CN204020987U - Tractor truck the first beam assembly - Google Patents

Tractor truck the first beam assembly Download PDF

Info

Publication number
CN204020987U
CN204020987U CN201420404659.9U CN201420404659U CN204020987U CN 204020987 U CN204020987 U CN 204020987U CN 201420404659 U CN201420404659 U CN 201420404659U CN 204020987 U CN204020987 U CN 204020987U
Authority
CN
China
Prior art keywords
steel plate
front cross
welded
cross rail
beam assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420404659.9U
Other languages
Chinese (zh)
Inventor
郦祥林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG GOODSENSE FORKLIFT CO Ltd
Original Assignee
ZHEJIANG GOODSENSE FORKLIFT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG GOODSENSE FORKLIFT CO Ltd filed Critical ZHEJIANG GOODSENSE FORKLIFT CO Ltd
Priority to CN201420404659.9U priority Critical patent/CN204020987U/en
Application granted granted Critical
Publication of CN204020987U publication Critical patent/CN204020987U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

The utility model relates to a kind of tractor truck the first beam assembly, the downside of the rear wall of front cross rail steel plate is welded with the first joist steel plate perpendicular to front cross rail steel plate, the left and right sides of the rear wall of front cross rail steel plate is welded with respectively perpendicular to the left side steel plate of front cross rail steel plate and right side steel plate, downside respectively with the first joist steel plate of the left side right side wall of steel plate and the left side wall of right side steel plate is by being welded and fixed, the upside of the left side wall of left side steel plate is welded with left crossbeam steel plate, the upside of the right side wall of right side steel plate is welded with right crossbeam steel plate, the leading flank of left crossbeam steel plate and right crossbeam steel plate and the rear wall of front cross rail steel plate are welded and fixed.Advantage is: make under the maximum bearing load of front cross rail steel plate of the first beam assembly, the bearing load in two holes of left and right side steel plate be and the bearing load in the first beam hole all under maximum duty, the static maximum stress of generation meets corresponding requirements much smaller than yield strength, maximum displacement and the minimum safety factor of the first beam assembly steel plate.

Description

Tractor truck the first beam assembly
Technical field
The utility model relates to the technical field of tractor accessories, especially relates to a kind of tractor truck the first beam assembly.
Background technology
At present traditional tractor truck the first beam assembly is in the process using, the design comparison of itself is simple, maximum displacement is larger, minimum safety factor is lower accordingly, under normal circumstances, above parameter determined tractor truck the first beam assembly ability to bear with and the safety of structure, there are some defects in the design of structure at the first beam assembly that adds itself, cause assembling tractor truck with existing design plan in traditional use always, make tractor truck load-carrying capacity and tractive force limited, safety factor is just corresponding reduction also.
Summary of the invention
The deficiency existing for above-mentioned prior art, the purpose of this utility model is to provide under a kind of maximum bearing load of front cross rail steel plate that makes the first beam assembly, the bearing load in two holes of left and right side steel plate be and the bearing load in the first beam hole all under maximum duty, the static maximum stress of generation meets the tractor truck first beam assembly of corresponding requirements much smaller than yield strength, maximum displacement and the minimum safety factor of the first beam assembly steel plate.
For realizing above-mentioned object, the utility model provides following technical scheme:
A kind of tractor truck the first beam assembly, comprise front cross rail steel plate, the downside of the rear wall of described front cross rail steel plate is welded with the first joist steel plate perpendicular to front cross rail steel plate, the left and right sides of the rear wall of front cross rail steel plate is welded with respectively perpendicular to the left side steel plate of front cross rail steel plate and right side steel plate, downside respectively with the first joist steel plate of the left side right side wall of steel plate and the left side wall of right side steel plate is by being welded and fixed, the upside of the left side wall of described left side steel plate is welded with left crossbeam steel plate, the upside of the right side wall of described right side steel plate is welded with right crossbeam steel plate, the leading flank of left crossbeam steel plate and right crossbeam steel plate and the rear wall of front cross rail steel plate are welded and fixed.
The utility model is further set to: the left and right sides of described the first joist steel plate is provided with recess, is drilled with respectively the corresponding through hole one in position with recess on described arranged on left and right sides steel plate.
The utility model is further set to: the rear side of described the first joist steel plate is drilled with through hole two.
The utility model is further set to: the thickness of described front cross rail steel plate is 20mm, and the thickness of described arranged on left and right sides steel plate is respectively 25mm, and the thickness of described the first joist steel plate is 20mm.
The utility model is further set to: the maximum yield stress of described the first beam assembly is (5.9e+007) N/m2, and maximum displacement is 0.282mm, and minimum safety factor is 2.35.
By adopting technique scheme, the technique effect that the utility model reaches is: it is 60000N that present design makes the maximum bearing load of the front cross rail of the first beam assembly, left, the bearing load in two holes of right side board is respectively 15000N, the bearing load in the first beam hole is 12000N, in current the first traditional beam assembly of the sheet material using in this programme, use the thin 5mm-7mm of sheet material, material has also obtained very large saving accordingly, and the maximum yield stress that the first beam assembly produces under design maximum load working condition is (5.9e+007) N/m2, much smaller than the yield strength that forms the first beam assembly steel plate, maximum displacement is 0.282mm, minimum safety factor is 2.35, these two indexs all meet design requirement.
Brief description of the drawings
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is one of perspective view of the present utility model.
Fig. 2 is two of perspective view of the present utility model.
Detailed description of the invention
As Fig. 1, shown in Fig. 2, for disclosed a kind of tractor truck the first beam assembly of the utility model, the downside of the rear wall of front cross rail steel plate 10 is welded with the first joist steel plate 11 perpendicular to front cross rail steel plate 10, the left and right sides of the rear wall of front cross rail steel plate 10 is welded with respectively perpendicular to the left side steel plate 12 of front cross rail steel plate 10 and right side steel plate 13, downside respectively with the first joist steel plate 11 of the left side right side wall of steel plate 12 and the left side wall of right side steel plate 13 is by being welded and fixed, the left and right sides of described the first joist steel plate 11 is provided with recess 16, a described left side, right both sides steel plate 12, on 13, be drilled with respectively the corresponding through hole 1 in position with recess 16.The rear side of described the first joist steel plate 11 is drilled with through hole 2 18.
In above-mentioned, the upside of the left side wall of described left side steel plate 12 is welded with left crossbeam steel plate 14, the upside of the right side wall of described right side steel plate 12 is welded with right crossbeam steel plate 15, and left crossbeam steel plate 14 is welded and fixed with the leading flank of right crossbeam steel plate 15 and the rear wall of front cross rail steel plate 10.
In above-mentioned, the thickness of described front cross rail steel plate 10 is 20mm, and the thickness of described arranged on left and right sides steel plate 12,13 is respectively 25mm, and the thickness of described the first joist steel plate 11 is 20mm.The maximum yield stress of described the first beam assembly is (5.9e+007) N/m2, and maximum displacement is 0.282mm, and minimum safety factor is 2.35.
The first beam assembly after optimizing is carried out to modal analysis, find that first order resonance frequency in the front 5 rank resonance frequencys of the first beam assembly is much larger than its frequency of operation, the vibration of the first beam assembly derives from driving engine, the maximum frequency of driving engine is 47 hertz, therefore in operating mode, there will not be resonance effect, so the structure of the first beam assembly is safe.
Above-described embodiment is only preferred embodiment of the present utility model, not limits according to this protection domain of the present utility model, therefore: all equivalences of doing according to structure of the present utility model, shape, principle change, within all should being covered by protection domain of the present utility model.

Claims (5)

1. a tractor truck first beam assembly, comprise front cross rail steel plate, it is characterized in that: the downside of the rear wall of described front cross rail steel plate is welded with the first joist steel plate perpendicular to front cross rail steel plate, the left and right sides of the rear wall of front cross rail steel plate is welded with respectively perpendicular to the left side steel plate of front cross rail steel plate and right side steel plate, downside respectively with the first joist steel plate of the left side right side wall of steel plate and the left side wall of right side steel plate is by being welded and fixed, the upside of the left side wall of described left side steel plate is welded with left crossbeam steel plate, the upside of the right side wall of described right side steel plate is welded with right crossbeam steel plate, the leading flank of left crossbeam steel plate and right crossbeam steel plate and the rear wall of front cross rail steel plate are welded and fixed.
2. tractor truck the first beam assembly according to claim 1, is characterized in that: the left and right sides of described the first joist steel plate is provided with recess, is drilled with respectively the corresponding through hole one in position with recess on described arranged on left and right sides steel plate.
3. tractor truck the first beam assembly according to claim 2, is characterized in that: the rear side of described the first joist steel plate is drilled with through hole two.
4. according to tractor truck the first beam assembly described in claim 1-3 any one, it is characterized in that: the thickness of described front cross rail steel plate is 20mm, and the thickness of described arranged on left and right sides steel plate is respectively 25mm, the thickness of described the first joist steel plate is 20mm.
5. tractor truck the first beam assembly according to claim 4, is characterized in that: the maximum yield stress of described the first beam assembly is (5.9e+007) N/m 2, maximum displacement is 0.282mm, minimum safety factor is 2.35.
CN201420404659.9U 2014-07-22 2014-07-22 Tractor truck the first beam assembly Expired - Fee Related CN204020987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420404659.9U CN204020987U (en) 2014-07-22 2014-07-22 Tractor truck the first beam assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420404659.9U CN204020987U (en) 2014-07-22 2014-07-22 Tractor truck the first beam assembly

Publications (1)

Publication Number Publication Date
CN204020987U true CN204020987U (en) 2014-12-17

Family

ID=52060886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420404659.9U Expired - Fee Related CN204020987U (en) 2014-07-22 2014-07-22 Tractor truck the first beam assembly

Country Status (1)

Country Link
CN (1) CN204020987U (en)

Similar Documents

Publication Publication Date Title
CN204020987U (en) Tractor truck the first beam assembly
CN204084657U (en) Chassis and adopt the air-conditioner outdoor unit on this chassis
CN103835498A (en) Steel wedge hang mould convenient to demount
CN104169503A (en) Hybrid construction machine
CN204109775U (en) A kind of engine bed
CN104019353B (en) A kind of industry angle bar
CN203318520U (en) Automobile side front edge beam reinforcing plate
CN202378694U (en) Reinforced fuel tank
CN203200910U (en) Support joint
CN202936070U (en) Spliced car roof
CN202201043U (en) Frame
CN203667771U (en) Shallow pit car bottom of elevator
CN203638921U (en) Angle steel for connecting elevator shaft and guide rail supporting frame
CN204371534U (en) The removable fuel tank of a kind of silencing case diesel engine unit Large Copacity
CN204111109U (en) A kind of safety tongs
CN203563912U (en) Bookcase and wardrobe assembling component
CN202901764U (en) Furniture positioning device
CN203448917U (en) Elevator compartment welding tool
CN202138940U (en) Elevator gantry crane
CN203270660U (en) Machine oil tank of excavator
CN202937542U (en) Draw bar type hydraulic cylinder
CN202753936U (en) Automobile rear bridge parking inhaul cable support
CN203832236U (en) Heat dissipation water tank installation structure
CN202686505U (en) Novel automobile side coaming
CN205148533U (en) Production woodworking router slewing mechanism connecting piece for wooden toy

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20180722