CN105314492A - Security monitoring method and device for building discharging platform - Google Patents

Security monitoring method and device for building discharging platform Download PDF

Info

Publication number
CN105314492A
CN105314492A CN201410262625.5A CN201410262625A CN105314492A CN 105314492 A CN105314492 A CN 105314492A CN 201410262625 A CN201410262625 A CN 201410262625A CN 105314492 A CN105314492 A CN 105314492A
Authority
CN
China
Prior art keywords
discharging platform
wireless camera
warning device
platform
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410262625.5A
Other languages
Chinese (zh)
Inventor
吴新星
麻国培
谢超
吴杰
吴能淼
李宗�
彭绍勇
张雷霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201410262625.5A priority Critical patent/CN105314492A/en
Publication of CN105314492A publication Critical patent/CN105314492A/en
Pending legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses a security monitoring method and device for a building discharging platform. A weighing platform is placed on the discharging platform. The bottoms of the four corners of the weighing platform are provided with weighing sensors. The weighing sensors are connected with a display and control device, an alarm device and a wireless camera. An alarm value and a photographing value are set on the display and control device. When the load carried by the discharging platform exceeds the set alarm value, the alarm device starts an alarm prompt; when the load carried by the discharging platform exceeds the set photographing value, photographing is performed by the wireless camera, and pictures are transmitted to a remote monitor computer in a wireless mode. The weight of loads stacked on the discharging platform can be monitored at any time, visualization is achieved, the acousto-optic alarm function, the wireless transmission and photographing functions are achieved, and the supervision level of the discharging platform is effectively improved. In addition, the whole monitoring device is powered by a wind driven generator, and the advantages of energy conservation and environmental protection are achieved.

