CN203977443U - 桩基础陆地风电塔架基础环 - Google Patents
桩基础陆地风电塔架基础环 Download PDFInfo
- Publication number
- CN203977443U CN203977443U CN201420342750.2U CN201420342750U CN203977443U CN 203977443 U CN203977443 U CN 203977443U CN 201420342750 U CN201420342750 U CN 201420342750U CN 203977443 U CN203977443 U CN 203977443U
- Authority
- CN
- China
- Prior art keywords
- pile
- ring
- electricity generation
- discharge ring
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 16
- 239000000945 filler Substances 0.000 claims abstract description 7
- 238000003466 welding Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 abstract description 2
- 239000010959 steel Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
本实用新型属于风力发电装备,特别涉及一种桩基础陆地风电塔架基础环,包括基础环法兰(6)、基础环主体(7)、连接臂(5),基础环主体(7)上面焊接连接基础环法兰(6),基础环主体(7)外圆周上分别均布焊接连接三个连接臂(5),连接臂(5)的外端头分别焊接连接桩管(3),桩管(3)内分别穿装管桩(1),桩管(3)与管桩(1)之间填装填料(4),管桩(1)上焊接装有定位环(2),桩管(3)的下端面置于定位环(2)的上端面上限位,桩基础陆地风电塔架基础环不再用在现场挖掘大型的基础坑、使用大量的钢筋混凝土,并可以节约大量用于混凝土养生干燥的时间,从而降低了施工成本和压缩了施工工期。
Description
技术领域
本实用新型属于风力发电装备,特别涉及一种桩基础陆地风电塔架基础环。
背景技术
风力发电是新能源中最具实用性的再生能源,风电塔架是风力发电装备主要组成部分之一,管塔式风电塔架一般由基础环及三段筒节组成,施工时将基础环部分安装调试合格后用混凝土浇到基础上,上部安装其它筒节,该方法的不足之处在于施工时受基础环到场时间的限制,受基础环完成后浇注混凝土时位置变换的影响,以及受安装基础环后的二次浇注工期影响等。
发明内容
本实用新型的目的在于克服上述技术不足,提供一种结构简单,安装便捷,能够大幅降低成本的桩基础陆地风电塔架基础环。
本发明解决技术问题采用的技术方案是:桩基础陆地风电塔架基础环包括基础环法兰、基础环主体、连接臂,其特点是基础环主体上面焊接连接基础环法兰,基础环主体外圆周上分别均布焊接连接三个连接臂,连接臂的外端头分别焊接连接桩管,桩管内分别穿装管桩,桩管与管桩之间填装填料,管桩上焊接装有定位环,桩管的下端面置于定位环的上端面上限位。
本实用新型的有益效果是:桩基础陆地风电塔架基础环不再用在现场挖掘大型的基础坑、使用大量的钢筋混凝土,并可以节约大量用于混凝土养生干燥的时间,从而降低了施工成本和压缩了施工工期。
附图说明
以下结合附图以实施例具体说明。
图1是桩基础陆地风电塔架基础环结构主视图。
图2是图1的俯视图。
图中,1-管桩;2-定位环;3-桩管;4-填料;5-连接臂;6-基础环法兰;7-基础环主体。
具体实施方式
实施例,参照附图1、2,桩基础陆地风电塔架基础环的基础环主体7的上面焊接连接基础环法兰6,基础环主体7的外圆周上分别均布焊接连接三个连接臂5,连接臂5的外端头分别焊接连接桩管3,桩管3内分别穿装管桩1,桩管3与管桩1之间填装填料4,管桩1上焊接装有定位环2,桩管3的下端面置于定位环2的上端面上限位。
桩基础陆地风电塔架基础环的施工过程是:在工厂内将基础环法兰6焊接到基础环主体7上,再将三个连接臂5分别均布焊接到基础环主体7的外圆周上,在每个连接臂5的外端头上焊接桩管6后运到施工现场,到场后先将管桩1置于预定安装位置用桩机打到预定的吃力层上,满足承力和抗拨要求,将定位环2按同一水平分别焊接固定到各自的管桩1上,用吊车将桩管3、连接臂5、基础环法兰6、基础环主体7组合后的组合体安装到管桩1上,桩管3的下端面置于定位环2的上端面上限位,桩管3与管桩1之间形成的间隙用填料4填充,待填料4干燥后,即可在基础环法兰6上面安装塔架。
Claims (1)
1.一种桩基础陆地风电塔架基础环,包括基础环法兰(6)、基础环主体(7)、连接臂(5),其特征在于基础环主体(7)上面焊接连接基础环法兰(6),基础环主体(7)外圆周上分别均布焊接连接三个连接臂(5),连接臂(5)的外端头分别焊接连接桩管(3),桩管(3)内分别穿装管桩(1),桩管(3)与管桩(1)之间填装填料(4),管桩(1)上焊接装有定位环(2),桩管(3)的下端面置于定位环(2)的上端面上限位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420342750.2U CN203977443U (zh) | 2014-06-26 | 2014-06-26 | 桩基础陆地风电塔架基础环 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420342750.2U CN203977443U (zh) | 2014-06-26 | 2014-06-26 | 桩基础陆地风电塔架基础环 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203977443U true CN203977443U (zh) | 2014-12-03 |
Family
ID=51974902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420342750.2U Expired - Lifetime CN203977443U (zh) | 2014-06-26 | 2014-06-26 | 桩基础陆地风电塔架基础环 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203977443U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047297A (zh) * | 2014-06-26 | 2014-09-17 | 辽宁大金重工股份有限公司 | 桩基础陆地风电塔架基础环 |
-
2014
- 2014-06-26 CN CN201420342750.2U patent/CN203977443U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047297A (zh) * | 2014-06-26 | 2014-09-17 | 辽宁大金重工股份有限公司 | 桩基础陆地风电塔架基础环 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204610156U (zh) | 海上风机单桩基础集成式附属结构 | |
CN103114604B (zh) | 预应力混凝土圆筒型风力发电机组基础 | |
CN202323978U (zh) | 海上风电机组安装基础组件 | |
CN202732247U (zh) | 桁架式海上风力发电机组基础结构 | |
CN102966115A (zh) | 一种风力发电机组基础 | |
CN102777333A (zh) | 桁架式风力发电机组结构 | |
CN201746849U (zh) | 海上风电场风机基础结构 | |
CN212336069U (zh) | 深海风力发电导管架式单桩复合结构 | |
CN204676584U (zh) | 一种高桩桁架式海上风机基础结构 | |
CN202247928U (zh) | 多桩门架式海上风力发电机组基础结构 | |
CN201953582U (zh) | 具有调平结构的海上风机基础 | |
CN103161174A (zh) | 海上风电机组安装基础组件 | |
CN203429648U (zh) | 大型钢圆筒围堰结构 | |
CN103953055A (zh) | 一种海上风电机组水上四桩基础 | |
CN203977443U (zh) | 桩基础陆地风电塔架基础环 | |
CN203594045U (zh) | 一种海上风机灌浆桩式基础及应用其的海上风机 | |
CN102628277B (zh) | 无过渡段单桩式海上风机基础结构 | |
CN204491567U (zh) | 预制钢管桩风力发电平台 | |
CN204401628U (zh) | 大跨度钢支撑多向连接件 | |
CN203613541U (zh) | 一种基于浅海吹填区竖桩沉桩的替打装置 | |
CN207062971U (zh) | 大功率海上风力发电机组单桩基础集成式主体结构限位装置 | |
CN207109848U (zh) | 一种用于海上风电基础结构灌浆施工的封底器 | |
CN203161459U (zh) | 用于固定风力发电机塔筒与平台的固定装置 | |
CN202031370U (zh) | 一种混凝土-钢结构复合风电塔架 | |
CN205776312U (zh) | 环形组合式超大直径海上风电单桩基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 123000 Fuxin city in Liaoning province Xin Qiu District Xinqiu Street No. 155 Patentee after: Dajin Heavy Industry Co.,Ltd. Address before: 123000 Fuxin city in Liaoning province Xin Qiu District Xinqiu Street No. 155 Patentee before: LIAONING DAJIN HEAVY INDUSTRY Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20141203 |