CN203947654U - A kind of main joist hanging piece of the Integral ceiling for parlor - Google Patents
A kind of main joist hanging piece of the Integral ceiling for parlor Download PDFInfo
- Publication number
- CN203947654U CN203947654U CN201420318376.2U CN201420318376U CN203947654U CN 203947654 U CN203947654 U CN 203947654U CN 201420318376 U CN201420318376 U CN 201420318376U CN 203947654 U CN203947654 U CN 203947654U
- Authority
- CN
- China
- Prior art keywords
- main joist
- suspension member
- chute
- hanging piece
- parlor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Floor Finish (AREA)
Abstract
The utility model relates to a kind of main joist hanging piece of the Integral ceiling for parlor.In existing ceiling system, suspension rod, when being installed to ceiling, can not effectively be controlled the height of furred ceiling bottom, thereby will cause out-of-flatness after main joist installation, and can leave because of unbalance stress potential safety hazard.The utility model provides a kind of main joist hanging piece of the Integral ceiling for parlor, comprise suspension rod and suspension member, suspension member is provided with for the draw-in groove of main joist is installed, it is characterized in that: also comprise adjusting bolt and lock bolt, suspension member is provided with and regulates chamber, regulate chamber to be positioned at the top of draw-in groove, on suspension member, have chute, this chute communicates with adjusting chamber and chute is positioned at the top that regulates chamber, suspension rod is provided with thread segment, adjusting bolt and lock bolt are all connected on thread segment, thread segment is through chute, and adjusting bolt is positioned at and regulates chamber, lock bolt is positioned at suspension member top.The utility model is simple in structure, reasonable in design, and the height of adjustable suspension member is easy for installation.
Description
Technical field
The utility model relates to a kind of main joist hanging piece of the Integral ceiling for parlor, for main joist is installed.
Background technology
In existing ceiling system, suspension rod is connected on ceiling, and bottom and the main joist of suspension rod are fixed, and therefore, during the suspension of main joist, by some suspension rods, is fixed.Because suspension rod is when being installed to ceiling, can not effectively control the height of furred ceiling bottom, thereby will cause out-of-flatness after main joist installation, affect the attractive in appearance of furred ceiling, and can leave because of unbalance stress potential safety hazard, therefore suspension rod need to be pulled down, after adjusting, again load onto, operation is trouble very, waste of manpower.In prior art, also have the suspension rod that can regulate, but its structure design is reasonable not, regulates trouble relatively.
In sum, in prior art, also there is no a kind of reasonable in design, easy for installation, easy to adjust, service-strong main joist hanging piece.
Utility model content
The purpose of this utility model is to overcome above shortcomings in prior art, and a kind of reasonable in design is provided, highly adjustable, the main joist hanging piece of the Integral ceiling for parlor easy for installation.
The technical scheme in the invention for solving the above technical problem is: be somebody's turn to do the main joist hanging piece for the Integral ceiling in parlor, comprise suspension rod and suspension member, described suspension member is provided with for the draw-in groove of main joist is installed, it is characterized in that: also comprise adjusting bolt and lock bolt, described suspension member is provided with and regulates chamber, described adjusting chamber is positioned at the top of draw-in groove, on described suspension member, have chute, this chute communicates with adjusting chamber and chute is positioned at the top that regulates chamber, described suspension rod is provided with thread segment, described adjusting bolt and lock bolt are all connected on thread segment, described thread segment is through chute, and adjusting bolt is positioned at and regulates chamber, lock bolt is positioned at suspension member top.During use, first suspension rod top is linked on ceiling, adjusting bolt and lock bolt are all linked on the thread segment of suspension rod and made has certain spacing between adjusting bolt and lock bolt, then suspension member is installed on suspension rod, and make adjusting bolt be positioned at adjusting chamber, and lock bolt is positioned on suspension member, by regulating adjusting bolt, make suspension member be positioned at required height, lock again lock bolt, finally main joist is snapped in draw-in groove, easy for installation, thereby and can, by regulating the height of suspension member to regulate the height of main joist, make main joist maintenance level.
