CN204029230U CN201420166575.6U CN201420166575U CN204029230U CN 204029230 U CN204029230 U CN 204029230U CN 201420166575 U CN201420166575 U CN 201420166575U CN 204029230 U CN204029230 U CN 204029230U
Authority
CN
China
Prior art keywords
electric power
automation
electric
experiment
training examination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420166575.6U
Other languages
Chinese (zh)
Inventor
郑群
郭红高
梁海斌
胡延峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QIUSHI TEACHING APPARATUS CO Ltd
Original Assignee
ZHEJIANG QIUSHI TEACHING APPARATUS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QIUSHI TEACHING APPARATUS CO Ltd filed Critical ZHEJIANG QIUSHI TEACHING APPARATUS CO Ltd
Priority to CN201420166575.6U priority Critical patent/CN204029230U/en
Application granted granted Critical
Publication of CN204029230U publication Critical patent/CN204029230U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model proposes a kind of IPS interconnected electric power system synthesis experiment platform, it comprises an Infinite bus system, two comprehensive automation of electric power system experiment porchs, five electric system microprocessor-based protection practice training examination devices, an electric system computer-based transformer protection practice training examination device, two automation of transformation substations experiment tablees, a Factory Electricity Supply and power distribution automation actual training device, described electric power Infinite bus system is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, comprehensive automation of electric power system experiment porch is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively.The utility model authentic and valid simulated field normal operating condition of energy and malfunction, can carry out electric system teaching and research, its compact conformation for teacher, complete function, more presses close to scene.

Description

A kind of IPS interconnected electric power system synthesis experiment platform
Technical field
The utility model relates to Practical teaching device, especially relates to a kind of IPS interconnected electric power system synthesis experiment platform.
Background technology
Ge Jiao instrument manufacturer has manufactured single isolated electric system experiment porch in the market; such as comprehensive automation of electric power system experiment porch, automation of transformation substations experiment table, electric system computer-based transformer protection practice training examination device, electric system microprocessor-based protection practice training examination device, Factory Electricity Supply and power distribution automation actual training device and electric power Infinite bus system, they have following characteristics and function respectively:
Comprehensive automation of electric power system experiment porch, be the typical model of a complete generating plant, it arranges organic semi-synchronizing device, microcomputer excitation system, microcomputer governing system, New Microcomputer Line Protection Device and genset usually.Comprehensive automation of electric power system testing table is a very much higher function test platform of automaticity.
Automation of transformation substations experiment table; be a typical transformer station model, it is provided with inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device, automatic reactive compensator, PLC, computer-based transformer protection and Multifunctional microcomputer protection device usually.
Electric system computer-based transformer protection practice training examination device is the model of a whole set of computer-based transformer protection device, and student by experiment, can understand the principle of electric system computer-based transformer protection further, and can grasp protection wiring and regulation experiment method.It is generally provided with inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device and computer-based transformer protection device.
Electric system microprocessor-based protection practice training examination device is the model of the New Microcomputer Line Protection Device of widespread use in a whole set of modern electric engineering; it is generally provided with inductance, resistance dish, capacitor, New Microcomputer Line Protection Device; mainly complete protective device characteristic test, wiring, adjust, the real training of the aspect such as operation, can be used for power industry training.
Factory Electricity Supply and power distribution automation actual training device, be a typical user model, it is generally provided with inductance, resistance dish, capacitor, transformer, automatic reactive compensator, PLC and New Microcomputer Line Protection Device.It systematically achieves the skills training requirement such as powered, conveying, distribution, control, protection of factory power supply system.
Electric power Infinite bus system, its feature is: 1. power is infinitely great; 2. short-circuit process medium frequency is constant; 3. voltage constant in short-circuit process; 4. system internal impedance is 0.
At present, the electric power class experiment table of market Shang Gejiao instrument manufacturer, practical traning platform are all isolated single platforms, be not connected to become the Large-Scale Interconnected electric system of real scene, simulated field normal operating condition that can not be authentic and valid and malfunction, can not provide truer, complicated power system network.
Utility model content
The utility model object is for the above-mentioned technical matters existing for prior art, provide a kind of product complete, rational in infrastructure, test real IPS interconnected electric power system synthesis experiment platform.
For achieving the above object, the utility model proposes a kind of IPS interconnected electric power system synthesis experiment platform, it comprises an Infinite bus system, two comprehensive automation of electric power system experiment porchs, five electric system microprocessor-based protection practice training examination devices, an electric system computer-based transformer protection practice training examination device, two automation of transformation substations experiment tablees, a Factory Electricity Supply and power distribution automation actual training device, described electric power Infinite bus system is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, comprehensive automation of electric power system experiment porch is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, electric system computer-based transformer protection practice training examination device is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, automation of transformation substations experiment table is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, Factory Electricity Supply and power distribution automation actual training device are connected by cable with two automation of transformation substations experiment tablees respectively.
As preferably; it also comprises a Long-Range Surveillance Unit, and described electric power Infinite bus system, comprehensive automation of electric power system experiment porch, electric system microprocessor-based protection practice training examination device, electric system computer-based transformer protection practice training examination device, automation of transformation substations experiment table, Factory Electricity Supply and power distribution automation actual training device are connected with Long-Range Surveillance Unit communication respectively.
As preferably, described electric power Infinite bus system, comprehensive automation of electric power system experiment porch, electric system microprocessor-based protection practice training examination device, electric system computer-based transformer protection practice training examination device, automation of transformation substations experiment table, Factory Electricity Supply and power distribution automation actual training device are connected with Long-Range Surveillance Unit respectively by Ethernet.
As preferably, described comprehensive automation of electric power system experiment porch comprises machine semi-synchronizing device, microcomputer excitation system, microcomputer governing system, New Microcomputer Line Protection Device and genset.
As preferably, described electric system microprocessor-based protection practice training examination device comprises inductance, resistance dish, capacitor and New Microcomputer Line Protection Device.
As preferably, described electric system computer-based transformer protection practice training examination device comprises inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device and computer-based transformer protection device.
As preferably, described automation of transformation substations experiment table comprises inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device, automatic reactive compensator, PLC, computer-based transformer protection and Multifunctional microcomputer protection device.
As preferably, described Factory Electricity Supply and power distribution automation actual training device comprise inductance, resistance dish, capacitor, transformer, automatic reactive compensator, PLC and New Microcomputer Line Protection Device.
The utility model is connected each other by multiple assembly and forms a complete large-scale power system synthesis experiment platform, and each several part assembly in this synthesis experiment platform is the experiment porch that independently can realize corresponding function, connects into catenet between each platform by cable.The utility model authentic and valid simulated field normal operating condition of energy and malfunction, can carry out electric system teaching and research, its compact conformation for teacher, complete function, more presses close to scene.
Accompanying drawing explanation
Fig. 1 is the theory diagram of a kind of IPS interconnected electric power system synthesis experiment platform described in the utility model.
Embodiment
Feature of the present utility model and advantage will be described in detail by reference to the accompanying drawings by embodiment.
(solid line represents that cable connects as shown in Figure 1, dotted line represents that Ethernet connects), a kind of IPS interconnected electric power system synthesis experiment platform, comprise an Infinite bus system 1, two comprehensive automation of electric power system experiment porchs 2, five electric system microprocessor-based protection practice training examination devices 3, an electric system computer-based transformer protection practice training examination device 4, two automation of transformation substations experiment tablees 5, a Factory Electricity Supply and power distribution automation actual training device 6, a Long-Range Surveillance Unit 7, described electric power Infinite bus system 1 is connected by cable with two electric system microprocessor-based protection practice training examination devices 3 respectively by 1# node, comprehensive automation of electric power system experiment porch 2 is connected by cable with two electric system microprocessor-based protection practice training examination devices 3 with 4# node respectively by 2# node, electric system computer-based transformer protection practice training examination device 4 is connected by cable with two electric system microprocessor-based protection practice training examination devices 3 respectively by 3# node, automation of transformation substations experiment table 5 is connected by cable with two electric system microprocessor-based protection practice training examination devices 3 with 4# node respectively by 5# node, Factory Electricity Supply and power distribution automation actual training device 6 are connected by cable with two automation of transformation substations experiment tablees 5 respectively.
Described electric power Infinite bus system 1, comprehensive automation of electric power system experiment porch 2, electric system microprocessor-based protection practice training examination device 3, electric system computer-based transformer protection practice training examination device 4, automation of transformation substations experiment table 5, Factory Electricity Supply and power distribution automation actual training device 6 are connected with Long-Range Surveillance Unit 7 respectively by Ethernet.
Described comprehensive automation of electric power system experiment porch 2 comprises machine semi-synchronizing device, microcomputer excitation system, microcomputer governing system, New Microcomputer Line Protection Device and genset, described electric system microprocessor-based protection practice training examination device 3 comprises inductance, resistance dish, capacitor and New Microcomputer Line Protection Device, described electric system computer-based transformer protection practice training examination device 4 comprises inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device and computer-based transformer protection device, described automation of transformation substations experiment table 5 comprises inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device, automatic reactive compensator, PLC, computer-based transformer protection and Multifunctional microcomputer protection device, described Factory Electricity Supply and power distribution automation actual training device 6 comprise inductance, resistance dish, capacitor, transformer, automatic reactive compensator, PLC and New Microcomputer Line Protection Device.
When the utility model is used for practice-training teaching, owing to adopting two comprehensive automation of electric power system experiment porchs, and two automation of transformation substations experiment tablees, electric power Infinite bus system, comprehensive automation of electric power system experiment porch, electric system computer-based transformer protection practice training examination device, automation of transformation substations experiment table is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively simultaneously, and Factory Electricity Supply and power distribution automation actual training device are connected with two automation of transformation substations experiment tablees respectively, thus can the backup of demo system and handoff procedure, more true.Connected by Ethernet, ruuning situation and the parameter of above-mentioned each experiment porch (device) are shown by telemonitoring (device) device in real time, and are more conducive to student and hold for the entirety of Operation of Electric Systems principle.
Specific embodiment described herein is only to the explanation for example of the utility model structure.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present utility model or surmount the scope that appended claims defines.

Claims (8)

1. an IPS interconnected electric power system synthesis experiment platform, it is characterized in that: it comprises an electric power Infinite bus system, two comprehensive automation of electric power system experiment porchs, five electric system microprocessor-based protection practice training examination devices, an electric system computer-based transformer protection practice training examination device, two automation of transformation substations experiment tablees, a Factory Electricity Supply and power distribution automation actual training device, described electric power Infinite bus system is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, comprehensive automation of electric power system experiment porch is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, electric system computer-based transformer protection practice training examination device is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, automation of transformation substations experiment table is connected by cable with two electric system microprocessor-based protection practice training examination devices respectively, Factory Electricity Supply and power distribution automation actual training device are connected by cable with two automation of transformation substations experiment tablees respectively.
2. IPS interconnected electric power system synthesis experiment platform as claimed in claim 1; it is characterized in that: it also comprises a Long-Range Surveillance Unit, described electric power Infinite bus system, comprehensive automation of electric power system experiment porch, electric system microprocessor-based protection practice training examination device, electric system computer-based transformer protection practice training examination device, automation of transformation substations experiment table, Factory Electricity Supply and power distribution automation actual training device are connected with Long-Range Surveillance Unit communication respectively.
3. IPS interconnected electric power system synthesis experiment platform as claimed in claim 2, is characterized in that: described electric power Infinite bus system, comprehensive automation of electric power system experiment porch, electric system microprocessor-based protection practice training examination device, electric system computer-based transformer protection practice training examination device, automation of transformation substations experiment table, Factory Electricity Supply and power distribution automation actual training device are connected with Long-Range Surveillance Unit respectively by Ethernet.
4. IPS interconnected electric power system synthesis experiment platform as claimed in claim 1, is characterized in that: described comprehensive automation of electric power system experiment porch comprises machine semi-synchronizing device, microcomputer excitation system, microcomputer governing system, New Microcomputer Line Protection Device and genset.
5. IPS interconnected electric power system synthesis experiment platform as claimed in claim 1, is characterized in that: described electric system microprocessor-based protection practice training examination device comprises inductance, resistance dish, capacitor and New Microcomputer Line Protection Device.
6. IPS interconnected electric power system synthesis experiment platform as claimed in claim 1, is characterized in that: described electric system computer-based transformer protection practice training examination device comprises inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device and computer-based transformer protection device.
7. IPS interconnected electric power system synthesis experiment platform as claimed in claim 1, is characterized in that: described automation of transformation substations experiment table comprises inductance, resistance dish, capacitor, transformer, New Microcomputer Line Protection Device, automatic reactive compensator, PLC, computer-based transformer protection and Multifunctional microcomputer protection device.
8. IPS interconnected electric power system synthesis experiment platform as claimed in claim 1, is characterized in that: described Factory Electricity Supply and power distribution automation actual training device comprise inductance, resistance dish, capacitor, transformer, automatic reactive compensator, PLC and New Microcomputer Line Protection Device.
CN201420166575.6U 2014-04-08 2014-04-08 A kind of IPS interconnected electric power system synthesis experiment platform Expired - Lifetime CN204029230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420166575.6U CN204029230U (en) 2014-04-08 2014-04-08 A kind of IPS interconnected electric power system synthesis experiment platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420166575.6U CN204029230U (en) 2014-04-08 2014-04-08 A kind of IPS interconnected electric power system synthesis experiment platform

Publications (1)

Publication Number Publication Date
CN204029230U true CN204029230U (en) 2014-12-17

Family

ID=52069066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420166575.6U Expired - Lifetime CN204029230U (en) 2014-04-08 2014-04-08 A kind of IPS interconnected electric power system synthesis experiment platform

Country Status (1)

Country Link
CN (1) CN204029230U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104835394A (en) * 2015-04-30 2015-08-12 神华集团有限责任公司 Wind power generation farm operation and maintenance simulation system
CN105070156A (en) * 2015-06-10 2015-11-18 浙江求是科教设备有限公司 Power system automation experimental device
CN105810038A (en) * 2016-05-10 2016-07-27 浙江求是科教设备有限公司 Looped microgrid grid-connected control teaching experiment device and method based on matlab-simulink XPC mode
CN106530919A (en) * 2016-12-30 2017-03-22 陈丽黄 Power system integrated automation technology innovation platform and use method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104835394A (en) * 2015-04-30 2015-08-12 神华集团有限责任公司 Wind power generation farm operation and maintenance simulation system
CN105070156A (en) * 2015-06-10 2015-11-18 浙江求是科教设备有限公司 Power system automation experimental device
CN105070156B (en) * 2015-06-10 2018-04-17 浙江求是科教设备有限公司 Automation of Electric Systems experimental provision
CN105810038A (en) * 2016-05-10 2016-07-27 浙江求是科教设备有限公司 Looped microgrid grid-connected control teaching experiment device and method based on matlab-simulink XPC mode
CN105810038B (en) * 2016-05-10 2019-01-11 浙江求是科教设备有限公司 The experiment device for teaching and its method controlled based on ring micro-grid connection under matlab-simulink XPC mode
CN106530919A (en) * 2016-12-30 2017-03-22 陈丽黄 Power system integrated automation technology innovation platform and use method thereof

Similar Documents

Publication Publication Date Title
CN103440803B (en) The authentic training system of 10kV power distribution equipment real voltage analog current closed loop
CN204029230U (en) A kind of IPS interconnected electric power system synthesis experiment platform
CN201853401U (en) Distribution room simulation system
CN201893058U (en) Safe simulation training system for distribution room
CN203798929U (en) Single-phase ground fault simulation testing platform of power distribution network
CN102097024B (en) Distribution room safety simulation training system
CN103792854A (en) Flexible direct current power transmission semi-physical simulation system based on modularization multi-level current converter
CN204965174U (en) Power hardware is at ring test system
CN104064081B (en) Current mulual inductor malfunction simulation and training device
CN103956775A (en) Micro-grid analogue simulation system based on real-time digital simulation platform
CN104298127A (en) Micro-grid semi-digital semi-physical real-time simulation system based on RT-LAB
CN203520719U (en) 10kV power distribution unit actual voltage simulation current closed-loop all-real training system
CN204405813U (en) Be applicable to load testing and the energy-recuperation system of the detection of DC energy storage medium charge-discharge characteristic
CN104091502A (en) Typical low-tension centralized meter reading and installation training device based on carrier technology
CN103869114A (en) Manufacturing technology and device for high-voltage high-power adjustable simulative transformer substation
CN202285151U (en) Double-path working power supply of integrative experimental device with electricity-theft prevention for simulating working condition of metering of electric energy
CN203490884U (en) Relay matrix fault simulation device
CN105513903A (en) Debugging platform of circuit breaker
CN108648580A (en) Distributed photovoltaic power generation O&M simulation training system
CN103500529B (en) Power electronic digital-analog hybrid system for technical skill training
CN104517510B (en) A kind of photo-voltaic power supply physical simulation system for dynamic analog test
CN205068857U (en) Electric power system multistation decompression training platform of sending a telegram in reply fast
CN104183178A (en) Transformer analog device
CN106560750B (en) Digital physical hybrid simulation device for micro-grid and distributed power supply
CN203503186U (en) Power generation, power transmission and power transformation comprehensive experiment training system