CN204009102U - 一种围岩裂隙测量的观测装置 - Google Patents
一种围岩裂隙测量的观测装置 Download PDFInfo
- Publication number
- CN204009102U CN204009102U CN201420360505.4U CN201420360505U CN204009102U CN 204009102 U CN204009102 U CN 204009102U CN 201420360505 U CN201420360505 U CN 201420360505U CN 204009102 U CN204009102 U CN 204009102U
- Authority
- CN
- China
- Prior art keywords
- pushing ram
- camera head
- air bag
- water filling
- annular fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Materials By The Use Of Optical Means Adapted For Particular Applications (AREA)
Abstract
一种围岩裂隙测量的观测装置,包括注水气囊、给水皮管、推进杆及摄像装置。其中注水气囊位于前端,其底部设置有注水孔,所述注水孔连接给水皮管,所述注水气囊底部的中心位置固定连接推进杆,所述推进杆有多根,通过推进杆衔接头连接;所述摄像装置包括钻孔摄像头、环形卡扣器、弹簧和牵引绳,所述钻孔摄像头设置在环形卡扣器上,所述环形卡扣器套在推进杆上,所述弹簧一端连接在推进杆顶端,另一端连接环形卡扣器的上端,所述牵引绳设置在环形卡扣器下端。该观测装置通过注水气囊阻止顶板水量过大对钻孔摄像头的干扰,可准确地观测围岩裂隙的发育,结构简单,操作方便,可达到较好的观测效果。
Description
技术领域
本实用新型涉及一种观测装置,尤其涉及一种围岩裂隙测量的观测装置。
背景技术
煤矿在水体下采煤时,为了合理地确定开采上限,缩小防水煤柱,充分地回收煤炭资源,首先必须确定顶板导水裂隙带高度,目前确定裂隙带高度的人为影响因素较大。经验公式计算法是在准确地分析判断矿区覆岩结构类型的基础上,利用《建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程》中的经验公式进行计算的一种方法。但是在利用公式时,由于在考虑煤层顶板覆岩内的岩性是按顶板分类中的软或硬这一模糊指标来衡量的,有时不容易确定,此时公式选择有难度,计算结果是否准确可靠尚有待于现场进一步验证。
对于岩石裂隙发育程度的观测目前方法主要有:利用经验公式推导、冲洗衣液法、注水实验法、高密度电阻率法、超声成像法、声波CT成像法、钻孔成像法等。但是在解决顶板淋水严重的矿井两带高度观测时,主要靠注水试验方法等,目前注水试验主要包括单端注水器、与双端堵水器,双端堵水器应用范围较广,此装置原理是根据液体的漏湿量来判断裂隙节理的发育程度及数目,但是这种装置无法准确反映绝对漏湿量,及操作过程及其复杂。对于钻孔电视在顶板水量过大时,采用何种装置进行对钻孔摄像头处理目前没有专门的研究。
实用新型内容
本实用新型的目的是提供一种围岩裂隙测量的观测装置,该观测装置使单端注水气囊与钻孔电视相结合,设置的单端注水气囊能够承受足够的水压,阻止在摄像头观测孔壁的时候顶板淋水,且摄像头的观测与气囊注水互不干扰,利用滑动机构使摄像头能在堵水器保护范围内上下滑动,观测孔成型要好,确保孔壁光滑,同时适用于竖直孔和斜孔。
本实用新型为了实现上述目的,采用的技术解决方案是:
一种围岩裂隙测量的观测装置,包括注水气囊、给水皮管、推进杆及摄像装置;所述注水气囊位于前端,其底部设置有注水孔,所述注水孔连接给水皮管,所述注水气囊底部的中心位置固定连接推进杆,所述摄像装置设置在推进杆上。
优选地,所述推进杆有多根,所述推进杆相互之间由推进杆衔接头连接,推进杆的两端设置有外丝,所述推进杆衔接头的两端设置有内丝,推进杆的外丝与推进杆衔接头的内丝相适配。
优选地,所述摄像装置包括钻孔摄像头、环形卡扣器、弹簧和牵引绳,所述钻孔摄像头固定设置在环形卡扣器上,所述环形卡扣器套在推进杆上且可带动钻孔摄像头一起沿推进杆轴向移动,所述推进杆靠近注水气囊的位置设有定位座,所述弹簧一端连接在定位座上,另一端连接环形卡扣器的上端,所述牵引绳设置在环形卡扣器下端。
