CN204012344U - Band electric treatment transforming plant primary equipment conductor joint heating fixture - Google Patents
Band electric treatment transforming plant primary equipment conductor joint heating fixture Download PDFInfo
- Publication number
- CN204012344U CN204012344U CN201420326073.5U CN201420326073U CN204012344U CN 204012344 U CN204012344 U CN 204012344U CN 201420326073 U CN201420326073 U CN 201420326073U CN 204012344 U CN204012344 U CN 204012344U
- Authority
- CN
- China
- Prior art keywords
- fastener
- primary equipment
- electric treatment
- band electric
- transforming plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 20
- 230000001131 transforming effect Effects 0.000 title claims abstract description 16
- 239000004020 conductor Substances 0.000 title claims abstract description 14
- 239000000463 material Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 3
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Abstract
The utility model discloses a kind of band electric treatment transforming plant primary equipment conductor joint heating fixture, comprise two fasteners and a baffler, baffler is connected by connecting rod with two fasteners, wherein, each fastener forms by fastener and two intermediate plates, heating primary equipment joint is placed between two intermediate plates and is clamped, make the current bypass shunting of heat generating spot place, realize band electric treatment primary equipment heating joint.The utility model can operate without having a power failure, and method of operation is simple, and successful improves equipment operational reliability, has safeguarded the stability of system.
Description
Technical field
The utility model relates to a kind of station power tool, specifically a kind of band electric treatment transforming plant primary equipment conductor joint heating fixture.
Background technology
Along with the growth of need for electricity, transforming plant primary equipment load rises very fast, and the increase of electric current, makes the through-flow joint of primary equipment that heating defect easily occur, and brings hidden danger.According to previous experiences, as temperature anomaly, need Continuous Tracking to pay close attention to, as temperature is above standard, need temporary interruption to process, system operation mode is brought to impact.
Utility model content
The purpose of this utility model is to provide a kind of band electric treatment transforming plant primary equipment conductor joint heating fixture, can construct without having a power failure, and safe and simple.
For achieving the above object, the technical solution adopted in the utility model is as follows:
Band electric treatment transforming plant primary equipment conductor joint heating fixture, comprises two fasteners and a baffler; Described each fastener forms by fastener and two intermediate plates, two sides up and down of described fastener are provided with draw-in groove, the two ends of described one of them intermediate plate are fixed on the both sides up and down of fastener, the two ends of described another intermediate plate are arranged in the draw-in groove of upper and lower two sides of fastener, and the lower end of this intermediate plate connects a whirligig; The bottom installing insulating handle of described whirligig; Described baffler is connected by connecting rod with two fasteners; Described connecting rod is fixed on the side arm of fastener.
The folder face of two intermediate plates of aforesaid each fastener is arc.
The arc folder face inner side of two intermediate plates of aforesaid each fastener is with profile of tooth.
The downside of fastener is all run through in the lower end of two intermediate plates of aforesaid each fastener, and the lower end of two intermediate plates is provided with manhole.
Aforesaid fastener, intermediate plate and connecting rod all adopt metallic conduction material to make.
Between aforesaid baffler and connecting rod, connect by rotating shaft.
The utility model, by two fasteners being connected respectively to the heating primary equipment of required processing, can be realized the heating tape electric treatment of transforming plant primary equipment, without power failure, method of operation is simple, successful, improves equipment operational reliability, has safeguarded the stability of system; And baffler of the present utility model adopts rotating shaft to be connected with connecting rod, can make to be any angle between baffler and connecting rod, adapts to greatest extent the putting position of two fasteners.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model band electric treatment transforming plant primary equipment conductor joint heating fixture;
Fig. 2 is the vertical view of the upper side of the utility model fastener.
Embodiment
Now describe the utility model in detail with embodiment by reference to the accompanying drawings.
As shown in Figure 1, band electric treatment transforming plant primary equipment conductor joint heating fixture of the present utility model, comprises two fasteners 2 and a baffler 3, particularly,
Two fasteners are the same, each fastener 2 forms by fastener 1 and two intermediate plates 8, wherein, two sides up and down of fastener 1 are provided with draw-in groove 9, as shown in Figure 2, are the draw-in groove of fastener upper side, the two ends of one of them intermediate plate are fixed on the both sides up and down of fastener 1, the two ends of another intermediate plate are arranged in the draw-in groove 9 of upper and lower two sides of fastener 1, and the lower end of this intermediate plate connects a whirligig 6, can make this intermediate plate move along draw-in groove 9 under the effect of whirligig 6.The bottom installing insulating handle 5 of whirligig 6, operates whirligig 6 by insulated handle 5, can ensure the safe distance of operating personnel and charging equipment, guarantees fail safe.
The folder face of two intermediate plates 8 of each fastener 2 of the present utility model is arc, when use, heating primary equipment joint is placed between two arc folder faces and is clamped, and arc folder face inner side is with profile of tooth, and profile of tooth can make intermediate plate better contact with joint.The downside of fastener 1 is all run through in the lower end of two intermediate plates 8, and the lower end of two intermediate plates 8 is provided with manhole 7.When operation, two fasteners 2 are installed in parallel on the wire at heat generating spot two ends, are stuck in by joint in the arc folder face of intermediate plate 8 of fastener 2, operate whirligig 6 by insulated handle 5, by joint clamping, then with insulated bolt, the through hole of two intermediate plate lower ends 7 is screwed.
Baffler 3 of the present utility model is connected by connecting rod 4 with two fasteners 2, and connecting rod 4 is fixed on the side arm of fastener 2.Fastener 1, intermediate plate 8 and connecting rod 4 all adopt metallic conduction material to make, and can shunt like this load current, make to diminish by the electric current of joint, are convenient to operate.
Preferably, between baffler 3 of the present utility model and connecting rod 4, connect by rotating shaft 10, can make to be like this any angle between baffler 3 and connecting rod 4, adapt to greatest extent the putting position of two fasteners 2.
The above is only preferred implementation of the present utility model; should be understood that; for those skilled in the art; do not departing under the prerequisite of the utility model know-why; can also make some improvement and distortion, these improvement and distortion also should be considered as protection range of the present utility model.
Claims (6)
1. band electric treatment transforming plant primary equipment conductor joint heating fixture, is characterized in that, comprises two fasteners and a baffler; Described each fastener forms by fastener and two intermediate plates, two sides up and down of described fastener are provided with draw-in groove, the two ends of described one of them intermediate plate are fixed on the both sides up and down of fastener, the two ends of described another intermediate plate are arranged in the draw-in groove of upper and lower two sides of fastener, and the lower end of this intermediate plate connects a whirligig; The bottom installing insulating handle of described whirligig; Described baffler is connected by connecting rod with two fasteners; Described connecting rod is fixed on the side arm of fastener.
2. band electric treatment transforming plant primary equipment conductor joint heating fixture according to claim 1, is characterized in that, the folder face of two intermediate plates of described each fastener is arc.
3. band electric treatment transforming plant primary equipment conductor joint heating fixture according to claim 2, is characterized in that, the arc folder face inner side of two intermediate plates of described each fastener is with profile of tooth.
4. band electric treatment transforming plant primary equipment conductor joint heating fixture according to claim 1, is characterized in that, the downside of fastener is all run through in the lower end of two intermediate plates of described each fastener, and the lower end of two intermediate plates is provided with manhole.
5. band electric treatment transforming plant primary equipment conductor joint heating fixture according to claim 1, is characterized in that, described fastener, and intermediate plate and connecting rod all adopt metallic conduction material to make.
6. band electric treatment transforming plant primary equipment conductor joint heating fixture according to claim 1, is characterized in that, between described baffler and connecting rod, connects by rotating shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420326073.5U CN204012344U (en) | 2014-06-18 | 2014-06-18 | Band electric treatment transforming plant primary equipment conductor joint heating fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420326073.5U CN204012344U (en) | 2014-06-18 | 2014-06-18 | Band electric treatment transforming plant primary equipment conductor joint heating fixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204012344U true CN204012344U (en) | 2014-12-10 |
Family
ID=52052287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420326073.5U Withdrawn - After Issue CN204012344U (en) | 2014-06-18 | 2014-06-18 | Band electric treatment transforming plant primary equipment conductor joint heating fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204012344U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104037631A (en) * | 2014-06-18 | 2014-09-10 | 国家电网公司 | Primary device connector heating clamp of electrified processing transformer substation |
CN104901208A (en) * | 2015-06-15 | 2015-09-09 | 国网山东章丘市供电公司 | Shunt diverter |
-
2014
- 2014-06-18 CN CN201420326073.5U patent/CN204012344U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104037631A (en) * | 2014-06-18 | 2014-09-10 | 国家电网公司 | Primary device connector heating clamp of electrified processing transformer substation |
CN104901208A (en) * | 2015-06-15 | 2015-09-09 | 国网山东章丘市供电公司 | Shunt diverter |
CN104901208B (en) * | 2015-06-15 | 2016-12-07 | 国网山东章丘市供电公司 | A kind of shunting air deflector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203774471U (en) | A special fixture for a low voltage switchgear cabinet busbar | |
CN204012344U (en) | Band electric treatment transforming plant primary equipment conductor joint heating fixture | |
CN104037631B (en) | On-line treatment transforming plant primary equipment conductor joint heating fixture | |
CN203103540U (en) | Iron tower ground wire connector | |
CN203895631U (en) | Grounding wire assembling and disassembling special-purpose device | |
CN202839974U (en) | Ground connecting device | |
CN102610937A (en) | Adjustable earthing wire clip | |
CN203385757U (en) | Angular adjustment mechanism cooperating with overhead line fault indicator installation tool for use | |
CN203109858U (en) | Bevel gear intermediate shaft insulating spanner | |
CN203674595U (en) | Live-line emergency processing short-circuit parallel connecting device for eliminating heating of electric transmission and transformation equipment cable clamp | |
CN205231570U (en) | Transformer substation generates heat and connects electrified scarce device that disappears | |
CN104377460B (en) | Portable anticreep, protection against electric shock grounding fastener device | |
CN202564586U (en) | Adjustable earthing wire clip | |
CN204290240U (en) | A kind of cable joint part flow arrangement | |
CN204558688U (en) | Earthing clamp | |
CN204118274U (en) | The pre-slip-off preventing breaking alarm device of a kind of butt joint type device clamp | |
CN203632140U (en) | Bolt-type ground protection fixing device | |
CN202817223U (en) | A high-voltage lead device | |
CN203617071U (en) | Flexible connection grounding device for components of transformer bank | |
CN204720588U (en) | A kind of temporary ground wire clamp | |
CN204144862U (en) | The shunting wire clamp that earth potential is installed can be adopted | |
CN203800447U (en) | Isolating switch contact finger dismounting tool | |
CN103633587A (en) | Bolt-type grounding protection fixing device | |
CN204012350U (en) | Transformer station's double-bus balance insulating ladder of sealing up a door | |
CN203932846U (en) | Small-sized wire payoff rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20141210 Effective date of abandoning: 20160323 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |