CN109469474A - 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置和方法 - Google Patents

基于下向穿层钻孔同时测定多煤层瓦斯压力的装置和方法 Download PDF

Info

Publication number
CN109469474A
CN109469474A CN201811480470.7A CN201811480470A CN109469474A CN 109469474 A CN109469474 A CN 109469474A CN 201811480470 A CN201811480470 A CN 201811480470A CN 109469474 A CN109469474 A CN 109469474A
Authority
CN
China
Prior art keywords
pressure
drilling
pipe
pouch
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811480470.7A
Other languages
English (en)
Other versions
CN109469474B (zh
Inventor
徐超
王凯
蔡永博
付强
王硕
郭超飞
冯玉凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201811480470.7A priority Critical patent/CN109469474B/zh
Publication of CN109469474A publication Critical patent/CN109469474A/zh
Application granted granted Critical
Publication of CN109469474B publication Critical patent/CN109469474B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

本发明专利公开了一种基于下向穿层钻孔同时测定多煤层瓦斯压力的装置和方法。所述测压装置包括置于钻孔内并通至多个煤层和岩层的套管,套管上装有与煤层顶底板位置对应的法兰盘,管路上与法兰盘相邻固定有隔离囊袋,隔离囊袋用于隔离气室与水泥砂浆填充室,避免水泥砂浆流入气室内。套管中各管分为注浆和测压两类用途,相邻隔离囊袋之间隔离的空间与孔口分别通过套管中注浆管和测压管相连,与岩层相接的隔离空间为水泥砂浆填充室,通过注浆管与孔口相通并注浆,注浆管孔口端与注浆泵相连并向水泥砂浆填充室注浆;与煤层相接的隔离空间为气室,通过测压管与孔口相通,测压管孔口端与压力表相连并用于测压。测压方法基于上述装置进行分层测压。本发明测压效果好、施工成本低、材料简单易得,能够有效解决单独测定煤层群瓦斯压力施工量大、测定成本高等问题。

