Tube panel weld seam thermal treatment rigidity fixture Download PDF

Info

Publication number
CN203999730U
CN203999730U CN201420427366.2U CN201420427366U CN203999730U CN 203999730 U CN203999730 U CN 203999730U CN 201420427366 U CN201420427366 U CN 201420427366U CN 203999730 U CN203999730 U CN 203999730U
Authority
CN
China
Prior art keywords
tube panel
weld seam
thermal treatment
steel
panel weld
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420427366.2U
Other languages
Chinese (zh)
Inventor
朱志前
李海川
潘现庭
张金合
李红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electrical Construction Group Henan Engineering Co Ltd
Original Assignee
Henan No2 Thermal Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan No2 Thermal Power Construction Co ltd filed Critical Henan No2 Thermal Power Construction Co ltd
Priority to CN201420427366.2U priority Critical patent/CN203999730U/en
Application granted granted Critical
Publication of CN203999730U publication Critical patent/CN203999730U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

A tube panel weld seam thermal treatment rigidity fixture, is divided into two, and monolithic fixture comprises upper and lower two steel pipes, and Welding flat steel between upper and lower two steel pipes is provided with bolt hole on described band steel, between two plate clamps, with bolt, connects.The utility model has solved the problem that in tube panel weld seam heat treatment process, well heater is heated and drops, and well heater and tube panel heating surface are combined closely, and allows weld seam be heated evenly, and guarantees thermal treatment quality, and can reduce the wasting of resources.

Description

Tube panel weld seam thermal treatment rigidity fixture
Technical field
The utility model belongs to the clamping device of workpiece being heat-treated to workpiece in process, particularly a kind of tube panel weld seam thermal treatment rigidity fixture using when tube panel weld seam is heat-treated.
Background technology
When the weld seam in tube panel is heat-treated, because the distance between pipe and pipe is less, cannot realize single pipe wrapping and heat-treat, so the thermal treatment of tube panel weld seam can only adopt the way of the whole wrapping processing of tube panel.But because the width of tube panel is generally all greater than 1 meter, tube panel is whole uses iron wire wrapping easily to cause well heater tenesmus, directly causes tube panel weld seam to be heated when thermal treatment inhomogeneous, occurs thermal treatment quality problem; And to the whole phenomenon of using iron wire wrapping to there will be a large amount of iron wire of waste of tube panel, as easy as rolling off a logly cause the wasting of resources.Moreover, return manufacturer and brought heavy economical load.
Utility model content
The purpose of this utility model is to provide a kind of tube panel weld seam thermal treatment rigidity fixture.
For achieving the above object, the utility model adopts following technical scheme:
A tube panel weld seam thermal treatment rigidity fixture, tube panel weld seam thermal treatment rigidity fixture is divided into two, and monolithic fixture comprises upper and lower two steel pipes, and Welding flat steel between upper and lower two steel pipes is provided with bolt hole on described band steel, between two plate clamps, with bolt, connects.
The length of steel pipe is that tube panel width adds 100 millimeters, and diameter of steel tube is 32 millimeters.
Between monolithic fixture two steel pipe medullary rays, spacing is L=400 millimeter.
Band steel is uniform to be welded between upper and lower two steel pipes, and between band steel, spacing is M=400 millimeter.
The two ends of band steel are provided with bolt hole, and the thickness of band steel is 3 millimeters, and width is 40 millimeters.
The two ends up and down of two band steels at monolithic fixture two steel pipe two ends arrange respectively bolt hole.
On the nut of bolt, weld handle.
By above technical scheme, can solve the problem that in tube panel weld seam heat treatment process, well heater is heated and drops, well heater and tube panel panel-pipe of heating surface are combined closely, allow weld seam be heated evenly, guarantee thermal treatment quality, and can reduce the wasting of resources.
Accompanying drawing explanation
Fig. 1 is that tube panel weld seam thermal treatment rigidity fixture is made schematic diagram;
1, steel pipe, 2, band steel, 3, bolt.
Embodiment
A kind of tube panel weld seam thermal treatment rigidity fixture is divided into two, and monolithic fixture comprises upper and lower two steel pipes, and Welding flat steel 2 between upper and lower two steel pipes is provided with bolt hole on band steel 2, between two plate clamps, with bolt 3, connects.
The length of steel pipe 1 is that tube panel width adds 100 millimeters, and steel pipe 1 diameter is 32 millimeters.
Between monolithic fixture two steel pipe 1 medullary rays, spacing is L=400 millimeter.
Band steel 2 is uniform to be welded between upper and lower two steel pipes, and between band steel 2, spacing is M=400 millimeter.
The two ends of band steel 2 are provided with bolt hole, and the thickness of band steel 2 is 3 millimeters, and width is 40 millimeters.
The two ends up and down of two band steels at monolithic fixture two steel pipe two ends arrange respectively bolt hole.
On the nut of bolt 3, weld handle and can replace spanner.

Claims (6)

1. a tube panel weld seam thermal treatment rigidity fixture, it is characterized in that: tube panel weld seam thermal treatment rigidity fixture is divided into two, monolithic fixture comprises upper and lower two steel pipes, Welding flat steel (2) between upper and lower two steel pipes, on described band steel (2), be provided with bolt hole, between two plate clamps, with bolt (3), connect.
2. tube panel weld seam thermal treatment rigidity fixture according to claim 1, is characterized in that: the length of steel pipe (1) is that tube panel width adds 100 millimeters, and steel pipe (1) diameter is 32 millimeters.
3. tube panel weld seam thermal treatment rigidity fixture according to claim 1, is characterized in that: between monolithic fixture two steel pipes (1) medullary ray, spacing is L=400 millimeter.
4. tube panel weld seam thermal treatment rigidity fixture according to claim 1, is characterized in that: band steel (2) is uniform to be welded between upper and lower two steel pipes, and between band steel (2), spacing is M=400 millimeter.
5. tube panel weld seam thermal treatment rigidity fixture according to claim 1, is characterized in that: the two ends of band steel (2) are provided with bolt hole, and the thickness of band steel (2) is 3 millimeters, and width is 40 millimeters.
6. tube panel weld seam thermal treatment rigidity fixture according to claim 1, is characterized in that: on the nut of bolt (3), weld handle.
CN201420427366.2U 2014-07-31 2014-07-31 Tube panel weld seam thermal treatment rigidity fixture Expired - Fee Related CN203999730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420427366.2U CN203999730U (en) 2014-07-31 2014-07-31 Tube panel weld seam thermal treatment rigidity fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420427366.2U CN203999730U (en) 2014-07-31 2014-07-31 Tube panel weld seam thermal treatment rigidity fixture

Publications (1)

Publication Number Publication Date
CN203999730U true CN203999730U (en) 2014-12-10

Family

ID=52039759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420427366.2U Expired - Fee Related CN203999730U (en) 2014-07-31 2014-07-31 Tube panel weld seam thermal treatment rigidity fixture

Country Status (1)

Country Link
CN (1) CN203999730U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108998651A (en) * 2018-09-06 2018-12-14 中国电建集团山东电力建设第工程有限公司 The fixed device of long piece post weld heat treatment
CN109136522A (en) * 2018-10-10 2019-01-04 中国电建集团山东电力建设第工程有限公司 A kind of fixed device of steel construction post weld heat treatment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108998651A (en) * 2018-09-06 2018-12-14 中国电建集团山东电力建设第工程有限公司 The fixed device of long piece post weld heat treatment
CN108998651B (en) * 2018-09-06 2023-09-26 中国电建集团山东电力建设第一工程有限公司 Long splice seam post-welding heat treatment fixing device
CN109136522A (en) * 2018-10-10 2019-01-04 中国电建集团山东电力建设第工程有限公司 A kind of fixed device of steel construction post weld heat treatment
CN109136522B (en) * 2018-10-10 2023-09-15 中国电建集团山东电力建设第一工程有限公司 Steel construction postweld heat treatment fixing device

Similar Documents

Publication Publication Date Title
CN204036288U (en) A kind of spot welding fixture (SWFX)
CN203999730U (en) Tube panel weld seam thermal treatment rigidity fixture
CN204053260U (en) Be applicable to the elbow pipe welding device of water heating pipe fittings processing
CN205200863U (en) Steel tube welding device
CN204195165U (en) A kind of pipeline quick-assembling positioning tool alignment device
CN201988862U (en) Preheating device for circular seam
CN203174166U (en) On-line annealing device for stainless steel drug core welding wire
CN204171570U (en) Cylinder post class weld parts preheating device
CN203695661U (en) Pipeline pipe opening jack correction tool
CN204076825U (en) Bridging type belt fusion splicer
CN203484825U (en) Tool for preventing welding deformation
CN201455120U (en) Hot punching heating device for angle irons
CN202317578U (en) Pipe supporting device
CN205111069U (en) Following aluminium alloy plate material friction stir welding of 1mm connects and uses heating device
CN204381760U (en) A kind of arm welding rotary tooling
CN205718451U (en) A kind of pipe type heating device
CN203712149U (en) Valve body hoop welding tool
CN203144454U (en) Heating and heat-preserving device of pile leg main board tube
CN202780371U (en) Simple pipe aligning device
CN203846068U (en) Steel chisel quenching support frame
CN203438209U (en) Supporting moulding bed for steel plate groove processing
CN204620758U (en) Large-diameter pipeline fixing collar makes aid
CN204237820U (en) A kind of improved structure of heat treatment material rest
CN204148691U (en) A kind of finned tube clamping device
CN204027351U (en) Electrode is special tightens clamp in a kind of steel-making

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee after: China Electric Power Construction Group Henan engineering company

Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee before: Henan No.2 Thermal Power Construction Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 450000 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee after: China Electrical Construction Group Henan Engineering Co., Ltd.

Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee before: China Electric Power Construction Group Henan engineering company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20190731