本实用新型是一种围岩裂隙测量的观测装置,与原有技术相比,在顶部设计注水气囊能够承受足够的水压,注水加压,气囊鼓起与孔壁耦合,阻隔了围岩钻孔上部流水,阻止在摄像头观测孔壁的时候顶板淋水过大,能够满足钻孔摄像头对于钻孔内部细微裂痕和围岩内部岩层发育程度观测;环形卡扣器套在推进杆上使钻孔摄像头能在堵水器保护范围内上下滑动,增加观测范围,可以更加准确来判断裂隙节理的发育程度及数目。
附图说明
图1是一种围岩裂隙测量的观测装置的结构示意图。
具体实施方式
下面结合附图对本实用新型进行详细说明:
结合图1,一种围岩裂隙测量的观测装置,包括注水气囊1、给水皮管2、推进杆3、推进杆衔接头4及摄像装置5,注水气囊1位于顶端,其底部设置有注水孔10,所述注水孔10连接给水皮管2,使给水皮管2与注水气囊1相连通;所述注水气囊1底部的中心位置固定连接推进杆3,所述推进杆3的另一端与推进杆衔接头4连接,所述推进杆衔接头4的另一端可以继续连接推进杆3。所述摄像装置5位于注水气囊1的下方,包括钻孔摄像头6、环形卡扣器7、弹簧8和牵引绳9,所述钻孔摄像头6固定设置在环形卡扣器7上,所述环形卡扣器套在推进杆3上且沿推进杆3轴向滑动,所述推进杆3靠近注水气囊1的外置设置定位座13,所述弹簧8一端连接在推进杆3顶端的定位座13上,另一端连接环形卡扣器7的上端,所述牵引绳9设置在环形卡扣器7下端。
具体地,此种围岩裂隙测量的观测装置在使用前,首先利用钻机在围岩11内钻孔,孔壁要求光滑,然后将此观测装置放入钻孔12中,推进杆3将注水气囊1送至预定位置,通过给水皮管2向注水气囊1内注水加压,使注水气囊1鼓起与孔壁耦合,阻隔钻孔12上部流水。开启钻孔摄像头6对孔壁细微裂痕和围岩内部岩层发育程度观测,在弹簧8和牵引绳9的相互配合下,环形卡扣器7带动钻孔摄像头6沿推进杆3的轴向移动,扩大了观测范围。需要变换钻孔12内的位置时,首先将注水气囊1的水经给水皮管2排出,在推进杆3把注水气囊1送至观测位置后重新注水加压,待阻止顶板水对钻孔摄像头6的干扰后进行观测。该观测装置不仅仅适用于竖直孔,同样对于倾斜孔也同样能达到很好的观测效果。
当然,上述说明并非是对本实用新型的限制,本实用新型也并不仅限于上述举例,本技术领域的技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也应属于本实用新型的保护范围。
Claims (3)
1.一种围岩裂隙测量的观测装置,其特征在于:包括注水气囊、给水皮管、推进杆及摄像装置;所述注水气囊位于前端,其底部设置有注水孔,所述注水孔连接给水皮管,所述注水气囊底部的中心位置固定连接推进杆,所述摄像装置设置在推进杆上。
2.根据权利要求1所述的一种围岩裂隙测量的观测装置,其特征在于:所述推进杆有多根,所述推进杆相互之间由推进杆衔接头连接,推进杆的两端设置有外丝,所述推进杆衔接头的两端设置有内丝,推进杆的外丝与推进杆衔接头的内丝相适配。
3.根据权利要求1所述的一种围岩裂隙测量的观测装置,其特征在于:所述摄像装置包括钻孔摄像头、环形卡扣器、弹簧和牵引绳,所述钻孔摄像头固定设置在环形卡扣器上,所述环形卡扣器套在推进杆上且可带动钻孔摄像头一起沿推进杆轴向移动,所述推进杆靠近注水气囊的位置设有定位座,所述弹簧一端连接在定位座上,另一端连接环形卡扣器的上端,所述牵引绳设置在环形卡扣器下端。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420360505.4U CN204009102U (zh) | 2014-07-01 | 2014-07-01 | 一种围岩裂隙测量的观测装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420360505.4U CN204009102U (zh) | 2014-07-01 | 2014-07-01 | 一种围岩裂隙测量的观测装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204009102U true CN204009102U (zh) | 2014-12-10 |
Family
ID=52049080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420360505.4U Expired - Fee Related CN204009102U (zh) | 2014-07-01 | 2014-07-01 | 一种围岩裂隙测量的观测装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204009102U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105334308A (zh) * | 2015-09-23 | 2016-02-17 | 辽宁工程技术大学 | 一种围岩裂隙发育动态监测方法及监测设备 |
CN112145118A (zh) * | 2020-10-19 | 2020-12-29 | 华北科技学院 | 一种集成钻孔窥视功能的双端堵水器装置及方法 |
-
2014
- 2014-07-01 CN CN201420360505.4U patent/CN204009102U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105334308A (zh) * | 2015-09-23 | 2016-02-17 | 辽宁工程技术大学 | 一种围岩裂隙发育动态监测方法及监测设备 |
CN112145118A (zh) * | 2020-10-19 | 2020-12-29 | 华北科技学院 | 一种集成钻孔窥视功能的双端堵水器装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201481A (zh) | 液态co2相变多点致裂增透方法 | |
CN103195468A (zh) | 一种在围岩内进行高效强化抽采的系统工艺 | |
CN106194244A (zh) | 低透气煤层液相co2相变致裂增透网格式瓦斯抽采方法 | |
CN110397428A (zh) | 一种直井与u型对接井联合开采煤层气的驱替煤层气增产方法 | |
CN102852490A (zh) | 复杂结构井抽放高瓦斯气工艺方法 | |
CN101892841A (zh) | 煤层采空区裂隙带注水观测系统 | |
CN105986795B (zh) | 煤层气水平井煤层改造方法 | |
CN109469474A (zh) | 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置和方法 | |
CN104453865A (zh) | 单回路水压致裂原地应力测量系统 | |
CN202810680U (zh) | 采用双壁钻杆的钻井组合装置 | |
CN206668328U (zh) | 一种钻孔式岩层沉降监测系统 | |
CN104405372A (zh) | 一种基于高位钻孔流量的测试采场覆岩竖三带高度方法 | |
CN109973082A (zh) | 基于上向穿层钻孔同时测定多煤层瓦斯压力的装置和方法 | |
CN104165025B (zh) | 一种长螺旋钻杆与潜孔锤相结合的钻具 | |
CN205400702U (zh) | 一种坚硬岩层浅层地热井压裂设备 | |
CN204009102U (zh) | 一种围岩裂隙测量的观测装置 | |
CN203164441U (zh) | 轻便式气囊隔离随钻压水试验器 | |
CN205532529U (zh) | 活塞控制式防返吐偏心配水器 | |
CN202900175U (zh) | 储气库悬挂压力计测压完井管柱 | |
CN204082116U (zh) | 油井水平井油套同注式双封单卡体积压裂管柱 | |
CN207004498U (zh) | 无限级开关滑套压裂工具 | |
CN201696048U (zh) | 煤层采空区裂隙带注水观测系统 | |
CN109441419B (zh) | 一种油气储层二次改造管柱 | |
CN106968664A (zh) | 一种工作面底板破坏带深度钻孔注水探测方法 | |
CN106855471A (zh) | 一种废弃矿井老空区导气裂隙带测定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20150701 |
|
EXPY | Termination of patent right or utility model |