Description

A kind of method for safety monitoring for building discharging platform and device
Technical field
the present invention relates to a kind of method for safety monitoring for building discharging platform and device, belonging to construction safety monitoring technique field.
Background technology
discharging platform is vertical transport platform important in building operation, the load-bearing of discharging platform has designing requirement, but be in use sometimes difficult to the weight estimating material, so mainly lean on the experience of operating personal to monitor the safe bearing load situation of discharging platform in actual applications, thisly carry out security monitoring by artificial mode, not only often can there is the situation of discharging platform overload operation, thus bring serious potential safety hazard to construction operation, but also easily increase the stress of operating personal, operating personal is easily made to produce tired, thus reduce production efficiency and construction quality.Therefore the security monitoring mode of existing building discharging platform is still very undesirable, can not meet the needs of use.
Summary of the invention
the object of the invention is to, a kind of method for safety monitoring for building discharging platform and device being provided, with in the use procedure of discharging platform, the heap carrying capacity of discharging platform can being understood at any time, and there is overweight warning function, thus improve construction safety and overcome the deficiencies in the prior art.
technical scheme of the present invention is achieved in that
a kind of method for safety monitoring for building discharging platform of the present invention is, the method is that discharging platform is arranged weighing platform, arrange LOAD CELLS at the tetrapod of weighing platform, LOAD CELLS is connected with display and control setup, warning device and wireless camera; When discharging platform load-carrying exceedes setting alarming value, point out field staff by warning device, when discharging platform load-carrying exceed setting take pictures value time to be taken pictures by wireless camera and image scene be sent to remote monitor and control computing machine.
in preceding method, described display and control setup can show rated weight and actual weight, display and control setup are provided with different jack simultaneously, are connected with warning device and wireless camera by different jack, and display and control setup can arrange different limit value for different jack.
in preceding method, described warning device sets alarming value and value of taking pictures, when discharging platform load-carrying exceedes setting alarming value, alarm opened by warning device, when discharging platform load-carrying exceed setting take pictures value time, wireless camera is taken pictures, and is sent to remote monitor and control computing machine by transmission over radio
in preceding method, between described wireless camera and remote monitor and control computing machine, adopt transmission over radio.
in preceding method, described weighing platform, display and control setup, warning device and wireless camera provide working power by powered by wind energy device.
in preceding method, Wind resource change is become electric energy by aerogenerator by described powered by wind energy device, and converts the electric energy that aerogenerator produces to exchange or vdc supporting with weighing platform, warning device and wireless camera by controller with inverter; Fuse and switch is provided with, to guarantee power supply safety and to be convenient to control between controller and inverter.
in preceding method, described powered by wind energy device is provided with a group storage battery, by storage battery by unnecessary electrical power storage, in order to time calm being weighing platform, display and control setup, warning device and wireless camera continued power.
in preceding method, described aerogenerator is arranged on ventilation by pylon, to obtain larger wind energy, can be placed in ground, also can be arranged on discharging platform or on climbing frame.
of the present invention a kind of safety monitoring device for building discharging platform according to said method structure is that this device comprises weighing platform, is provided with one group of LOAD CELLS bottom weighing platform; LOAD CELLS and display and control setup are electrically connected, show and control setup and warning device and wireless camera are electrically connected, and wireless camera is connected with remote monitor and control computer radio; LOAD CELLS, display and control setup, warning device are connected with power supply with wireless camera.
above-mentioned power supply comprises aerogenerator, and aerogenerator via controller is connected with inverter and storage battery, and the power input of the mouth of inverter and LOAD CELLS, display and control setup, warning device and wireless camera is connected.
above-mentioned stating between controller and inverter is in series with switch and fuse.
above-mentioned aerogenerator is arranged on pylon.
owing to have employed technique scheme, the present invention compared with prior art, the present invention can monitor the supporting power of discharging platform at any time, and there is sound and light of alarm, display and control setup set alarming value and value of taking pictures, when discharging platform exceedes the alarming value of setting, alarm activation, reminds workmen's discharging platform to overload.When discharging platform load-carrying exceed setting take pictures value time, wireless camera is taken pictures, and is sent to by transmission over radio the supervision level that remote monitor and control computing machine effectively raises discharging platform, improves degree of safety.Whole control monitor unit adopts aerogenerator to power in addition, has the feature of energy-conserving and environment-protective.
Accompanying drawing explanation
fig. 1 is structural representation of the present invention;
fig. 2 is the structural representation of wind power supply part of the present invention.
being labeled as in figure: 1-weighing platform, 2-LOAD CELLS, 3-warning device, 4-wireless camera, 5-remote monitor and control computing machine, 6-aerogenerator, 7-controller, 8-inverter, 9-storage battery, 10-switch, 11-fuse, 12-pylon, 13-display and control setup.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
a kind of method for safety monitoring for building discharging platform of the present invention is (as shown in Figure 1), the method is that discharging platform is arranged weighing platform, arrange LOAD CELLS at the tetrapod of weighing platform, LOAD CELLS is connected with display and control setup, warning device and wireless camera; When discharging platform load-carrying exceedes setting alarming value, point out field staff by warning device, when discharging platform load-carrying exceed setting take pictures value time to be taken pictures by wireless camera and image scene be sent to remote monitor and control computing machine.Display and control setup can show rated weight and actual weight, and display and control setup are provided with different jack simultaneously, are connected with warning device and wireless camera by different jack, and display and control setup can arrange different limit value for different jack.Warning device sets alarming value and value of taking pictures, when discharging platform load-carrying exceedes setting alarming value, alarm opened by warning device, when discharging platform load-carrying exceed setting take pictures value time, wireless camera is taken pictures, and is sent between remote monitor and control computer radio camera and remote monitor and control computing machine by transmission over radio and adopts transmission over radio.Weighing platform, display and control setup, warning device and wireless camera provide working power by powered by wind energy device.
wind resource change as shown in Figure 2, is become electric energy by aerogenerator by powered by wind energy device, and converts the electric energy that aerogenerator produces to exchange or vdc supporting with weighing platform, warning device and wireless camera by controller with inverter; Fuse and switch is provided with, to guarantee power supply safety and to be convenient to control between controller and inverter.Powered by wind energy device is provided with a group storage battery, by storage battery by unnecessary electrical power storage, in order to time calm being weighing platform, display and control setup, warning device and wireless camera continued power.Aerogenerator is arranged on ventilation by pylon, to obtain larger wind energy, can be placed in ground, also can be arranged on discharging platform or on climbing frame.
according to said method build of the present invention a kind of safety monitoring device for building discharging platform structural representation as shown in Figure 1, this safety monitoring device comprises weighing platform 1, is provided with one group of LOAD CELLS 2 bottom weighing platform 1; LOAD CELLS 2 and display and control setup 13 are electrically connected, show and control setup 13 is electrically connected with warning device 3 and wireless camera 4, wireless camera 4 and remote monitor and control computing machine 5 wireless connections; LOAD CELLS 2, display and control setup 13, warning device 3 are connected with power supply with wireless camera 4.Power supply comprises aerogenerator 6, and aerogenerator 6 via controller 7 is connected with inverter 8 and storage battery 9, the mouth of inverter 8 and LOAD CELLS 2, to show and the power input of control setup 13, warning device 3 and wireless camera 4 is connected.Switch 10 and fuse 11 is in series with between controller 7 and inverter 8.Aerogenerator 6 is arranged on pylon 12.
Embodiment
during concrete enforcement, using existing discharging platform as weighing platform 1, existing discharging platform can install four LOAD CELLS 2, be had the weight of discharging platform material by LOAD CELLS 2 induction.Four LOAD CELLS 2 and display and control setup 13, warning device 3 are connected, and warning device 3 can adopt sound and light alarm, can display setting weight and actual weight on display and control setup 13.Warning device 3 has sound and light of alarm, after the material weight on discharging platform is greater than setting weight value, the chimes of doom that warning device 3 meeting is ear-piercing, blinking red lamp simultaneously, prompting field staff discharging platform is overweight, field staff, according to the setting weight on read-out and actual weight, can very clearly know discharging platform excess weight, overweight part to be shifted out from discharging platform timely.When after the value of taking pictures exceeding setting, wireless camera 4 starts, and when installing wireless camera 4, the image pickup scope of wireless camera 4 should comprise discharging platform four corner, and can know the content seen and showing and shown by control setup.Weight on live video and discharging platform can be sent to remote monitor and control computing machine 5 after starting by wireless camera 4 simultaneously.Project director can understand the disposition of field staff in time by remote monitor and control computing machine 5 and command treating process.
because monitoring alarm device is low voltage electrical equipment, its power consumption is also little, and in order to reduce the trouble of cable laying, electric power system of the present invention adopts aerogenerator to power.Aerogenerator 6 can select vertical axis aerogenerator, horizontal axis wind-driven generator or inclined shaft aerogenerator; As long as the power of electrical generator can meet the need for electricity that monitoring alarm device normally works.Due to the increase along with building height, wind-force is comparatively large, so it is comparatively suitable to take aerogenerator to be arranged on discharging platform or climbing frame, also can be placed in ground ventilation place, when installing aerogenerator 6, by pylon 12, aerogenerator 6 can be arranged on ventilation.Aerogenerator 6 also can on surface-based pylon.Pylon 12 is provided with switch box, controller 7, inverter 8 and storage battery 9 are installed in switch box, the mouth via controller 7 of aerogenerator 6 is connected with inverter 8 and storage battery 9, storage battery 9 can by unnecessary electrical power storage, in order to time calm being weighing platform, warning device and wireless camera continued power.The output voltage of aerogenerator 6 is transformed into monitoring alarm device required voltage by inverter 8, and the mouth of inverter 8 is connected with the power input of monitoring alarm device.In order to ensure safety and the steerability of monitoring alarm device, between controller 7 and inverter 8, be in series with switch 10 and fuse 11.Can be controlled monitoring alarm device by switch 10, safety and the reliability of monitoring alarm device can be guaranteed by fuse 11.
device of the present invention can repeat turnover and use, and amortization charge is low; Power supply has the free of contamination feature of energy-conserving and environment-protective.

Claims (11)

1. one kind for building the method for safety monitoring of discharging platform, it is characterized in that: the method is that discharging platform is arranged weighing platform, arrange LOAD CELLS at the tetrapod of weighing platform, LOAD CELLS is connected with display and control setup, warning device and wireless camera; When discharging platform load-carrying exceedes setting alarming value, point out field staff by warning device, when discharging platform load-carrying exceed setting take pictures value time to be taken pictures by wireless camera and image scene be sent to remote monitor and control computing machine.
2. method according to claim 1, it is characterized in that: described display and control setup can show rated weight and actual weight, display and control setup are provided with different jack simultaneously, be connected with warning device and wireless camera by different jack, display and control setup can arrange different limit value for different jack.
3. method according to claim 1, it is characterized in that: described warning device sets alarming value and value of taking pictures, when discharging platform load-carrying exceedes setting alarming value, alarm opened by warning device, when discharging platform load-carrying exceed setting take pictures value time, wireless camera is taken pictures, and is sent to remote monitor and control computing machine by transmission over radio, according to claim 1, method, is characterized in that: adopt transmission over radio between described wireless camera and remote monitor and control computing machine.
4. method according to claim 1, is characterized in that: described weighing platform, display and control setup, warning device and wireless camera provide working power by powered by wind energy device.
5. method according to claim 2, it is characterized in that: Wind resource change is become electric energy by aerogenerator by described powered by wind energy device, and convert the electric energy that aerogenerator produces to exchange or vdc supporting with weighing platform, warning device and wireless camera by controller with inverter; Fuse and switch is provided with, to guarantee power supply safety and to be convenient to control between controller and inverter.
6. method according to claim 3, it is characterized in that: described powered by wind energy device is provided with a group storage battery, by storage battery by unnecessary electrical power storage, in order to time calm being weighing platform, display and control setup, warning device and wireless camera continued power.
7. method according to claim 4, is characterized in that: described aerogenerator is arranged on ventilation by pylon, to obtain larger wind energy, can be placed in ground, also can be arranged on discharging platform or on climbing frame.
8. the safety monitoring device for building discharging platform that method is formed according to the arbitrary claim of claim 1 to 6, comprises weighing platform (1), it is characterized in that: weighing platform (1) bottom is provided with one group of LOAD CELLS (2); LOAD CELLS (2) and display and control setup (13) are electrically connected, show and control setup (13) is electrically connected with warning device (3) and wireless camera (4), wireless camera (4) and remote monitor and control computing machine (5) wireless connections; LOAD CELLS (2), display and control setup (13), warning device (3) are connected with power supply with wireless camera (4).
9. the safety monitoring device for building discharging platform according to claim 7, it is characterized in that: described power supply comprises aerogenerator (6), aerogenerator (6) via controller (7) is connected with inverter (8) and storage battery (9), the mouth of inverter (8) and LOAD CELLS (2), to show and the power input of control setup (13), warning device (3) and wireless camera (4) is connected.
10. the safety monitoring device for building discharging platform according to claim 8, is characterized in that: be in series with switch (10) and fuse (11) between described controller (7) and inverter (8).
11. safety monitoring devices for building discharging platform according to claim 9, is characterized in that: described aerogenerator (6) is arranged on pylon (12).
CN201410262625.5A 2014-06-13 2014-06-13 Security monitoring method and device for building discharging platform Pending CN105314492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410262625.5A CN105314492A (en) 2014-06-13 2014-06-13 Security monitoring method and device for building discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410262625.5A CN105314492A (en) 2014-06-13 2014-06-13 Security monitoring method and device for building discharging platform

Publications (1)

Publication Number Publication Date
CN105314492A true CN105314492A (en) 2016-02-10

Family

ID=55242948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410262625.5A Pending CN105314492A (en) 2014-06-13 2014-06-13 Security monitoring method and device for building discharging platform

Country Status (1)

Country Link
CN (1) CN105314492A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106932062A (en) * 2017-04-26 2017-07-07 马斯利自动化技术(苏州)有限公司 A kind of accurate clout supervising device and its monitoring method
CN109505316A (en) * 2018-12-25 2019-03-22 安徽省建设工程测试研究院有限责任公司 The preloading safety monitoring system and method that a kind of test of static load of pile foundation uses
CN109592579A (en) * 2018-12-11 2019-04-09 中冶建工集团有限公司 A kind of discharging platform monitoring method
CN107678386B (en) * 2017-10-11 2024-03-22 中建八局第二建设有限公司 Overload-proof and inclination-proof discharging platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852009A (en) * 2010-05-18 2010-10-06 桂林电子科技大学 Monitoring system of guide-rail attached lifting scaffold
CN101968200A (en) * 2010-07-24 2011-02-09 无锡同春新能源科技有限公司 Wind power generating system applied to lighting device on building tower crane
CN201835530U (en) * 2010-01-14 2011-05-18 中铁建工集团有限公司 Load limiting system for overhanging unloading platform
CN102509428A (en) * 2011-11-08 2012-06-20 天津长城科安电子科技有限公司 Construction site remote real-time monitoring system
CN203514812U (en) * 2013-08-29 2014-04-02 中国建筑股份有限公司 Automatic alarming and discharging platform
PL68263Y1 (en) * 2012-01-20 2016-03-31 Betomax Polska Spółka Akcyjna Unloading platform, especially for the construction industry

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201835530U (en) * 2010-01-14 2011-05-18 中铁建工集团有限公司 Load limiting system for overhanging unloading platform
CN101852009A (en) * 2010-05-18 2010-10-06 桂林电子科技大学 Monitoring system of guide-rail attached lifting scaffold
CN101968200A (en) * 2010-07-24 2011-02-09 无锡同春新能源科技有限公司 Wind power generating system applied to lighting device on building tower crane
CN102509428A (en) * 2011-11-08 2012-06-20 天津长城科安电子科技有限公司 Construction site remote real-time monitoring system
PL68263Y1 (en) * 2012-01-20 2016-03-31 Betomax Polska Spółka Akcyjna Unloading platform, especially for the construction industry
CN203514812U (en) * 2013-08-29 2014-04-02 中国建筑股份有限公司 Automatic alarming and discharging platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106932062A (en) * 2017-04-26 2017-07-07 马斯利自动化技术(苏州)有限公司 A kind of accurate clout supervising device and its monitoring method
CN107678386B (en) * 2017-10-11 2024-03-22 中建八局第二建设有限公司 Overload-proof and inclination-proof discharging platform
CN109592579A (en) * 2018-12-11 2019-04-09 中冶建工集团有限公司 A kind of discharging platform monitoring method
CN109505316A (en) * 2018-12-25 2019-03-22 安徽省建设工程测试研究院有限责任公司 The preloading safety monitoring system and method that a kind of test of static load of pile foundation uses

Similar Documents

Publication Publication Date Title
CN105314492A (en) Security monitoring method and device for building discharging platform
CN104682832A (en) Energy source supplying system for field camp
CN107517276A (en) A kind of wind light mutual complementing water surface cage culture comprehensive monitoring platform
CN206471908U (en) A kind of wind light mutual complementing is powered and monitoring system
CN203691539U (en) Field portable type all-wireless security monitoring machine
CN203359745U (en) Hot blast stove refractory vertical transport device
CN203998501U (en) A kind of for building the safety monitoring device of discharging platform
CN203039806U (en) Forest wind-light complementation monitoring system
CN206914661U (en) A kind of unmanned plane charging device
CN201733119U (en) Wind-light complementary controlling-inverting integrated machine
CN103607560A (en) Power transmission project construction field video monitoring system
CN103607561A (en) Video supervision terminal
CN203632791U (en) Outdoor wind-solar-electricity wireless camera device
CN205881072U (en) Civilian security and protection project monitoring device
CN207194599U (en) A kind of tower bar tilts monitoring bracing means
CN106444546B (en) Intelligent control remote real-time monitoring device
CN206418754U (en) A kind of elevating scaffold automatic horizontal control system
CN214498537U (en) Assembled basic station
CN201540624U (en) Forest fire prevention remote monitoring system with solar energy and wind energy power supply
CN204624400U (en) A kind of can the rubbish container of remote monitor and control
CN209327859U (en) Low pressure scene turn-key system for axle power servo-system
CN203742191U (en) Intelligent protection net for constructional engineering
CN205092643U (en) High -voltage line tower early warning terminal with solar charging
CN207251680U (en) A kind of wind light mutual complementing water surface cage culture comprehensive monitoring platform
CN205944890U (en) Power cable support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160210