CN104037631B - On-line treatment transforming plant primary equipment conductor joint heating fixture - Google Patents
On-line treatment transforming plant primary equipment conductor joint heating fixture Download PDFInfo
- Publication number
- CN104037631B CN104037631B CN201410272655.4A CN201410272655A CN104037631B CN 104037631 B CN104037631 B CN 104037631B CN 201410272655 A CN201410272655 A CN 201410272655A CN 104037631 B CN104037631 B CN 104037631B
- Authority
- CN
- China
- Prior art keywords
- fastener
- primary equipment
- line treatment
- transforming plant
- conductor joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
本发明公开了一种带电处理变电站一次设备接头发热夹具,包括两个紧固装置和一个导流板,导流板和两个紧固装置通过连接杆连接,其中,每个紧固装置均由卡件和两个夹片构成,将发热一次设备接头置于两个夹片之间卡紧,使发热点处电流旁路分流,实现带电处理一次设备发热接头。本发明无需停电即可操作,操作方法简单,效果明显,提高设备运行可靠性,维护了系统的稳定性。
The invention discloses a heat-generating clamp for a primary equipment joint of a live processing substation, which comprises two fastening devices and a deflector, the deflector and the two fastening devices are connected by a connecting rod, wherein each fastening device is composed of The clip is composed of two clips, and the heat-generating primary equipment connector is placed between the two clips for clamping, so that the current at the heat-generating point bypasses and shunts, and realizes the live treatment of the heat-generating connector of the primary equipment. The invention can be operated without power failure, the operation method is simple, the effect is obvious, the operation reliability of the equipment is improved, and the stability of the system is maintained.
Description
技术领域 technical field
本发明涉及一种变电站检修作业工具,具体地说是一种带电处理变电站一次设备接头发热夹具。 The invention relates to a substation inspection and maintenance operation tool, in particular to a heat-generating clamp for the primary equipment joint of a live-line processing substation.
背景技术 Background technique
随着用电需求的增长,变电站一次设备负荷上升很快,电流的增加,使得一次设备通流接头容易发生发热缺陷,带来隐患。根据以往经验,如温度异常,则需要连续跟踪关注,如温度超过标准,需临时停电进行处理,对系统运行方式带来影响。 With the increase of electricity demand, the load of primary equipment in substations rises rapidly, and the increase of current makes the flow joints of primary equipment prone to heat defects, which brings hidden dangers. According to past experience, if the temperature is abnormal, continuous tracking and attention is required. If the temperature exceeds the standard, a temporary power outage is required to deal with it, which will affect the operation mode of the system.
发明内容 Contents of the invention
本发明的目的在于提供一种带电处理变电站一次设备接头发热夹具,无需停电即可施工,且安全简便。 The object of the present invention is to provide a heat-generating fixture for the primary equipment joint of a live treatment substation, which can be constructed without power failure, and is safe and convenient.
为达到上述目的,本发明采用的技术方案如下: In order to achieve the above object, the technical scheme adopted in the present invention is as follows:
带电处理变电站一次设备接头发热夹具,包括两个紧固装置和一个导流板;所述每个紧固装置均由卡件和两个夹片构成,所述卡件的上下两个侧面设有卡槽,所述其中一个夹片的两端固定在卡件的上下两侧,所述另一个夹片的两端安装在卡件上下两个侧面的卡槽内,并且该夹片的下端连接一旋转装置;所述旋转装置的下部安装绝缘手柄;所述导流板和两个紧固装置通过连接杆连接;所述连接杆固定在紧固装置的侧臂上。 The heating fixture of the primary equipment joint of the live processing substation includes two fastening devices and a deflector; each fastening device is composed of a clip and two clips, and the upper and lower sides of the clip are provided with Card slot, the two ends of one of the clips are fixed on the upper and lower sides of the clip, the two ends of the other clip are installed in the slots on the upper and lower sides of the clip, and the lower end of the clip is connected A rotating device; an insulating handle is installed on the lower part of the rotating device; the deflector and the two fastening devices are connected through a connecting rod; the connecting rod is fixed on the side arm of the fastening device.
前述的每个紧固装置的两个夹片的夹面为弧形。 The clamping surfaces of the two clips of each of the aforementioned fastening devices are arc-shaped.
前述的每个紧固装置的两个夹片的弧形夹面内侧带有齿形。 The inner sides of the two clips of each fastening device are toothed.
前述的每个紧固装置的两个夹片的下端均贯穿卡件的下侧面,并且两个夹片的下端设有圆形通孔。 The lower ends of the two clips of each of the aforementioned fastening devices pass through the lower side of the clip, and the lower ends of the two clips are provided with circular through holes.
前述的卡件,夹片和连接杆均采用金属导电材料制成。 The aforementioned clips, clips and connecting rods are all made of conductive metal materials.
前述的导流板和连接杆之间通过转轴连接。 The aforesaid deflector and the connecting rod are connected by a rotating shaft.
本发明通过将两个紧固装置分别连接到所需处理的发热一次设备,即可实现变电站一次设备的发热带电处理,无需停电,操作方法简单,效果明显,提高设备运行可靠性,维护了系统的稳定性;并且本发明的导流板和连接杆采用转轴连接,可使导流板和连接杆之间呈任何角度,最大限度的适应两个紧固装置的摆放位置。 In the present invention, by connecting the two fastening devices respectively to the heating primary equipment to be treated, the heating and heating treatment of the primary equipment of the substation can be realized without power failure, the operation method is simple, the effect is obvious, the operation reliability of the equipment is improved, and the system is maintained stability; and the deflector and the connecting rod of the present invention are connected by a rotating shaft, so that any angle can be formed between the deflector and the connecting rod, and the placement position of the two fastening devices can be adapted to the greatest extent.
附图说明 Description of drawings
图1为本发明带电处理变电站一次设备接头发热夹具的结构示意图; Fig. 1 is a structural schematic diagram of a heat-generating fixture for a primary equipment joint of a live treatment substation according to the present invention;
图2为本发明卡件的上侧面的俯视图。 Fig. 2 is a top view of the upper side of the clip of the present invention.
具体实施方式 detailed description
现结合附图和具体实施方式详细说明本发明。 The present invention will now be described in detail in conjunction with the accompanying drawings and specific embodiments.
如图1所示,本发明的带电处理变电站一次设备接头发热夹具,包括两个紧固装置2和一个导流板3,具体地, As shown in FIG. 1 , the heat-generating fixture for the primary equipment joint of the live treatment substation of the present invention includes two fastening devices 2 and a deflector 3 , specifically,
两个紧固装置是一样的,每个紧固装置2均由卡件1和两个夹片8构成,其中,卡件1的上下两个侧面设有卡槽9,如图2所示,为卡件上侧面的卡槽,其中一个夹片的两端固定在卡件1的上下两侧,另一个夹片的两端安装在卡件1上下两个侧面的卡槽9内,并且该夹片的下端连接一旋转装置6,可使该夹片在旋转装置6的作用下沿着卡槽9移动。旋转装置6的下部安装绝缘手柄5,通过绝缘手柄5操作旋转装置6,可以保证操作人员和带电设备的安全距离,确保安全性。 The two fastening devices are the same, and each fastening device 2 is composed of a clip 1 and two clips 8, wherein the upper and lower sides of the clip 1 are provided with a slot 9, as shown in Figure 2, It is the card groove on the upper side of the card, wherein the two ends of one clip are fixed on the upper and lower sides of the card 1, and the two ends of the other clip are installed in the card grooves 9 on the upper and lower sides of the card 1, and the The lower end of the clip is connected with a rotating device 6 , so that the clip can move along the slot 9 under the action of the rotating device 6 . An insulating handle 5 is installed on the bottom of the rotating device 6, and the rotating device 6 is operated through the insulating handle 5, which can ensure a safe distance between the operator and the live equipment and ensure safety.
本发明的每个紧固装置2的两个夹片8的夹面均为弧形,使用时,将发热一次设备接头置于两个弧形夹面之间卡紧,并且弧形夹面内侧带有齿形,齿形可以使夹片与接头更好的接触。两个夹片8的下端均贯穿卡件1的下侧面,并且两个夹片8的下端设有圆形通孔7。操作时,将两个紧固装置2并联安装在发热点两端的导线上,即将接头卡在紧固装置2的夹片8的弧形夹面内,通过绝缘手柄5操作旋转装置6,将接头卡紧,然后用绝缘螺栓将两个夹片下端的通孔7旋紧。 The clamping surfaces of the two clips 8 of each fastening device 2 of the present invention are both arc-shaped. With tooth shape, the tooth shape can make the clip contact with the joint better. The lower ends of the two clips 8 both pass through the lower side of the clip 1 , and the lower ends of the two clips 8 are provided with a circular through hole 7 . During operation, two fastening devices 2 are installed in parallel on the wires at both ends of the heating point, that is, the joint is clamped in the arc-shaped clamping surface of the clip 8 of the fastening device 2, and the rotating device 6 is operated through the insulating handle 5 to close the joint. Fasten, and then tighten the through holes 7 at the lower ends of the two clips with insulating bolts.
本发明的导流板3和两个紧固装置2通过连接杆4连接,连接杆4固定在紧固装置2的侧臂上。卡件1,夹片8和连接杆4均采用金属导电材料制成,这样可以分流负荷电流,使得通过接头的电流变小,便于进行操作。 The deflector 3 of the present invention is connected with the two fastening devices 2 through a connecting rod 4 , and the connecting rod 4 is fixed on the side arm of the fastening device 2 . The clip 1, the clip 8 and the connecting rod 4 are all made of metal conductive material, so that the load current can be shunted, so that the current passing through the joint becomes smaller, which is convenient for operation.
优选的,本发明的导流板3和连接杆4之间通过转轴10连接,这样可使导流板3和连接杆4之间呈任何角度,最大限度的适应两个紧固装置2的摆放位置。 Preferably, the deflector 3 of the present invention and the connecting rod 4 are connected through a rotating shaft 10, so that any angle can be formed between the deflector 3 and the connecting rod 4, and the swing of the two fastening devices 2 can be adapted to the greatest extent. place.
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。 The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the technical principle of the present invention, some improvements and modifications can also be made. It should also be regarded as the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410272655.4A CN104037631B (en) | 2014-06-18 | 2014-06-18 | On-line treatment transforming plant primary equipment conductor joint heating fixture |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410272655.4A CN104037631B (en) | 2014-06-18 | 2014-06-18 | On-line treatment transforming plant primary equipment conductor joint heating fixture |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104037631A CN104037631A (en) | 2014-09-10 |
| CN104037631B true CN104037631B (en) | 2016-03-23 |
Family
ID=51468303
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410272655.4A Active CN104037631B (en) | 2014-06-18 | 2014-06-18 | On-line treatment transforming plant primary equipment conductor joint heating fixture |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104037631B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107546646B (en) * | 2017-09-29 | 2023-04-11 | 国网湖南省电力公司 | Special tool and method for replacing drop-out fuse under load |
| CN108923214B (en) * | 2018-07-16 | 2020-08-11 | 叶祺 | Transformer equipment joint heating live processing device and use method |
| CN109066149B (en) * | 2018-09-27 | 2020-03-17 | 谢昊铭 | Lever type substation equipment joint heating live processing device and using method |
| CN115275844B (en) * | 2022-08-15 | 2026-07-10 | 国网福建省电力有限公司福州供电公司 | A shunt clamp for heating and shunting the contacts of a substation disconnect switch and its operation method. |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000152435A (en) * | 1998-11-17 | 2000-05-30 | Kawamura Electric Inc | Switchboard |
| CN202423578U (en) * | 2011-12-07 | 2012-09-05 | 河南省电力公司南阳供电公司 | Device for processing heating and energizing of joint of power transformation equipment |
| CN103378424B (en) * | 2012-04-16 | 2016-10-05 | 国家电网公司 | The emergent electrical treatment device of high pressure connection heating |
| CN203645250U (en) * | 2014-01-13 | 2014-06-11 | 国家电网公司 | Wire current-guiding plate heat emission current-splitting processing device |
| CN204012344U (en) * | 2014-06-18 | 2014-12-10 | 国家电网公司 | Band electric treatment transforming plant primary equipment conductor joint heating fixture |
-
2014
- 2014-06-18 CN CN201410272655.4A patent/CN104037631B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN104037631A (en) | 2014-09-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104037631A (en) | Primary device connector heating clamp of electrified processing transformer substation | |
| CN202997413U (en) | Electrified treatment tool for wire clamp heating strip | |
| CN204464857U (en) | A kind of wire charged disconnecting lead-in wire line clamping device | |
| CN204012344U (en) | Band electric treatment transforming plant primary equipment conductor joint heating fixture | |
| CN204516929U (en) | For the crimp connector of stube cable and busbar or bus | |
| CN103441350A (en) | Low-voltage grounding wire device for compact electrical structure | |
| CN102868031A (en) | Detachable grounding wire connecting device | |
| CN104901110B (en) | Insulating puncturing formula wire clamp | |
| CN102386497B (en) | Converting equipment conductor joint heating electrical treatment device | |
| CN203674595U (en) | Live-line emergency processing short-circuit parallel connecting device for eliminating heating of electric transmission and transformation equipment cable clamp | |
| CN204947126U (en) | The electricity testing grounding ring of the charged installation of a kind of distribution insulated overhead line | |
| CN202917668U (en) | Live-line processing apparatus for heating due to failed contact of equipment wiring board and current leading wire clamp | |
| CN204339669U (en) | Charged tight bolt tool | |
| CN202797696U (en) | Diversion wire clamp of ground potential processing transformer device node heating device | |
| CN205157712U (en) | Insulating telescopic link detection device is put in combined electrical apparatus office | |
| CN203445264U (en) | Low voltage grounding wire device for compact electrical structure | |
| CN102820563B (en) | Equipment terminal block and the loose contact of drainage thread wire clamp are generated heat electrical treatment device and processing method | |
| CN105977891A (en) | High-efficiency energy-saving electric power suspension wire clamp | |
| CN103532040A (en) | Special tool and method for fixing middle-phase bypass jumper during 10kV hot-line working | |
| CN104836154A (en) | Method for repairing overheating defect of tension jumper drainage plate in on-load state | |
| CN204441687U (en) | Main transformer secondary wiring of current mutual inductor terminal special vice | |
| CN205791391U (en) | Strain clamp drainage plate heating part flow arrangement | |
| CN102832552B (en) | Node heating device of ground potential processing transformer device | |
| CN204088982U (en) | A kind of ground protection pincers | |
| CN202550337U (en) | Special tool for carrying out on-load clip opening check and fastening lead wire clip of electric transmission and transformation equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee after: JIANGSU ELECTRIC POWER Co. Patentee after: State Grid Corporation of China Co-patentee after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. MAINTENANCE BRANCH Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee before: JIANGSU ELECTRIC POWER Co. Patentee before: State Grid Corporation of China Co-patentee before: MAINTENANCE DIVISION OF STATE GRID JIANGSU ELECTRIC POWER Co. Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee after: JIANGSU ELECTRIC POWER Co. Patentee after: State Grid Corporation of China Co-patentee after: MAINTENANCE DIVISION OF STATE GRID JIANGSU ELECTRIC POWER Co. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee before: JIANGSU ELECTRIC POWER Co. Patentee before: State Grid Corporation of China Co-patentee before: JIANGSU ELECTRIC POWER COMPANY MAINTENANCE BRANCH |