CN104047297A - 桩基础陆地风电塔架基础环 - Google Patents

桩基础陆地风电塔架基础环 Download PDF

Info

Publication number
CN104047297A
CN104047297A CN201410289981.6A CN201410289981A CN104047297A CN 104047297 A CN104047297 A CN 104047297A CN 201410289981 A CN201410289981 A CN 201410289981A CN 104047297 A CN104047297 A CN 104047297A
Authority
CN
China
Prior art keywords
pile
foundation
welded
ring
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410289981.6A
Other languages
English (en)
Inventor
崔志忠
杨洋
冯照周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Original Assignee
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING DAJIN HEAVY INDUSTRY Co Ltd filed Critical LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority to CN201410289981.6A priority Critical patent/CN104047297A/zh
Publication of CN104047297A publication Critical patent/CN104047297A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Wind Motors (AREA)

Abstract

本发明属于风力发电装备,特别涉及一种桩基础陆地风电塔架基础环,包括基础环法兰(6)、基础环主体(7)、连接臂(5),基础环主体(7)上面焊接连接基础环法兰(6),基础环主体(7)外圆周上分别均布焊接连接三个连接臂(5),连接臂(5)的外端头分别焊接连接桩管(3),桩管(3)内分别穿装管桩(1),桩管(3)与管桩(1)之间填装填料(4),管桩(1)上焊接装有定位环(2),桩管(3)的下端面置于定位环(2)的上端面上限位,桩基础陆地风电塔架基础环不再用在现场挖掘大型的基础坑、使用大量的钢筋混凝土,并可以节约大量用于混凝土养生干燥的时间,从而降低了施工成本和压缩了施工工期。

Description

桩基础陆地风电塔架基础环
技术领域
本发明属于风力发电装备,特别涉及一种桩基础陆地风电塔架基础环。
背景技术
风力发电是新能源中最具实用性的再生能源,风电塔架是风力发电装备主要组成部分之一,管塔式风电塔架一般由基础环及三段筒节组成,施工时将基础环部分安装调试合格后用混凝土浇到基础上,上部安装其它筒节,该方法的不足之处在于施工时受基础环到场时间的限制,受基础环完成后浇注混凝土时位置变换的影响,以及受安装基础环后的二次浇注工期影响等。
发明内容
本发明的目的在于克服上述技术不足,提供一种结构简单,安装便捷,能够大幅降低成本的桩基础陆地风电塔架基础环。
本发明解决技术问题采用的技术方案是:桩基础陆地风电塔架基础环包括基础环法兰、基础环主体、连接臂,其特点是基础环主体上面焊接连接基础环法兰,基础环主体外圆周上分别均布焊接连接三个连接臂,连接臂的外端头分别焊接连接桩管,桩管内分别穿装管桩,桩管与管桩之间填装填料,管桩上焊接装有定位环,桩管的下端面置于定位环的上端面上限位。
本发明的有益效果是:桩基础陆地风电塔架基础环不再用在现场挖掘大型的基础坑、使用大量的钢筋混凝土,并可以节约大量用于混凝土养生干燥的时间,从而降低了施工成本和压缩了施工工期。
附图说明
以下结合附图以实施例具体说明。
图1是桩基础陆地风电塔架基础环结构主视图。
图2是图1的俯视图。
图中,1-管桩;2-定位环;3-桩管;4-填料;5-连接臂;6-基础环法兰;7-基础环主体。
具体实施方式
实施例,参照附图1、2,桩基础陆地风电塔架基础环的基础环主体7的上面焊接连接基础环法兰6,基础环主体7的外圆周上分别均布焊接连接三个连接臂5,连接臂5的外端头分别焊接连接桩管3,桩管3内分别穿装管桩1,桩管3与管桩1之间填装填料4,管桩1上焊接装有定位环2,桩管3的下端面置于定位环2的上端面上限位。
桩基础陆地风电塔架基础环的施工过程是:在工厂内将基础环法兰6焊接到基础环主体7上,再将三个连接臂5分别均布焊接到基础环主体7的外圆周上,在每个连接臂5的外端头上焊接桩管6后运到施工现场,到场后先将管桩1置于预定安装位置用桩机打到预定的吃力层上,满足承力和抗拨要求,将定位环2按同一水平分别焊接固定到各自的管桩1上,用吊车将桩管3、连接臂5、基础环法兰6、基础环主体7组合后的组合体安装到管桩1上,桩管3的下端面置于定位环2的上端面上限位,桩管3与管桩1之间形成的间隙用填料4填充,待填料4干燥后,即可在基础环法兰6上面安装塔架。    

Claims (1)

1.一种桩基础陆地风电塔架基础环,包括基础环法兰(6)、基础环主体(7)、连接臂(5),其特征在于基础环主体(7)上面焊接连接基础环法兰(6),基础环主体(7)外圆周上分别均布焊接连接三个连接臂(5),连接臂(5)的外端头分别焊接连接桩管(3),桩管(3)内分别穿装管桩(1),桩管(3)与管桩(1)之间填装填料(4),管桩(1)上焊接装有定位环(2),桩管(3)的下端面置于定位环(2)的上端面上限位。
CN201410289981.6A 2014-06-26 2014-06-26 桩基础陆地风电塔架基础环 Pending CN104047297A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410289981.6A CN104047297A (zh) 2014-06-26 2014-06-26 桩基础陆地风电塔架基础环

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410289981.6A CN104047297A (zh) 2014-06-26 2014-06-26 桩基础陆地风电塔架基础环

Publications (1)

Publication Number Publication Date
CN104047297A true CN104047297A (zh) 2014-09-17

Family

ID=51500668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410289981.6A Pending CN104047297A (zh) 2014-06-26 2014-06-26 桩基础陆地风电塔架基础环

Country Status (1)

Country Link
CN (1) CN104047297A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20109981U1 (de) * 2001-06-16 2001-10-04 Hansen Conrad Gründung für eine Offshore-Windkraftanlage
EP1878652A2 (de) * 2006-07-13 2008-01-16 Jan They Auftriebsgestützte Offshore-Gründung für Windenergieanlagen und andere Bauwerke
CN202247928U (zh) * 2011-08-31 2012-05-30 中国水电顾问集团华东勘测设计研究院 多桩门架式海上风力发电机组基础结构
CN202543954U (zh) * 2012-02-14 2012-11-21 江苏海上龙源风力发电有限公司 一种海上风电风机多角架基础
CN102926946A (zh) * 2012-12-05 2013-02-13 湘电风能有限公司 一种风力发电机组基础环
CN203977443U (zh) * 2014-06-26 2014-12-03 辽宁大金重工股份有限公司 桩基础陆地风电塔架基础环

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20109981U1 (de) * 2001-06-16 2001-10-04 Hansen Conrad Gründung für eine Offshore-Windkraftanlage
EP1878652A2 (de) * 2006-07-13 2008-01-16 Jan They Auftriebsgestützte Offshore-Gründung für Windenergieanlagen und andere Bauwerke
CN202247928U (zh) * 2011-08-31 2012-05-30 中国水电顾问集团华东勘测设计研究院 多桩门架式海上风力发电机组基础结构
CN202543954U (zh) * 2012-02-14 2012-11-21 江苏海上龙源风力发电有限公司 一种海上风电风机多角架基础
CN102926946A (zh) * 2012-12-05 2013-02-13 湘电风能有限公司 一种风力发电机组基础环
CN203977443U (zh) * 2014-06-26 2014-12-03 辽宁大金重工股份有限公司 桩基础陆地风电塔架基础环

Similar Documents

Publication Publication Date Title
CN103114604B (zh) 预应力混凝土圆筒型风力发电机组基础
CN205152976U (zh) 海上预制混凝土承台风机基础
CN202732247U (zh) 桁架式海上风力发电机组基础结构
CN105201010A (zh) 海上风机装配式斜桩基础
CN204676584U (zh) 一种高桩桁架式海上风机基础结构
CN201746849U (zh) 海上风电场风机基础结构
CN111101535A (zh) 海上风电多桩-吸力桶-导管架基础结构及其施工方法
CN202247928U (zh) 多桩门架式海上风力发电机组基础结构
CN203429648U (zh) 大型钢圆筒围堰结构
CN201953582U (zh) 具有调平结构的海上风机基础
CN212336069U (zh) 深海风力发电导管架式单桩复合结构
CN203594045U (zh) 一种海上风机灌浆桩式基础及应用其的海上风机
CN203977443U (zh) 桩基础陆地风电塔架基础环
CN204401628U (zh) 大跨度钢支撑多向连接件
CN102628277B (zh) 无过渡段单桩式海上风机基础结构
CN204491567U (zh) 预制钢管桩风力发电平台
CN204608823U (zh) 一种锚杆束嵌岩式海上风机高桩承台基础
CN106592622A (zh) 一种基于环形砼带竖向预应力的风机基础结构
CN204608813U (zh) 一种预应力锚杆嵌岩海上风机高桩承台基础
CN203613541U (zh) 一种基于浅海吹填区竖桩沉桩的替打装置
CN104047297A (zh) 桩基础陆地风电塔架基础环
CN108331007A (zh) 一种用于海上风电大功率机组的基础结构及安装方法
CN205776297U (zh) 一种带有环形钢板箍的潮流发电灌注桩基础
CN205776423U (zh) 一种用于海上风电导管架基础的调平装置
CN205046569U (zh) 基于双波纹钢筒成型的环形风电基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140917