CN203998501U - A kind of for building the safety monitoring device of discharging platform - Google Patents

A kind of for building the safety monitoring device of discharging platform Download PDF

Info

Publication number
CN203998501U
CN203998501U CN201420314561.4U CN201420314561U CN203998501U CN 203998501 U CN203998501 U CN 203998501U CN 201420314561 U CN201420314561 U CN 201420314561U CN 203998501 U CN203998501 U CN 203998501U
Authority
CN
China
Prior art keywords
discharging platform
demonstration
wireless camera
control setup
load cells
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420314561.4U
Other languages
Chinese (zh)
Inventor
吴新星
麻国培
谢超
吴杰
吴能淼
李宗�
彭绍勇
张雷霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201420314561.4U priority Critical patent/CN203998501U/en
Application granted granted Critical
Publication of CN203998501U publication Critical patent/CN203998501U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses that a kind of this safety monitoring device comprises weighing platform for building the safety monitoring device of discharging platform, weighing platform bottom is provided with one group of LOAD CELLS; LOAD CELLS and demonstration and control setup electrical connection, demonstration and control setup and warning device and wireless camera electrical connection, wireless camera is connected with remote monitor and control computer radio; LOAD CELLS, demonstration and control setup, warning device and wireless camera are connected with power supply.The utility model can be monitored the heap load carrying ability of discharging platform at any time, and visual, and has sound and light of alarm, transmission over radio, camera function, effectively raises the supervision level of discharging platform.Whole control monitor unit adopts aerogenerator power supply in addition, has the feature of energy-conserving and environment-protective.

Description

A kind of for building the safety monitoring device of discharging platform
Technical field
the utility model relates to a kind of for building the safety monitoring device of discharging platform, belongs to construction safety monitoring technique field.
Background technology
discharging platform is vertical transport platform important in building operation, the load-bearing of discharging platform has designing requirement, but in use be sometimes difficult to estimate the weight of material, so mainly monitor in actual applications the safe bearing load situation of discharging platform by the experience of operating personal, thisly carry out security monitoring by artificial mode, not only often can there is the situation of discharging platform overload operation, thereby bring serious potential safety hazard to construction operation, but also easily increase the stress of operating personal, easily make operating personal produce tired, thereby reduce production efficiency and construction quality.Therefore the security monitoring mode of existing building discharging platform is still very undesirable, can not meet the needs of use.
Utility model content
the purpose of this utility model is, provide a kind of for building the safety monitoring device of discharging platform, with in the use procedure of discharging platform, can understand at any time the heap carrying capacity of discharging platform, and there is overweight warning function, thereby improve construction safety and overcome the deficiencies in the prior art.
the technical solution of the utility model is achieved in that
of the present utility modelly a kind ofly for the safety monitoring device of building discharging platform be, this safety monitoring device comprises weighing platform, and weighing platform bottom is provided with one group of LOAD CELLS; LOAD CELLS and demonstration and control setup electrical connection, demonstration and control setup and warning device and wireless camera electrical connection, wireless camera is connected with remote monitor and control computer radio; LOAD CELLS, demonstration and control setup, warning device and wireless camera are connected with power supply.
above-mentioned power supply comprises aerogenerator, and aerogenerator via controller is connected with inverter and storage battery, and the mouth of inverter is connected with the power input of LOAD CELLS, demonstration and control setup, warning device and wireless camera.
above-mentioned stating is in series with switch and fuse between controller and inverter.
above-mentioned aerogenerator is arranged on pylon.
owing to having adopted technique scheme, the utility model compared with prior art, the utility model can be monitored the supporting power of discharging platform at any time, and there is sound and light of alarm, on demonstration and control setup, set alarming value and the value of taking pictures, in the time that discharging platform exceedes the alarming value of setting, alarm activation, reminds workmen's discharging platform to overload.Set when the value of taking pictures when discharging platform load-carrying exceedes, wireless camera is taken pictures, and is sent to remote monitor and control computing machine and is effectively raised the supervision level of discharging platform by transmission over radio, has improved degree of safety.Whole control monitor unit adopts aerogenerator power supply in addition, has the feature of energy-conserving and environment-protective.
Brief description of the drawings
fig. 1 is structural representation of the present utility model;
fig. 2 is the structural representation of the utility model wind power supply part.
being labeled as in figure: 1-weighing platform, 2-LOAD CELLS, 3-warning device, 4-wireless camera, 5-remote monitor and control computing machine, 6-aerogenerator, 7-controller, 8-inverter, 9-storage battery, 10-switch, 11-fuse, 12-pylon, 13-shows and control setup.
Detailed description of the invention
below in conjunction with drawings and Examples, the utility model is described in further detail, but not as to any restriction of the present utility model.
the utility model is according to following a kind of constructed for building the method for safety monitoring of discharging platform, as shown in Figure 1, the method is that discharging platform is arranged to weighing platform, tetrapod at weighing platform arranges LOAD CELLS, and LOAD CELLS is connected with demonstration and control setup, warning device and wireless camera; In the time that discharging platform load-carrying exceedes setting alarming value, point out field staff by warning device, in the time that discharging platform load-carrying exceedes the setting value of taking pictures, take pictures and image scene is sent to remote monitor and control computing machine by wireless camera.Demonstration and control setup can show rated weight and actual weight, and demonstration and control setup are provided with different jacks simultaneously, are connected with warning device and wireless camera by different jacks, and demonstration and control setup can arrange different limit values for different jacks.On warning device, set alarming value and the value of taking pictures, in the time that discharging platform load-carrying exceedes setting alarming value, warning device is opened alarm, in the time that discharging platform load-carrying exceedes the setting value of taking pictures, wireless camera is taken pictures, and is sent between remote monitor and control computer radio camera and remote monitor and control computing machine and is adopted transmission over radio by transmission over radio.Weighing platform, demonstration and control setup, warning device and wireless camera provide working power by powered by wind energy device.
powered by wind energy device as shown in Figure 2, converts wind energy to electric energy by aerogenerator, and converts exchange or vdc supporting with weighing platform, warning device and wireless camera by controller to the electric energy that inverter produces aerogenerator; Between controller and inverter, be provided with fuse and switch, control to guarantee power supply safety and to be convenient to.Powered by wind energy device is provided with a group storage battery, by unnecessary electrical power storage, is weighing platform, demonstration and control setup, warning device and wireless camera continued power by storage battery when calm.Aerogenerator is arranged on ventilation by pylon, to obtain larger wind energy, can be placed in ground, also can be arranged on discharging platform or on climbing frame.
according to said method build of the present utility model a kind of for build discharging platform safety monitoring device structural representation as shown in Figure 1, this safety monitoring device comprises weighing platform 1, weighing platform 1 bottom is provided with one group of LOAD CELLS 2; LOAD CELLS 2 is with demonstration and control setup 13 is electrically connected, demonstration and control setup 13 are electrically connected with warning device 3 and wireless camera 4, wireless camera 4 and 5 wireless connections of remote monitor and control computing machine; LOAD CELLS 2, demonstration and control setup 13, warning device 3 and wireless camera 4 are connected with power supply.Power supply comprises aerogenerator 6, and aerogenerator 6 via controllers 7 are connected with inverter 8 and storage battery 9, and the mouth of inverter 8 is connected with the power input of LOAD CELLS 2, demonstration and control setup 13, warning device 3 and wireless camera 4.Between controller 7 and inverter 8, be in series with switch 10 and fuse 11.Aerogenerator 6 is arranged on pylon 12.
Embodiment
when concrete enforcement, can, using existing discharging platform as weighing platform 1, four LOAD CELLS 2 be installed on existing discharging platform, have the weight of discharging platform material by LOAD CELLS 2 inductions.Four LOAD CELLS 2 and demonstration and control setup 13, warning device 3 are connected, and warning device 3 can adopt sound and light alarm, show and control setup 13 on can display setting weight and actual weight.Warning device 3 has sound and light of alarm, when the material weight on discharging platform is greater than after setting weight value, the ear-piercing chimes of doom of warning device 3 meeting, blinking red lamp simultaneously, prompting field staff discharging platform is overweight, field staff, according to the setting weight on read-out and actual weight, can very clearly know discharging platform excess weight, to timely overweight part is shifted out from discharging platform.When exceeding after the value of taking pictures of setting, wireless camera 4 starts, and when wireless camera 4 is installed, the image pickup scope of wireless camera 4 should comprise discharging platform four corner, and can know and see demonstration and the shown content of control setup.After wireless camera 4 starts, the weight on live video and discharging platform can be sent to remote monitor and control computing machine 5 simultaneously.Project director can be understood in time field staff's disposition and treating process is commanded by remote monitor and control computing machine 5.
because monitoring alarm device is low voltage electrical equipment, its power consumption is also little, and in order to reduce the trouble of cable laying, electric power system of the present utility model adopts aerogenerator power supply.Aerogenerator 6 can be selected vertical axis aerogenerator, horizontal axis wind-driven generator or inclined shaft aerogenerator; As long as the power of electrical generator can meet the need for electricity of the normal work of monitoring alarm device.Due to the increase along with building height, wind-force is larger, so it is comparatively suitable to take aerogenerator to be arranged on discharging platform or climbing frame, also can be placed in ground ventilation place, in the time that aerogenerator 6 is installed, can aerogenerator 6 be arranged on to ventilation by pylon 12.Aerogenerator 6 also can surface-based pylon on.Pylon 12 is provided with switch box, controller 7, inverter 8 and storage battery 9 are installed in switch box, the mouth via controller 7 of aerogenerator 6 is connected with inverter 8 and storage battery 9, storage battery 9 can be by unnecessary electrical power storage, is weighing platform, warning device and wireless camera continued power when calm.The output voltage of aerogenerator 6 is transformed into monitoring alarm device required voltage by inverter 8, and the mouth of inverter 8 is connected with the power input of monitoring alarm device.In order to ensure safety and the steerability of monitoring alarm device, between controller 7 and inverter 8, be in series with switch 10 and fuse 11.Can control monitoring alarm device by switch 10, can guarantee safety and the reliability of monitoring alarm device by fuse 11.
device of the present utility model can repeat turnover and use, and amortization charge is low; Power supply has the free of contamination feature of energy-conserving and environment-protective.

Claims (4)

1. for building a safety monitoring device for discharging platform, comprise weighing platform (1), it is characterized in that: weighing platform (1) bottom is provided with one group of LOAD CELLS (2); LOAD CELLS (2) and demonstration and control setup (13) electrical connection, demonstration and control setup (13) and warning device (3) and wireless camera (4) electrical connection, wireless camera (4) and remote monitor and control computing machine (5) wireless connections; LOAD CELLS (2), demonstration and control setup (13), warning device (3) and wireless camera (4) are connected with power supply.
2. according to claim 1 for building the safety monitoring device of discharging platform, it is characterized in that: described power supply comprises aerogenerator (6), aerogenerator (6) via controller (7) is connected with inverter (8) and storage battery (9), and the mouth of inverter (8) is connected with the power input of LOAD CELLS (2), demonstration and control setup (13), warning device (3) and wireless camera (4).
3. according to claim 2 for building the safety monitoring device of discharging platform, it is characterized in that: between described controller (7) and inverter (8), be in series with switch (10) and fuse (11).
4. according to claim 3 for building the safety monitoring device of discharging platform, it is characterized in that: described aerogenerator (6) is arranged on pylon (12).
CN201420314561.4U 2014-06-13 2014-06-13 A kind of for building the safety monitoring device of discharging platform Expired - Fee Related CN203998501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420314561.4U CN203998501U (en) 2014-06-13 2014-06-13 A kind of for building the safety monitoring device of discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420314561.4U CN203998501U (en) 2014-06-13 2014-06-13 A kind of for building the safety monitoring device of discharging platform

Publications (1)

Publication Number Publication Date
CN203998501U true CN203998501U (en) 2014-12-10

Family

ID=52038533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420314561.4U Expired - Fee Related CN203998501U (en) 2014-06-13 2014-06-13 A kind of for building the safety monitoring device of discharging platform

Country Status (1)

Country Link
CN (1) CN203998501U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105136256A (en) * 2015-08-18 2015-12-09 北京建筑大学 Discharging platform early warning system and method based on anchoring part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105136256A (en) * 2015-08-18 2015-12-09 北京建筑大学 Discharging platform early warning system and method based on anchoring part

Similar Documents

Publication Publication Date Title
CN201230185Y (en) Failure eliminating device for electric power line
CN105314492A (en) Security monitoring method and device for building discharging platform
CN206471908U (en) A kind of wind light mutual complementing is powered and monitoring system
CN107517276A (en) A kind of wind light mutual complementing water surface cage culture comprehensive monitoring platform
CN203998501U (en) A kind of for building the safety monitoring device of discharging platform
CN201733119U (en) Wind-light complementary controlling-inverting integrated machine
CN203039806U (en) Forest wind-light complementation monitoring system
CN204045117U (en) A kind of intelligent micro-grid teaching experiment platform equipment
CN207194599U (en) A kind of tower bar tilts monitoring bracing means
CN205881072U (en) Civilian security and protection project monitoring device
CN204624400U (en) A kind of can the rubbish container of remote monitor and control
CN207251680U (en) A kind of wind light mutual complementing water surface cage culture comprehensive monitoring platform
CN205092643U (en) High -voltage line tower early warning terminal with solar charging
CN209327859U (en) Low pressure scene turn-key system for axle power servo-system
CN205944890U (en) Power cable support
CN203742191U (en) Intelligent protection net for constructional engineering
CN206350087U (en) A kind of transmission line of electricity visualizes inspection device
CN201839096U (en) Novel comprehensive monitoring system of transformer station
CN206021496U (en) A kind of anti-tendril warning device of overhead power transmission line pole tower
CN207070230U (en) A kind of mobile on-site operation supervision and management device
CN206135433U (en) Get electric installation based on exchange insulating ground wire of overhead transmission line
CN201528217U (en) On-line emergency power supply
CN206332500U (en) A kind of warmhouse booth planting solar electric power supply system
CN205692011U (en) A kind of safety monitoring control system of power regulation station
CN210629143U (en) Water aerator control system with wind energy and solar energy complementary power supply

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20160613