CN203977405U - Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure - Google Patents

Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure Download PDF

Info

Publication number
CN203977405U
CN203977405U CN201420329351.2U CN201420329351U CN203977405U CN 203977405 U CN203977405 U CN 203977405U CN 201420329351 U CN201420329351 U CN 201420329351U CN 203977405 U CN203977405 U CN 203977405U
Authority
CN
China
Prior art keywords
band drain
band
drain
vacuum preloading
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420329351.2U
Other languages
Chinese (zh)
Inventor
李凌
汪海洋
李建
吴云海
邹杨
王瑞新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
Original Assignee
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Harbour Engineering Co Ltd
Priority to CN201420329351.2U priority Critical patent/CN203977405U/en
Application granted granted Critical
Publication of CN203977405U publication Critical patent/CN203977405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of based on the curing gutter binding structure of using of new hydraulic reclamation super soft ground vacuum preloading shallow-layer, it is characterized in that: mainly comprise several band drains unit, each band drain unit includes the main band drain of four quadrate layouts and is positioned at the auxiliary band drain at square center; The equal colligation in end of several band drains unit of above-mentioned laying each band drain is in the same direction at same drainage pipe, form several single single filter structures, the end of described band drain is wrapped in the external surface of drainage pipe entirely, and after parcel, the surface of band drain is coated with from zip.Convenient, firm with existing more traditional connected mode, guaranteed combining closely of plastic draining board and chimney filter, effectively reduced loss when vacuum passes to band drain by chimney filter, strengthened the consolidation effect of vacuum preloading.

Description

Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure
Technical field
The utility model belongs to super soft ground reinforcing technique field, particularly relates to a kind of based on the curing gutter binding structure of using of new hydraulic reclamation super soft ground vacuum preloading shallow-layer.
Background technology
Along with the fast development of China's Coastal Areas economy, land resources growing tension, utilizes and carries out ground stabilization after basin and waterway dredging soil land reclamation again and become the Main Means of alleviating shortage of land resource.Because the dredging soil soil property of hydraulic reclamation mostly recently is mud, its moisture content surpasses 100%, and void ratio is greater than 2.0, and outward appearance is mud scum~stream mud shape, and not yet formation has the soil skeleton structure of intensity, and bearing capacity is almost nil.In the face of super soft ground like this, the main vacuum method that adopts is carried out consolidation process at present.In vacuum method construction technology, setting plastic draining board needs the special-purpose equipment that re-packs, and this equipment belongs to heavy-duty machinery, and weight is about 10-15 ton.How the mire forming at new hydraulic reclamation dredging soil re-packs to construct and becomes the key issue that ground is processed, and mainly comprises following several method at present for this problem:
The one, the equipment modification that re-packs of conventional rail mounted is become to crawler type, operation directly re-pack in the mire that can form at new hydraulically filled sludge.In the method, transform the equipment cost that re-packs higher, the equipment of re-packing after repacking can only fall back and construct in addition, and efficiency of construction is lower, to completing the region re-packing, easily causes disturbance to destroy, and in the process that re-packs, anti-mud situation is serious, and follow-up vacuum preloading construction is had a certain impact.
The 2nd, allow mire that new hydraulic reclamation dredging soil forms first through airing after a while, make its top layer by the fixed formation of natural sediment, there is the crust layer of certain bearing capacity, the more common working cushion layer that meets the equipment construction that re-packs that forms of the flour sand bed course of hydraulic reclamation 80cm~100cm.
The 3rd, on the mire forming at new hydraulic reclamation dredging soil, by artificial plate, carry out the processing of shallow-layer vacuum preloading, make its top layer form the crust layer that one deck has some strength and thickness, and then the common working cushion layer that meets the equipment construction that re-packs that forms of the flour sand of hydraulic reclamation 80cm~100cm.
Method two and method three all need can meet by the certain thickness flour sand bed course of hydraulic reclamation the requirement of the construction working bed course that re-packs, but due to transition exploitation and the use of flour sand in recent years, flour sand resource is more and more in short supply at present, and the construction of hydraulic reclamation flour sand is subject to weather effect larger, usually need long period of time just can complete, this certainly will make construction costs and duration be difficult to guarantee.
In view of above three kinds of construction technologies are to super soft ground stabilization works cost, quality and the Different Effects of duration, we work out a kind of " without sand working cushion layer " vacuum method, can make without hydraulic reclamation flour sand, also can form the working cushion layer that meets follow-up plant equipment construction after shallow layer reinforcement processing.Allow vacuum pre-press reinforcing no longer disturbed in flour sand resource, duration and strengthening quality are all effectively guaranteed, in the middle of design, gutter binding structure is particularly important, it will directly affect drainage effect, existing connected mode is that band drain is ridden on chimney filter and tied up by the mode being wound around, after completing, colligation there is larger gap between its both sides and chimney filter, this gap will have a strong impact on vacuum preloading effect, refer to Fig. 4.
Summary of the invention
The utility model provides a kind of based on the curing gutter binding structure of using of new hydraulic reclamation super soft ground vacuum preloading shallow-layer for solving the technical problem existing in known technology, this simple in structure, more traditional connected mode is convenient, firm, guaranteed combining closely of plastic draining board and chimney filter, effectively reduce loss when vacuum passes to band drain by chimney filter, strengthened the consolidation effect of vacuum preloading.
The technical scheme that the utility model is taked for the technical problem existing in solution known technology is:
A kind of based on the curing gutter binding structure of using of new hydraulic reclamation super soft ground vacuum preloading shallow-layer, it is characterized in that: mainly comprise several band drains unit, each band drain unit includes the main band drain of four quadrate layouts and is positioned at the auxiliary band drain at square center; The equal colligation in end of several band drains unit of above-mentioned laying each band drain is in the same direction at same drainage pipe, form several single single filter structures, the end of described band drain is wrapped in the external surface of drainage pipe entirely, and after parcel, the surface of band drain is coated with from zip.
Advantage and the good effect that the utlity model has are: because the utility model adopts technique scheme, be that band drain is connected with chimney filter by carry out " parcel entirely " colligation from zip, more traditional connected mode is convenient, firm, guaranteed combining closely of plastic draining board and chimney filter, effectively reduce loss when vacuum passes to band drain by chimney filter, strengthened the consolidation effect of vacuum preloading.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is band drain block construction schematic diagram;
Fig. 3 is gutter and single band drain syndeton schematic diagram;
Fig. 4 is existing binding structure schematic diagram
In figure: 1, band drain unit; 1-1, main band drain; 1-2, auxiliary band drain; 2, drainage pipe; 3, from zip.
The specific embodiment
For further understanding summary of the invention of the present utility model, Characteristic, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1 to Fig. 3, a kind of based on the curing gutter binding structure of using of new hydraulic reclamation super soft ground vacuum preloading shallow-layer, it is characterized in that: mainly comprise several band drains unit 1, each band drain unit includes the main band drain 1-1 of four quadrate layouts and is positioned at the auxiliary band drain 1-2 at square center; The equal colligation in end of several band drains unit of above-mentioned laying each band drain is in the same direction at same drainage pipe 2, form several single single structures of considering, the end of described band drain is wrapped in the external surface of drainage pipe entirely, and after parcel, the surface of band drain is coated with from zip 3.Adopt technique scheme, be that band drain is connected with chimney filter by carry out " parcel entirely " colligation from zip, more traditional connected mode is convenient, firm, guaranteed combining closely of plastic draining board and chimney filter, effectively reduce loss when vacuum passes to band drain by chimney filter, strengthened the consolidation effect of vacuum preloading.
The above is only to preferred embodiment of the present utility model, not the utility model is done to any pro forma restriction, every foundation technical spirit of the present utility model is to any simple modification made for any of the above embodiments, equivalent variations and modification, all belong in the scope of technical solutions of the utility model.

Claims (1)

1. one kind solidifies and uses gutter binding structure based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, it is characterized in that: mainly comprise several band drains unit, each band drain unit includes the main band drain of four quadrate layouts and is positioned at the auxiliary band drain at square center; The equal colligation in end of several band drains unit of above-mentioned laying each band drain is in the same direction at same drainage pipe, form several single single filter structures, the end of described band drain is wrapped in the external surface of drainage pipe entirely, and after parcel, the surface of band drain is coated with from zip.
CN201420329351.2U 2014-06-19 2014-06-19 Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure Active CN203977405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420329351.2U CN203977405U (en) 2014-06-19 2014-06-19 Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420329351.2U CN203977405U (en) 2014-06-19 2014-06-19 Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure

Publications (1)

Publication Number Publication Date
CN203977405U true CN203977405U (en) 2014-12-03

Family

ID=51974863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420329351.2U Active CN203977405U (en) 2014-06-19 2014-06-19 Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure

Country Status (1)

Country Link
CN (1) CN203977405U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436683A (en) * 2016-11-09 2017-02-22 浙江水利水电学院 Dredger fill plastic drainage plate planting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436683A (en) * 2016-11-09 2017-02-22 浙江水利水电学院 Dredger fill plastic drainage plate planting device

Similar Documents

Publication Publication Date Title
CN202496187U (en) Severe saline -alkali area green plant-planting soil layer salt drainage system
CN206294623U (en) A kind of underground water-permeable device based on sponge city
CN102322054B (en) Method for processing ultra-soft soil through combining shallow-surface-layer intermittent strong water-pumping/draining with short-term air-curing
CN204803703U (en) Concrete road surface water collect structures permeates water
CN201321593Y (en) Surface layer treatment structure for bamboo spar latticework ultra-soft soil foundation
CN205591066U (en) Fine grained soil is received sloping embankment and is filled structure
CN101831898A (en) Horizontal shallow layer negative-pressure consolidation working cushion layer technique
CN203977405U (en) Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify and use gutter binding structure
CN201502019U (en) Permeable ground structure
CN204898645U (en) Building rubbish regeneration drainage CFG stake ground
CN100487202C (en) Vibration pressurizing quick solidification soft foundation processing method
CN203977404U (en) Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer, solidify the layout structure with gutter
CN104018487A (en) Vacuum preloading shallow-layer solidification device based on newly-reclaimed ultra-soft soil foundation and method of device
CN203977403U (en) Based on new hydraulic reclamation super soft ground vacuum preloading shallow-layer solidification equipment
CN202214731U (en) Filtration composite geogrid
CN202658595U (en) Vacuum vertical drainage device
CN201943060U (en) Reinforcing structure for gate dam foundation of deep riverbed covering layer
CN104746507B (en) A kind of construction refuse regenerated draining CFG pile foundation and construction method thereof
CN210636388U (en) Composite drainage structure of homogeneous earth dam
CN203346857U (en) Prefabricated part for trapezoid channel lining
CN208152219U (en) A kind of dry depression for sponge city
CN203583304U (en) Carbonate rock filling foundation stagnant water structure
CN204252116U (en) For the hard shell body of dredged mud consolidation
CN207047790U (en) A kind of protection slope
CN205934752U (en) Be applied to permeability road surface structure in sponge city

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CCCC TIANJIN DREDGING CO., LTD. CCCC TDC ENVIRONME

Effective date: 20150427

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150427

Address after: 300450 Xingang Road, Tanggu District, No. 57, No.

Patentee after: China Traffic Tianjin Dredging Harbour Construction Engineering Co., Ltd.

Patentee after: CCCC Tianjin Dredging Co., Ltd.

Patentee after: CCCC-TDC ENVIRONMENTAL ENGINEERING CO., LTD.

Patentee after: CCCC-TDC Binhai Environmental Channel Dredging Co., Ltd.

Patentee after: Cccc-TDC Yantai Environmental Protection Dredging Co., Ltd.

Patentee after: Tianjin Pore Avigation Survey and Design Research Co., Ltd. of China Communications Construction Co.

Address before: 300450 Xingang Road, Tanggu District, No. 57, No.

Patentee before: China Traffic Tianjin Dredging Harbour Construction Engineering Co., Ltd.