CN204006684U - Water heater liner and water heater - Google Patents

Water heater liner and water heater Download PDF

Info

Publication number
CN204006684U
CN204006684U CN201420126418.2U CN201420126418U CN204006684U CN 204006684 U CN204006684 U CN 204006684U CN 201420126418 U CN201420126418 U CN 201420126418U CN 204006684 U CN204006684 U CN 204006684U
Authority
CN
China
Prior art keywords
water heater
middle barrel
bucket
end socket
inner bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420126418.2U
Other languages
Chinese (zh)
Inventor
孙强
蔡想周
杨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Economic And Technology Development District Haier Water Heater Co ltd
Haier Group Corp
Original Assignee
Qingdao Economic And Technology Development District Haier Water Heater Co ltd
Haier Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Economic And Technology Development District Haier Water Heater Co ltd, Haier Group Corp filed Critical Qingdao Economic And Technology Development District Haier Water Heater Co ltd
Priority to CN201420126418.2U priority Critical patent/CN204006684U/en
Application granted granted Critical
Publication of CN204006684U publication Critical patent/CN204006684U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/40—Solar thermal energy, e.g. solar towers

Landscapes

  • Cookers (AREA)

Abstract

The utility model discloses a water heater inner bag and water heater belongs to water heater and accessory field, for solving the big problem design of the current inner bag processing degree of difficulty. The inner container of the water heater comprises a first part and a second part which are connected, wherein the first part comprises a spherical first sealing head and a cylindrical first middle barrel, and the first middle barrel and the first sealing head are integrally formed; the second part comprises a spherical second end socket and a cylindrical second middle barrel, and the second middle barrel and the second end socket are integrally formed; the length of the first middle barrel is larger than that of the second middle barrel. The utility model discloses the water heater includes above-mentioned water heater inner bag. The utility model discloses water heater inner bag and water heater had both solved well bucket length too big and be difficult to the problem of processing, left the first well bucket of sufficient length again so that set up various tube holes, and processing is simple and convenient, is difficult for leaking.

Description

热水器内胆及热水器Water heater liner and water heater

技术领域technical field

本实用新型涉及一种热水器内胆以及安装有该内胆的热水器。The utility model relates to a water heater liner and a water heater equipped with the liner.

背景技术Background technique

内胆是热水中储水的重要元件,当焊缝较多时不但劳动强度大而且容易造成漏水。为了解决这一问题,现有的部分内胆是由两部分组成,两部分之间焊接。The liner is an important component for storing water in hot water. When there are many welds, it is not only labor-intensive but also prone to water leakage. In order to solve this problem, some existing inner tanks are composed of two parts, which are welded between the two parts.

在这种结构中,中桶和一端封头是旋转拉伸而形成。中桶的长度较长,旋转拉伸工艺的难度较大、技术要求较高。In this structure, the middle barrel and one end head are formed by rotating and stretching. The length of the middle barrel is longer, the difficulty of the rotary stretching process is greater, and the technical requirements are higher.

实用新型内容Utility model content

本实用新型的一个目的是提出一种加工难度小、易于焊接的热水器内胆。One purpose of the utility model is to provide a water heater liner which is less difficult to process and easy to weld.

本实用新型的再一个目的是提出一种多个管孔定位精度高、加工方便的热水器内胆。Another object of the utility model is to provide a water heater inner container with a plurality of pipe holes with high positioning accuracy and convenient processing.

本实用新型的还一个目的是提出一种内胆加工难度小且不易漏水的热水器。Another purpose of the utility model is to provide a water heater with less difficulty in processing the inner tank and less prone to water leakage.

为达此目的,一方面,本实用新型采用以下技术方案:For this purpose, on the one hand, the utility model adopts the following technical solutions:

一种热水器内胆,所述内胆包括相连接的第一部分和第二部分,第一部分包括球冠状的第一封头和筒状的第一中桶,所述第一中桶和第一封头为一体成型;第二部分包括球冠状的第二封头和筒状的第二中桶,所述第二中桶和第二封头为一体成型;所述第一中桶的长度大于所述第二中桶的长度。A water heater liner, the liner includes a connected first part and a second part, the first part includes a spherical crown first head and a cylindrical first middle barrel, the first middle barrel and the first seal The head is integrally formed; the second part includes a spherical second head and a cylindrical second middle barrel, and the second middle barrel and the second head are integrally formed; the length of the first middle barrel is longer than the Describe the length of the second middle barrel.

特别是,内胆上设置有出水管孔和进水管孔,所述出水管孔和进水管孔都设置在所述第一中桶的侧壁上。In particular, the inner container is provided with a water outlet pipe hole and a water inlet pipe hole, and the water outlet pipe hole and the water inlet pipe hole are both arranged on the side wall of the first middle tub.

进一步,所述内胆上还设置有镁棒孔,所述镁棒孔设置在所述第一中桶的侧壁上。Further, magnesium rod holes are also arranged on the inner tank, and the magnesium rod holes are arranged on the side wall of the first middle barrel.

更进一步,所述出水管孔、进水管孔和镁棒孔并列设置在所述第一中桶的侧壁上。Furthermore, the outlet pipe hole, the water inlet pipe hole and the magnesium rod hole are arranged side by side on the side wall of the first middle barrel.

特别是,所述第一封头上或第二封头上设有法兰盘,所述法兰盘上设有溢流口。In particular, a flange is provided on the first sealing head or the second sealing head, and an overflow port is provided on the flange.

特别是,所述第一部分和第二部分焊接形成内胆。In particular, the first part and the second part are welded to form an inner container.

特别是,所述第一中桶和第一封头为多次拉伸形成或旋转拉伸形成;所述第二中桶和第二封头为多次拉伸形成或旋转拉伸形成。In particular, the first middle barrel and the first head are formed by multiple stretching or rotation stretching; the second middle barrel and the second head are formed by multiple stretching or rotation stretching.

另一方面,本实用新型采用以下技术方案:On the other hand, the utility model adopts the following technical solutions:

一种热水器,所述热水器包括上述热水器内胆。A water heater, comprising the above water heater liner.

本实用新型热水器内胆的中桶包括第一中桶和第二中桶两个部分,第一中桶的长度大于第二中桶的长度,既解决了中桶长度过大而导致加工困难的问题,又令第一中桶有足够的长度以便于设置各种管孔;将进出水管孔以及镁棒孔都相邻设置有助于提高管孔的定位精度。两个部分通过一道环形焊缝连接成内胆整体,加工简便,不易漏水。适用于各种热水器。The middle barrel of the inner tank of the water heater of the utility model includes two parts, the first middle barrel and the second middle barrel. The length of the first middle barrel is greater than the length of the second middle barrel, which not only solves the problem of processing difficulties caused by the excessive length of the middle barrel The problem is that the length of the first middle barrel is sufficient to facilitate the installation of various pipe holes; adjacently arranging the water inlet and outlet pipe holes and the magnesium rod holes helps to improve the positioning accuracy of the pipe holes. The two parts are connected by a circular weld to form a whole inner tank, which is easy to process and not easy to leak. Suitable for all kinds of water heaters.

本实用新型热水器包括上述热水器内胆,防漏水性能好,加工简便,成本低。The water heater of the utility model comprises the above-mentioned water heater liner, which has good water leakage prevention performance, simple and convenient processing and low cost.

附图说明Description of drawings

图1是本实用新型优选实施例一热水器内胆的结构示意图;Fig. 1 is a schematic structural view of a water heater inner tank of a preferred embodiment of the present invention;

图2是本实用新型优选实施例二热水器内胆的结构示意图。Fig. 2 is a schematic structural view of the inner container of the water heater according to the preferred embodiment 2 of the present invention.

图中标记为:Labeled in the figure:

3、焊缝;4、法兰盘;11、第一封头;12、第一中桶;13、出水管孔;14、进水管孔;15、镁棒孔;21、第二封头;22、第二中桶;41、溢流口。3. Weld seam; 4. Flange; 11. First head; 12. First middle barrel; 13. Outlet pipe hole; 14. Inlet pipe hole; 15. Magnesium rod hole; 21. Second head; 22, the second middle barrel; 41, the overflow port.

具体实施方式Detailed ways

下面结合附图并通过具体实施方式来进一步说明本实用新型的技术方案。The technical scheme of the utility model will be further described below in conjunction with the accompanying drawings and through specific embodiments.

优选实施例一:Preferred embodiment one:

如图1所示,本优选实施例提供一种热水器内胆。该内胆包括相连接的第一部分和第二部分,其中,第一部分包括球冠状的第一封头11和筒状的第一中桶12,第一中桶12和第一封头11为多次拉伸形成;第二部分包括球冠状的第二封头21和筒状的第二中桶22,第二中桶22和第二封头21为多次拉伸形成;第一中桶12的长度大于第二中桶22的长度。As shown in Figure 1, this preferred embodiment provides a water heater liner. The liner includes a connected first part and a second part, wherein the first part includes a spherical first head 11 and a cylindrical first middle barrel 12, the first middle barrel 12 and the first head 11 are multiple Formed by secondary stretching; the second part includes a spherical second head 21 and a cylindrical second middle barrel 22, the second middle barrel 22 and the second head 21 are formed by multiple stretches; the first middle barrel 12 The length is greater than the length of the second middle barrel 22.

内胆上设置有出水管孔13和进水管孔14,出水管孔13和进水管孔14都设置在第一中桶12的侧壁上。第一封头11上设有法兰盘4,法兰盘4上设有溢流口41。出水管孔13、进水管孔14和法兰盘4设置在中桶的同一部分上,定位更加准确,有利于后续加热管等装配定位。A water outlet pipe hole 13 and a water inlet pipe hole 14 are arranged on the inner container, and both the water outlet pipe hole 13 and the water inlet pipe hole 14 are arranged on the side wall of the first middle barrel 12 . A flange 4 is provided on the first sealing head 11 , and an overflow port 41 is provided on the flange 4 . The water outlet pipe hole 13, the water inlet pipe hole 14 and the flange plate 4 are arranged on the same part of the barrel, and the positioning is more accurate, which is beneficial to the assembly and positioning of subsequent heating pipes and the like.

第一部分和第二部分焊接形成内胆,在第一部分和第二部分的连接处形成环形焊缝3。第一部分和第二部分的外侧设置有保护层。The first part and the second part are welded to form an inner container, and the joint of the first part and the second part forms a circular weld 3 . The outer sides of the first part and the second part are provided with protective layers.

优选实施例二:Preferred embodiment two:

如图2所示,本优选实施例提供一种热水器内胆,其结构与优选实施例一基本相同。该内胆包括相连接的第一部分和第二部分,其中,第一部分包括球冠状的第一封头11和筒状的第一中桶12,第一中桶12和第一封头11为一体成型;第二部分包括球冠状的第二封头21和筒状的第二中桶22,第二中桶22和第二封头21为一体成型;第一中桶12的长度大于第二中桶22的长度。As shown in Fig. 2, this preferred embodiment provides a water heater inner container, the structure of which is basically the same as that of the first preferred embodiment. The liner includes a connected first part and a second part, wherein the first part includes a spherical first head 11 and a cylindrical first middle barrel 12, and the first middle barrel 12 and the first head 11 are integrated Molding; the second part includes a spherical second head 21 and a cylindrical second middle barrel 22, and the second middle barrel 22 and the second head 21 are integrally formed; the length of the first middle barrel 12 is greater than that of the second middle barrel Barrel 22 length.

内胆上设置有出水管孔13和进水管孔14,出水管孔13和进水管孔14都设置在第一中桶12的侧壁上。第一部分和第二部分焊接形成内胆,在第一部分和第二部分的连接处形成焊缝3。A water outlet pipe hole 13 and a water inlet pipe hole 14 are arranged on the inner container, and both the water outlet pipe hole 13 and the water inlet pipe hole 14 are arranged on the side wall of the first middle barrel 12 . The first part and the second part are welded to form an inner container, and the joint of the first part and the second part forms a welding seam 3 .

不同之处在于:第一中桶12和第一封头11为旋转拉伸形成,第二中桶22和第二封头21也是由旋转拉伸形成。The difference is that: the first middle barrel 12 and the first head 11 are formed by rotating and stretching, and the second middle barrel 22 and the second head 21 are also formed by rotating and stretching.

内胆上还设置有镁棒孔15,镁棒孔15设置在第一中桶12的侧壁上。出水管孔13、进水管孔14和镁棒孔15并列设置在第一中桶12的侧壁上,定位准确,加工方便。Magnesium rod holes 15 are also arranged on the liner, and the magnesium rod holes 15 are arranged on the side wall of the first middle barrel 12 . The water outlet pipe hole 13, the water inlet pipe hole 14 and the magnesium rod hole 15 are arranged side by side on the side wall of the first middle barrel 12, with accurate positioning and convenient processing.

设置有溢流口41的法兰盘4安装在第二封头12上。第二中桶22的长度较短,所以在第二封头12上安装法兰盘4则更为简易。The flange plate 4 provided with the overflow port 41 is installed on the second sealing head 12 . The length of the second middle barrel 22 is shorter, so it is easier to install the flange 4 on the second head 12 .

优选实施例三:Preferred embodiment three:

本优选实施例提供一种热水器内胆,其结构与优选实施例一基本相同。该内胆包括相连接的第一部分和第二部分,其中,第一部分包括球冠状的第一封头和筒状的第一中桶,第一中桶和第一封头为一体成型;第二部分包括球冠状的第二封头和筒状的第二中桶,第二中桶和第二封头为一体成型;第一中桶的长度大于第二中桶的长度。This preferred embodiment provides a water heater liner, the structure of which is basically the same as that of the first preferred embodiment. The liner includes a connected first part and a second part, wherein the first part includes a spherical first head and a cylindrical first middle barrel, and the first middle barrel and the first head are integrally formed; the second Partly includes a spherical crown-shaped second head and a cylindrical second middle barrel, the second middle barrel and the second head are integrally formed; the length of the first middle barrel is greater than the length of the second middle barrel.

不同之处在于:第一部分和第二部分之间的固定连接方式不限于焊接,其它能将两部分连接形成内胆的方式亦可。进水管孔、出水管孔和/或镁棒孔可以都位于第一中桶的侧壁上,也可以是进水管孔和出水管孔位于第一中桶的侧壁,而镁棒孔位于另一侧。第一部分和第二部分都为一体成型,但具体的工艺不限,可以是多次拉伸形成也可以旋转拉伸形成。法兰盘可以与进水管孔和出水管孔位于同一部分上,也可以位于不同的部分上。The difference is that the fixed connection method between the first part and the second part is not limited to welding, and other methods that can connect the two parts to form the inner tank are also available. The water inlet pipe hole, the water outlet pipe hole and/or the magnesium rod hole can all be located on the side wall of the first middle barrel, and the water inlet pipe hole and the water outlet pipe hole can also be located on the side wall of the first middle barrel, while the magnesium rod hole is located on the other side wall. side. Both the first part and the second part are integrally formed, but the specific process is not limited, and may be formed by multiple stretching or rotational stretching. The flange can be located on the same part as the water inlet pipe hole and the water outlet pipe hole, and can also be located on a different part.

优选实施例四:Preferred embodiment four:

本优选实施例提供一种热水器,该热水器中设置有如优选实施例一至三任一所述的热水器内胆。This preferred embodiment provides a water heater, the water heater is provided with the water heater liner as described in any one of preferred embodiments 1 to 3.

Claims (7)

