CN203978384U - Preheat aeration de-plugging of well device systems - Google Patents

Preheat aeration de-plugging of well device systems Download PDF

Info

Publication number
CN203978384U
CN203978384U CN201420235355.4U CN201420235355U CN203978384U CN 203978384 U CN203978384 U CN 203978384U CN 201420235355 U CN201420235355 U CN 201420235355U CN 203978384 U CN203978384 U CN 203978384U
Authority
CN
China
Prior art keywords
plugging
car
heating
aeration
injection pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420235355.4U
Other languages
Chinese (zh)
Inventor
赵虹
崔涵微
冯桂荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd
Original Assignee
Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd filed Critical Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd
Priority to CN201420235355.4U priority Critical patent/CN203978384U/en
Application granted granted Critical
Publication of CN203978384U publication Critical patent/CN203978384U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

Preheat aeration de-plugging of well device systems, tank car or Agitation Tank (1), heating pump truck (2), fluid reservoir (3), high head injection pump car (4) are connected by pipeline successively with well mouth of oil well device (6); Press windmill (5) to access on the pipeline between high head injection pump car (4) and wellhead assembly (6) by threeway, access point is greater than 3 times of distance of wellhead assembly (6) to the distance of high head injection pump car (4), access point is as far as possible near well head.The heating-up temperature of heating pump truck (3) is made as design temperature, improves the activation energy of blockages relieving fluid reaction, and melting wax, heat are washed obstruction, can also accelerate to mix air and produce cavitation effect; At the tail end of infusion process, by pressing windmill (5) to mix air toward blockages relieving fluid, air is heated on stratum, expands, effusion, debacle, and cavitation effect occurs, and peels off obstruction, assistant chemical de-plugging; Physics de-plugging and chemical plugging removal effect organically combine, and promote overall de-plugging effect.

Description

Preheat aeration de-plugging of well device systems
Technical field
The utility model relates to oil exploitation auxiliary equipment device, especially preheats aeration de-plugging of well device systems.
Background technology
In oilfield development process, along with the decline of reservoir pressure and temperature and separating out of solution gas, in crude oil, formation rock skeleton surface can be separated out and be deposited on to the polymer substance such as contained paraffin, colloid and pitch gradually; Microbes Fast-propagation in the time that temperature drops to optimum range in oil reservoir also produces a large amount of metabolites, adheres to, is deposited on formation rock skeleton surface.These obstructions can stop up formation pore, cause reservoir permeability to reduce, and oil well output declines.And this obstruction in the area that approaches oil well is particularly serious.
Conventionally removing oil well by de-plugging measure operation stops up.Be main obstruction for organic matter, generally adopt the localized hyperthermia that organic solvent cleans or chemical heat generating agent produces to melt and the row of returning; Be main obstruction for bacterium, also can adopt high temperature to kill processing.The method of plug removal in oil and water well is mainly divided into two large classes, and a class is chemical method, and a class is physical method, but respectively has pluses and minuses.
Utility model content
The purpose of this utility model is to provide one and preheats aeration de-plugging of well device, adopts the de-plugging of physical method assistant chemical, improves de-plugging of well working effect and quality.
The purpose of this utility model will realize by following technical measures: mainly comprise tank car or Agitation Tank, heating pump truck, fluid reservoir, high head injection pump car, press windmill.Tank car or Agitation Tank, heating pump truck, fluid reservoir, high head injection pump car, well mouth of oil well device connect successively by pipeline; Press windmill to access on the pipeline between high head injection pump car and wellhead assembly by threeway.
Especially, after tank car or Agitation Tank, access the heating pump truck for heating blockages relieving fluid.
Especially, the heating-up temperature of heating pump truck is made as design temperature, improves the activation energy of blockages relieving fluid reaction, and melting wax, heat are washed obstruction, can also accelerate to mix air and produce cavitation effect.
Especially, press windmill to access on the pipeline between high head injection pump car and wellhead assembly by threeway, access point is greater than 3 times of distance of wellhead assembly to the distance of high head injection pump car, and access point is near well head.Allow gas-liquid mixture enter as early as possible pit shaft and formation function in the region that needs de-plugging, the air mixing expands on stratum, overflows, bubble breaks, and produces the de-plugging of cavitation effect assistant chemical.
Especially, the operating pressure of pump truck and pressure windmill matches.
Advantage of the present utility model and effect: heating pump truck heating blockages relieving fluid, the chemical reaction velocity of quickening blockages relieving fluid, melting wax, heat are washed obstruction, can also accelerate to mix air and produce cavitation effect; Press windmill to mix air to blockages relieving fluid, the blockages relieving fluid of heating causes cavitation effect on stratum, effectively peels off obstruction; Physics de-plugging and chemical plugging removal effect organically combine, and promote overall de-plugging effect.System adopts oil field conventional equipment, installation, operation, easy to maintenance.Be applicable to the well stimulation such as de-plugging of well, viscosity reduction, clear wax control, can extend measure interval time, reduce production suspension induced losses, effect is remarkable.
Brief description of the drawings
Fig. 1 is the utility model embodiment 1 structural representation.
Reference numeral comprises: tank car or Agitation Tank 1, heating pump truck 2, fluid reservoir 3, high head injection pump car 4, pressure windmill 5, well mouth of oil well device 6.
Detailed description of the invention
The utility model principle is, makes full use of oil field conventional equipment, by heating blockages relieving fluid, improves blockages relieving fluid activation energy, promotes de-plugging reaction, and melting wax, heat are washed obstruction; Press windmill to heating after blockages relieving fluid in mix air, make blockages relieving fluid produce cavitation effect on stratum, effectively peel off obstruction; Physics de-plugging and the combination of chemical plugging removal effect machine, promote overall de-plugging effect.
The utility model mainly comprises: tank car or Agitation Tank 1, heating pump truck 2, fluid reservoir 3, high head injection pump car 4, pressure windmill 5, well mouth of oil well device 6.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment 1: as shown in Figure 1, tank car or Agitation Tank 1, heating pump truck 2, fluid reservoir 3, high head injection pump car 4 are connected by pipeline successively with well mouth of oil well device 6; Press windmill 5 access on the pipeline between high head injection pump car 4 and wellhead assembly 6 by threeway, access point is greater than 3 times of distance of wellhead assembly 6 to the distance of high head injection pump car 4, i.e. the access point close well head of trying one's best.Heating pump truck 2 heating-up temperatures are design setting temperature, and higher than the temperature of fouling wax deposition point, press in windmill 3 thermotropism blockages relieving fluids and be pressed into air, and pump truck 5 is by the injection of design discharge capacity.
In aforementioned, heating pump truck 2 is the conventional paraffin removal unit in oil field, and scene is commonly called as deep fat car.
In aforementioned, press the access point of windmill as far as possible near well head.
In aforementioned, high head injection pump car 5 is fluid injection pump truck, according to design pressure, blockages relieving fluid is injected to stratum along pipe.
In aforementioned, pressing windmill 6 is vehicle-mounted blast machine equipment, and air amount is also pressed into blockages relieving fluid.
When the utility model work, blockages relieving fluid is shipped from make-up station by tank car 1, or on-the-spot preparation in Agitation Tank, after 2 heating of heating pump truck, pump into fluid reservoir 3, high head injection pump 4 enters wellhead assembly 6 through pipeline by the blockages relieving fluid pumping in fluid reservoir 3, press windmill 5 that air is pressed into blockages relieving fluid, the mixed stratum of injecting of gas-liquid; The heating-up temperature of heating pump truck 2 is set as design temperature; Make it to produce cavitation by air capacity and the downhole temperature of controlling blockages relieving fluid.
The concrete implementation step of the utility model:
1, before construction, prepare: check that well head, pit shaft meet execution conditions; Connect ground installation and pipeline; Detect high pressure pipe joint and each parts, pipeline is carried out to pressure testing, guarantee that pipeline pressure-bearing is qualified.
2, blockages relieving fluid preparation: prepare blockages relieving fluid or draw liquid to scene from make-up station tank car in Agitation Tank by component design and liquid measure.
3, blockages relieving fluid heating: start heating pump truck, extract blockages relieving fluid and be heated to design temperature from tank car or Agitation Tank, be stored in fluid reservoir;
4, opening high head injection pump car injects into well blockages relieving fluid: inject 15min by the design discharge capacity of pump, then start and press windmill, slowly aeration reaches design air entrainment, and the 0.3%-1.2% that total air entrainment is liquid measure, also can design point 2,3 aeratings.In aeration process, observe wellhead back pressure and change, when wellhead back pressure reduces after 3MPa, reduce air entrainment; In the time that wellhead back pressure no longer changes, stop aeration and by normal infusion.If stratum imbibition difficulty, can suitably improve infusion pressure; If pressure reaches still feed liquor not of the highest pressure limiting, should stop infusion, infusion again after immersion 10min-20min with pressure.In whole work progress, pump pressure is controlled in the highest pressure limiting.Construction finishes, the row of returning after closing well reaction half an hour; Raffinate enters tank car, and process roping to appointed place.
In the utility model, the feature of stopping up according to oil well, the operation of choose reasonable pump truck.In work progress, press feedback and technological requirement transformation to inject according to oil jacket, cause vibration wave, cause solia particle or emulsion droplet vibration in stratum, make its desorption or breakdown of emulsion coalescence, remove formation blockage, dredging stratum filtration passage.In the time that energy is enough, the TRANSIENT HIGH TEMPERATURE high pressure producing due to cavitation effect can make stratum produce microfissure to improve in-place permeability, make crude oil C-C bond fission and reduce Crude viscosity, further improve oil relative permeability.In liquid stream flow at high speed, also there is complicated cavitation flow phenomenon, the generation of cavity, develop and the process that crumbles and fall in exist thermomechanical effect and bring out the best in each other by heating power and high velocity stream.
The advantage of the present embodiment compared with the conventional de-plugging of well equipment system in oil field is: increased the pressure windmill 5 that heats the heating pump truck 2 of blockages relieving fluid and be pressed into air to blockages relieving fluid.Wherein, the advantage that increases heating pump truck 2 is: improve blockages relieving fluid activation energy, promote that chemical reaction carries out, hot melt wax, heat are washed Organic Material Blocking, are conducive to produce cavitation effect, and three aspects: is favourable each other, collaborative de-plugging; Increase and press the advantage of windmill 5 to be: increase gas flow and bring out cavitation effect, the effect of cooperatively interacting of temperature and gas flow, the potential safety hazard of avoiding long-time operations involving high pressure to cause.The power that pumps into that does not change pump truck 5, pump truck 5 discharge capacities are larger, are applicable to removing the obstruction of near wellbore zone.
Above-described embodiment of the present utility model is only for the utility model example is clearly described, and is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.The application cannot give exhaustive to all embodiments.And these belong to apparent variation that spirit of the present utility model extended out or variation still among the protection domain in the application.

Claims (5)

1. preheat aeration de-plugging of well device systems, comprise tank car or Agitation Tank (1), heating pump truck (2), fluid reservoir (3), high head injection pump car (4), press windmill (5), it is characterized in that: tank car or Agitation Tank (1), heating pump truck (2), fluid reservoir (3), high head injection pump car (4) are connected by pipeline successively with well mouth of oil well device (6); Press windmill (5) to access on the pipeline between high head injection pump car (4) and wellhead assembly (6) by threeway.
2. the aeration de-plugging of well device systems that preheats as claimed in claim 1, is characterized in that, heating pump truck (2) is connected with tank car or Agitation Tank (1).
3. the aeration de-plugging of well device systems that preheats as claimed in claim 1, is characterized in that, heating pump truck (2) heating blockages relieving fluid, and the chemical reaction velocity of quickening blockages relieving fluid, realizes physical thermal to obstruction simultaneously and washes; It is that base area layer original temperature, de-plugging agent activation energy comprehensive consideration are determined that deep fat car (2) heating-up temperature is set, and higher than the temperature of fouling wax deposition point.
4. the aeration de-plugging of well device systems that preheats as claimed in claim 1, is characterized in that, high head injection pump car (4) discharge capacity is by designing requirement work.
5. the aeration de-plugging of well device systems that preheats as claimed in claim 1, it is characterized in that, by pressing windmill to blockages relieving fluid aeration, bring out cavitation effect, press windmill (5) to access on the pipeline between high head injection pump car (4) and wellhead assembly (6) by threeway, access point is greater than 3 times of distance of wellhead assembly (6) to the distance of high head injection pump car (4), be access point as far as possible near well head, ensure in air Injection well and produce Cavitation having in the pit shaft of obstruction and stratum.
CN201420235355.4U 2014-05-04 2014-05-04 Preheat aeration de-plugging of well device systems Expired - Lifetime CN203978384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420235355.4U CN203978384U (en) 2014-05-04 2014-05-04 Preheat aeration de-plugging of well device systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420235355.4U CN203978384U (en) 2014-05-04 2014-05-04 Preheat aeration de-plugging of well device systems

Publications (1)

Publication Number Publication Date
CN203978384U true CN203978384U (en) 2014-12-03

Family

ID=51975843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420235355.4U Expired - Lifetime CN203978384U (en) 2014-05-04 2014-05-04 Preheat aeration de-plugging of well device systems

Country Status (1)

Country Link
CN (1) CN203978384U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401918A (en) * 2015-10-23 2016-03-16 克拉玛依新科澳石油天然气技术股份有限公司 Oil well cavitation method physicochemical heat blockage relieving technology
CN105986771A (en) * 2015-02-11 2016-10-05 谢晓峰 Continuous hydraulic negative pressure pulse plug removal system and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986771A (en) * 2015-02-11 2016-10-05 谢晓峰 Continuous hydraulic negative pressure pulse plug removal system and use method thereof
CN105401918A (en) * 2015-10-23 2016-03-16 克拉玛依新科澳石油天然气技术股份有限公司 Oil well cavitation method physicochemical heat blockage relieving technology

Similar Documents

Publication Publication Date Title
CN104533354B (en) Plug type sand control method for slim hole sidetracked well
CN106089166A (en) A kind of fine and close oil reservoir CO2foam handle up improve recovery ratio method
CN106640000B (en) Viscous oil field operated by steam Deep channel blocking expansible graphite blocking agent system and method for implanting
CN100572492C (en) Self-breaking glue solution body plug horizontal well in segments perforating and fracturing technology and plug
CN205154105U (en) Stifled equipment system is separated in continuous acidizing of little discharge capacity of water injection well
CN106593389A (en) Method for fracturing high-angle naturally-fractured oil reservoir by using permanent plugging agent
CN106761650A (en) Oil, many microcrack pressure break block releasing techniques of well
CN205135590U (en) Pulse adds pump of middle displacing liquid of sand fracturing and annotates device
CN106753299B (en) A kind of thin oil well selective water shutoff agent and the preparation method and application thereof
CN203978384U (en) Preheat aeration de-plugging of well device systems
CN104314540B (en) A kind of steam injection oil reservoir preventing and treating vapour alters method
CN104033138A (en) Device and method for integrating functions of steam injection fluctuation and chemical blocking removal of heavy oil reservoir without removing tubular columns
CN109751033A (en) A kind of fracturing process for tight sandstone reservoir
CN107288574A (en) A kind of diverting agent and preparation method thereof
CN109083626A (en) It is a kind of to realize temporary stall to the fracturing process with high-speed channel by fiber
CN102585787B (en) Efficient urea-formaldehyde resin plugging agent and application thereof
CN105401918A (en) Oil well cavitation method physicochemical heat blockage relieving technology
CN101914373B (en) Horizontal well biology yield increasing solution
CN108949132B (en) Sand consolidation and blockage removal treatment fluid for sand prevention of fine silt reservoir oil well, sand prevention treatment fluid system and sand prevention method using sand consolidation and blockage removal treatment fluid system
CN105089562A (en) Preheating variable-frequency injection unblocking process system for water injection well
CN103195364A (en) Method and device for reducing well-bottom annulus confining pressure and improving radial horizontal well rock breaking efficiency
CN103867179A (en) Hydraulic jet fracturing method for U-shaped well
CN102504779B (en) Paraffin rosin water plugging agent for water plugging of thick oil huff-puff well and water plugging construction method
CN104948157A (en) Method for steam huff and puff heavy oil reservoir development shifted after fracturing sand control
CN106996284A (en) One kind utilizes oleic acid mixture upgrading combination mixed phase hot fluid oil flooding method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant