Prior art keywords
dam
concrete
power plant
plant building
overlapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420350732.9U
Other languages
Chinese (zh)
Inventor
陈海坤
杨平
雷声军
杨家修
李刚
王明
高传彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201420350732.9U priority Critical patent/CN204023522U/en
Application granted granted Critical
Publication of CN204023522U publication Critical patent/CN204023522U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses the composite construction that a kind of concrete overflow dam is overlapping with power plant building, it comprises the concrete dam being arranged in upstream and the power plant building being arranged in concrete dam downstream, the dam body of described concrete dam is furnished with wasteway, diversion and power penstock is furnished with in concrete dam, after described power plant building next-door neighbour is arranged in concrete dam, described diversion and power penstock is embedded in concrete dam, and become interlaced arrangement along axis of dam direction with wasteway, structural joint is set between the interface that concrete dam contacts with power plant building or adopts integrated connection.The utility model adopts concrete overflow dam and power plant building arranged superposed, structural configuration is compact, make full use of concrete dam dam body upper space and arrange building, excavation and the concreting engineering quantity of two sides is saved compared with the multi-purpose project of dispersed placement, be conducive to centralised motorisation construction, decrease construction investment, operational management condition is better.

Description

The composite construction that a kind of concrete overflow dam is overlapping with power plant building
Technical field
The utility model belongs to the dam technical field in Hydraulic and Hydro-Power Engineering, specifically relates to the composite construction that a kind of concrete overflow dam is overlapping with power plant building.
Background technology
In Hydraulic and Hydro-Power Engineering, usually barrage is needed to build a dam formation reservoir, arrange flood discharge and generating system by piloting water simultaneously, although concrete dam can arrange flood discharge at dam body, but because of the impact by topographic and geologic condition, dam, factory building, flood discharge three are set up at cloth often exists very large interference and contradiction, and especially at high-mountain gorge areas, this contradiction is quite given prominence to.For avoiding concrete dam, factory building and flood discharge are set up the problem of interference mutually at cloth, when riverbed is comparatively narrow, bank slope is steep, when discharge is larger, usually flood discharge is arranged in concrete dam dam body, and by dam and generating system by piloting water arranged apart, factory building is arranged in bank or underground, to solve dam, flood discharge, factory building three cloth is set up the contradiction of striving position, but structure needs set up longer diversion tunnel, and high-mountain gorge areas ground power house or underground power house condition often not satisfactory, thus cause the excavation of two sides and concreting engineering quantity large, invest higher, and factory, dam is arranged apart, relative distribution, operational management condition is relatively poor.
Utility model content
The purpose of this utility model is the deficiency overcome existing for prior art, provide the composite construction that a kind of concrete overflow dam is overlapping with power plant building, this structural configuration is compact, narrow river bed upper space can be made full use of and arrange building, save excavation and the concreting engineering quantity of two sides, reduce construction investment, simultaneously also for centralised motorisation construction brings convenience, building centralized arrangement, operational management condition is relatively better.
The utility model is achieved by following technical solution.
The composite construction that a kind of concrete overflow dam is overlapping with power plant building, comprise the concrete dam being arranged in upstream and the power plant building being arranged in concrete dam downstream, the dam body of described concrete dam is furnished with wasteway, diversion and power penstock is furnished with in concrete dam, after described power plant building next-door neighbour is arranged in concrete dam, described diversion and power penstock is embedded in concrete dam, and becomes interlaced arrangement along axis of dam direction with wasteway.
Structural joint is set between the interface, downstream of described concrete dam and the interface, upstream of power plant building or adopts integrated connection.
The wasteway that described concrete dam dam body is arranged is weir surface curve pattern, and end is higher than the top of power plant building.The current let out under wasteway can be made like this to cross the top of power plant building.
The upstream dam slope slope of described concrete dam is than being 1:0 ~ 1:0.3.The interface, upstream of next-door neighbour power plant building, downstream.
The fundamental profile line of described concrete dam is triangle pattern, and the slope, downstream of fundamental profile line is than being 1:0.75 ~ 1:0.85;
The top of described power plant building is closed type, and its thickness is 2m ~ 4m.Can resist certain under let out water impact.
The beneficial effects of the utility model are:
Compared with prior art, the utility model adopts concrete overflow dam and power plant building arranged superposed, structural configuration is compact, make full use of concrete dam dam body upper space and arrange building, excavation and the concreting engineering quantity of two sides is saved compared with the multi-purpose project of dispersed placement, be conducive to centralised motorisation construction, decrease construction investment, operational management condition is better.This structure economics is feasible, especially at high-mountain gorge areas, has good compliance and wide application prospect.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-concrete dam, 2-wasteway, 3-diversion and power penstock, 4-power plant building.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1, the composite construction that a kind of concrete overflow dam described in the utility model is overlapping with power plant building, comprise the concrete dam 1 being arranged in upstream and the power plant building 4 being arranged in concrete dam 1 downstream, the dam body of described concrete dam 1 is furnished with wasteway 2, diversion and power penstock 3 is furnished with in concrete dam 1, after described power plant building 4 next-door neighbour is arranged in concrete dam 1, described diversion and power penstock 3 is embedded in concrete dam 1, and along axis of dam direction and wasteway 2 one-tenth interlaced arrangement.
Described power plant building 4 next-door neighbour arranges structural joint or adopts integrated connection after being arranged in concrete dam 1 between the interface, downstream of solidifying native dam 1 and the interface, upstream of power plant building 4; The wasteway 2 arranged at concrete dam 1 dam body adopts weir surface curve pattern, and its end, higher than the top of power plant building 4, can make the current let out for 2 times from wasteway cross the top of power plant building 4 like this.
The upstream dam slope slope of described concrete dam 1 is than being 1:0 ~ 1:0.3, the interface, upstream of next-door neighbour power plant building, downstream 2, at the top layout wasteway 2 of concrete dam 1, the fundamental profile line of concrete dam 1 is triangle pattern, and the slope, downstream of fundamental profile line is than being 1:0.75 ~ 1:0.85.
The top of described power plant building 4 is closed type, and its thickness is 2m ~ 4m, can resist certain under let out water impact.

Claims (6)

1. the composite construction that a concrete overflow dam is overlapping with power plant building, comprise the concrete dam (1) being arranged in upstream and the power plant building (4) being arranged in concrete dam (1) downstream, it is characterized in that: the dam body of described concrete dam (1) is furnished with wasteway (2), diversion and power penstock (3) is furnished with in concrete dam (1), after described power plant building (4) next-door neighbour is arranged in concrete dam (1), described diversion and power penstock (3) is embedded in concrete dam (1), and become interlaced arrangement along axis of dam direction with wasteway (2).
2. the composite construction that a kind of concrete overflow dam according to claim 1 is overlapping with power plant building, is characterized in that: arrange structural joint between the interface, downstream of described concrete dam (1) and the interface, upstream of power plant building (4) or adopt integrated connection.
3. the composite construction that a kind of concrete overflow dam according to claim 1 is overlapping with power plant building, it is characterized in that: the wasteway (2) that described concrete dam (1) dam body is arranged is weir surface curve pattern, and end is higher than the top of power plant building (4).
4. the composite construction that overfall dam according to claim 1 is overlapping with power plant building, is characterized in that: the upstream dam slope slope of described concrete dam (1) is than being 1:0 ~ 1:0.3.
5. the composite construction that a kind of concrete overflow dam according to claim 1 is overlapping with power plant building, it is characterized in that: the fundamental profile line of described concrete dam (1) is triangle pattern, the slope, downstream of fundamental profile line is than being 1:0.75 ~ 1:0.85.
6. the composite construction that a kind of concrete overflow dam according to claim 1 is overlapping with power plant building, is characterized in that: the top of described power plant building (4) is closed type, and its thickness is 2m ~ 4m.
CN201420350732.9U 2014-06-26 2014-06-26 The composite construction that a kind of concrete overflow dam is overlapping with power plant building Active CN204023522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420350732.9U CN204023522U (en) 2014-06-26 2014-06-26 The composite construction that a kind of concrete overflow dam is overlapping with power plant building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420350732.9U CN204023522U (en) 2014-06-26 2014-06-26 The composite construction that a kind of concrete overflow dam is overlapping with power plant building

Publications (1)

Publication Number Publication Date
CN204023522U true CN204023522U (en) 2014-12-17

Family

ID=52063409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420350732.9U Active CN204023522U (en) 2014-06-26 2014-06-26 The composite construction that a kind of concrete overflow dam is overlapping with power plant building

Country Status (1)

Country Link
CN (1) CN204023522U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593226A (en) * 2019-10-11 2019-12-20 中国电建集团成都勘测设计研究院有限公司 Flood discharge drainage channel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593226A (en) * 2019-10-11 2019-12-20 中国电建集团成都勘测设计研究院有限公司 Flood discharge drainage channel structure

Similar Documents

Publication Publication Date Title
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN204690679U (en) Buffering reverse-flow type bank protection on a kind of power station
CN204023522U (en) The composite construction that a kind of concrete overflow dam is overlapping with power plant building
CN203904857U (en) Precast-concrete three-arch culvert pipe
CN103290804B (en) Method and the structure of downstream ecology flow are provided after lock under water conservancy diversion outlet structure escape works
CN203393682U (en) Retaining dam for water resources and hydropower engineering
CN204551377U (en) Flow-guiding type bank protection on a kind of power station
CN205000309U (en) Cross fish device suitable for low water head overfall dam
CN203113359U (en) Earth rock cofferdam structure
CN206768766U (en) A kind of intake tunnel layout pattern using vertical shaft transition
CN205062777U (en) Down stream surge -chamber slant business turn over water arrangement structure under complex geological condition
CN204608736U (en) A kind of power plant building be arranged in solution cavity
CN204000796U (en) Power station in river channel's structure
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN208899441U (en) Power plant building arragement construction for hydro-electric power project
CN203049551U (en) Overflow face energy dissipation structure for rock overflow cofferdam
CN202730719U (en) Rock-fill dam measuring weir
CN206157755U (en) Carry on anti - seepage prevention of dam foundation system of straining structure of double -deck level in deep overburden high dam
CN205975474U (en) Set up pivot arrangement structure of high rock -fill dam on river is curved
CN203546548U (en) Protective structure for raising and reconstructing road bed
CN205653752U (en) Seepage prevention structure is united to checkdam
CN203307766U (en) Discharge structure
CN204898603U (en) Novel water conservancy diversion dyke structure
CN204225043U (en) The gravity dam structure of band structure reinforcing bar