1. a water heater liner, described inner bag comprises first and the second portion being connected, it is characterized in that, first comprise first end socket (11) of spherical crown shape and tubular first in bucket (12), bucket (12) and the first end socket (11) are formed in one in described first; Second portion comprise second end socket (21) of spherical crown shape and tubular second in bucket (22), bucket (22) and the second end socket (21) are formed in one in described second; In described first, the length of bucket (12) is greater than the length of bucket (22) in described second; On inner bag, be provided with water outlet pore (13) and water inlet pore (14), described water outlet pore (13) and water inlet pore (14) are all arranged on the sidewall of bucket (12) in described first.
2. water heater liner according to claim 1, is characterized in that, is also provided with magnesium rod hole (15) on described inner bag, and described magnesium rod hole (15) is arranged on the sidewall of bucket (12) in described first.
3. water heater liner according to claim 2, is characterized in that, described water outlet pore (13), water inlet pore (14) and magnesium rod hole (15) are set up in parallel on the sidewall of bucket (12) in described first.
4. according to the arbitrary described water heater liner of claims 1 to 3, it is characterized in that, described the first end socket (11) is gone up or the second end socket (12) is provided with ring flange (4), and described ring flange (4) is provided with overfall (41).
5. according to the arbitrary described water heater liner of claims 1 to 3, it is characterized in that, described first and second portion welding form inner bag.
6. according to the arbitrary described water heater liner of claims 1 to 3, it is characterized in that, bucket (12) and the first end socket (11) are multi-drawing formation or circumgyration stretch formation in described first;
In described second, bucket (22) and the second end socket (21) are multi-drawing formation or circumgyration stretch formation.
7. a water heater, is characterized in that, described water heater comprises the water heater liner as described in as arbitrary in claim 1 to 6.
CN201420126418.2U 2014-03-20 2014-03-20 Water heater liner and water heater Expired - Lifetime CN204006684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420126418.2U CN204006684U (en) 2014-03-20 2014-03-20 Water heater liner and water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420126418.2U CN204006684U (en) 2014-03-20 2014-03-20 Water heater liner and water heater

Publications (1)

Publication Number Publication Date
CN204006684U true CN204006684U (en) 2014-12-10

Family

ID=52046677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420126418.2U Expired - Lifetime CN204006684U (en) 2014-03-20 2014-03-20 Water heater liner and water heater

Country Status (1)

Country Link
CN (1) CN204006684U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106881562A (en) * 2015-12-16 2017-06-23 武汉宏海科技股份有限公司 The manufacture method and manufacture system of inner container of electric water heater
CN109866034A (en) * 2019-02-28 2019-06-11 广东精一智能制造有限公司 A hot-rolled plate automatic deep drawing welding integrated line
CN112113338A (en) * 2019-06-19 2020-12-22 青岛经济技术开发区海尔热水器有限公司 Water heater inner container processing equipment and water heater inner container

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106881562A (en) * 2015-12-16 2017-06-23 武汉宏海科技股份有限公司 The manufacture method and manufacture system of inner container of electric water heater
CN109866034A (en) * 2019-02-28 2019-06-11 广东精一智能制造有限公司 A hot-rolled plate automatic deep drawing welding integrated line
CN112113338A (en) * 2019-06-19 2020-12-22 青岛经济技术开发区海尔热水器有限公司 Water heater inner container processing equipment and water heater inner container
CN112113338B (en) * 2019-06-19 2022-04-22 青岛经济技术开发区海尔热水器有限公司 Water heater inner container processing equipment and water heater inner container

Similar Documents

Publication Publication Date Title
CN103527307A (en) Automotive expansion tank assembly
CN202182565U (en) water heater liner
CN205747504U (en) A kind of gas heater constant warm tube
CN204128754U (en) Deep Hole Welding helium leak test plug frock
CN109637690A (en) A kind of neutron source target nucleus core structure
CN103471445A (en) Finned heat exchange tube
CN204063698U (en) Air-conditioner connecting pipings structure
CN203718248U (en) Metal framework enhanced composite polymer pipeline joint
CN204535469U (en) A kind of for the cylindrical member cooled and heat
CN103350311B (en) Positioning device between heat exchange tube and tube hole
CN205637181U (en) Reinforced concrete pond pool wall sleeve pipe plugging device
CN203499797U (en) Expansion tank assembly for automobile
CN105571368B (en) Pipeline connection structure and microchannel heat exchanger
CN203772070U (en) Positive displacement heat exchanger
CN202902673U (en) Horizontal hot water tank of solar water heater
CN104455409A (en) A deflector type full jacket
CN205003028U (en) Square cooler core hydrostatic test of group frock
CN203719200U (en) Seal ring structure for copper pipe of water heater
CN206291747U (en) A kind of New Marine cargo oil heating steam pipe coil
CN204987955U (en) Titanium pipe heat exchanger structures
CN105333629B (en) A kind of separated type solar water tank
CN204437555U (en) A kind of connection set of Glass Steel Tube
CN204044000U (en) A kind of pressure test device for heat exchange tubes
CN104266510B (en) A kind of quickly heat exchanging water storage tank
CN201636317U (en) triple seal ring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141210