Description

基于下向穿层钻孔同时测定多煤层瓦斯压力的装置和方法
所属技术领域
本发明涉及一种煤矿井下瓦斯压力测定的装置及方法,尤其是基于下向钻孔同时测定多煤层瓦斯压力的装置及方法,适用于多煤层地质条件下施工下向穿层钻孔同时测定下组煤层群瓦斯压力的技术领域。
背景技术
我国煤炭赋存地质条件复杂,随着煤炭开采深度加大,煤层瓦斯含量和压力增大,瓦斯灾害危险性增高,瓦斯灾害防治是保障煤炭安全开采工作中的重中之重。煤层瓦斯压力值是鉴定矿井瓦斯等级、评价煤层的煤与瓦斯突出危险性以及制定瓦斯抽采方案的重要指标之一。测定煤层瓦斯压力是瓦斯灾害防治工作的一项重要内容,煤层瓦斯压力值测定是否准确直接影响着煤矿的安全生产。
我国煤炭多呈煤层群条件赋存。现有煤层瓦斯压力测定装置及方法中,每个钻孔只能测定一个煤层的瓦斯压力,如若测定下组煤层群瓦斯压力,只能通过施工若干个钻孔后逐个封孔测定,费时费力且成本较高。因此,如何准确、便捷、经济、实用的实现多煤层瓦斯压力同时测定,是摆在科研工作者和现场工程技术人员面前的一道难题。
发明内容
针对现有煤层瓦斯压力测定装置及方法的缺陷,本发明目的是提供一种准确、便捷、经济、实用的基于下向钻孔同时测定多煤层瓦斯压力的装置及方法。为了实现上述目的,本发明采用如下技术方案:
一种基于下向钻孔同时测定多煤层瓦斯压力的装置,测压装置包括置于钻孔内并通至多个煤层和岩层的套管,套管上装有与煤层顶底板位置对应的法兰盘,管路上与法兰盘相邻固定有隔离囊袋,隔离囊袋用于隔离气室与水泥砂浆填充室,避免水泥砂浆流入气室内。套管中各管分为注浆和测压两类用途,相邻隔离囊袋之间隔离的空间与孔口分别通过套管中注浆管和测压管相连,与岩层相接的隔离空间为水泥砂浆填充室,通过注浆管与孔口相通并注浆,注浆管孔口端与注浆泵相连并向水泥砂浆填充室注浆;与煤层相接的隔离空间为气室,通过测压管与孔口相通,测压管孔口端与压力表相连并用于测压。
采用前述方案的本发明,通过套管和多个法兰盘隔离囊袋结构将钻孔隔离成多个功能室,利用水泥砂浆填充的填充室将不同煤层测压气室分开,从而实现对多个煤层同时测压。
优选地,法兰盘以小于钻孔直径10mm为宜,过小支撑能力差,过大会导致装置在钻孔中推进困难。
优选地,所述隔离囊袋可用干膨胀水泥或棉纱等填充于耐磨布袋中制成;如用干膨胀水泥填充,隔离囊袋应略小于钻孔直径;如隔离囊袋中为棉纱弹性填充物,隔离囊袋直径应略大于钻孔直径;以保证良好的隔离作用前提下能顺利将隔离囊袋放入预定位置。
一种基于下向钻孔同时测定多煤层瓦斯压力的方法,应用上述装置进行,该方法包括以下步骤:
a.选定无地质构造的且稳定的位置,利用钻机施工下向穿层钻孔,记录钻孔穿层情况,根据打钻过程中记录的煤层和岩层的厚度,确定注浆管和测压管的各段安装长度,并确定法兰盘与隔离囊袋在套管上的安装位置,钻孔施工完毕之后压风吹孔;
b.将套管、法兰盘、隔离囊袋等装置依次放置入钻孔中,并使三组法兰盘、隔离囊袋从上至下分别位于上层煤层顶板、上层煤层底板、下层煤层顶板,
两根测压管下端头位置分别为两层煤层中,两根注浆管下端头位置分别为两层岩层中;
c.先后利用两根注浆管分别向水泥砂浆填充室灌注水泥砂浆;
d.注浆36-48小时待水泥砂浆凝固后,通过球阀分别连接瓦斯压力表,并保持测压管上球阀打开状态,开始测压。
本发明具有如下有益效果:
a.本发明能够准确测定出煤层瓦斯压力值,尤其是解决了两层或多层下组煤层群瓦斯压力同时准确测定的难题。
b.本发明仅通过一个下向穿层钻孔即可测定两层或多层煤层的瓦斯压力,能够有效节省钻孔施工数量及时间,大大节省了瓦斯压力测定成本。
c.本发明涉及的施工材料普通、易获取,施工工艺简单易行,实用性强。
附图说明
图1是本发明的结构示意图。
图1中,1-注浆泵,2、3-测压管,4、5-注浆管,6-水泥砂浆填充室,7、9-岩层,8、 10-煤层,11、13-气室,12-水和钻屑,14、16、18-法兰盘,15、17、19-隔离囊袋,20-瓦斯压力表,21、22、23-球阀。
具体实施方式
结合附图1所示,一种基于下向钻孔同时测定多煤层瓦斯压力的装置,包括置于钻孔内并通至多个煤层8、10和岩层7、9的套管,套管由测压管2、3,注浆管4、5组成,套管上装有与煤层8、10顶底板位置对应的法兰盘14、16、18,管路上与法兰盘14、16、18相邻分别固定有隔离囊袋15、17、19,隔离囊袋15、17、19用于隔离气室11、13与水泥砂浆填充室6,避免水泥砂浆流入气室11、13内。套管中各管分为注浆和测压两类用途,相邻隔离囊袋之间隔离的空间与孔口分别通过套管中注浆管4、5和测压管2、3相连;与岩层7、9相接的隔离空间为水泥砂浆填充室6,通过注浆管4、5与孔口相通,注浆管4、5与注浆泵1相连并向水泥砂浆填充室6注浆,与煤层8、10相接的隔离空间为气室11、13,通过测压管2、3与孔口相通,测压管2、3与瓦斯压力表20相连并用于测压。
本发明还提出了一种基于下向钻孔同时测定多煤层瓦斯压力的方法,应用上述装置进行。结合附图1,基于下向钻孔同时测定多煤层瓦斯压力的方法包括步骤阐述如下:
a.打钻施工至目标下层煤层10底板下方3-5m,打钻过程中记录穿层情况,根据打钻过程中记录的煤层8、10和岩层7、9的厚度,确定注浆管4、5和测压管2、3的各段安装长度,并确定法兰盘14、16、18与隔离囊袋15、17、19在套管上的安装位置。钻孔施工完毕后,利用井下压风装置,将孔内积水吹出;
b.根据钻孔的穿层情况,向钻孔内连接测压管2,长度1-2m;
c.在已连接的测压管2末端连接法兰盘14,法兰盘应该与测压管2固定,避免后续安装过程中滑脱;
d.在法兰盘14上端测压管2上安装隔离囊袋15并固定,确保在安装过程中不与测压管发生相对位移,隔离囊袋15长度在1m为宜,作用是封堵下方水泥砂浆填充室6的水泥砂浆,以避免注浆时水泥砂浆流入气室11;
e.连接延长测压管2,并行安装注浆管4,此段注浆管4安装长度小于岩层9的厚度1m-2m;
f.待注浆管4达到预定长度时,将测压管2、注浆管4穿过法兰盘16并固定,在法兰盘16 上端测压管2、注浆管4上安装隔离囊袋17并固定,确保在安装过程中不与测压管2、注浆管4 发生相对位移,隔离囊袋17长度为1m为宜;
g.连接延长测压管2、注浆管4,待此段安装长度将达到煤层8厚度时并行安装测压管3,测压管3安装长度为1-2m;
h.将测压管2、注浆管4、测压管3穿过法兰盘18并固定,在法兰盘16上端测压管2、注浆管4、测压管3上安装隔离囊袋19并固定,确保在安装过程中不与四分管发生相对位移,隔离囊袋19长度为1m为宜;
i.连接延长测压管2、注浆管4、测压管3,并不断将套管下入钻孔,直至法兰盘14至煤层10顶板处,此时法兰盘16的位置为煤层8底板,法兰盘18位置为煤层8顶板,测压管2下端头位置为煤层10中,测压管3位置为煤层8中,注浆管4位置为岩层9中,达到预定位置后将套管在孔口固定;
j.连接注浆管5至隔离囊袋19上方1-2m,同时准备注浆泵,混制水泥砂浆;
k.将注浆泵1与注浆管4通过球阀23连接,打开球阀23并开始注浆,注浆量根据注浆位置体积确定,待注浆完成后关闭球阀23;
l.将注浆泵1与注浆管5连接并开始注浆,待注浆量达到注浆位置体积或孔口开始返浆时停止注浆,注浆时根据砂浆位置逐步撤出注浆管5直至完全撤出;
m.注浆36-48小时待水泥砂浆凝固后,通过球阀21、球阀22分别连接瓦斯压力表,并保持球阀21、球阀22打开状态,开始测压。

Claims (6)

1.一种基于下向钻孔同时测定多煤层瓦斯压力的装置,测压装置包括置于钻孔内并通至多个煤层和岩层的套管,套管上装有与煤层顶底板位置对应的法兰盘,管路上与法兰盘相邻固定有隔离囊袋,隔离囊袋用于隔离气室与水泥砂浆填充室,避免水泥砂浆流入气室内。套管中各管分为注浆和测压两类用途,相邻隔离囊袋之间隔离的空间与孔口分别通过套管中注浆管和测压管相连,与岩层相接的隔离空间为水泥砂浆填充室,通过注浆管与孔口相通并注浆,注浆管孔口端与注浆泵相连并向水泥砂浆填充室注浆;与煤层相接的隔离空间为气室,通过测压管与孔口相通,测压管孔口端与压力表相连并用于测压。
2.根据权利要求1所述的基于下向钻孔同时测定多煤层瓦斯压力的装置,其特征在于:所述套管由法兰盘连接固定,外部安装固定隔离囊袋。
3.根据权利要求1所述的基于下向钻孔同时测定多煤层瓦斯压力的装置,其特征在于:法兰盘以小于钻孔直径10mm为宜,过小支撑能力差,过大会导致装置在钻孔中推进困难。
4.根据权利要求1所述的基于下向钻孔同时测定多煤层瓦斯压力的装置,其特征在于:所述隔离囊袋可用膨胀水泥或棉纱等填充于耐磨布袋中制成;如用干水泥填充,隔离囊袋应略小于钻孔直径;如隔离囊袋中为棉纱弹性填充物,隔离囊袋直径应略大于钻孔直径;以保证良好的隔离作用前提下能顺利将隔离囊袋放入预定位置。
5.采用前述方案的本发明,通过套管和多个法兰盘隔离囊袋结构将钻孔隔离成多个功能室,利用水泥砂浆填充的填充室将不同煤层测压气室分开,从而实现对多个煤层同时测压。
6.一种基于下向钻孔同时测定多煤层瓦斯压力的方法,应用上述装置进行,该方法包括以下步骤:
a.选定无地质构造的且稳定的位置,利用钻机施工下向穿层钻孔,记录钻孔穿层情况,根据打钻过程中记录的煤层和岩层的厚度,确定注浆管和测压管的各段安装长度,并确定法兰盘与隔离囊袋在套管上的安装位置,钻孔施工完毕之后压风吹孔;;
b.将套管、法兰盘、隔离囊袋等装置依次放置入钻孔中,并使3组法兰盘、隔离囊袋从上至下分别位于上层煤层顶板、上层煤层底板、下层煤层顶板,2根测压管下端头位置分别为2层煤层中,2根注浆管下端头位置分别为2层岩层中;
c.先后利用2根注浆管分别向水泥砂浆填充室灌注水泥砂浆;
d.注浆36-48小时待水泥砂浆凝固后,通过球阀分别连接瓦斯压力表,并保持测压管上球阀打开状态,开始测压。
CN201811480470.7A 2018-12-05 2018-12-05 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置及方法 Active CN109469474B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811480470.7A CN109469474B (zh) 2018-12-05 2018-12-05 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811480470.7A CN109469474B (zh) 2018-12-05 2018-12-05 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置及方法

Publications (2)

Publication Number Publication Date
CN109469474A true CN109469474A (zh) 2019-03-15
CN109469474B CN109469474B (zh) 2021-11-02

Family

ID=65675630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811480470.7A Active CN109469474B (zh) 2018-12-05 2018-12-05 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置及方法

Country Status (1)

Country Link
CN (1) CN109469474B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109917101A (zh) * 2019-04-12 2019-06-21 中国矿业大学(北京) 基于上向穿层钻孔同时测定多煤层瓦斯含量的方法
CN109973082A (zh) * 2019-04-18 2019-07-05 中国矿业大学(北京) 基于上向穿层钻孔同时测定多煤层瓦斯压力的装置和方法
CN110173231A (zh) * 2019-07-08 2019-08-27 中煤科工集团重庆研究院有限公司 一种长距离下向钻孔分段密实封孔测压装置及方法
CN112253247A (zh) * 2020-08-26 2021-01-22 煤科集团沈阳研究院有限公司 瓦斯压力快速测定装置及测定方法
CN114607361A (zh) * 2022-03-24 2022-06-10 安徽理工大学 一种同时测定近距离煤层群瓦斯压力的方法
CN117345226A (zh) * 2023-10-26 2024-01-05 中国矿业大学 一种煤层双套管阶梯式注浆穿层测压钻孔施工方法

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2360595Y (zh) * 1998-12-17 2000-01-26 中原石油勘探局采油工艺技术研究所 一种分层挤堵管柱
US20020020533A1 (en) * 1995-02-09 2002-02-21 Paulo Tubel Production well telemetry system and method
GB2396179A (en) * 2001-08-27 2004-06-16 Weatherford Lamb Drillable inflatable packer and methods of use
JP2004300904A (ja) * 2003-03-28 2004-10-28 Uerushii:Kk 井戸水脈同時多段採水配水システム及びその装置
RU2371567C1 (ru) * 2008-03-17 2009-10-27 Геннадий Иосифович Геймаш Способ локализации зон негерметичности эксплуатационной колонны
CN102003173A (zh) * 2010-10-29 2011-04-06 北京中矿天安科技发展有限公司 煤层封孔自动测量记录瓦斯压力的系统及方法
CN103015984A (zh) * 2012-12-19 2013-04-03 河南焦煤能源有限公司科学技术研究所 套管高压封孔法测定煤层瓦斯压力的方法
CN103089295A (zh) * 2013-01-23 2013-05-08 重庆大学 多煤层联合开采过程中煤层气抽采试验方法
CN104314607A (zh) * 2014-08-28 2015-01-28 太原理工大学 一种多阶段提高煤层钻孔瓦斯抽采浓度的方法
CN104389587A (zh) * 2014-10-11 2015-03-04 安徽建筑大学 一种煤层瓦斯压力快速测定方法
CN105040775A (zh) * 2015-08-21 2015-11-11 山东省水利科学研究院 深层承压自流井封堵系统与方法
KR101573470B1 (ko) * 2015-05-18 2015-12-14 (주)인텔리지오 수평집수관용 청소배관 주입 장치
CN105178908A (zh) * 2015-08-24 2015-12-23 中国科学院武汉岩土力学研究所 井下地层封堵的化学注浆封隔装置及方法
US20160168962A1 (en) * 2010-05-26 2016-06-16 Randy C. Tolman Assembly and Method For Multi-Zone Fracture Stimulation of A Reservoir Using Autonomous Tubular Units
CN107701143A (zh) * 2016-08-09 2018-02-16 中国石油化工股份有限公司 一种基于一趟管柱的多层段封窜堵漏装置及其方法
US20180171780A1 (en) * 2016-12-21 2018-06-21 Schlumberger Technology Corporation Method for determining an inflow profile in a multilayer well
CN108222882A (zh) * 2018-01-25 2018-06-29 安徽省煤田地质局第勘探队 巨厚冲积层单井多层段注浆新型套管与施工方法
CN108361002A (zh) * 2018-01-28 2018-08-03 湖南科技大学 一种大俯角长距离煤层瓦斯压力测试钻孔水泥砂浆封孔方法
CN108798760A (zh) * 2018-06-12 2018-11-13 中国矿业大学 一种单孔测定多煤层瓦斯压力的方法
CN108825213A (zh) * 2018-09-21 2018-11-16 中国矿业大学(北京) 一种单钻孔内多煤层瓦斯压力测量装置及方法

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020020533A1 (en) * 1995-02-09 2002-02-21 Paulo Tubel Production well telemetry system and method
CN2360595Y (zh) * 1998-12-17 2000-01-26 中原石油勘探局采油工艺技术研究所 一种分层挤堵管柱
GB2396179A (en) * 2001-08-27 2004-06-16 Weatherford Lamb Drillable inflatable packer and methods of use
JP2004300904A (ja) * 2003-03-28 2004-10-28 Uerushii:Kk 井戸水脈同時多段採水配水システム及びその装置
RU2371567C1 (ru) * 2008-03-17 2009-10-27 Геннадий Иосифович Геймаш Способ локализации зон негерметичности эксплуатационной колонны
US20160168962A1 (en) * 2010-05-26 2016-06-16 Randy C. Tolman Assembly and Method For Multi-Zone Fracture Stimulation of A Reservoir Using Autonomous Tubular Units
CN102003173A (zh) * 2010-10-29 2011-04-06 北京中矿天安科技发展有限公司 煤层封孔自动测量记录瓦斯压力的系统及方法
CN103015984A (zh) * 2012-12-19 2013-04-03 河南焦煤能源有限公司科学技术研究所 套管高压封孔法测定煤层瓦斯压力的方法
CN103089295A (zh) * 2013-01-23 2013-05-08 重庆大学 多煤层联合开采过程中煤层气抽采试验方法
CN104314607A (zh) * 2014-08-28 2015-01-28 太原理工大学 一种多阶段提高煤层钻孔瓦斯抽采浓度的方法
CN104389587A (zh) * 2014-10-11 2015-03-04 安徽建筑大学 一种煤层瓦斯压力快速测定方法
KR101573470B1 (ko) * 2015-05-18 2015-12-14 (주)인텔리지오 수평집수관용 청소배관 주입 장치
CN105040775A (zh) * 2015-08-21 2015-11-11 山东省水利科学研究院 深层承压自流井封堵系统与方法
CN105178908A (zh) * 2015-08-24 2015-12-23 中国科学院武汉岩土力学研究所 井下地层封堵的化学注浆封隔装置及方法
CN107701143A (zh) * 2016-08-09 2018-02-16 中国石油化工股份有限公司 一种基于一趟管柱的多层段封窜堵漏装置及其方法
US20180171780A1 (en) * 2016-12-21 2018-06-21 Schlumberger Technology Corporation Method for determining an inflow profile in a multilayer well
CN108222882A (zh) * 2018-01-25 2018-06-29 安徽省煤田地质局第勘探队 巨厚冲积层单井多层段注浆新型套管与施工方法
CN108361002A (zh) * 2018-01-28 2018-08-03 湖南科技大学 一种大俯角长距离煤层瓦斯压力测试钻孔水泥砂浆封孔方法
CN108798760A (zh) * 2018-06-12 2018-11-13 中国矿业大学 一种单孔测定多煤层瓦斯压力的方法
CN108825213A (zh) * 2018-09-21 2018-11-16 中国矿业大学(北京) 一种单钻孔内多煤层瓦斯压力测量装置及方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张京泉: "河床下多层采空区叠加区域帷幕注浆充填技术", 《煤矿开采》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109917101A (zh) * 2019-04-12 2019-06-21 中国矿业大学(北京) 基于上向穿层钻孔同时测定多煤层瓦斯含量的方法
CN109973082A (zh) * 2019-04-18 2019-07-05 中国矿业大学(北京) 基于上向穿层钻孔同时测定多煤层瓦斯压力的装置和方法
CN110173231A (zh) * 2019-07-08 2019-08-27 中煤科工集团重庆研究院有限公司 一种长距离下向钻孔分段密实封孔测压装置及方法
CN112253247A (zh) * 2020-08-26 2021-01-22 煤科集团沈阳研究院有限公司 瓦斯压力快速测定装置及测定方法
CN112253247B (zh) * 2020-08-26 2021-10-22 中煤科工集团沈阳研究院有限公司 瓦斯压力快速测定装置及测定方法
CN114607361A (zh) * 2022-03-24 2022-06-10 安徽理工大学 一种同时测定近距离煤层群瓦斯压力的方法
CN114607361B (zh) * 2022-03-24 2022-11-18 安徽理工大学 一种同时测定近距离煤层群瓦斯压力的方法
US11959379B2 (en) 2022-03-24 2024-04-16 Anhui University of Science and Technology Method for measuring gas pressure of close-distance seam group simultaneously
CN117345226A (zh) * 2023-10-26 2024-01-05 中国矿业大学 一种煤层双套管阶梯式注浆穿层测压钻孔施工方法

