CN203949373U - Water-heater system - Google Patents

Water-heater system Download PDF

Info

Publication number
CN203949373U
CN203949373U CN201420393731.2U CN201420393731U CN203949373U CN 203949373 U CN203949373 U CN 203949373U CN 201420393731 U CN201420393731 U CN 201420393731U CN 203949373 U CN203949373 U CN 203949373U
Authority
CN
China
Prior art keywords
water
heater
water inlet
inlet pipe
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420393731.2U
Other languages
Chinese (zh)
Inventor
曾云
谢帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Original Assignee
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd filed Critical Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority to CN201420393731.2U priority Critical patent/CN203949373U/en
Application granted granted Critical
Publication of CN203949373U publication Critical patent/CN203949373U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model discloses a kind of water-heater system, comprising: water heater components, water inlet pipe, outlet pipe, control valve, water pump and controller.Water heater components has water inlet and delivery port.Water inlet pipe is suitable for being connected with water source and having cooling water outlet, and water inlet pipe is connected with water inlet.Outlet pipe has hot water outlet, and outlet pipe is connected with delivery port.Control valve is connected between outlet pipe and water inlet pipe so that the unidirectional inflow water inlet pipe of water in outlet pipe.Water pump is connected in parallel on water inlet pipe so that the water in water inlet pipe is pumped in water heater components.Controller is electrically connected to control respectively respectively the operation of water heater components and water pump with water heater components and water pump.According to water-heater system of the present utility model, make water-heater system there is water return function, the water heating capable of circulation in water-heater system, and make with water spot, all can use hot water arbitrarily, and pipe laying is simple, and cost is not high.In addition, can avoid energy waste, and the function of instant-heating can realize water time.

