适于天然主、支流河道交汇处的透水耐冲分流坝 Download PDFInfo
- Publication number
- CN203960807U CN203960807U CN201420395689.8U CN201420395689U CN203960807U CN 203960807 U CN203960807 U CN 203960807U CN 201420395689 U CN201420395689 U CN 201420395689U CN 203960807 U CN203960807 U CN 203960807U
- Authority
- CN
- China
- Prior art keywords
- dam body
- body section
- fluid stream
- stream channel
- rushes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000012530 fluid Substances 0.000 title claims abstract description 27
- 230000001105 regulatory effect Effects 0.000 title claims abstract description 11
- 241000826860 Trapezium Species 0.000 claims abstract description 4
- 239000004575 stone Substances 0.000 claims abstract description 3
- 230000002349 favourable effect Effects 0.000 abstract description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- -1 stone-laying Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开了一种适于天然主、支流河道交汇处的透水耐冲分流坝,包括沿所述支流河道趋势线设置在主、支流河道交汇处相对两岸之间的坝体;所述坝体由沿纵向设置的、横截面为梯形结构的中间坝体段和沿纵向衔接在所述中间坝体段左、右两侧的左岸坝体段和右岸坝体段构成;所述中间坝体段为由石块构成的堆石坝结构,所述左岸坝体段和右岸坝体段均为由铅丝石笼构成的石笼坝体结构。本实用新型采取控导分流结构,在天然主、支流河道交汇处的滩岸边坡之间设置透水耐冲分流坝,改善河流流势,减少河道交汇处的淤积,使河流河势处于有利形态;结构整体性好,抗冲能力强,对地形、地质条件要求不高;采用透水结构,平衡两侧水压力,结构稳定性能好。
Description
技术领域
本实用新型涉及支流河道入主流河道交汇处的控导分流工程,尤其是涉及适于天然主、支流河道交汇处的透水耐冲分流坝。
背景技术
由于天然主、支流河道交汇处水流紊乱,易淤积,这就给上游河道防洪带来较大的危害,也给下游河道治理带来困难。一般情况,天然主、支流河道交汇处都采用护岸或护滩工程,即采用砌石、混凝土、模袋等抗冲材料加固河道交汇处的滩岸边坡,防止水流对滩岸的冲刷,进而保护交汇处附近的工矿企业和人民生命财产的安全,达到有限的防洪减灾目的。这类工程受水流淘刷,易产生滑塌等破坏现象,需要经常加固,同时河势变化后,工程易脱流,又需要对工程进行上延下续。这类工程属于被动防守型工程,缺乏长期、主动改造河道的措施,不能有效解决河道交汇处的水流紊乱、淤积等问题。
发明内容
本实用新型目的在于提供一种经济、耐用的适于天然主、支流河道交汇处的透水耐冲分流坝。
为实现上述目的,本实用新型采取下述技术方案:
本实用新型所述适于天然主、支流河道交汇处的透水耐冲分流坝,包括沿所述支流河道趋势线设置在主、支流河道交汇处相对两岸之间的坝体;所述坝体由沿纵向设置的、横截面为梯形结构的中间坝体段和沿纵向衔接在所述中间坝体段左、右两侧的左岸坝体段和右岸坝体段构成;所述中间坝体段为由石块构成的堆石坝结构,所述左岸坝体段和右岸坝体段均为由铅丝石笼构成的石笼坝体结构。
所述左岸坝体段和右岸坝体段均由自下而上的多层铅丝石笼构成。
本实用新型优点在于采取控导分流结构,在天然主、支流河道交汇处的滩岸边坡之间设置透水耐冲分流坝,坝体沿支流河道趋势线设置能主动地调整并稳定支流河道入主河道流路,避免两河的河流夹角增大、主河道侵蚀支流等不利形态,使相汇的两河平顺行河,改善河流流势,减少河道交汇处的淤积,使河流河势处于有利形态;从结构来说,结构整体性好,抗冲能力强,对地形、地质条件要求不高;采用透水结构,平衡两侧水压力,结构稳定性能好。同时,本实用新型是对主、支流河道交汇处河道的控导和分流,因此两侧不需要设置坝垛,且进占施工方便,从而大大缩短了工期;该工程相对于同类传统工程,长度将会大大缩短,从而使工程投资明显减少。
附图说明
图1是本实用新型布置于天然主、支流河道交汇处的示意图。
图2是图1的I-I向剖面放大结构示意图。
具体实施方式
如图1、2所示,本实用新型所述适于天然主、支流河道交汇处的透水耐冲分流坝,包括沿所述天然支流河道1趋势线2设置在主流河道3与支流河道1交汇处相对两岸之间的坝体4;所述坝体4由沿纵向设置的、横截面为梯形结构的中间坝体段5和沿纵向衔接在所述中间坝体段5左、右两侧的左岸坝体段6和右岸坝体段7构成;所述中间坝体段5为由散抛石块8构成的堆石坝结构,所述左岸坝体段6和右岸坝体段7均为由铅丝石笼9构成的石笼坝体结构,所述左岸坝体段6和右岸坝体段7均由自下而上堆放的多层铅丝石笼9构成。
Claims (2)
1.一种适于天然主、支流河道交汇处的透水耐冲分流坝,其特征在于:包括沿所述支流河道趋势线设置在主、支流河道交汇处相对两岸之间的坝体;所述坝体由沿纵向设置的、横截面为梯形结构的中间坝体段和沿纵向衔接在所述中间坝体段左、右两侧的左岸坝体段和右岸坝体段构成;所述中间坝体段为由石块构成的堆石坝结构,所述左岸坝体段和右岸坝体段均为由铅丝石笼构成的石笼坝体结构。
2.根据权利要求1所述适于天然主、支流河道交汇处的透水耐冲分流坝,其特征在于:所述左岸坝体段和右岸坝体段均由自下而上的多层铅丝石笼构成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420395689.8U CN203960807U (zh) | 2014-07-17 | 2014-07-17 | 适于天然主、支流河道交汇处的透水耐冲分流坝 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420395689.8U CN203960807U (zh) | 2014-07-17 | 2014-07-17 | 适于天然主、支流河道交汇处的透水耐冲分流坝 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203960807U true CN203960807U (zh) | 2014-11-26 |
Family
ID=51921409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420395689.8U Expired - Lifetime CN203960807U (zh) | 2014-07-17 | 2014-07-17 | 适于天然主、支流河道交汇处的透水耐冲分流坝 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203960807U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099896A (zh) * | 2014-07-17 | 2014-10-15 | 黄河勘测规划设计有限公司 | 适于天然主、支流河道交汇处的透水耐冲分流坝 |
-
2014
- 2014-07-17 CN CN201420395689.8U patent/CN203960807U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099896A (zh) * | 2014-07-17 | 2014-10-15 | 黄河勘测规划设计有限公司 | 适于天然主、支流河道交汇处的透水耐冲分流坝 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203782664U (zh) | 一种砂性土地基水闸的防冲结构 | |
CN204039977U (zh) | 一种抗震消浪护坡 | |
CN104099896A (zh) | 适于天然主、支流河道交汇处的透水耐冲分流坝 | |
CN203755243U (zh) | 一种桥头锥坡的防护结构 | |
CN203960807U (zh) | 适于天然主、支流河道交汇处的透水耐冲分流坝 | |
CN103541330B (zh) | 一种有效提前排水并延长澄清距离的尾矿库排洪系统 | |
CN203361095U (zh) | 一种组合挡水坝结构 | |
CN206279504U (zh) | 一种导流洞出口的消能结构 | |
CN205617341U (zh) | 一种矿山尾矿库排渗盲沟 | |
CN204174577U (zh) | 水利工程用的组合式砌块墙 | |
CN203530921U (zh) | 一种透水桩基丁坝 | |
CN203145027U (zh) | 用于土石围堰的防冲结构 | |
CN103614986B (zh) | 一种适用于尾矿库排洪的无压流进水方法 | |
CN104264626A (zh) | 一种控导河势及稳定河道主流的结构 | |
CN101768941B (zh) | 河道设有上游围堰的导流明渠截流进占戗堤 | |
CN205399343U (zh) | 一种加固型防水防渗护坡 | |
CN204982785U (zh) | 一种护岸框架连接装置 | |
CN208055980U (zh) | 一种水利工程用透水防冲墙结构 | |
CN205604186U (zh) | 一种粘土心墙风化料坝 | |
CN204385687U (zh) | 无翼墙水闸布置形式 | |
CN205296064U (zh) | 一种河道驳岸加固结构 | |
CN202482830U (zh) | 一种200m级高碾压混凝土防渗坝 | |
CN104404978A (zh) | 一种水利工程挡土墙 | |
CN204097961U (zh) | 一种控导河势及稳定河道主流的结构 | |
CN204238204U (zh) | 一种船用水闸过道的墙体结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CX01 | Expiry of patent term |
Granted publication date: 20141126 |
|
CX01 | Expiry of patent term |