Also Published As

Publication number Publication date
CN109469474B (zh) 2021-11-02

Similar Documents

Publication Publication Date Title
CN109469474A (zh) 基于下向穿层钻孔同时测定多煤层瓦斯压力的装置和方法
CN109973082A (zh) 基于上向穿层钻孔同时测定多煤层瓦斯压力的装置和方法
He et al. Current status and trend of separated layer water flooding in China
CN104632075B (zh) 一种用于覆岩裂隙探测的钻测一体化系统及方法
CN201672998U (zh) 围岩钻孔多点应力计
Pine et al. In-situ stress measurement in the Carnmenellis granite—II. Hydrofracture tests at Rosemanowes quarry to depths of 2000 m
CN105333904B (zh) 煤岩上行钻孔瓦斯参数的测定方法
CN106979012B (zh) 立井井筒冻结孔内隐蔽导水通道综合处治方法
CN107503727B (zh) 一种基于地应力监测的穿层水力压裂范围考察方法
CN110173231A (zh) 一种长距离下向钻孔分段密实封孔测压装置及方法
CN100434653C (zh) 煤层气井爆破式洞穴完井工艺方法
CN105804787B (zh) 一种测定煤矿回采工作面上覆煤岩裂隙发育高度的方法
CN110243746A (zh) 一种穿层钻孔快速原位测试煤层渗透率的装置和方法
CN206625831U (zh) 一种岩溶注浆自动监控系统
CN107724953A (zh) 流体密封的潜孔锤反循环钻进工艺施工方法
CN109296361A (zh) 一种煤层采动裂隙场瓦斯压力测定系统
CN109269955A (zh) 一种煤岩层渗透率原位测试装置及方法
CN101050699B (zh) 一种利用同层垂向干扰试井获取厚油层垂向渗透率的方法及测试管柱
CN109341934A (zh) 一种底板含水层水压动态监测设备及监测方法
CN108798760A (zh) 一种单孔测定多煤层瓦斯压力的方法
CN108119134A (zh) 水文地质钻探同径两次抽水试验装置
CN208953189U (zh) 一种底板含水层水压动态监测设备
CN103161499B (zh) 井下煤层突出危险区域划分方法
CN109709297A (zh) 基于下向穿层钻孔同时测定多煤层瓦斯含量的方法
CN107237624A (zh) 一种监测采动煤体瓦斯流动及有效应力变化规律的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant