CN203981827U - Capacitor integrated proving installation - Google Patents

Capacitor integrated proving installation Download PDF

Info

Publication number
CN203981827U
CN203981827U CN201420339766.8U CN201420339766U CN203981827U CN 203981827 U CN203981827 U CN 203981827U CN 201420339766 U CN201420339766 U CN 201420339766U CN 203981827 U CN203981827 U CN 203981827U
Authority
CN
China
Prior art keywords
capacitor
tester
copper sheet
insulation resistance
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420339766.8U
Other languages
Chinese (zh)
Inventor
刘崇新
刘惠渤
李立棠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuxin Xin Pu Electronics Co Ltd
Original Assignee
Fuxin Xin Pu Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuxin Xin Pu Electronics Co Ltd filed Critical Fuxin Xin Pu Electronics Co Ltd
Priority to CN201420339766.8U priority Critical patent/CN203981827U/en
Application granted granted Critical
Publication of CN203981827U publication Critical patent/CN203981827U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to checkout equipment, be particularly related to a kind of capacitor integrated proving installation, on a rectangular insulcrete (6), inlay be provided with three groups respectively with withstands voltage tester (1), Insulation Resistance Tester (2), the test copper sheet (5) that capacity and loss test instrument (3) are corresponding, below test copper sheet (5) the right side test copper sheet (5) being connected with withstands voltage tester (1) and Insulation Resistance Tester (2), be provided with discharge resistance (9), two ends on insulcrete (6) is provided with copper sheet for short circuit (4), two condenser terminal posts (8-1) on capacitor (8) connect withstands voltage tester (1) successively with lead-in wire (7), wiring point on the capacitor copper lug (11) of Insulation Resistance Tester (2) and capacity and loss test instrument (3) correspondence, save manpower, raise the efficiency, device takes up space little.

Description

Capacitor integrated proving installation
Technical field
The utility model belongs to checkout equipment, particularly a kind of capacitor integrated proving installation.
Background technology
At present, in capacitor production run, need to detect according to relevant technical standard, in the ordinary course of things, four technical indicators of Detection capacitance device, i.e. proof voltage, insulation resistance, electric capacity grade and loss tangent.In the time detecting these several indexs, need three instruments, three people operating personnel detect respectively, and waste man-hour and manpower, because three instruments of need take up room greatly.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, and a kind of compact conformation, capacitor integrated proving installation that volume is little, multiple functional, easy to operate are provided.
The technical scheme that the utility model technical solution problem adopts is: capacitor integrated proving installation comprises capacitor, withstands voltage tester, Insulation Resistance Tester, capacity and loss test instrument, be characterized in inlaying on a rectangular insulcrete be provided with three groups respectively with withstands voltage tester, Insulation Resistance Tester, the test copper sheet that capacity and loss test instrument are corresponding, below the test copper sheet right side test copper sheet being connected with withstands voltage tester and Insulation Resistance Tester, be provided with discharge resistance, two ends on insulcrete is provided with short circuit copper sheet, two condenser terminal posts on capacitor connect withstands voltage tester successively with lead-in wire, wiring point on capacitor copper lug corresponding to Insulation Resistance Tester and capacity and loss test instrument.
The beneficial effects of the utility model are: use this proving installation only to need operating personnel, use the wiring of capacitor to streak from the test copper sheet of withstands voltage tester, Insulation Resistance Tester, capacity loss tester function successively from left to right, can complete the detection of four technical parameters of capacitor, save manpower, raise the efficiency, device takes up space little.
Brief description of the drawings
Illustrate with embodiment below in conjunction with accompanying drawing.
Fig. 1 is capacitor integrated proving installation structural drawing.
In figure, 1-withstands voltage tester; 2-Insulation Resistance Tester; 3-capacity and loss test instrument; 4-short circuit copper sheet; 5-tests copper sheet; 6-insulcrete; 7-lead-in wire; 8-capacitor; 8-1-condenser terminal post; 9-discharge resistance; 10-insulcrete base; 11-capacitor copper lug.
Embodiment
Embodiment, with reference to accompanying drawing 1, capacitor integrated proving installation is the test copper sheet 5 of inlaying on the insulcrete 6 of making at a rectangular epoxy resin bonded fiber applying 3 three groups, 7 withstands voltage tester 1, Insulation Resistance Tester 2 and the capacity that connect that go between and loss test instrument, below the test copper sheet 5 on test copper sheet 5 right sides that are connected with withstands voltage tester 1 and Insulation Resistance Tester 2, is provided with discharge resistance 9.Parallelly with test copper sheet 5 in the two ends of insulcrete 6 be provided with copper sheet 4 for short circuit.A side at every group of test copper sheet 5 is equipped with a capacitor lug plate 11.Below capacitor 8, be provided with two binding post 8-1, condenser terminal post 8-1 with lead-in wire 7 while testing respectively successively the capacitor lug plate 11 corresponding with withstands voltage tester 1, Insulation Resistance Tester 2 and capacity and loss test instrument 3 connect, on the fixing insulcrete base 10 of four jiaos in its lower section of whole insulcrete 6.
The course of work of capacitor integrated proving installation is: when work, by withstands voltage tester 1, lead-in wire 7 on Insulation Resistance Tester 2 and capacity and loss test instrument 3 accesses from below respectively on the wiring point of the test copper sheet 5 on insulcrete 6, then the lead-in wire 7 on capacitor 8 condenser terminal post 8-1 below is first received on the capacitor lug plate 11 of corresponding withstands voltage tester 1, receive successively again Insulation Resistance Tester 2, on the capacitor lug plate 11 of capacity and loss test instrument 3 correspondences, on each capacitor lug plate 11, need to stop a moment, can test out the technical indicator parameter of capacitor.

Claims (1)

1. a capacitor integrated proving installation, comprise capacitor (8), withstands voltage tester (1), Insulation Resistance Tester (2), capacity and loss test instrument (3), it is characterized in that inlaying on a rectangular insulcrete (6) be provided with three groups respectively with withstands voltage tester (1), Insulation Resistance Tester (2), the test copper sheet (5) that capacity and loss test instrument (3) are corresponding, below test copper sheet (5) the right side test copper sheet (5) being connected with withstands voltage tester (1) and Insulation Resistance Tester (2), be provided with discharge resistance (9), two ends on insulcrete (6) is provided with copper sheet for short circuit (4), two condenser terminal posts (8-1) on capacitor (8) connect withstands voltage tester (1) successively with lead-in wire (7), wiring point on the capacitor copper lug (11) of Insulation Resistance Tester (2) and capacity and loss test instrument (3) correspondence.
CN201420339766.8U 2014-06-24 2014-06-24 Capacitor integrated proving installation Expired - Fee Related CN203981827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420339766.8U CN203981827U (en) 2014-06-24 2014-06-24 Capacitor integrated proving installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420339766.8U CN203981827U (en) 2014-06-24 2014-06-24 Capacitor integrated proving installation

Publications (1)

Publication Number Publication Date
CN203981827U true CN203981827U (en) 2014-12-03

Family

ID=51979261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420339766.8U Expired - Fee Related CN203981827U (en) 2014-06-24 2014-06-24 Capacitor integrated proving installation

Country Status (1)

Country Link
CN (1) CN203981827U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105116298A (en) * 2014-12-16 2015-12-02 铜陵翔宇商贸有限公司 High-efficiency type withstand voltage testing device for capacitor
CN107300652A (en) * 2017-06-07 2017-10-27 深圳市智胜新电子技术有限公司 Aluminum electrolytic capacitor test device and method of testing
CN113567799A (en) * 2021-09-28 2021-10-29 广东电网有限责任公司中山供电局 10kV capacitor integrated test device and test method thereof
CN115483025A (en) * 2022-09-30 2022-12-16 安徽锐光电子科技有限公司 Preparation process of mica sheet capacitor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105116298A (en) * 2014-12-16 2015-12-02 铜陵翔宇商贸有限公司 High-efficiency type withstand voltage testing device for capacitor
CN107300652A (en) * 2017-06-07 2017-10-27 深圳市智胜新电子技术有限公司 Aluminum electrolytic capacitor test device and method of testing
CN113567799A (en) * 2021-09-28 2021-10-29 广东电网有限责任公司中山供电局 10kV capacitor integrated test device and test method thereof
CN115483025A (en) * 2022-09-30 2022-12-16 安徽锐光电子科技有限公司 Preparation process of mica sheet capacitor

Similar Documents

Publication Publication Date Title
CN203981827U (en) Capacitor integrated proving installation
CN202903935U (en) A multifunctional portable line detector
CN102156273A (en) Electric energy meter verification circuit for error test and direct current and even harmonic test
CN103499805B (en) Detection device compatible with three-phase intelligent electric energy meter and type-III special transform acquisition terminal
CN205092826U (en) A frock for solar module high -voltage insulation test and EL test
CN204882853U (en) Electric energy meter pressure resistance test installation
CN203376429U (en) Novel portable low-voltage circuit line checker
CN204168001U (en) A kind of intelligent duplicate power supply automatic change-over based on DSP
CN202837527U (en) Watt hour meter testing platform
CN203490274U (en) Voltage testing device for four-terminal capacitor
CN202049230U (en) High-voltage load box
CN203054115U (en) Interface board power-up checkout console
CN204732043U (en) Automobile circuit line examination experimental box
CN104820202A (en) Electric energy meter testing device
CN202998251U (en) ADSL signal test tool
CN204666771U (en) A kind of GIS partial discharge locating device
CN202939254U (en) Set-top-box card reader detection apparatus
CN204214898U (en) A kind of polarity electrolytic condenser multipole test position fix fixture
CN204302349U (en) A kind of voltage check device
CN203191466U (en) A system for conveniently checking the aging of large-scale capacitors used for a high-voltage transmission intelligent power grid
CN203455472U (en) Detecting device capable of detecting both three-phase intelligent electric energy meter and III-type special transformer acquisition terminal
CN212932935U (en) Be applied to device stage body of examination disk import electric energy meter
CN203606444U (en) Complete machine frequency conversion on-line test circuit
CN203275632U (en) Voltage transformer detection concentrator
CN203084064U (en) Multifunctional electroscope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141203

Termination date: 20150624

EXPY Termination of patent right or utility model