stowage unit and method
CN104373126A (en) Method and equipment for filling gangue by aid of drilling and production process
CN103256051B (en) The continuous coal winning technology method of double-vane of open coal mine
CN107676096B (en) Continuous mining system and mining process for ferrous metallurgy open-pit mine
CN204041072U (en) Raw coal tubulose roadway conveying system is equipped
CN105201512A (en) Lateral type double-drum opencast machine
CN104234714B (en) A kind of underground coal mine green high-efficient transporting method
CN202031643U (en) Gangue storage and transportation device
CN103821530A (en) Continuous excavating equipment and process for roadways
CN102510931B (en) Spraying and dust reduction device for coal mine
CN108915680A (en) Girdle bastard coal sorts fully mechanized mining and fully mechanized mining system
CN102777184B (en) The mining system in mine and method
CN202039860U (en) Parallel oppositely pulling full-mechanized face structure
CN104329117A (en) Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment
CN203961987U (en) The full section cutterhead of mining rock gangway speedy drivage machine
CN104196533A (en) Pipe-shaped raw coal gateway conveying system equipment and coal conveying method
CN204113288U (en) A kind of New Coal Mine down-hole green high-efficient haulage device
CN104121022A (en) Coal mine roadway opening tunneling process
CN208718652U (en) Girdle bastard coal sorts fully mechanized mining system
CN205462422U (en) Elevating conveyor aircraft nose uninstallation department secondary breaker
CN202520309U (en) Parallel rapid bolt supporting operation system for heading machine
CN205101031U (en) Can sieve formula scraper blade elevating conveyor
CN107882562B (en) Method for realizing recovery of coal pillars arranged on opposite-pulling working face

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20160825

CF01 Termination of patent right due to non-payment of annual fee