CN203925585U - Formula tunnel, turning stock retaining wall - Google Patents
Formula tunnel, turning stock retaining wall Download PDFInfo
- Publication number
- CN203925585U CN203925585U CN201420291691.0U CN201420291691U CN203925585U CN 203925585 U CN203925585 U CN 203925585U CN 201420291691 U CN201420291691 U CN 201420291691U CN 203925585 U CN203925585 U CN 203925585U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- rope
- reinforcing rib
- tunnel
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Formula tunnel, a turning stock retaining wall, structure is connected to form by wallboard, reinforcing rib and rope.Wallboard is a rectangular turning iron plate, horizontal both sides at wallboard are provided with outside flanging, lateral surface at wallboard is provided with some roads reinforcing rib, on the reinforcing rib of the two ends of wallboard, is provided with several holes, and two blocks of wallboards can be sewed up and be connected as a body with screw by silk hole.On wallboard, be provided with rope and hook, hook can insert in dog hole below, with this, increases the force intensity that is subject to of wallboard Side face.
Description
Technical field
Formula tunnel, a turning stock retaining wall, belongs to mining equiment field.
Background technology
In the tunnel of down-hole, often to store the bulk cargo that some shotcretes are used, in order to make the bulk cargo side of occupation of land and prevent from shedding waste less, a side in tunnel has been built stock retaining wall by laying bricks or stones, but not only own vol is large for this backgauge body of wall of building by laying bricks or stones, can't integrated moving and Reusability, be not suitable with the needs of bulk cargo transition.
Summary of the invention
The application's object is that formula tunnel, a kind of turning stock retaining wall will be provided, and it can be removed easily, installation and Reusability.Structure is connected to form by wallboard, reinforcing rib and rope.Wallboard is a rectangular turning iron plate, and the corner angle of wallboard is 90 degree, and the height of wallboard is less than the height of mine car, so that decking.The base width of wallboard is greater than the side height of wallboard, can be firm while using like this.Horizontal both sides at wallboard are provided with outside flanging, with this, increase the structural strength of wallboard.
Lateral surface at wallboard is provided with some roads reinforcing rib, between reinforcing rib, is parallel to each other, and reinforcing rib adopts angle bar or square tube to make, and the width of reinforcing rib equals the width of flanging.Reinforcing rib and wallboard are weldingly connected and are integral.Reinforcing rib after welding and flanging are at grade.The reinforcing rib at every wallboard two ends and the termination of wallboard are at grade.On the reinforcing rib of the two ends of wallboard, be provided with several holes, two blocks of wallboards can be sewed up and be connected as a body with screw by silk hole.
In the two sides (bottom surface and side) of wallboard, between Side, be provided with rope, the flanging place, top of the upper end of rope and wallboard is connected as a body, and at the low side of rope, is provided with hook, and hook and rope are connected as a body.Bottom surface at wallboard is provided with dog hole near flanging place, and hook can insert in dog hole, and the hook inserting in dog hole can be by rope stretch, between the rope after tension and the two sides of wallboard, forms triangle, with this, increases the force intensity that is subject to of wallboard Side face.
In the time of need to wallboard being installed, the reinforcing rib on the bottom surface of wallboard lands, and the side of wallboard is facing to the wall in tunnel, some blocks of wallboards are placed in to a side in tunnel, make the base of wallboard near the wall in tunnel, with screw, by silk hole, some blocks of wallboards are stitched together, the hook of rope is inserted in dog hole, make rope stretch, formula tunnel, turning stock retaining wall just can have been used, during entrucking, running into rope is in the way, hook can be removed, rope be foundered to the sidewall outer of wallboard, in order to avoid affect entrucking.Used time not, is oppositely placed on wallboard one jiao of tunnel wall, saves very much the space in tunnel.
Facts have proved, formula tunnel, turning stock retaining wall is highly suitable for storing in the tunnel of down-hole, transition is used, thereby saved a large amount of masonry panels.
Accompanying drawing explanation
Fig. 1, formula tunnel, turning stock retaining wall front view Fig. 2, anchor rod type tunnel stock retaining wall lateral view
1, wallboard, 2, reinforcing rib, 3, rope, 4, flanging, 5, silk hole, 6, hook, 7, dog hole, 8, wall.
The specific embodiment
As shown in Figure 1, 2, provide formula tunnel, a kind of turning stock retaining wall, it can be removed easily, installation and Reusability.Structure is connected to form by wallboard 1, reinforcing rib 2 and rope 3.Wallboard 1 is a rectangular turning iron plate, and the corner angle of wallboard 1 is 90 degree, and the height of wallboard 1 is less than the height of mine car, so that decking.The base width of wallboard 1 is greater than the side height of wallboard 1, can be firm while using like this.Horizontal both sides at wallboard 1 are provided with outside flanging 4, with this, increase the structural strength of wallboard 1.
Lateral surface at wallboard 1 is provided with some roads reinforcing rib 2, between reinforcing rib 2, is parallel to each other, and reinforcing rib 2 adopts angle bar or square tube to make, and the width of reinforcing rib 2 equals the width of flanging 4; Reinforcing rib 2 and wallboard 1 are weldingly connected and are integral.Reinforcing rib 2 after welding and flanging 4 are at grade.The reinforcing rib 2 at the two ends of every block of wallboard 1 and the termination of wallboard 1 are at grade.On the reinforcing rib 2 at the two ends of wallboard 1, being provided with 5, two blocks, several holes wallboard 1 can be sewed up and be connected as a body by silk hole 5 use screws.
In the two sides (bottom surface and side) of wallboard 1, between Side, be provided with rope 3, flanging 4 places of the upper end of rope 3 and wallboard 1 top are connected as a body, and at the low side of rope 3, are provided with hook 6, and hook 6 and rope 3 are connected as a body.Bottom surface at wallboard 1 is provided with dog hole 7 near flanging 4 places, and hook 6 can insert in dog hole 7, and the hook 6 inserting in dog hole 7 can form triangle between the rope 3 after tension and the two sides of wallboard 1 by rope 3 tensions, and the Side face that increases wallboard 1 with this is subject to force intensity.
In the time of need to wallboard 1 being installed, first the reinforcing rib 2 on the bottom surface of wallboard 1 is landed, the side of wallboard 1 is facing to the wall 8 in tunnel, some blocks of wallboards 1 are placed in to a side in tunnel, make the base of wallboard 1 near the wall 8 in tunnel, with screw, by silk hole 5, some blocks of wallboards 1 are stitched together, the hook of rope 36 is inserted in dog hole 7, make rope 3 tensions, formula tunnel, turning stock retaining wall just can have been used, during entrucking, running into rope 3 is in the way, hook 6 can be removed, rope 3 be foundered to the sidewall outer of wallboard 1, in order to avoid affect entrucking.Used time not, is oppositely placed on wallboard 1 one jiao of tunnel wall 8, saves very much the space in tunnel.
Facts have proved, formula tunnel, turning stock retaining wall is highly suitable for storing in the tunnel of down-hole, transition is used, thereby saved a large amount of masonry panels.
Claims (1)
1. a turning formula tunnel stock retaining wall, it can be removed easily, installation and Reusability; Feature is: structure is connected to form by wallboard (1), reinforcing rib (2) and rope (3).Wallboard (1) is a rectangular turning iron plate, and the corner angle of wallboard (1) is 90 degree, and the height of wallboard (1) is less than the height of mine car, so that decking; The base width of wallboard (1) is greater than the side height of wallboard (1), can be firm while using like this; On the horizontal both sides of wallboard (1), be provided with outside flanging (4), with this, increase the structural strength of wallboard (1);
Lateral surface at wallboard (1) is provided with some roads reinforcing ribs (2), and reinforcing rib is parallel to each other between (2), and reinforcing rib (2) adopts angle bar or square tube to make, and the width of reinforcing rib (2) equals the width of flanging (4); Reinforcing rib (2) and wallboard (1) are weldingly connected and are integral; Reinforcing rib after welding (2) and flanging (4) are at grade; The reinforcing rib (2) at the two ends of every block of wallboard (1) and the termination of wallboard (1) are at grade; On the reinforcing rib (2) at the two ends of wallboard (1), be provided with several holes (5), two blocks of wallboards (1) can be sewed up and be connected as a body with screw by a silk hole (5);
In the two sides of wallboard (1), between Side, be provided with rope (3), the flanging (4) of the upper end of rope (3) and wallboard (1) top is located to be connected as a body, low side at rope (3) is provided with hook (6), and hook (6) and rope (3) are connected as a body; Dog hole (7) is located to be provided with near flanging (4) in bottom surface at wallboard (1), hook (6) can insert in dog hole (7), the hook (6) inserting in dog hole (7) can be strained rope (3), between the two sides of the rope after tension (3) and wallboard (1), form triangle, the Side face that increases wallboard (1) with this is subject to force intensity;
When wallboard (1) need to be installed, first the reinforcing rib on the bottom surface of wallboard (1) (2) is landed, the side of wallboard (1) is facing to the wall (8) in tunnel, some blocks of wallboards (1) are placed in to a side in tunnel, make the base of wallboard (1) near the wall (8) in tunnel, with screw, by silk hole (5), some blocks of wallboards (1) are stitched together, the hook of rope (3) (6) is inserted in dog hole (7), make rope (3) tension, formula tunnel, turning stock retaining wall just can have been used; During entrucking, run into rope (3) and be in the way, hook (6) can be removed, rope (3) is foundered to the sidewall outer of wallboard (1), in order to avoid affect entrucking; Used time not, is oppositely placed on wallboard (1) a jiao of tunnel wall (8), saves very much the space in tunnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420291691.0U CN203925585U (en) | 2014-05-28 | 2014-05-28 | Formula tunnel, turning stock retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420291691.0U CN203925585U (en) | 2014-05-28 | 2014-05-28 | Formula tunnel, turning stock retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203925585U true CN203925585U (en) | 2014-11-05 |
Family
ID=51821414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420291691.0U Expired - Fee Related CN203925585U (en) | 2014-05-28 | 2014-05-28 | Formula tunnel, turning stock retaining wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203925585U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104948229A (en) * | 2014-05-28 | 2015-09-30 | 冯世英 | Corner type roadway material blocking wall |
-
2014
- 2014-05-28 CN CN201420291691.0U patent/CN203925585U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104948229A (en) * | 2014-05-28 | 2015-09-30 | 冯世英 | Corner type roadway material blocking wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204920975U (en) | Tunnel supporting construction | |
CN203925585U (en) | Formula tunnel, turning stock retaining wall | |
CN104005790A (en) | Corner type roadway blocking wall | |
CN203640745U (en) | Gob-side entry retaining concrete mould bag with roof contacting function | |
CN104947662B (en) | A kind of soil-nail wall support system based on the recyclable technique of assembled | |
CN104005791B (en) | The construction method of formula tunnel, turning stock retaining wall | |
CN104963723A (en) | Anchor rod-type material retaining wall for roadway | |
CN203856509U (en) | Anchor rod type roadway material blocking wall | |
CN202768034U (en) | High-strength whole thread equal-strength resin anchor bar steel bar | |
CN104963722A (en) | Plate chain-type material-retaining wall for roadway | |
CN203856510U (en) | Plate chain type roadway stop wall | |
CN205135661U (en) | Support frame is pour to tunnel secondary | |
CN104018878B (en) | Manufacture and the installation method of anchor rod type tunnel stock retaining wall | |
CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
CN103993908B (en) | The manufacture of plate chain type tunnel stock retaining wall and mounting method | |
CN203925584U (en) | Pile-column tunnel stock retaining wall | |
CN202578720U (en) | Mining anchor post | |
CN104018880A (en) | Pile type keep-off wall of roadway | |
CN104018879B (en) | The method of manufacture and use thereof of pile-column tunnel stock retaining wall | |
CN203189063U (en) | Airtight device for filling support roadway | |
CN203783610U (en) | High-strength anchor-net-supported prestressed supporting plate beam | |
CN202359574U (en) | Double-sided steel formwork for underground continuous wall construction | |
CN106194227B (en) | Gob side entry retaining control helps device and gob side entry retaining control to help construction method | |
CN203769288U (en) | Cold-formed thin-walled steel scaffold board | |
CN105484760B (en) | Big angle coal face advance support structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 Termination date: 20150528 |
|
EXPY | Termination of patent right or utility model |