The utility model also comprises the baffle plate for preventing that main joist from skidding off from the outlet of draw-in groove, and described baffle plate is arranged on the opening part of draw-in groove.The setting of baffle plate can prevent that main joist from dropping out.
Baffle plate described in the utility model is provided with rail groove, and described suspension member is provided with the guide rail coordinating with rail groove.Baffle plate can directly coordinate with guide rail while installing, easy for installation.
It is L-shaped that the utility model is told rail groove.The rail groove of " L " shape can tilt by anti-baffle plate laterally.
The utility model also comprises set bolt, and described set bolt passes baffle plate and is threaded with suspension member.Can skid off by anti-baffle plate.
The utility model also comprises the limiting plate for preventing that suspension rod from skidding off along chute direction, described limiting plate is sleeved on suspension rod and between lock bolt and chute, described limiting plate comprises a confined planes and No. two confined planes, and a described confined planes and No. two confined planes lay respectively at chute two ends.The setting of limiting plate can prevent that suspension rod from skidding off along chute direction.
The utility model compared with prior art, have the following advantages and effect: simple in structure, reasonable in design, during use, first suspension rod top is linked on ceiling, adjusting bolt and lock bolt are all linked on the thread segment of suspension rod and made has certain spacing between adjusting bolt and lock bolt, then suspension member is installed on suspension rod, and make adjusting bolt be positioned at adjusting chamber, and lock bolt is positioned on suspension member, by regulating adjusting bolt, make suspension member be positioned at required height, lock again lock bolt, finally main joist is snapped in draw-in groove, easy for installation, thereby and can be by regulating the height of suspension member to regulate the height of main joist, make main joist maintenance level.
Accompanying drawing explanation
Fig. 1 is for the main TV structure schematic diagram of the main joist hanging piece of the Integral ceiling in parlor in the utility model embodiment.
Fig. 2 is the enlarged diagram at A place in Fig. 1.
Fig. 3 is the structural representation that Fig. 1 removes limiting plate.
Fig. 4 is the left view of Fig. 1.
Fig. 5 is the structural representation of baffle plate.
Fig. 6 is the structural representation of suspension member.
Fig. 7 is the structural representation of limiting plate.
Fig. 8 is the left view of Fig. 7.
The specific embodiment
Below in conjunction with accompanying drawing and by embodiment, the utility model is described in further detail, and following examples are to explanation of the present utility model and the utility model is not limited to following examples.
Embodiment.
Referring to Fig. 1 to Fig. 8, the main joist hanging piece of the Integral ceiling for parlor in the present embodiment comprises suspension rod 1, suspension member 2, adjusting bolt 3, lock bolt 4, baffle plate 5, limiting plate 6 and set bolt 7.
Suspension member 2 in the present embodiment is provided with for the draw-in groove 21 of main joist is installed, suspension member 2 is provided with and regulates chamber 22, regulate chamber 22 to be positioned at the top of draw-in groove 21, on suspension member 2, have chute 23, this chute 23 communicates with adjusting chamber 22 and chute 23 is positioned at the top that regulates chamber 22, suspension rod 1 is provided with thread segment 11, adjusting bolt 3 and lock bolt 4 are all connected on thread segment 11, thread segment 22 is through chute 23, and adjusting bolt 3 is positioned at and regulates chamber 22, lock bolt 4 is positioned at suspension member 2 tops, and thread segment 11 is positioned at and regulates the length in chamber 22 to regulate by adjusting bolt 3.
During use, first suspension rod 1 top is linked on ceiling, adjusting bolt 3 and lock bolt 4 are all linked on the thread segment 11 of suspension rod 1 and are made to have certain spacing between adjusting bolt 3 and lock bolt 4, then suspension member 2 is installed on suspension rod 1, specifically suspension member 2 is packed into along its chute 23, and make adjusting bolt 3 be positioned at adjusting chamber 22, and lock bolt 4 is positioned on suspension member 2, by regulating adjusting bolt 3, make suspension member 2 be positioned at required height, lock again lock bolt 4, finally main joist is snapped in draw-in groove 21, easy for installation, thereby and can be by regulating the height of suspension member 2 to regulate the height of main joist, make main joist maintenance level.Main joist snaps in from the draw-in groove 21 of suspension member 2, install simple, without in advance main joist and suspension member 2 being assembled, can wait until suspension rod 1 coordinate with suspension member 2 after in the installation of carrying out main joist.
Baffle plate 5 in the present embodiment is provided with rail groove 51, suspension member 2 is provided with the guide rail 24 coordinating with rail groove 51, baffle plate 5 can directly coordinate with guide rail 24 while installing, baffle plate 5 is fixed by set bolt 7 after installing again, baffle plate 5 is arranged on the opening part of draw-in groove 21, for preventing that main joist from dropping out from draw-in groove 21.
Rail groove 51 in the present embodiment is L-shaped, and the rail groove 51 of " L " shape can tilt by anti-baffle plate 5 laterally, and can toward outside slip, go out by anti-baffle plate 5.
Limiting plate 6 in the present embodiment is sleeved on suspension rod 1 and between lock bolt 4 and chute 23, during lock bolt 4 locking, limiting plate 6 has been compressed to installation, limiting plate 6 comprises a confined planes 61 and No. two confined planes 62, a confined planes 61 and No. two confined planes 62 lay respectively at chute 23 two ends, and the setting of limiting plate 6 can prevent that suspension rod 2 from skidding off along chute 23 directions.
In addition, it should be noted that, the specific embodiment described in this manual, the shape of its parts and components, institute's title of being named etc. can be different, and the above content described in this manual is only to the utility model structure and the explanation of accompanying drawing example.All equivalence variation or simple change of doing according to described structure, feature and the principle of the utility model patent design, are included in the protection domain of the utility model patent.The utility model person of ordinary skill in the field can make various modifications or supplements or adopt similar mode to substitute described specific embodiment; only otherwise depart from structure of the present utility model or surmount this scope as defined in the claims, all should belong to protection domain of the present utility model.
Claims (6)
1. the main joist hanging piece for the Integral ceiling in parlor, comprise suspension rod and suspension member, described suspension member is provided with for the draw-in groove of main joist is installed, it is characterized in that: also comprise adjusting bolt and lock bolt, described suspension member is provided with and regulates chamber, described adjusting chamber is positioned at the top of draw-in groove, on described suspension member, have chute, this chute communicates with adjusting chamber and chute is positioned at the top that regulates chamber, described suspension rod is provided with thread segment, described adjusting bolt and lock bolt are all connected on thread segment, described thread segment is through chute, and adjusting bolt is positioned at and regulates chamber, lock bolt is positioned at suspension member top.
2. the main joist hanging piece of the Integral ceiling for parlor according to claim 1, is characterized in that: also comprise the baffle plate for preventing that main joist from skidding off from the outlet of draw-in groove, described baffle plate is arranged on the opening part of draw-in groove.
3. the main joist hanging piece of the Integral ceiling for parlor according to claim 2, is characterized in that: described baffle plate is provided with rail groove, and described suspension member is provided with the guide rail coordinating with rail groove.
4. the main joist hanging piece of the Integral ceiling for parlor according to claim 3, is characterized in that: it is L-shaped that rail groove is told by institute.
5. according to the main joist hanging piece of the Integral ceiling for parlor described in claim 2 or 3, it is characterized in that: also comprise set bolt, described set bolt passes baffle plate and is threaded with suspension member.
6. the main joist hanging piece of the Integral ceiling for parlor according to claim 1 and 2, it is characterized in that: also comprise the limiting plate for preventing that suspension rod from skidding off along chute direction, described limiting plate is sleeved on suspension rod and between lock bolt and chute, described limiting plate comprises a confined planes and No. two confined planes, and a described confined planes and No. two confined planes lay respectively at chute two ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420318376.2U CN203947654U (en) | 2014-06-16 | 2014-06-16 | A kind of main joist hanging piece of the Integral ceiling for parlor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420318376.2U CN203947654U (en) | 2014-06-16 | 2014-06-16 | A kind of main joist hanging piece of the Integral ceiling for parlor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203947654U true CN203947654U (en) | 2014-11-19 |
Family
ID=51889700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420318376.2U Expired - Fee Related CN203947654U (en) | 2014-06-16 | 2014-06-16 | A kind of main joist hanging piece of the Integral ceiling for parlor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203947654U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652682A (en) * | 2015-01-04 | 2015-05-27 | 嘉兴市今顶电器科技有限公司 | Panel mounting structure for integrated ceiling |
CN105672549A (en) * | 2016-03-28 | 2016-06-15 | 中国建筑第六工程局有限公司 | Insertion connection type combined metal suspended ceiling |
CN108222353A (en) * | 2018-01-05 | 2018-06-29 | 海宁市豪派新材料科技有限公司 | It is a kind of to carry out flexible Integral ceiling supporting rack |
-
2014
- 2014-06-16 CN CN201420318376.2U patent/CN203947654U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652682A (en) * | 2015-01-04 | 2015-05-27 | 嘉兴市今顶电器科技有限公司 | Panel mounting structure for integrated ceiling |
CN105672549A (en) * | 2016-03-28 | 2016-06-15 | 中国建筑第六工程局有限公司 | Insertion connection type combined metal suspended ceiling |
CN105672549B (en) * | 2016-03-28 | 2017-12-12 | 中国建筑第六工程局有限公司 | A kind of splicing type combines metal ceiling |
CN108222353A (en) * | 2018-01-05 | 2018-06-29 | 海宁市豪派新材料科技有限公司 | It is a kind of to carry out flexible Integral ceiling supporting rack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203947654U (en) | A kind of main joist hanging piece of the Integral ceiling for parlor | |
CN204940660U (en) | Full suspended ceiling combines self-contained provision for disengagement | |
CN104772619B (en) | A kind of sunshade swing arm extension spring assembly machine | |
CN204187846U (en) | The adjustable for height fixed support of a kind of water heater | |
CN205374972U (en) | Projection curtain convenient to installation | |
CN203947655U (en) | A kind of hanging piece for low floor height Integral ceiling | |
CN205638007U (en) | Multi -functional hanging wheel device | |
CN207401032U (en) | A kind of novel safety belt fixing device | |
CN204114767U (en) | A kind of panel light with multiple mounting modes | |
CN205276646U (en) | Suspended ceiling keel | |
CN205477308U (en) | Sun blind altitude controller | |
CN206016033U (en) | Adjustable lifting is held court from behind a screen variola | |
CN207230866U (en) | The pipeline elevator of central air-conditioning | |
CN204999059U (en) | Honey holding vessel | |
CN205785196U (en) | A kind of derrick Anti-inclining instruction device | |
CN206513010U (en) | Movable disk button for support system | |
CN204445235U (en) | A kind of liftable clothes hanger | |
CN206722408U (en) | A kind of portable building support frame | |
CN205042150U (en) | Buffer tank bracket | |
CN204715852U (en) | Annular cement electric pole dedicated safety belt suspension member | |
CN205197713U (en) | Portable (window) curtain support | |
CN204959410U (en) | Embedded clothes hanger's that dries in air of furred ceiling top cap fixing device | |
CN204780615U (en) | Template fixing device is pour to bridge cylinder | |
CN104193157B (en) | A kind of annealing kiln D district wind guider | |
CN202992390U (en) | Cable hook facilitating inclined roadway passing by people |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 314300, No. 3, Star Road, Saline Lake Road Industrial District, Haiyan Town, Haiyan County, Zhejiang, Jiaxing Patentee after: Fsilon Building Material Technology Co., Ltd. Address before: 314300, No. 3, Star Road, Saline Lake Road Industrial District, Haiyan Town, Haiyan County, Zhejiang, Jiaxing Patentee before: Haiyan Fsilon Building Materials Technology Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141119 Termination date: 20150616 |
|
EXPY | Termination of patent right or utility model |