Description

Water-heater system
Technical field
The utility model relates to field of household appliances, especially relates to a kind of water-heater system.
Background technology
In the actual use of water heater, with being connected with one section of pipeline between water spot and firing equipment, during for a long time without hot water, the water in this pipeline changes cold water into.When needs are used hot water, user cannot use hot water immediately, the shortlyest need to wait for several seconds and just can use hot water.
Utility model content
The utility model is intended at least solve the technical problem existing in prior art.For this reason, the purpose of this utility model is to provide a kind of water-heater system, and this water-heater system can heat the water in the pipeline with between water spot and water heater, and can realize instant-heating.
According to water-heater system of the present utility model, comprising: water heater components, described water heater components has water inlet and delivery port; Be suitable for being connected with water source and have the water inlet pipe of cooling water outlet, one end of described water inlet pipe is connected with described water inlet; The outlet pipe with hot water outlet, one end of described outlet pipe is connected with described delivery port; Control valve, described control valve is connected between the other end of described outlet pipe and the other end of described water inlet pipe so that the described water inlet pipe of the unidirectional inflow of water in described outlet pipe; Water pump, described water pump is connected in parallel on described water inlet pipe so that the water in described water inlet pipe is pumped in described water heater components; Controller, described controller is electrically connected to control respectively respectively the operation of described water heater components and described water pump with described water heater components and described water pump.
According to water-heater system of the present utility model, by be arranged in parallel water pump on water inlet pipe, and the control valve of connecting between water inlet pipe and outlet pipe is so that the water single flow direction water inlet pipe in outlet pipe, thereby make water-heater system there is water return function, water heating capable of circulation in water-heater system, and make with water spot, all can use hot water arbitrarily.And water-heater system pipe laying is simple, cost is not high.By controller being set to control the operation of water heater components and water pump, can improve the harmony of water-heater system operation, avoid energy waste, and the function of instant-heating can realize water time.
In addition, according to water-heater system of the present utility model, also can there is following additional technical feature:
In embodiment more of the present utility model, water-heater system also comprises the first check valve, and described the first check valve and described water pump are connected in series and are connected in parallel on described water inlet pipe.Thus, can avoid the aqueous reflux in water pump to cause water pump to damage, thereby extend the service life of water pump.In addition, can avoid the current direction water pump in water heater components, thereby guarantee the normal operation of water-heater system.
Further, water-heater system also comprises the second check valve, described the second check valve series connection be located at described water inlet pipe be suitable for the port that is connected with described water source with at described water source to one-way conduction in the direction of described water inlet pipe.Thus, can avoid the water after heating in water inlet pipe to flow out from water source port, thereby reduce the energy consumption of water-heater system.
In embodiment more of the present utility model, described water heater components comprises: gas heater, and described gas heater has the first water inlet and the first delivery port, and described water inlet pipe is connected with described the first water inlet; Electric heater, described electric heater has the second water inlet and the second delivery port, and described the second water inlet is connected with described the first delivery port, and described the second delivery port is connected with described outlet pipe.Wherein, gas heater heating rapidly, can realize fast supply hot water.And the heat production water yield of electric heater is large, can meet a large amount of waters of user, and electric heater has water tank with retaining, therefore the water preheat in water-heater system completes and stops after circulation, hot water major part in water-heater system is stored in electric heater, thereby reduce heat, run off, further to reduce energy consumption.
Particularly, water-heater system also comprises relief valve, and described relief valve is connected between described the first delivery port and described the second water inlet.Thus, can guarantee that in electric heater, hydraulic pressure is suitable, to guarantee the normal operation of water-heater system.
Further, water-heater system also comprises the first temperature measurement one for detection of water temperature, described the first temperature measurement one is located on described water heater components or described outlet pipe, and described controller is electrically connected to according to the testing result of described the first temperature measurement one, to control opening and cutting out of described water pump with described the first temperature measurement one.Thus, the water temperature that hot water outlet flows out can be determined, thus the controllability of raising water temperature.
Alternatively, described the first temperature measurement one is located at described the first water outlet.Thus, can shorten the length of connection line, be convenient to trace arrangements.
Further, water-heater system also comprises the second temperature measurement one for detection of the water temperature in described electric heater, and described controller is electrically connected to according to the testing result of described the second temperature measurement one, to control opening and cutting out of described electric heater with described the second temperature measurement one.
Alternatively, described control valve is check valve.Thus, the cost of control valve is lower, installs easily.
Advantageously, described controller is provided with for controlling the water return function key of the operation of described water pump and described water heater components.Thus, user is when section is used hot water at any time, all can be by pressing water return function key so that the water heating capable of circulation in water-heater system, thereby realize whole day heat supply, instant-heating.
Additional aspect of the present utility model and advantage in the following description part provide, and part will become obviously from the following description, or recognize by practice of the present utility model.
Accompanying drawing explanation
Above-mentioned and/or additional aspect of the present utility model and advantage accompanying drawing below combination obviously and is easily understood becoming the description of embodiment, wherein:
Fig. 1 is according to the structural representation of the water-heater system of the utility model embodiment.
Reference numeral:
Water-heater system 100,
Water heater components 1, water inlet A, water outlet B, gas heater 11, the first water inlet 11A, the first delivery port 11B, electric heater 12, the second water inlet 12A, the second delivery port 12B,
Water inlet pipe 3, cooling water outlet 31, water source port 32,
Outlet pipe 4, hot water outlet 41,
Control valve 51, water pump 52,
The first check valve 53, the second check valve 54, relief valve 55,
Water source 200.
The specific embodiment
Describe embodiment of the present utility model below in detail, the example of described embodiment is shown in the drawings, and wherein same or similar label represents same or similar element or has the element of identical or similar functions from start to finish.Below by the embodiment being described with reference to the drawings, be exemplary, be intended to for explaining the utility model, and can not be interpreted as restriction of the present utility model.
In addition, term " first ", " second " be only for describing object, and can not be interpreted as indication or hint relative importance or the implicit quantity that indicates indicated technical characterictic.Thus, one or more these features can be expressed or impliedly be comprised to the feature that is limited with " first ", " second ".In description of the present utility model, except as otherwise noted, the implication of " a plurality of " is two or more.
In description of the present utility model, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection ", " fixing " should be interpreted broadly, and for example, can be to be fixedly connected with, and can be also to removably connect, or be integral; Can be mechanical connection, can be to be also electrically connected to; Can be to be directly connected, also can indirectly be connected by intermediary, can be the connection of two element internals or the interaction relationship of two elements.For the ordinary skill in the art, can concrete condition understand the concrete meaning of above-mentioned term in the utility model.
Below with reference to Fig. 1, describe according to the water-heater system 100 of the utility model embodiment.
Water-heater system 100 according to the utility model embodiment, as shown in Figure 1, comprising: water heater components 1, water inlet pipe 3, outlet pipe 4, control valve 51, water pump 52 and controller.
Wherein, water heater components 1 has water inlet A and water outlet B, and water inlet pipe 3 is suitable for being connected with water source 200 and having cooling water outlet 31, and one end of water inlet pipe 3 is connected with water inlet A, and outlet pipe 4 has hot water outlet 41, and one end of outlet pipe 4 is connected with water outlet B.
Here, water source 200 can be from municipal water supply, and water inlet pipe 3 is provided with water source port 32, and water source port 32 is connected with water source 200 with the heating of supplying water to water heater components 1, and the water after water heater components 1 heating can flow out by outlet pipe 4.It should be noted that, the water that the cooling water outlet 31 on water inlet pipe 3 flows out is generally normal-temperature water, and the water that the hot water outlet 41 on outlet pipe 4 flows out is generally the hot water after water heater components 1 heating.Cooling water outlet 31 and hot water outlet 41 can be located in bathroom or kitchen, as in the example depicted in fig. 1, cooling water outlet 31 and hot water outlet 41 are respectively a plurality of, and a plurality of cooling water outlets 31 are located at respectively washbowl and shower place, and a plurality of hot water outlets 41 are also located at respectively washbowl and shower place.Certainly, the utility model is not limited to this, and the setting position of cooling water outlet 31 and hot water outlet 41 is determined by practical situations, does not do concrete restriction here.
With reference to Fig. 1, control valve 51 is connected between the other end of outlet pipe 4 and the other end of water inlet pipe 3 so that the unidirectional inflow water inlet pipe 3 of water in outlet pipe 4, water pump 52 is connected in parallel on water inlet pipe 3 so that the water in water inlet pipe 3 is pumped in water heater components 1, and controller is electrically connected to control respectively respectively the operation of water heater components 1 and water pump 52 with water heater components 1 and water pump 52.
That is to say, water inlet pipe 3 is connected by control valve 51 with outlet pipe 4, and under the driving effect of water pump 52, the water in outlet pipe 4 can flow to water inlet pipe 3 by control valve 51, then by water inlet pipe 3, flows in water heater components 1 with heating.Thus, water-heater system 100 has water return function, the water heating capable of circulation in water-heater system 100.By control valve 51 being set to be connected in series in water inlet pipe 3 and outlet pipe 4, make the water in outlet pipe 4 can single flow direction water inlet pipe 3, avoid the return pipe that water is directed to water heater components 1 is set in addition on outlet pipe 4, thereby greatly reduce the cost of water-heater system 100.
Here it should be noted that, current water-heater system scarcely possesses water return function, before water heater starts, water in outlet pipe is generally normal-temperature water and cannot be heated, and water heater water after starting a period of time just can be heated to the temperature needing, make during this period of time, the coolant-temperature gage of discharging from hot water outlet is not high.When user need to use hot water, for example, when user needs bathing, common way is hot water outlet to be opened to sky put, until the temperature of the water flowing out from hot water outlet is just used suitable.Therefore, according to the water-heater system 100 of the utility model embodiment, by being provided with water return function, reduce water consumption greatly, and can improve the convenience of user's water.
Alternatively, control valve 51 is located at least favorable water spot place, and here, least favorable refers to from water heater components 1 to each with the resistance to water-flow maximum of water spot with water spot, least favorable with water spot, be generally and water heater components 1 between connecting pipe the longest use water spot.For example in the example depicted in fig. 1, water-heater system 100 is provided with four with water spot, water inlet pipe 3 is provided with respectively a cooling water outlet 31 at four with water spot place, is also provided with four corresponding hot water outlets 41 on outlet pipe 4, control valve 51 be located at apart from water heater components 1 farthest use water spot place.Because the water in water-heater system 100 can be realized circulating-heating, therefore, when hot water outlet 41 is far away apart from water heater components 1, the temperature of the water that this hot water outlet 41 flows out also can reach preference temperature.
By controller being set to control the operation of water heater components 1 and water pump 52, can improve the harmony of water heater components 1 and water pump 52 operations, avoid energy waste.For example, under the control of controller, water pump 52 can start heating or start after heating a period of time in water heater components 1 in water heater components 1, and after the temperature of the water that hot water outlet 41 flows out is suitable, it is out of service that controller can be controlled water pump 52.
And, controller controlled heat water producer assembly 1 is set and water pump 52 moves in setting-up time, producer or user can be according to set of time a plurality of preheating time of the sections of the daily use hot water of people, water heater components 1 and water pump 52 are moved within a predetermined period of time, thereby make user can obtain at once hot water in use, reach the object of instant-heating.For example, people are interior bathing during this period of time in 9 o'clock to ten one at night conventionally, therefore section preheating time on controller can be set to from point eight thirty to ten one of evening, water heater components 1 and water pump 52 are brought into operation at night eight thirty, thereby user can obtain immediately hot water when evening on the same day 9 bathings.
Alternatively, on controller, can be provided with water return function key, water return function key is for controlling the operation of water pump 52 and water heater components 1, thus, during user's section use at any time hot water, all can be by pressing water return function key so that the water heating capable of circulation in water-heater system 100, thereby realize whole day heat supply, instant-heating.
According to the water-heater system 100 of the utility model embodiment, by be arranged in parallel water pump 52 on water inlet pipe 3, and the control valve 51 of connecting between water inlet pipe 3 and outlet pipe 4 is so that the water single flow direction water inlet pipe 3 in outlet pipe 4, thereby make water-heater system 100 there is water return function, water heating capable of circulation in water-heater system 100, and make with water spot, all can use hot water arbitrarily.And water-heater system 100 pipe laying are simple, cost is not high.By controller being set to control the operation of water heater components 1 and water pump 52, can improve the harmony of water-heater system 100 operations, avoid energy waste, and the function of instant-heating can realize water time.
In embodiment more of the present utility model, as shown in Figure 1, water-heater system 100 also comprises the first check valve 53, the first check valve 53 is connected in series and is connected in parallel on water inlet pipe 3 with water pump 52, wherein, the water that the first check valve 53 can pump water pump 52 is unidirectional to water heater components 1, thus, can avoid the aqueous reflux in water pump 52 to cause water pump 52 to damage, thereby extend the service life of water pump 52.In addition, water pump 52 can produce certain low pressure when out of service, water pump 52 can be absorbed water from connecting one end of water heater components 1, and the setting of the first check valve 53 can be avoided the current direction water pump 52 in water heater components 1, thereby guarantees the normal operation of water-heater system 100.
Further, as shown in Figure 1, water-heater system 100 also comprises the second check valve 54, the second check valve 54 series connection is located at the port that is connected with water source 200 of being suitable for of water inlet pipe 3, that is to say, the second check valve 54 is located at water source port 32 places of water inlet pipe 3, the second check valve 54 at water source 200 to one-way conduction in the direction of water inlet pipe 3.Thus, can avoid the water after the interior heating of water inlet pipe 3 to flow out from water source port 32, thereby reduce the energy consumption of water-heater system 100.
Alternatively, control valve 51 is check valve.Thus, the cost of control valve 51 is lower, installs easily.Certainly, the utility model is not limited to this, and for example, control valve 51 also can be magnetic valve, and magnetic valve is connected with controller, and when water pump 52 starts, control valve 51 is opened magnetic valve, under the driving of water pump 52, and the water single flow direction water inlet pipe 3 in outlet pipe 4.
In embodiment more of the present utility model, water heater components 1 comprises a water heater, and this water heater is a kind of in electric heater 12, gas heater 11, solar water heater and air-source water heater, does not do concrete restriction here.
In other embodiment of the present utility model, water heater components 1 is multiple-energy-source heat of mixing hydrophone, that is to say, water heater components 1 can comprise the water heater of various energy resources type, for example, water heater components 1 can comprise two or more in electric heater 12, gas heater 11, solar water heater and air-source water heater.
It should be noted that, above-mentioned four kinds of water heaters respectively have pluses and minuses, and therefore the applicable crowd of above-mentioned four kinds of water heaters is also different.By water heater components 1 being set to multiple-energy-source heat of mixing hydrophone, making water-heater system 100 can be suitable for the needs of different crowd, and can meet the requirement of people to energy-conserving and environment-protective.
In addition, along with the raising of people's living standard, people also improve gradually to the instructions for use of hot water, as the increase of using amount of hot water, the increase with water spot etc. of water simultaneously.Therefore, the water-heater system 100 of employing multiple-energy-source heat of mixing hydrophone can meet user's the requirement that using amount of hot water is large, heat supply is fast.
In specific embodiments more of the present utility model, as shown in Figure 1, water heater components 1 comprises gas heater 11 and electric heater 12.Gas heater 11 has the first water inlet 11A and the first delivery port 11B, and water inlet pipe 3 is connected with the first water inlet 11A, and the first water inlet 11A forms above-mentioned water inlet A.Electric heater 12 has the second water inlet 12A and the second delivery port 12B, and the second water inlet 12A is connected with the first delivery port 11B, and the second delivery port 12B is connected with outlet pipe 4, and the second delivery port 12B forms above-mentioned water outlet B.Wherein, it is interior with heating that the water in water inlet pipe 3 flows into gas heater 11, and the water in gas heater 11 can flow into the interior heating of electric heater 12 and flow into outlet pipe 4 from the second delivery port 12B.
That is to say, water-heater system 100 is the electric complementary type hot-water heating system of combustion, and wherein, gas heater 11 heating rapidly, can realize fast supply hot water.And the heat production water yield of electric heater 12 is large, can meet a large amount of waters of user, and electric heater 12 has water tank with retaining, therefore the water preheat in water-heater system 100 completes and stops after circulation, hot water major part in water-heater system 100 is stored in electric heater 12, thereby reduce heat, run off, further to reduce energy consumption.
Particularly, as shown in Figure 1, water-heater system 100 also comprises relief valve 55, and relief valve 55 is connected between the first delivery port 11B and the second water inlet 12A.Thus, can guarantee that the interior hydraulic pressure of electric heater 12 is suitable, to guarantee the normal operation of water-heater system 100.More specifically, relief valve 55 is located at the second water inlet 12A place.
Alternatively, controller can comprise the first sub-controller and the second sub-controller, and wherein, the first sub-controller is electrically connected to control opening and closing of water pump 52 with water pump 52.The second sub-controller can be located on electric heater to control the operation of electric heater.
In a specific embodiment of the present utility model, the length of the running time of water pump 52 can be set by controller, that is to say, at controller after 1 operation of scheduled time point control water pump 52 and water heater components, through setting-up time, it is out of service that controller is controlled water pump 52, and be fixed value the running time of water pump 52.Here, this setting-up time is determined by the factors such as speed of the hot water temperature of needs, the water yield in water-heater system 100 and water heater components 1 heating.
In another specific embodiment of the present utility model, water-heater system 100 also comprises the first temperature measurement one (scheming not shown) for detection of water temperature, the first temperature measurement one is located on water heater components 1 or outlet pipe 4, and controller is electrically connected to control opening and cutting out of water pump 52 according to the testing result of the first temperature measurement one with the first temperature measurement one.When the detected water temperature of the first temperature measurement one reaches after the first predetermined value, it is out of service that controller is controlled water pump 52, makes the water in water-heater system 100 stop circulating-heating.Thus, the water temperature that hot water outlet 41 flows out can be determined, thus the controllability of raising water temperature.
Here, the large I of the first predetermined value arranges by controller, and producer or user can arrange the first predetermined value according to actual user demand.It should be noted that, the big or small setting of the first predetermined value, while making controller control water pump 52 out of service, water heater components 1 still can continue constant temperature water supply.
Alternatively, the first temperature measurement one is located at the first delivery port 11B place.Here, the first temperature measurement one is connected with the first sub-controller, when the first temperature measurement one is located at the first delivery port 11B place, the first sub-controller can be close to the first temperature measurement one and water pump 52 arranges, thereby shorten the length of the connection line between the first temperature measurement one and the first controller, the first controller and water pump 52, be convenient to trace arrangements.Certainly, the first temperature measurement one also can be located on outlet pipe 4, and the first temperature measurement one even can be located at hot water outlet 41 places, does not do concrete restriction here.
Further, water-heater system 100 also comprises the second temperature measurement one (scheming not shown) for detection of the water temperature in electric heater 12, and controller is electrically connected to control opening and cutting out of electric heater 12 according to the testing result of the second temperature measurement one with the second temperature measurement one.
After gas heater 11 starts, water temperature in the second temperature measurement one detects electric heater 12 is during lower than the second predetermined value, controller is controlled electric heater 12 and is started, and gas heater 11 and electric heater 12 is heated simultaneously, so that the temperature of the water in water-heater system 100 rises rapidly.Afterwards, when the water temperature in the second temperature measurement one detects electric heater 12 reaches the second predetermined value, it is out of service that controller is controlled electric heater 12.Water temperature in electric heater 12 when the water temperature that here, outlet pipe 4 is discharged meets user's instructions for use is the second predetermined value.
In a concrete example of the present utility model, user is when using hot water, municipal water supply flows to gas heater 11 by water inlet pipe 3, gas heater 11 detected current through time start immediately, and the interior water temperature of gas heater 11 slowly rises, the water after heating a period of time in gas heater 11 reaches set temperature and constant temperature output.
When arbitrary while opening hot water outlet 41 with water spot, the hot water of gas heater 11 outputs flows into electric heater 12 from the second water inlet 12A, when the second temperature measurement one detects water tank water temperature lower than the second predetermined value, electric heater 12 starts heating until water temperature reaches the second predetermined value.If when the second temperature measurement one detection water tank water temperature is more than or equal to the second predetermined value, electric heater 12 does not start, hot water directly flows out and arrives water point from the second outlet.
When controller, set a plurality of preheating time during section, controller can be controlled the first temperature measurement one and in section, automatically detect water temperature preheating time.When the testing result of the first temperature measurement one is during lower than the first predetermined value, controller is controlled water pump 52 and is started.Water pump 52 pumps into gas heater 11 heating by water, and the water after heating is headed into and by outlet pipe 4, flows to each after electric heater 12 and use water spot by gas heater 11.Water in outlet pipe 4 flows back to water inlet pipe 3 with water spot place through control valve 51 in least favorable, and the water in water inlet pipe 3 flows into gas heater 11 to form circulation by water pump 52 again.When the testing result of the first temperature measurement one is more than or equal to the first predetermined value, it is out of service that controller is controlled water pump 52.
In addition, when the testing result of water pump 52 operation a period of time first temperature measurement ones is during always lower than the first predetermined value, controller infers that water-heater system 100 goes wrong, and it is out of service that controller can be controlled water pump 52, and controller can be warned to user by blowing a whistle.
In the description of this description, the description of reference term " embodiment ", " some embodiment ", " example ", " concrete example " or " some examples " etc. means to be contained at least one embodiment of the present utility model or example in conjunction with specific features, structure, material or the feature of this embodiment or example description.In this manual, the schematic statement of above-mentioned term is not necessarily referred to identical embodiment or example.And the specific features of description, structure, material or feature can be with suitable mode combinations in any one or more embodiment or example.
Although illustrated and described embodiment of the present utility model, those having ordinary skill in the art will appreciate that: in the situation that not departing from principle of the present utility model and aim, can carry out multiple variation, modification, replacement and modification to these embodiment, scope of the present utility model is limited by claim and equivalent thereof.

Claims (10)

1. a water-heater system, is characterized in that, comprising:
Water heater components, described water heater components has water inlet and delivery port;
Be suitable for being connected with water source and have the water inlet pipe of cooling water outlet, one end of described water inlet pipe is connected with described water inlet;
The outlet pipe with hot water outlet, one end of described outlet pipe is connected with described delivery port;
Control valve, described control valve is connected between the other end of described outlet pipe and the other end of described water inlet pipe so that the described water inlet pipe of the unidirectional inflow of water in described outlet pipe;
Water pump, described water pump is connected in parallel on described water inlet pipe so that the water in described water inlet pipe is pumped in described water heater components;
Controller, described controller is electrically connected to control respectively respectively the operation of described water heater components and described water pump with described water heater components and described water pump.
2. water-heater system according to claim 1, is characterized in that, also comprises the first check valve, and described the first check valve and described water pump are connected in series and are connected in parallel on described water inlet pipe.
3. water-heater system according to claim 1, it is characterized in that, also comprise the second check valve, described the second check valve series connection be located at described water inlet pipe be suitable for the port that is connected with described water source with at described water source to one-way conduction in the direction of described water inlet pipe.
4. according to the water-heater system described in any one in claim 1-3, it is characterized in that, described water heater components comprises:
Gas heater, described gas heater has the first water inlet and the first delivery port, and described water inlet pipe is connected with described the first water inlet;
Electric heater, described electric heater has the second water inlet and the second delivery port, and described the second water inlet is connected with described the first delivery port, and described the second delivery port is connected with described outlet pipe.
5. water-heater system according to claim 4, is characterized in that, also comprises relief valve, and described relief valve is connected between described the first delivery port and described the second water inlet.
6. water-heater system according to claim 4, it is characterized in that, also comprise the first temperature measurement one for detection of water temperature, described the first temperature measurement one is located on described water heater components or described outlet pipe, and described controller is electrically connected to according to the testing result of described the first temperature measurement one, to control opening and cutting out of described water pump with described the first temperature measurement one.
7. water-heater system according to claim 6, is characterized in that, described the first temperature measurement one is located at described the first water outlet.
8. water-heater system according to claim 4, it is characterized in that, also comprise the second temperature measurement one for detection of the water temperature in described electric heater, described controller is electrically connected to according to the testing result of described the second temperature measurement one, to control opening and cutting out of described electric heater with described the second temperature measurement one.
9. water-heater system according to claim 1, is characterized in that, described control valve is check valve.
10. water-heater system according to claim 1, is characterized in that, described controller is provided with for controlling the water return function key of the operation of described water pump and described water heater components.
CN201420393731.2U 2014-07-16 2014-07-16 Water-heater system Withdrawn - After Issue CN203949373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420393731.2U CN203949373U (en) 2014-07-16 2014-07-16 Water-heater system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420393731.2U CN203949373U (en) 2014-07-16 2014-07-16 Water-heater system

Publications (1)

Publication Number Publication Date
CN203949373U true CN203949373U (en) 2014-11-19

Family

ID=51891405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420393731.2U Withdrawn - After Issue CN203949373U (en) 2014-07-16 2014-07-16 Water-heater system

Country Status (1)

Country Link
CN (1) CN203949373U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104633907A (en) * 2015-01-16 2015-05-20 芜湖美的厨卫电器制造有限公司 Gas-electricity complementary hot-water system
CN105042869A (en) * 2015-06-24 2015-11-11 芜湖美的厨卫电器制造有限公司 Temperature control method for gas and power complementary hot water system
CN104110856B (en) * 2014-07-16 2019-06-25 芜湖美的厨卫电器制造有限公司 Water-heater system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110856B (en) * 2014-07-16 2019-06-25 芜湖美的厨卫电器制造有限公司 Water-heater system
CN104633907A (en) * 2015-01-16 2015-05-20 芜湖美的厨卫电器制造有限公司 Gas-electricity complementary hot-water system
CN104633907B (en) * 2015-01-16 2018-08-17 芜湖美的厨卫电器制造有限公司 The electric complementary hot-water system of combustion
CN105042869A (en) * 2015-06-24 2015-11-11 芜湖美的厨卫电器制造有限公司 Temperature control method for gas and power complementary hot water system
CN105042869B (en) * 2015-06-24 2018-03-16 芜湖美的厨卫电器制造有限公司 Fire the temprature control method of electric complementary hot-water system

Similar Documents

Publication Publication Date Title
CN104110856A (en) Water heater system
JP5500866B2 (en) Hot water system
CN203824042U (en) Hot water system
EP3333493B1 (en) Water circulation module and hot water system using the same
CN202511477U (en) Temperature-control water-saving device for water heater
CN203177309U (en) Central hot water system
CN106969495A (en) Intelligent constant-temperature water-saving water heater and control method
CN104359228A (en) Water heater and dry burning-resisting control method thereof
CN102865621A (en) System and method for solar energy centralized hot water supply for high-rise residence
CN102679534A (en) Energy-saving constant temperature electric water heater
CN102589177A (en) Water feeding and discharging temperature control device for solar water heater
CN104482657A (en) Hot-water system and control method thereof
CN203949373U (en) Water-heater system
CN105091329A (en) Heat pump water heating system and control method of heat pump water heating system
CN201607002U (en) Household energy-saving water heater
CN102997428B (en) Water heater with water saving system
CN205619574U (en) Full -automatic hot -water circulation supercharging device and water heater system
CN104567032A (en) Management system for intelligent solar water heater
CN202852977U (en) High-rise residence solar energy centralized hot water supplying system
CN202532719U (en) Home hot water circulation system
CN205909484U (en) Water -saving gas heater
CN201218591Y (en) Instant heating type water heater
CN202973355U (en) Household independent heating and domestic hot water supply control system
CN203036004U (en) Intelligent temperature-control water-saving faucet for water heater
CN203687390U (en) Cold water recycling device for bathroom

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141119

Effective date of abandoning: 20190625

AV01 Patent right actively abandoned

Granted publication date: 20141119

Effective date of abandoning: 20190625

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned