CN102504779B - Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method - Google Patents

Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method Download PDF

Info

Publication number
CN102504779B
CN102504779B CN 201110432488 CN201110432488A CN102504779B CN 102504779 B CN102504779 B CN 102504779B CN 201110432488 CN201110432488 CN 201110432488 CN 201110432488 A CN201110432488 A CN 201110432488A CN 102504779 B CN102504779 B CN 102504779B
Authority
CN
China
Prior art keywords
water
paraffin
rosin
plugging agent
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110432488
Other languages
Chinese (zh)
Other versions
CN102504779A (en
Inventor
马春宝
闫长生
向延安
吴洪举
徐恩宽
韩松
高玉军
张玉增
刘广友
詹美珍
罗艳红
姜晨华
闻晶
姜佳悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN 201110432488 priority Critical patent/CN102504779B/en
Publication of CN102504779A publication Critical patent/CN102504779A/en
Application granted granted Critical
Publication of CN102504779B publication Critical patent/CN102504779B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

The invention provides a paraffin rosin water shutoff agent for water shutoff of a heavy oil huff-puff well and a water shutoff construction method. The water plugging agent for the thickened oil huff and puff well is a mixed solution prepared by adding water into paraffin and rosin. The water plugging construction method of the thickened oil huff and puff well comprises the following steps: the paraffin-rosin mixed liquid water shutoff agent is injected into a stratum to be treated for selective water shutoff, and the temperature of the water shutoff agent in the injection process is ensured to be higher than the freezing point temperature of paraffin and the softening point temperature of rosin. By utilizing the technology of the invention, because the construction temperature when the water plugging agent is injected is higher than the freezing point of the paraffin and the softening point of the rosin, the solid contents such as the paraffin, the rosin and the like and water form a liquid-liquid mixed phase, and the liquid-liquid mixed phase can easily enter the deep part of the stratum; after the water is squeezed into the stratum, paraffin and rosin are crystallized and separated out along with heat exchange when the temperature is lower than 55 ℃, and the paraffin and rosin are dissolved with oil and are unchanged with water, so that selective water plugging is realized; meanwhile, the problem of cold injury can be effectively avoided.

Description

Be used for viscous crude handle up the paraffin rosin plugging agent and the water-blocking construction method of well water blockoff
Technical field
The invention belongs to heavy oil wells water-plugging technique field, specifically relate to a kind of viscous crude that is used for and handle up the adding the plugging agent that water is mixed with and utilizing this plugging agent to carry out the method for plug water construction of well water blockoff by paraffin, rosin.
Background technology
In the present petroleum industry, the chemical water plugging poor selectivity, the water blockoff success ratio is low, and the selective water shut-off way is few.For realizing steady oil control water, increase crude production rate, Liaohe Oil Field company invention team develops the paraffin wax emulsion water-plugging technique.
The paraffin wax emulsion water-plugging technique is a kind of selective water shut-off technology, mainly be by paraffin being carried out modification, adding emulsifying agent it is dispersed into oil-in-water emulsion, adopt conventional form of construction work, after under normal temperature condition, modified paraffin milk sap being clamp-oned the stratum, add a certain amount of emulsion splitter again, with its breakdown of emulsion, making wax crystalline substance etc. contain thing admittedly separates out, be gathered into large-size particle, the shutoff water exit is realized selective water shut-off.Relevant paraffin wax emulsion water-plugging technique can be referring to document: CN1644647A " compound method of modified paraffin selective water shutoff agent "; " modified paraffin selective water shut-off technical study and rig-site utilization ", Li Jinquan, " special reservoirs " the 14th the 4th phase of volume, in August, 2007: 79-80; " paraffin wax emulsion selective water shut-off technology ", Gao Yujun, " oilfield chemistry " 2008 the 25th volumes (4): 342-344; " modified paraffin selective water shut-off technology desk research and test in place ", Zhang Shuhua, " special reservoirs " 2007 the 14th volume z1 phases; " development of modified paraffin selective water shutoff agent reaches in Jinzhou oilfield application ", Wang Fengzhu, " Inner Mongol petrochemical complex " 2010 the 36th the 14th phases of volume; Deng.
Yet above-mentioned paraffin wax emulsion water-plugging technique is used for the heavy oil wells water blockoff, because the high temperature sensitive property of viscous crude can cause viscous crude chance condensation knot in the stratum, the row's of returning difficulty forms cold damage, influences water plugging effect.
Cold damage is meant mainly that at present high wax containing well is (referring to " early stage cold water injection exploitation is to the cold damage of high content of wax high-solidification point oil reservoir ", Tian Nailin, Feng's accumulation, a beautiful jade, Zhang Lihua, Shanghai Metallurgy Inst., Chinese Academy of Sciences, " Materials Physics and Chemistry Ph D dissertation " 2000 years; " northern lakelet oil field oil reservoir cold damage experimental study ", Liu Huiqing, yellow partly cloudy, Bi Guoqiang, Zhang Zelan, Guo Yunyao, petroleum engineering institute of University of Petroleum, tell and breathe out three Tang Hu oil recovery factories, oil field, petroleum engineering institute of University of Petroleum, Shandong Dongying, Shandong Dongying, Hami) and the chemical agent of super viscous crude is handled up and carbonic acid gas is handled up etc., maximum is with cooperating steam treatment to construct, utilize the heat of steam to solve the problem of cold damage.Aspect viscous crude production, seldom there is document to mention the problem of water blockoff measure cold damage, there is not concrete terms of settlement yet.
Summary of the invention
Main purpose of the present invention is to provide a kind of handle up water-blocking construction method of well of viscous crude that is applicable to, avoids and solve the cold damage problem that traditional shutoff method brings the viscous crude recovery well.On this basis, another object of the present invention is to provide a kind of handle up plugging agent of well water-blocking construction method of this viscous crude that is applicable to.
For reaching above-mentioned purpose, on the one hand, the invention provides a kind of handle up plugging agent of well water blockoff of viscous crude that is applicable to, this plugging agent mainly is to add the formulated mixed solution of water by paraffin and rosin.Also this plugging agent is called " paraffin-rosin plugging agent " among the present invention or abbreviates " paraffin-rosin mixed solution plugging agent " as.
On the other hand, the invention provides and utilize described plugging agent to carry out the method that viscous crude is handled up the well plug water construction, this method comprises: paraffin of the present invention-rosin plugging agent is injected pending stratum carry out selective water shut-off, and, guarantee that the temperature of plugging agent in injection process is at the freezing point temperature of paraffin and more than the rosiny softening point temperature.
Plugging agent of the present invention and water-blocking construction method, mainly be zero pour characteristic and the rosiny softening temperature characteristic of having utilized paraffin, the freezing point temperature of paraffin is generally about 60 ℃, and rosin of the present invention is selected the rosin of heatproof difference for use, and for example softening temperature is at the rosin of (70~75 ℃) below 75 ℃.Among the present invention, because the construction temperature when injecting plugging agent is higher than the zero pour and the rosiny softening temperature of paraffin, paraffin and rosin etc. contain thing admittedly and water forms liquid-liquid mixed phase (paraffin, rosin mixes the back agitation as appropriate with water evenly can inject construction, because implantation temperature is higher than the zero pour and the rosiny softening temperature of paraffin, paraffin, water all is fluid, rosin adopts the less colophonium powder of particle diameter, after softening also is fluid basically, the three mixes inequality or emulsification is not fine, can not influence construction quality yet, do not need to add the prior paraffin plugging agent the emulsifying agent that must add), be easy to enter earth formation deep; After clamp-oning the stratum, along with heat exchange, when temperature is lower than paraffin and rosiny zero pour particularly below 55 ℃ the time, paraffin and CRYSTALLIZATION OF ROSIN are separated out, and it meets the oil dissolving, it is constant to meet water, thereby realizes selective water shut-off.On the other hand, the contriver finds in research process, when temperature in the construction process is higher than 70 ℃, the water blockoff intensity of simple paraffin and water mixed liquid can descend to some extent, and in the plugging agent of the present invention, rosiny adds can effectively improve plugging agent intensity, has improved the validity period of oilwell water shutoff.
According to specific embodiments of the present invention, the zero pour that requires used paraffin among the present invention is in 55~70 ℃ of preferred 55~65 ℃ of scopes, described rosin is preferably the colophonium powder of softening temperature below 75 ℃, particle diameter 0.1~1mm, and concrete paraffin and rosin kind are not had particular requirement, can be modification or non-modified product, for example, be applicable to that paraffin of the present invention can be industrial paraffin 52,54,56,58 etc., rosin can be the low colophonium powder through grinding of rank, can require construction temperature to guarantee that rosin is only softening when specifically implementing and differs and finish fusing surely.
According to specific embodiments of the present invention, the viscous crude that is applicable to of the present invention is handled up in the plugging agent of well water blockoff, and described paraffinicity is preferably 20wt%~30wt% more than 20wt%, more preferably at 25wt%~30wt%.
According to specific embodiments of the present invention, the viscous crude that is applicable to of the present invention is handled up in the plugging agent of well water blockoff, and described rosiny mass content is preferably 5wt%~10wt% more than 5wt%.
Except that specifying, ratio described in the present invention and content are part by weight and content.
According to specific embodiments of the present invention, the viscous crude that is applicable to of the present invention is handled up in the plugging agent of well water blockoff, described water can be oilfield sewage, for guaranteeing construction temperature, water temperature should be greater than the freezing point temperature and the rosiny softening point temperature of paraffin, usually require water temperature more than 70 ℃, preferred more than 75 ℃, more preferably more than 80 ℃.According to the zero pour and the rosiny softening temperature of concrete paraffin, can suitably adjust construction temperature, guarantee that the plugging agent temperature is in the zero pour of paraffin with more than the rosiny softening temperature.Be appreciated that under the prerequisite that guarantees water plugging effect of the present invention, do not advise using the paraffin and the rosin of high softening-point.
Plugging agent of the present invention and water-blocking construction method mainly are to design at causing the handling up well of cold damage, that is to say, plugging agent of the present invention and water-blocking construction method are applicable to that formation temperature is at the high water-cut well in latter stage of handling up of the viscous crude below 50 ℃.
When utilizing plugging agent of the present invention to carry out plug water construction, except that guaranteeing that the plugging agent implantation temperature is in the zero pour of paraffin with more than the rosiny softening point temperature, displacing liquid also is the hot sewage more than 70 ℃, its construction process and processing parameter can carry out according to the water-plugging technology of prior art, normally adopt at a slow speed and inject, can make plugging agent preferentially enter high permeability formation and carry out shutoff.When the present invention specifically implements, can increase a truck with boiler at the scene, provide heat to guarantee construction temperature.
According to specific embodiments of the present invention, be under the situation of motionless oil well pipe, from the oil jacket annular space plugging agent of the present invention is pressed 0.2~0.3m 3/ minute speed is clamp-oned the stratum, and the control entry pressure is lower than 15MPa, clamp-oning construction and finishing back closing well 3 days, and normally opening well and making production gets final product.
Adopt plugging agent of the present invention, effective water blockoff component content wherein is higher, can reach 30% or higher very easily, and blocking agent intensity is promoted significantly.Than before, because blocking agent intensity is improved, can be used for the big oil well of water outlet intensity.
Water-plugging technique of the present invention has the following advantages:
1, utilizes water-blocking construction method of the present invention,, can prevent effectively that low temperature from causing cold damage to the stratum, increase oil pump capacity, prolong fuel-displaced validity period because whole construction course is in more than the relatively-high temperature state (70 ℃).
2, utilize method of the present invention, do not need to add emulsifying agent preparation paraffin wax emulsion during blocking agent in preparation, do not need to inject emulsion splitter after blocking agent is injected the stratum yet, its expense integral construction temperature that is used to raise, not increasing under the condition of cost, can finish same construction task.
3, utilize method of the present invention, fixed tubular column adopts former tubing string construction, can save operating cost and production time.
4, utilize method of the present invention, than the plugging agent of prior art, effectively the water blockoff component content is higher in the blocking agent of the present invention, and water blockoff intensity is big, and liquid phase helps entering the oil reservoir deep, can enlarge the water blockoff radius, can effectively improve the validity period of oilwell water shutoff.
Embodiment
Below describe the enforcement of technical solution of the present invention and the beneficial effect of generation in detail by specific embodiment, be intended to help the reader to understand essence of the present invention and characteristics better, but not as qualification to this case practical range.
Embodiment 1
Certain oil well adopts conventional modified paraffin milk sap construction, prepares blocking agent water generally below 25 ℃, the heavy oil wells early period of origination draining after the construction, not fuel-displaced phenomenon, after general 10 days, just can see the oil increasing precipitation effect, think that the viscous crude in the stratum is met the condensation knot, form cold damage, treat that the formation temperature recovery is just normal, in addition, under the low-temperature condition, wax crystal is too early, be unfavorable for entering earth formation deep, cause validity period to shorten.
At this oil well, adopt plugging agent of the present invention and plug water construction technology, concrete operations are as follows:
With 20 meters of core intersections is example:
The preparation temperature is 80 ℃, and effectively selective water shutoff agent 60 sides of paraffinicity 20%+ rosin content 5% are on-the-spot by truck with boiler assurance blocking agent temperature, by pump truck blocking agent pressed 0.2~0.3m 3/ minute speed is clamp-oned oil reservoir, and the control entry pressure is lower than 15MPa, and displacing liquid is 15~20 sides.Construction back closing well 3 days, conventional construction closing well 5 days.Opening well and making production then.
Specific embodiment: Jin611-15-16Jing.This well 2003.05.12 goes into operation, 830.8-1028.5m, in the building+and prosperous table oil floor, 32.1 meters/9 layers, average effective porosity 24.02, stratum mean permeability 0.9826 μ m 2, in-place oil viscosity 1526mPa.s, construction on May 22nd, 2009, the preparation temperature is 80 ℃, and effectively selective water shutoff agent 90 sides of paraffinicity 20%+ rosin content 5% are on-the-spot by truck with boiler assurance blocking agent temperature, by pump truck blocking agent is clamp-oned oil reservoir from the oil jacket annular space, displacing liquid is hot sewage 20 sides.Construction back closing well 3 days.After driving a well, increase oily 1016.8t, precipitation 6131.8m 3, validity period 198d.
2009-2010, the present invention test 16 wells, increase oily 9775t, increased oil 610.9t, average effective phase 177d implements before the present invention (with 2006~2007 years, oil recovery factory, Jinzhou uses paraffin wax emulsion selective water shut-off technology 11 wells, and accumulative total increases oily 6093.5t, precipitation 12515.41m 3, average effective phase 154d, " paraffin wax emulsion selective water shut-off technology ", Gao Yujun, " oilfield chemistry " 2008 the 25th volumes (4): 342-344 compares), individual well increases 57 tons of the average increases of oil, and the average effective phase prolongs 23 days.(2005 and 2006, modified paraffin selective water shut-off technology was tested 11 wells in oil recovery factory, Jinzhou, add up to increase oily 3093.5t, tired precipitation 12515.41m with other prior aries 3, average effective phase 84d." modified paraffin selective water shut-off technology desk research and test in place ", Zhang Shuhua, " special reservoirs " 2007 the 14th volume z1 phases; Accumulative total was implemented 16 wells successively in oil recovery factory, Jinzhou, Liaohe Oil Field and Liaohe Oil Field dawn oil recovery factory rig-site utilization in 2005~2006 years, and measure is efficient 96.17%, and average individual well increases oily 187t." modified paraffin selective water shut-off technical study and rig-site utilization ", Li Jinquan, " special reservoirs " the 14th the 4th phase of volume, in August, 2007: 79-80) compare, had especially to increase substantially.
The present invention also can be used for other water base oilwell water shutoff, the cold damage problem that solution may bring the viscous crude recovery well.

Claims (8)

1. viscous crude well water-blocking construction method of handling up, this method comprises:
A kind of plugging agent is injected pending stratum carry out selective water shut-off, this plugging agent is for to add the formulated mixed solution of water by paraffin and rosin, and, guarantee that the temperature of plugging agent in injection process is at the freezing point temperature of paraffin and more than the rosiny softening point temperature.
2. method according to claim 1, wherein, the described viscous crude well of handling up is a formation temperature at the high water-cut well in latter stage of handling up of the viscous crude below 50 ℃.
3. method according to claim 1, wherein, in the described plugging agent, described paraffin is the modification of 55~70 ℃ at zero pour or the paraffin of non-modification, described rosin is softening temperature below 75 ℃, the modification of particle diameter 0.1~1mm or the colophonium powder of non-modification.
4. method according to claim 1, wherein, the paraffinicity in the described plugging agent is more than 20wt%.
5. method according to claim 4, wherein, the paraffinicity in the described plugging agent is 20wt%~30wt%.
6. method according to claim 1, wherein, the rosin content in the described plugging agent is more than 5wt%.
7. method according to claim 6, wherein, the rosin content in the described plugging agent is 5wt%~10wt%.
8. according to each described method of claim 1~7, this method comprises:
Under the situation of motionless oil well pipe, described plugging agent is pressed 0.2~0.3m from the oil jacket annular space 3/ minute speed is clamp-oned the stratum, and the control entry pressure is lower than 15MPa, clamp-oning construction and finishing back closing well 3 days, normally opening well and making production.
CN 201110432488 2011-12-21 2011-12-21 Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method Active CN102504779B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110432488 CN102504779B (en) 2011-12-21 2011-12-21 Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110432488 CN102504779B (en) 2011-12-21 2011-12-21 Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method

Publications (2)

Publication Number Publication Date
CN102504779A CN102504779A (en) 2012-06-20
CN102504779B true CN102504779B (en) 2013-07-31

Family

ID=46216916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110432488 Active CN102504779B (en) 2011-12-21 2011-12-21 Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method

Country Status (1)

Country Link
CN (1) CN102504779B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107828394A (en) * 2017-11-23 2018-03-23 长江大学 A kind of diverting agent and preparation method thereof

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877811B (en) * 2012-09-21 2016-02-10 中国石油天然气股份有限公司 Selective plugging ball for profile control of water injection well and preparation method and application thereof
CN107882531B (en) * 2017-12-01 2020-10-09 中国石油天然气股份有限公司 Selective water control channeling sealing method for flooding production well of water-flooded oil reservoir
CN109504358A (en) * 2018-12-19 2019-03-22 新疆贝肯能源工程股份有限公司 It can de-plugging environment-friendly resin sealing agent and preparation method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1023239A (en) * 1973-05-01 1977-12-27 Leroy L. Carney Water-in-oil emulsions and emulsifiers for preparing the same
US4233162A (en) * 1978-02-07 1980-11-11 Halliburton Company Oil well fluids and dispersants

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107828394A (en) * 2017-11-23 2018-03-23 长江大学 A kind of diverting agent and preparation method thereof

Also Published As

Publication number Publication date
CN102504779A (en) 2012-06-20

Similar Documents

Publication Publication Date Title
US10023787B2 (en) Surfactant selection methods for fluid recovery in subterranean formations
US9725986B2 (en) Multi-functional surfactant complexes for use in subterranean formations
US20190003294A1 (en) Phase-change hydraulic fracturing process
CN102504779B (en) Paraffin rosin water shutoff agent for water shutoff of heavy oil huff-puff well and water shutoff construction method
CN103937475B (en) Carbon dioxide acidification blocking remover and process of not reversely discharging raffinate after acidification
AU2014236272B2 (en) Methods and compositions for use in oil and/or gas wells
BR112013031449B1 (en) method of inhibiting or controlling the release of well treatment agent
RU2583104C1 (en) Method for processing bottomhole formation zone
RU2700851C1 (en) Method of selective treatment of bottom-hole formation zone
CN108003857A (en) A kind of efficiently emulsion-type oil well Wax removing agent and preparation method thereof
US9982185B2 (en) Methods and systems for preparing surfactant polyelectrolyte complexes for use in subterranean formations
Shi et al. A state of the art review on the wellbore blockage of condensate gas wells: Towards understanding the blockage type, mechanism, and treatment
EP3262135B1 (en) Emulsion system utilizing nitrogen and heat to treat deep water blockage
RU2442888C1 (en) Method for formation acid treatment
CN101852073B (en) Novel integration technique for improving recovery ratio of thick oil with high thickness and low yield
RU2525413C2 (en) Method of production of oils, gas condensates and gases from deposits and provision of continuous operation of production and injection wells
CN102676137B (en) Crude oil emulsifier for water plugging of oil well and preparation method and application thereof
CN106634921B (en) The continuous online production of viscous oil emulsion particle diverting agent and injection integral method
RU2645320C9 (en) Bitumen emulsions for application in oil industry
CN203978384U (en) Preheat aeration de-plugging of well device systems
RU2501941C2 (en) Development method of high-viscosity oil deposit
RU2702175C1 (en) Method of treatment of bottomhole formation zone with high-permeability fractures of hydraulic fracturing of formation
Nurgalieva et al. Improving the Efficiency of Oil and Gas Wells Complicated by the Formation of Asphalt–Resin–Paraffin Deposits. Energies 2021, 14, 6673
AU2016269415B2 (en) Multi-functional surfactant complexes for use in subterranean formations
CN112746829A (en) Water-plugging viscosity-reducing exploitation method for thick oil in high water-cut period

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant