CN204010940U - A kind of testing transformer of simulating multiple iron core and winding failure - Google Patents

A kind of testing transformer of simulating multiple iron core and winding failure Download PDF

Info

Publication number
CN204010940U
CN204010940U CN201420402990.7U CN201420402990U CN204010940U CN 204010940 U CN204010940 U CN 204010940U CN 201420402990 U CN201420402990 U CN 201420402990U CN 204010940 U CN204010940 U CN 204010940U
Authority
CN
China
Prior art keywords
pressure winding
fixture
fixed disk
high pressure
low pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420402990.7U
Other languages
Chinese (zh)
Inventor
汲胜昌
朱叶叶
张凡
刘勇
董鸿魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Original Assignee
Xian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University filed Critical Xian Jiaotong University
Priority to CN201420402990.7U priority Critical patent/CN204010940U/en
Application granted granted Critical
Publication of CN204010940U publication Critical patent/CN204010940U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The utility model discloses a kind of testing transformer of simulating multiple iron core and winding failure, comprise the first upper boom, the second upper boom, the first lower beam, the second lower beam, the first iron core, the second iron core and some windings mechanism, winding mechanism comprises high pressure winding, upper high pressure winding fixed disk, lower high pressure winding fixed disk, upper low pressure winding fixed disk, lower low pressure winding fixed disk, low pressure winding, for regulating the first governor motion of the first iron core fastening force, for regulating the second governor motion of the second iron core fastening force, for regulating the 3rd governor motion of high pressure winding thrust, for regulating the 4th governor motion of low pressure winding thrust, for making the 5th regulating mechanism of low pressure winding deformation and for making the 6th governor motion of high pressure winding deformation, the utility model can analogue transformer in winding failure and iron core fault.

Description

A kind of testing transformer of simulating multiple iron core and winding failure
Technical field
The utility model relates to a kind of testing transformer, is specifically related to a kind of testing transformer of simulating multiple iron core and winding failure.
Background technology
In the development in past 10 years, China's power construction fast development, has made brilliant achievements.Wherein, capacity of installed generator rapid growth, power grid construction speed is advanced by leaps and bounds, structure adjustment of power source is continued to optimize, technical equipment significantly promotes, energy-saving and emission-reduction consumption reduction effect is remarkable, and power construction has realized great-leap-forward development, and such development has proposed higher challenge to the safe operation of electrical network.As one of most important equipment in electric power system, transmitting, flexible allocation and the safe and reliable use of the normal operation of power transformer to electric energy plays conclusive effect.The safe operation of electric power system and maintenance are the coefficient results of plurality of devices, and therein, power transformer belongs to value costliness but acts on a class large and that involve many areas, is therefore significant for the research that ensures its safe operation.Only consider from economic aspect, the 250MVA/500kV transformer of import is approximately 1,330,000 dollars/platform on average, domestic same specification also reach about 1,000 ten thousand yuan/platform.When the power transformer of the operation of having put into production when burst accident, may cause casualties and cause having a power failure on a large scale in running.In addition, as large scale electrical power unit, once damage, possible maintenance cycle may reach half a year or more than, therefore need to seek transmission capacity of instead of transformers or this transformer station of corresponding reduction etc., involve scope extremely wide, make a very bad impression, spending a large amount of manpower and materials, is in power system operation, to need to do one's utmost to avoid.
Repair based on condition of component is that current practical working situation taking equipment is as foundation, carry out the state of judgment device by advanced status monitoring means, reliably evaluation means and the predicting means in life-span, position, the order of severity and the development trend that can occur fault judge, can make up " maintenance is superfluous " of the periodic maintenance of traditional main employing taking the time as standard and the defect of " maintenance is not enough ", at present, the State Maintenance of power transformer is the study hotspot problem of power direction.
But transformer is a complicated system, be operated under the electric and mechanical environment of load, inner aging, failure mechanism is complicated, has uncertainty, and the key that equipment carries out repair based on condition of component is undoubtedly to the extraction of fault characteristic signals and the setting of failure criterion.At present, varied for the condition detection method of transformer, there are vibration analysis method, oil chromatography analysis, dielectric loss detection, partial discharge monitoring, frequency sweep impedance method etc.No matter be to utilize what principle to carry out status monitoring to transformer, be all a kind of means, what reach the same goal by different routes is to extract the characteristic value that can distinguish fault type for different faults, and determines fault alarm threshold value accurately.Therefore, design one and can simulate multiple transformer fault, and the fault characteristic signals extracting under different faults type in conjunction with various the study of the monitoring methods as platform is very important.
External fault is the various faults that occur on oil tank of transformer exterior insulation sleeve pipe and lead-out wire thereof, its main Types has: insulating sleeve flashover or ground short circuit broken and that occur, phase-to phase fault etc. occurs between lead-out wire and cause power transformer interior fault or winding deformation etc.
Internal fault is the various faults that occur in oil tank of transformer, and its main Types has: turn-to-turn short circuit, winding or the lead-out wire occurring between the phase fault occurring between each winding, the wire turn of winding is by shell generation earth fault etc.Because transformer fault involvement aspect is wider, the dividing mode of particular type is more, if divide from the agent structure of transformer, can be divided into traditionally winding failure, iron core fault, shunting switch fault and other annex fault.
Although the kind of transformer fault is various, but the probability that all kinds of faults occur is different, the domestic demonstration of the calendar year statistics data about transformer, winding and shunting switch are the more parts that break down, in fault rootstock, 53% belongs to mechanical breakdown, and 31% belongs to electric fault.For the transformer that does not have on-load tap changer, statistics finds that 26.6% fault comes from winding failure, and 6.4% fault is attributed to iron core fault simultaneously.And also there is similar conclusion in foreign scholar's correlative study, B.Sparling provides in his research report, Years Of Service distributes in the fault of the large-scale power transformer of 15 years to 25 years, it is the principal element that causes transformer cisco unity malfunction that fault and iron core fault are polluted in winding deformation fault, insulation, therefore develops that one can be simulated winding failure and iron core fault is extremely urgent.
Utility model content
The purpose of this utility model is to overcome the shortcoming of above-mentioned prior art, and a kind of testing transformer of simulating multiple iron core and winding failure is provided, this testing transformer can analogue transformer in winding failure and iron core fault.
For achieving the above object, testing transformer of simulating multiple iron core and winding failure described in the utility model comprises the first upper boom, the second upper boom, the first lower beam, the second lower beam, the first iron core, the second iron core and some windings mechanism, winding mechanism comprises high pressure winding, upper high pressure winding fixed disk, lower high pressure winding fixed disk, upper low pressure winding fixed disk, lower low pressure winding fixed disk, low pressure winding, for regulating the first governor motion of the first iron core fastening force, for regulating the second governor motion of the second iron core fastening force, for regulating the 3rd governor motion of high pressure winding thrust, for regulating the 4th governor motion of low pressure winding thrust, for making the 5th governor motion of low pressure winding deformation and for making the 6th governor motion of high pressure winding deformation,
Described the first iron core clamp is held between the first upper boom and the second upper boom, and the first iron core, the first upper boom and the second upper boom are connected by the first governor motion;
Described the second iron core clamp is held between the first lower beam and the second lower beam, and the second iron core, the first lower beam and the second lower beam are connected by the second governor motion;
Described high pressure winding is socketed on low pressure winding, upper high pressure winding fixed disk and lower high pressure winding fixed disk are individually fixed in upper end and the lower end of high pressure winding, upper low pressure winding fixed disk and lower low pressure winding fixed disk are individually fixed in upper end and the lower end of low pressure winding, the first upper boom, the second upper boom, high pressure winding, upper high pressure winding fixed disk, lower high pressure winding fixed disk, the first lower beam and the second lower beam are connected by the 3rd governor motion, the first upper boom, the second upper boom, low pressure winding, upper low pressure winding fixed disk, lower low pressure winding fixed disk, the first lower beam and the second lower beam are connected by the 4th governor motion, the 5th governor motion and the first lower beam, the second lower beam and lower high pressure winding fixed disk are connected, the 6th governor motion is connected with the 5th adjustment structure and lower low pressure winding fixed disk
Described the first governor motion comprises some the first screw rods, and the first screw rod is connected the first upper boom, the first iron core and the second upper boom through the first upper boom, the first iron core and the second upper boom successively, and the two ends of the first screw rod are all socketed with the first fixture.
Described the second governor motion comprises some the second screw rods, and the second screw rod is connected the first lower beam, the second iron core and the second lower beam through the first lower beam, the second iron core and the second lower beam successively, and the two ends of the second screw rod are all socketed with the second fixture.
Described the 3rd governor motion comprises some the 3rd screw rods and some the 4th screw rods;
On described upper high pressure winding fixed disk, offer the first chute and the second chute, on lower high pressure winding fixed disk, offer the 3rd chute and the 4th chute;
Described the 3rd screw rod is connected the first upper boom, upper high pressure winding fixed disk, high pressure winding, lower high pressure winding fixed disk and the first lower beam through the 3rd chute and first lower beam of the first chute on the first upper boom, upper high pressure winding fixed disk, high pressure winding, lower high pressure winding fixed disk successively, the two ends of the 3rd screw rod are all socketed with the 3rd fixture, the 3rd screw rod middle part is socketed with the 4th fixture and the 5th fixture, the 4th fixture is between upper high pressure winding fixed disk and the first upper boom, and the 5th fixture is between lower high pressure winding fixed disk and the first lower beam;
Described the 4th screw rod is connected the second upper boom, upper high pressure winding fixed disk, high pressure winding, lower high pressure winding fixed disk and the second lower beam through the 4th chute and second lower beam of the second chute of the second upper boom, upper high pressure winding fixed disk, high pressure winding, lower high pressure winding fixed disk successively, the two ends of the 4th screw rod are all socketed with the 6th fixture, the middle part of the 4th screw rod is socketed with the 7th fixture and the 8th fixture, the 7th fixture is between upper high pressure winding fixed disk and the second upper boom, and the 8th fixture is between lower high pressure winding fixed disk and the second lower beam.
Described the 4th governor motion comprises some the 5th screw rods and some the 6th screw rods;
On described upper low pressure winding fixed disk, offer the 5th chute and the 6th chute, on lower low pressure winding fixed disk, offer the 7th chute and the 8th chute;
Described the 5th screw rod is successively through the first upper boom, the 5th chute on upper low pressure winding fixed disk, low pressure winding, the 7th chute on lower low pressure winding fixed disk and the first lower beam are by the first upper boom, upper low pressure winding fixed disk, low pressure winding, lower low pressure winding fixed disk and the first lower beam are connected, the two ends of the 5th screw rod are all socketed with the 9th fixture, the middle part of the 5th screw rod is socketed with the tenth fixture and the 11 fixture, the tenth fixture is between upper low pressure winding fixed disk and the first upper boom, the 11 fixture is between lower low pressure winding fixed disk and the first lower beam,
Described the 6th screw rod is successively through the second upper boom, the 6th chute on upper low pressure winding fixed disk, low pressure winding, the 8th chute on lower low pressure winding fixed disk and the second lower beam are by the second upper boom, upper low pressure winding fixed disk, low pressure winding, lower low pressure winding fixed disk and the second lower beam are connected, the two ends of the 6th screw rod are all socketed with the 12 fixture, the middle part of the 6th screw rod is socketed with the 13 fixture and the 14 fixture, the 13 fixture is between the second upper boom and upper low pressure winding fixed disk, the 14 fixture is between the second lower beam and lower low pressure winding fixed disk.
Between described the 4th fixture and upper high pressure winding fixed disk, between the 5th fixture and lower high pressure winding fixed disk, between the 7th fixture and upper high pressure winding fixed disk, between the 8th fixture and lower high pressure winding fixed disk, between the tenth fixture and upper low pressure winding fixed disk, between the 11 fixture and lower low pressure winding fixed disk, between the 13 fixture and lower low pressure winding fixed disk and be equipped with pad between the 14 fixture and lower low pressure winding fixed disk.
Described the 5th governor motion comprises the first fixed block, the first fixed head, the first adjusting rod, the second fixed head and the 15 fixture, the middle part of the first fixed head is connected with the first lower beam and the second lower beam, the side of first fixed head one end is fixed in one end of the second fixed head, the 15 fixture is socketed on one end of the first adjusting rod, the other end of the first adjusting rod is flexibly connected with the first fixed block through the second fixed head, and the first fixed block is connected with lower low pressure winding fixed disk;
Described the 6th governor motion comprises the second fixed block, the 3rd fixed head, the second adjusting rod and the 16 fixture, the side of the first fixed head other end is fixed in one end of the 3rd fixed head, the 16 fixture is socketed on one end of the second adjusting rod, the other end of the second adjusting rod is flexibly connected with the second fixed block through the 3rd fixed head, and the second fixed block is connected with lower high pressure winding fixed disk.
Also comprise some the 7th screw rods and some the 8th screw rods, the 7th screw rod is connected the first upper boom and the second lower beam through the first upper boom and the first lower beam, the 8th screw rod is connected the second upper boom and the second lower beam through the second upper boom and the second lower beam, and the two ends of the two ends of the 7th screw rod and the 8th screw rod are all socketed with the 17 fixture.
The side of the side of the side of described the first screw rod, the side of the second screw rod, the 3rd screw rod, the side of the 4th screw rod, the 5th screw rod, side, the side of the 7th screw rod and the side of the 8th screw rod of the 6th screw rod are equipped with screw thread;
Described the first fixture, the second fixture, the 3rd fixture, the 4th fixture, the 5th fixture, the 6th fixture, the 7th fixture, the 8th fixture, the 9th fixture, the tenth fixture, the 11 fixture, the 12 fixture, the 13 fixture, the 14 fixture, the 15 fixture, the 16 fixture and the 17 fixture are nut.
Described low pressure winding and high pressure winding are Continuous winding, spacing in low pressure winding between adjacent two line cakes is 8mm, spacing in high pressure winding between adjacent two line cakes is 8mm, in low pressure winding, between adjacent two line cakes and in high pressure winding, between adjacent two line cakes, be equipped with cushion block, described cushion block is couch board.
The utlity model has following beneficial effect:
Testing transformer of simulating multiple iron core and winding failure described in the utility model is in the time of the winding failure of analogue transformer and iron core fault, the fastening force that regulates the first iron core to be subject to by the first governor motion, the fastening force that regulates the second iron core to be subject to by the second governor motion, thus realize the simulation to iron core fault.In addition, the thrust that regulates respectively thrust that high pressure winding 1 is subject to and low pressure winding to receive by the 3rd governor motion and the 4th governor motion, regulate the deformation of low pressure winding by the 5th governor motion simultaneously, and by the deformation of the 6th governor motion adjusting high pressure winding, thereby realize the simulation of the fault of fault to high pressure winding and low pressure winding, simple in structure, easy to operate.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is end view of the present utility model.
Wherein, 1 is high pressure winding, 2 is the first upper boom, 3 is the second upper boom, 4 is the first lower beam, 5 is the second lower beam, 6 is upper high pressure winding fixed disk, 7 is lower high pressure winding fixed disk, 8 is upper low pressure winding fixed disk, 9 is lower low pressure winding fixed disk, 10 is the 3rd screw rod, 11 is the 4th screw rod, 12 is the 5th screw rod, 13 is the 7th screw rod, 14 is the first screw rod, 15 is the second screw rod, 16 is the first iron core, 17 is the second iron core, 18 is the first fixed head, 19 is the second fixed head, 20 is the first adjusting rod, 21 is the first fixed block, 22 is the 3rd fixed head, 23 is the second adjusting rod, 24 is the second fixed block.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail:
With reference to figure 1 and Fig. 2, testing transformer of simulating multiple iron core and winding failure described in the utility model comprises the first upper boom 2, the second upper boom 3, the first lower beam 4, the second lower beam 5, the first iron core 16, the second iron core 17 and some windings mechanism, winding mechanism comprises high pressure winding 1, upper high pressure winding fixed disk 6, lower high pressure winding fixed disk 7, upper low pressure winding fixed disk 8, lower low pressure winding fixed disk 9, low pressure winding, for regulating the first governor motion of the first iron core 16 fastening forces, for regulating the second governor motion of the second iron core 17 fastening forces, for regulating the 3rd governor motion of high pressure winding 1 thrust, for regulating the 4th governor motion of low pressure winding thrust, for making the 5th governor motion of low pressure winding deformation and for making the 6th governor motion of high pressure winding 1 deformation, the first iron core 16 is held between the first upper boom 2 and the second upper boom 3, the first iron core 16, the first upper boom 2 and the second upper boom 3 are connected by the first governor motion, and the second iron core 17 is held between the first lower beam 4 and the second lower beam 5, the second iron core 17, the first lower beam 4 and the second lower beam 5 are connected by the second governor motion, high pressure winding 1 is socketed on low pressure winding, upper high pressure winding fixed disk 6 and lower high pressure winding fixed disk 7 are individually fixed in upper end and the lower end of high pressure winding 1, upper low pressure winding fixed disk 8 and lower low pressure winding fixed disk 9 are individually fixed in upper end and the lower end of low pressure winding, the first upper boom 2, the second upper boom 3, high pressure winding 1, upper high pressure winding fixed disk 6, lower high pressure winding fixed disk 7, the first lower beam 4 and the second lower beam 5 are connected by the 3rd governor motion, the first upper boom 2, the second upper boom 3, low pressure winding, upper low pressure winding fixed disk 8, lower low pressure winding fixed disk 9, the first lower beam 4 and the second lower beam 5 are connected by the 4th governor motion, the 5th governor motion and the first lower beam 4, the second lower beam 5 and lower high pressure winding fixed disk 7 are connected, and the 6th governor motion is connected with the 5th adjustment structure and lower low pressure winding fixed disk 9.
Described the first governor motion comprises some the first screw rods 14, the first screw rod 14 is connected the first upper boom 2, the first iron core 16 and the second upper boom 3 through the first upper boom 2, the first iron core 16 and the second upper boom 3 successively, the two ends of the first screw rod 14 are all socketed with the first fixture, the second governor motion comprises some the second screw rods 15, the second screw rod 15 is connected the first lower beam 4, the second iron core 17 and the second lower beam 5 through the first lower beam 4, the second iron core 17 and the second lower beam 5 successively, and the two ends of the second screw rod 15 are all socketed with the second fixture.
Described the 3rd governor motion comprises some the 3rd screw rods 10 and some the 4th screw rods 11, on upper high pressure winding fixed disk 6, offer the first chute and the second chute, on lower high pressure winding fixed disk 7, offer the 3rd chute and the 4th chute, the 3rd screw rod 10 is successively through the first upper boom 2, the first chute on upper high pressure winding fixed disk 6, high pressure winding 1, the 3rd chute of lower high pressure winding fixed disk 7 and the first lower beam 4 are by the first upper boom 2, upper high pressure winding fixed disk 6, high pressure winding 1, lower high pressure winding fixed disk 7 and the first lower beam 4 are connected, the two ends of the 3rd screw rod 10 are all socketed with the 3rd fixture, the 3rd screw rod 10 middle parts are socketed with the 4th fixture and the 5th fixture, the 4th fixture is between upper high pressure winding fixed disk 6 and the first upper boom 2, the 5th fixture is between lower high pressure winding fixed disk 7 and the first lower beam 4, the 4th screw rod 11 is successively through the second upper boom 3, the second chute of upper high pressure winding fixed disk 6, high pressure winding 1, the 4th chute of lower high pressure winding fixed disk 7 and the second lower beam 5 are by the second upper boom 3, upper high pressure winding fixed disk 6, high pressure winding 1, lower high pressure winding fixed disk 7 and the second lower beam 5 are connected, the two ends of the 4th screw rod 11 are all socketed with the 6th fixture, the middle part of the 4th screw rod 11 is socketed with the 7th fixture and the 8th fixture, the 7th fixture is between upper high pressure winding fixed disk 6 and the second upper boom 3, the 8th fixture is between lower high pressure winding fixed disk 7 and the second lower beam 5.
Described the 4th governor motion comprises some the 5th screw rods 12 and some the 6th screw rods, on upper low pressure winding fixed disk 8, offer the 5th chute and the 6th chute, on lower low pressure winding fixed disk 9, offer the 7th chute and the 8th chute, the 5th screw rod 12 is successively through the first upper boom 2, the 5th chute on upper low pressure winding fixed disk 8, low pressure winding, the 7th chute on lower low pressure winding fixed disk 9 and the first lower beam 4 are by the first upper boom 2, upper low pressure winding fixed disk 8, low pressure winding, lower low pressure winding fixed disk 9 and the first lower beam 4 are connected, the two ends of the 5th screw rod 12 are all socketed with the 9th fixture, the middle part of the 5th screw rod 12 is socketed with the tenth fixture and the 11 fixture, the tenth fixture is between upper low pressure winding fixed disk 8 and the first upper boom 2, the 11 fixture is between lower low pressure winding fixed disk 9 and the first lower beam 4, the 6th screw rod is successively through the second upper boom 3, the 6th chute on upper low pressure winding fixed disk 8, low pressure winding, the 8th chute on lower low pressure winding fixed disk 9 and the second lower beam 5 are by the second upper boom 3, upper low pressure winding fixed disk 8, low pressure winding, lower low pressure winding fixed disk 9 and the second lower beam 5 are connected, the two ends of the 6th screw rod are all socketed with the 12 fixture, the middle part of the 6th screw rod is socketed with the 13 fixture and the 14 fixture, the 13 fixture is between the second upper boom 3 and upper low pressure winding fixed disk 8, the 14 fixture is between the second lower beam 5 and lower low pressure winding fixed disk 9.
Described the 5th governor motion comprises the first fixed block 21, the first fixed head 18, the first adjusting rod 20, the second fixed head the 19 and the 15 fixture, the middle part of the first fixed head 18 is connected with the first lower beam 4 and the second lower beam 5, the side of first fixed head 18 one end is fixed in one end of the second fixed head 19, the 15 fixture is socketed on one end of the first adjusting rod 20, the other end of the first adjusting rod 20 is flexibly connected with the first fixed block 21 through the second fixed head 19, the first fixed block 21 is connected with lower low pressure winding fixed disk 9, the 6th governor motion comprises the second fixed block 24, the 3rd fixed head 22, the second adjusting rod the 23 and the 16 fixture, the side of first fixed head 18 other ends is fixed in one end of the 3rd fixed head 22, the 16 fixture is socketed on one end of the second adjusting rod 23, the other end of the second adjusting rod 23 is flexibly connected with the second fixed block 24 through the 3rd fixed head 22, the second fixed block 24 is connected with lower high pressure winding fixed disk 7.
In addition, the utility model also comprises some the 7th screw rods 13 and some the 8th screw rods, the 7th screw rod 13 is connected the first upper boom 2 and the second lower beam 5 through the first upper boom 2 and the first lower beam 4, the 8th screw rod is connected the second upper boom 3 and the second lower beam 5 through the second upper boom 3 and the second lower beam 5, and the two ends of the two ends of the 7th screw rod 13 and the 8th screw rod are all socketed with the 17 fixture.The side of the side of the side of the first screw rod 14, the side of the second screw rod 15, the 3rd screw rod 10, the side of the 4th screw rod 11, the 5th screw rod 12, side, the side of the 7th screw rod 13 and the side of the 8th screw rod of the 6th screw rod are equipped with screw thread; The first fixture, the second fixture, the 3rd fixture, the 4th fixture, the 5th fixture, the 6th fixture, the 7th fixture, the 8th fixture, the 9th fixture, the tenth fixture, the 11 fixture, the 12 fixture, the 13 fixture, the 14 fixture, the 15 fixture, the 16 fixture and the 17 fixture are nut.
Described low pressure winding and high pressure winding 1 are Continuous winding, spacing in low pressure winding between adjacent two line cakes is 8mm, spacing in high pressure winding 1 between adjacent two line cakes is 8mm, in low pressure winding, between adjacent two line cakes and in high pressure winding 1, between adjacent two line cakes, be equipped with cushion block, described cushion block is couch board.In addition, between the 4th fixture and upper high pressure winding fixed disk 6, between the 5th fixture and lower high pressure winding fixed disk 7, between the 7th fixture and upper high pressure winding fixed disk 6, between the 8th fixture and lower high pressure winding fixed disk 7, between the tenth fixture and upper low pressure winding fixed disk 8, between the 11 fixture and lower low pressure winding fixed disk 9, between the 13 fixture and lower low pressure winding fixed disk 9 and be equipped with pad between the 14 fixture and lower low pressure winding fixed disk 9.
Specific works process of the present utility model is:
When simulation iron core fault, regulate the first upper boom 2 and the fastening force of the second upper boom 3 to the first iron core 16 by rotating described the first fixture, regulate the first lower beam 4 and the fastening force of the second lower beam 5 to the second iron core 17 by rotating the second fixture, thereby realize the simulation to iron core fault, when simulated high-pressure winding 1 fault, by rotating the 4th fixture, the 5th fixture, the 7th fixture and the 8th fixture regulate upper high pressure winding fixed disk 6 and the thrust of lower high pressure winding fixed disk 7 to high pressure winding 1, rotate the 16 fixture simultaneously, the second adjusting rod 23 promotes lower high pressure winding fixed disk 7 and moves, thereby realize the simulation to the deformation of high pressure winding, when simulation low pressure winding failure, regulate upper low pressure winding fixed disk 8 and the thrust of lower low pressure winding fixed disk 9 to low pressure winding by rotating the tenth fixture, the 11 fixture, the 13 fixture and the 14 fixture, rotate the 15 fixture simultaneously, the first adjusting rod 20 can promote lower low pressure winding fixed disk 9 and move, thereby realizes the simulation to the deformation of low pressure winding.

Claims (10)

1. can simulate the testing transformer of multiple iron core and winding failure for one kind, it is characterized in that, comprise the first upper boom (2), the second upper boom (3), the first lower beam (4), the second lower beam (5), the first iron core (16), the second iron core (17) and some windings mechanism, winding mechanism comprises high pressure winding (1), upper high pressure winding fixed disk (6), lower high pressure winding fixed disk (7), upper low pressure winding fixed disk (8), lower low pressure winding fixed disk (9), low pressure winding, be used for regulating the first governor motion of the first iron core (16) fastening force, be used for regulating the second governor motion of the second iron core (17) fastening force, be used for regulating the 3rd governor motion of high pressure winding (1) thrust, for regulating the 4th governor motion of low pressure winding thrust, for making the 5th governor motion of low pressure winding deformation and for making the 6th governor motion of high pressure winding (1) deformation,
Described the first iron core (16) is held between the first upper boom (2) and the second upper boom (3), and the first iron core (16), the first upper boom (2) and the second upper boom (3) are connected by the first governor motion;
Described the second iron core (17) is held between the first lower beam (4) and the second lower beam (5), and the second iron core (17), the first lower beam (4) and the second lower beam (5) are connected by the second governor motion;
Described high pressure winding (1) is socketed on low pressure winding, upper high pressure winding fixed disk (6) and lower high pressure winding fixed disk (7) are individually fixed in upper end and the lower end of high pressure winding (1), upper low pressure winding fixed disk (8) and lower low pressure winding fixed disk (9) are individually fixed in upper end and the lower end of low pressure winding, the first upper boom (2), the second upper boom (3), high pressure winding (1), upper high pressure winding fixed disk (6), lower high pressure winding fixed disk (7), the first lower beam (4) and the second lower beam (5) are connected by the 3rd governor motion, the first upper boom (2), the second upper boom (3), low pressure winding, upper low pressure winding fixed disk (8), lower low pressure winding fixed disk (9), the first lower beam (4) and the second lower beam (5) are connected by the 4th governor motion, the 5th governor motion and the first lower beam (4), the second lower beam (5) and lower high pressure winding fixed disk (7) are connected, and the 6th governor motion is connected with the 5th adjustment structure and lower low pressure winding fixed disk (9).
2. testing transformer of simulating multiple iron core and winding failure according to claim 1, it is characterized in that, described the first governor motion comprises some the first screw rods (14), the first screw rod (14) is connected the first upper boom (2), the first iron core (16) and the second upper boom (3) through the first upper boom (2), the first iron core (16) and the second upper boom (3) successively, and the two ends of the first screw rod (14) are all socketed with the first fixture.
3. testing transformer of simulating multiple iron core and winding failure according to claim 2, it is characterized in that, described the second governor motion comprises some the second screw rods (15), the second screw rod (15) is connected the first lower beam (4), the second iron core (17) and the second lower beam (5) through the first lower beam (4), the second iron core (17) and the second lower beam (5) successively, and the two ends of the second screw rod (15) are all socketed with the second fixture.
4. testing transformer of simulating multiple iron core and winding failure according to claim 3, is characterized in that, described the 3rd governor motion comprises some the 3rd screw rods (10) and some the 4th screw rods (11);
On described upper high pressure winding fixed disk (6), offer the first chute and the second chute, on lower high pressure winding fixed disk (7), offer the 3rd chute and the 4th chute;
Described the 3rd screw rod (10) is successively through the first upper boom (2), the first chute on upper high pressure winding fixed disk (6), high pressure winding (1), the 3rd chute of lower high pressure winding fixed disk (7) and the first lower beam (4) are by the first upper boom (2), upper high pressure winding fixed disk (6), high pressure winding (1), lower high pressure winding fixed disk (7) and the first lower beam (4) are connected, the two ends of the 3rd screw rod (10) are all socketed with the 3rd fixture, the 3rd screw rod (10) middle part is socketed with the 4th fixture and the 5th fixture, the 4th fixture is positioned between high pressure winding fixed disk (6) and the first upper boom (2), the 5th fixture is positioned between lower high pressure winding fixed disk (7) and the first lower beam (4),
Described the 4th screw rod (11) is successively through the second upper boom (3), the second chute of upper high pressure winding fixed disk (6), high pressure winding (1), the 4th chute of lower high pressure winding fixed disk (7) and the second lower beam (5) are by the second upper boom (3), upper high pressure winding fixed disk (6), high pressure winding (1), lower high pressure winding fixed disk (7) and the second lower beam (5) are connected, the two ends of the 4th screw rod (11) are all socketed with the 6th fixture, the middle part of the 4th screw rod (11) is socketed with the 7th fixture and the 8th fixture, the 7th fixture is positioned between high pressure winding fixed disk (6) and the second upper boom (3), the 8th fixture is positioned between lower high pressure winding fixed disk (7) and the second lower beam (5).
5. testing transformer of simulating multiple iron core and winding failure according to claim 4, is characterized in that, described the 4th governor motion comprises some the 5th screw rods (12) and some the 6th screw rods;
On described upper low pressure winding fixed disk (8), offer the 5th chute and the 6th chute, on lower low pressure winding fixed disk (9), offer the 7th chute and the 8th chute;
Described the 5th screw rod (12) is successively through the first upper boom (2), the 5th chute on upper low pressure winding fixed disk (8), low pressure winding, the 7th chute on lower low pressure winding fixed disk (9) and the first lower beam (4) are by the first upper boom (2), upper low pressure winding fixed disk (8), low pressure winding, lower low pressure winding fixed disk (9) and the first lower beam (4) are connected, the two ends of the 5th screw rod (12) are all socketed with the 9th fixture, the middle part of the 5th screw rod (12) is socketed with the tenth fixture and the 11 fixture, the tenth fixture is positioned between low pressure winding fixed disk (8) and the first upper boom (2), the 11 fixture is positioned between lower low pressure winding fixed disk (9) and the first lower beam (4),
Described the 6th screw rod is successively through the second upper boom (3), the 6th chute on upper low pressure winding fixed disk (8), low pressure winding, the 8th chute on lower low pressure winding fixed disk (9) and the second lower beam (5) are by the second upper boom (3), upper low pressure winding fixed disk (8), low pressure winding, lower low pressure winding fixed disk (9) and the second lower beam (5) are connected, the two ends of the 6th screw rod are all socketed with the 12 fixture, the middle part of the 6th screw rod is socketed with the 13 fixture and the 14 fixture, the 13 fixture is positioned between the second upper boom (3) and upper low pressure winding fixed disk (8), the 14 fixture is positioned between the second lower beam (5) and lower low pressure winding fixed disk (9).
6. testing transformer of simulating multiple iron core and winding failure according to claim 5, it is characterized in that, between described the 4th fixture and upper high pressure winding fixed disk (6), between the 5th fixture and lower high pressure winding fixed disk (7), between the 7th fixture and upper high pressure winding fixed disk (6), between the 8th fixture and lower high pressure winding fixed disk (7), between the tenth fixture and upper low pressure winding fixed disk (8), between the 11 fixture and lower low pressure winding fixed disk (9), between the 13 fixture and lower low pressure winding fixed disk (9) and between the 14 fixture and lower low pressure winding fixed disk (9), be equipped with pad.
7. testing transformer of simulating multiple iron core and winding failure according to claim 5, it is characterized in that, described the 5th governor motion comprises the first fixed block (21), the first fixed head (18), the first adjusting rod (20), the second fixed head (19) and the 15 fixture, the middle part of the first fixed head (18) is connected with the first lower beam (4) and the second lower beam (5), the side of the first fixed head (18) one end is fixed in one end of the second fixed head (19), the 15 fixture is socketed on one end of the first adjusting rod (20), the other end of the first adjusting rod (20) is flexibly connected with the first fixed block (21) through the second fixed head (19), the first fixed block (21) is connected with lower low pressure winding fixed disk (9),
Described the 6th governor motion comprises the second fixed block (24), the 3rd fixed head (22), the second adjusting rod (23) and the 16 fixture, the side of the first fixed head (18) other end is fixed in one end of the 3rd fixed head (22), the 16 fixture is socketed on one end of the second adjusting rod (23), the other end of the second adjusting rod (23) is flexibly connected with the second fixed block (24) through the 3rd fixed head (22), and the second fixed block (24) is connected with lower high pressure winding fixed disk (7).
8. testing transformer of simulating multiple iron core and winding failure according to claim 7, it is characterized in that, also comprise some the 7th screw rods (13) and some the 8th screw rods, the 7th screw rod (13) is connected the first upper boom (2) and the second lower beam (5) through the first upper boom (2) and the first lower beam (4), the 8th screw rod is connected the second upper boom (3) and the second lower beam (5) through the second upper boom (3) and the second lower beam (5), the 7th two ends of screw rod (13) and the two ends of the 8th screw rod are all socketed with the 17 fixture.
9. testing transformer of simulating multiple iron core and winding failure according to claim 8, it is characterized in that, the side of the side of the side of described the first screw rod (14), the side of the second screw rod (15), the 3rd screw rod (10), the side of the 4th screw rod (11), the 5th screw rod (12), side, the 7th side of screw rod (13) and the side of the 8th screw rod of the 6th screw rod are equipped with screw thread;
Described the first fixture, the second fixture, the 3rd fixture, the 4th fixture, the 5th fixture, the 6th fixture, the 7th fixture, the 8th fixture, the 9th fixture, the tenth fixture, the 11 fixture, the 12 fixture, the 13 fixture, the 14 fixture, the 15 fixture, the 16 fixture and the 17 fixture are nut.
10. testing transformer of simulating multiple iron core and winding failure according to claim 1, it is characterized in that, described low pressure winding and high pressure winding (1) are Continuous winding, spacing in low pressure winding between adjacent two line cakes is 8mm, spacing in high pressure winding (1) between adjacent two line cakes is 8mm, in low pressure winding, between adjacent two line cakes and in high pressure winding (1), between adjacent two line cakes, be equipped with cushion block, described cushion block is couch board.
CN201420402990.7U 2014-07-21 2014-07-21 A kind of testing transformer of simulating multiple iron core and winding failure Expired - Fee Related CN204010940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420402990.7U CN204010940U (en) 2014-07-21 2014-07-21 A kind of testing transformer of simulating multiple iron core and winding failure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420402990.7U CN204010940U (en) 2014-07-21 2014-07-21 A kind of testing transformer of simulating multiple iron core and winding failure

Publications (1)

Publication Number Publication Date
CN204010940U true CN204010940U (en) 2014-12-10

Family

ID=52050903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420402990.7U Expired - Fee Related CN204010940U (en) 2014-07-21 2014-07-21 A kind of testing transformer of simulating multiple iron core and winding failure

Country Status (1)

Country Link
CN (1) CN204010940U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107591072A (en) * 2017-10-09 2018-01-16 贵州电网有限责任公司 A kind of Synthesized Diagnosis On Transformer Faults simulator and its emulation mode
CN107783072A (en) * 2017-11-13 2018-03-09 广西电网有限责任公司电力科学研究院 A kind of flexible winding deformation analogue means

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107591072A (en) * 2017-10-09 2018-01-16 贵州电网有限责任公司 A kind of Synthesized Diagnosis On Transformer Faults simulator and its emulation mode
CN107591072B (en) * 2017-10-09 2023-08-25 贵州电网有限责任公司 Transformer comprehensive fault diagnosis simulation device and simulation method thereof
CN107783072A (en) * 2017-11-13 2018-03-09 广西电网有限责任公司电力科学研究院 A kind of flexible winding deformation analogue means

Similar Documents

Publication Publication Date Title
CN110929853A (en) Power distribution network line fault prediction method based on deep learning
CN202230150U (en) On-line monitoring intelligent terminal for electric power lightning arrester with fiber for power supply
CN206114842U (en) Cubical switchboard local discharge signal processing device device
CN103149517B (en) Oil-immersed equipment insulation ag(e)ing non-destructive testing device based on virtual instrument and method
CN103063985A (en) Very fast transient overvoltage horizontal identification method
CN103760448A (en) Comprehensive live test method of insulation defects of metal oxide arrester for electric power
CN107247247A (en) A kind of fault detector detection platform
CN101551442B (en) A generator rotor insulation on-line monitoring grounding locating method and device
CN204010940U (en) A kind of testing transformer of simulating multiple iron core and winding failure
CN204349328U (en) A kind of SF6 gas-insulated ring network cabinet with local discharge on-line monitoring device
CN207039180U (en) A kind of iron core of transformer status monitoring and excess current control system
CN103995227B (en) The planned state test method of distribution switch
CN203798971U (en) Physical model for simulating air gap-type partial discharge
Gan et al. Research and implementation of on-line monitoring techniques for high voltage equipments in smart grid
CN101702511B (en) Intelligent oil-immersed transformer
CN205450042U (en) Experimental switching operation platform of power transformer
CN105071337A (en) Self-feedback intelligent earth leakage protection controlling device and method
CN206401796U (en) A kind of non-maintaining high-voltage ring main unit of small size
CN202153638U (en) Complete set of protective apparatus for transformer neutral point
CN203166397U (en) Circuit structure for eliminating induction voltage
CN202563012U (en) Large-scale power station grounding net impedance parameter measuring device
CN201616334U (en) Intelligent oil immersed transformer
CN202548279U (en) Locally discharging insulator internal defect discharge device
CN207781030U (en) A kind of the high and low pressure side winding and core insulation fault simulator of transformer
CN204631130U (en) Transformer low-voltage short-circuit reactance proving installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210