CN204022253U - The pin-connected panel suspender of factory building roof plate - Google Patents

The pin-connected panel suspender of factory building roof plate Download PDF

Info

Publication number
CN204022253U
CN204022253U CN201420344189.1U CN201420344189U CN204022253U CN 204022253 U CN204022253 U CN 204022253U CN 201420344189 U CN201420344189 U CN 201420344189U CN 204022253 U CN204022253 U CN 204022253U
Authority
CN
China
Prior art keywords
suspension rod
steel pipe
top suspension
flange
hoist cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420344189.1U
Other languages
Chinese (zh)
Inventor
胡文福
荆优荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201420344189.1U priority Critical patent/CN204022253U/en
Application granted granted Critical
Publication of CN204022253U publication Critical patent/CN204022253U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to construction of hydropower field, be specially a kind of pin-connected panel suspender of factory building roof plate, it is characterized in that: it comprises top suspension rod, hoist cable, bottom bracket, the docking that described top suspension rod is the some sections of two ends steel pipe that is provided with flange by flange forms, described bottom bracket is that some steel pipe supporting plate outpacking rubber crusts form, described steel pipe two ends of bearing plate is also provided with flange and can each steel pipe supporting plate be fixedly connected with by flange, top suspension rod surface soldered has hoist cable locating dowel pin, and top suspension rod is connected by hoist cable with bottom bracket.The utility model adopts above-mentioned design, and top suspension rod, bottom bracket are reusable, and easy accessibility can also form the suspender of different length according to contour plate length, easy to use and economize on resources.

Description

The pin-connected panel suspender of factory building roof plate
Technical field
The utility model relates to construction of hydropower field, is specially a kind of pin-connected panel suspender of factory building roof plate.
Background technology
In modern large-scale steel structure industrial premises, factory building roof building enclosure generally adopts metal press plate, plate personal attendant steel structure span size and determining, and do not allow to overlap, this just causes the long overlength of plate, and conventional plate length is generally more than 60m, and main construction method is for adopting crane to winch to roofing, so both needed the suspender of speciality to coordinate lifting, as adopted the suspender of fixed sturcture formula cannot tackle the panel of different length.
Summary of the invention
The purpose of this utility model is, a kind of suspender of the cooperation contour plate length being repeatedly used is provided, and needs the defect that adopts special hanger to lift in solution prior art.
In order to achieve the above object, the utility model is achieved in that
A kind of pin-connected panel suspender of factory building roof plate, it comprises top suspension rod, hoist cable, bottom bracket, the docking that described top suspension rod is the some sections of two ends steel pipe that is provided with flange by flange forms, described bottom bracket is that some steel pipe supporting plate outpacking rubber crusts form, described steel pipe two ends of bearing plate is also provided with flange and can each steel pipe supporting plate be fixedly connected with by flange, top suspension rod surface soldered has hoist cable locating dowel pin, and top suspension rod is connected by hoist cable with bottom bracket.
The pin-connected panel suspender of described factory building roof plate, according to the length of hung roof boarding, selects multistage steel pipe to connect to form top suspension rod by flange, according to the length of hung roof boarding, selects polylith steel pipe supporting plate to connect to form bottom bracket by flange.
The pin-connected panel suspender of described factory building roof plate, hoist cable locating dowel pin has a plurality of, be welded in evenly and at intervals the surface of top suspension rod, one end of each hoist cable is connected with top suspension rod by hoist cable locating dowel pin, and the other end of each hoist cable is connected with each steel pipe supporting plate that forms bottom bracket.
The utility model adopts above-mentioned design, and top suspension rod, bottom bracket are reusable, and easy accessibility can also form the suspender of different length according to contour plate length, easy to use and economize on resources.
Accompanying drawing explanation
Fig. 1 is the front view of top suspension rod in the utility model.
Fig. 2 is the assembling schematic diagram of top suspension rod in the utility model.
Fig. 3 is the lateral plan of mode of operation of the present utility model.
The specific embodiment
By specific embodiment, further illustrate the utility model below.
As shown in Figure 1, Figure 2 and Figure 3, a kind of pin-connected panel suspender of factory building roof plate, it comprises top suspension rod 2, hoist cable 3, bottom bracket 5, the steel pipe that described top suspension rod 2 is provided with flange 1 for some sections of two ends consists of the docking of flange 1, described bottom bracket 5 forms for some steel pipe supporting plate outpacking rubber crusts, described steel pipe two ends of bearing plate is also provided with flange and can each steel pipe supporting plate be fixedly connected with by flange, suspension rod 2 surface soldered in top have hoist cable locating dowel pin 4, and top suspension rod 2 is connected by hoist cable 3 with bottom bracket 5.
The pin-connected panel suspender of described factory building roof plate, according to the length of hung roof boarding, selects multistage steel pipe to connect to form top suspension rod 2 by flange 1, according to the length of hung roof boarding, selects polylith steel pipe supporting plate to connect to form bottom bracket 5 by flange.
The pin-connected panel suspender of described factory building roof plate, hoist cable locating dowel pin 4 has a plurality of, be welded in evenly and at intervals the surface of top suspension rod 2, one end of each hoist cable 3 is connected with top suspension rod 2 by hoist cable locating dowel pin 4, and the other end of each hoist cable 3 is connected with each steel pipe supporting plate that forms bottom bracket 5.
The utility model adopts above-mentioned design, and top suspension rod, bottom bracket are reusable, and easy accessibility can also form the suspender of different length according to the length of contour plate 6, easy to use and economize on resources.

Claims (3)

1. the pin-connected panel suspender of a factory building roof plate, it is characterized in that: it comprises top suspension rod, hoist cable, bottom bracket, the docking that described top suspension rod is the some sections of two ends steel pipe that is provided with flange by flange forms, described bottom bracket is that some steel pipe supporting plate outpacking rubber crusts form, described steel pipe two ends of bearing plate is also provided with flange and can each steel pipe supporting plate be fixedly connected with by flange, top suspension rod surface soldered has hoist cable locating dowel pin, and top suspension rod is connected by hoist cable with bottom bracket.
2. the pin-connected panel suspender of factory building roof plate according to claim 1, it is characterized in that: according to the length of hung roof boarding, select multistage steel pipe to connect to form top suspension rod by flange, according to the length of hung roof boarding, select polylith steel pipe supporting plate to connect to form bottom bracket by flange.
3. the pin-connected panel suspender of factory building roof plate according to claim 1 and 2, it is characterized in that: hoist cable locating dowel pin has a plurality of, be welded in evenly and at intervals the surface of top suspension rod, one end of each hoist cable is connected with top suspension rod by hoist cable locating dowel pin, and the other end of each hoist cable is connected with each steel pipe supporting plate that forms bottom bracket.
CN201420344189.1U 2014-06-26 2014-06-26 The pin-connected panel suspender of factory building roof plate Expired - Fee Related CN204022253U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420344189.1U CN204022253U (en) 2014-06-26 2014-06-26 The pin-connected panel suspender of factory building roof plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420344189.1U CN204022253U (en) 2014-06-26 2014-06-26 The pin-connected panel suspender of factory building roof plate

Publications (1)

Publication Number Publication Date
CN204022253U true CN204022253U (en) 2014-12-17

Family

ID=52062145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420344189.1U Expired - Fee Related CN204022253U (en) 2014-06-26 2014-06-26 The pin-connected panel suspender of factory building roof plate

Country Status (1)

Country Link
CN (1) CN204022253U (en)

Similar Documents

Publication Publication Date Title
CN203959642U (en) Steel plate hoisting implement
CN203845712U (en) Heavy-duty equipment hoisting device
CN204675617U (en) A kind of coil of strip lifting appliance
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN204752012U (en) Wall -hanging miniature hoist
CN204022253U (en) The pin-connected panel suspender of factory building roof plate
CN201746222U (en) Installation lifting device of cooling wall of furnace shell
CN204490327U (en) Joist steel hoisting clamp
CN202988576U (en) Simple and easy chain hoist lifting support
CN204384697U (en) A kind of metal plate hanging beam
CN203411226U (en) Common lifting device for cable bridge and vent pipeline
CN205023729U (en) Gallows frame
CN204643675U (en) A kind of be applicable to suspension rod after the bont that fills
CN203497921U (en) Special lifting appliance for lifting slender rod piece
CN204139571U (en) Straddle block formula hitch
CN204138145U (en) A kind of lifting hoisting clamp
CN204823896U (en) Four bars balance crane
CN204057672U (en) A kind of combined material suspender
CN202519582U (en) Hoop device for lifting and turning irregular longitudinal beams
CN203266615U (en) Suspension cable frame
CN203767840U (en) Lifting hook capable of allowing hung article to automatically fall off
CN204010911U (en) Dry-type transformer indoor type shell boom hoisting
CN203269425U (en) Movable lifting equipment
CN203903820U (en) Fixed electric hoist semi-portal crane
CN203269334U (en) Sling for lifting steel grating of trash rack slot of hydropower station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190816

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217