Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320787259.6U
Other languages
Chinese (zh)
Inventor
曾二贤
赵江涛
段松涛
曾德森
尹鹏
吴海洋
白强
冯衡
冯德奎
包永忠
舒爱强
郭念
柯嘉
胡星
徐彬
李鑫
刘嘉鹏
宗保龙
薛春林
何江
范峥
王学明
殷锴
张媛
肖兵
肖洪伟
李育兵
张哲鑫
王启明
施芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
China Power Engineering Consulting Group Corp
Electric Power Planning and Engineering Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
North China Electric Power Design Institute of China Power Engineering Consulting Group Corp
China Power Engineering Consulting Group Corp
Electric Power Planning and Engineering Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Northwest Electric Power Design Institute of China Power Engineering Consulting Group, Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group, China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd, China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp, Northeast Electric Power Design Institute of China Power Engineering Consulting Group, North China Electric Power Design Institute of China Power Engineering Consulting Group Corp, China Power Engineering Consulting Group Corp, Electric Power Planning and Engineering Institute Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320787259.6U priority Critical patent/CN203924858U/en
Application granted granted Critical
Publication of CN203924858U publication Critical patent/CN203924858U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model embodiment provides on a kind of UHVDC Transmission Lines around formula anchor support, comprise tower body, tower leg, earth wire support and wire cross-arm, around wire jumper support, upper vertical around the lower plane of wire jumper support and the axis of earth wire support in earth wire support outside layout one; By upper, around wire jumper support, upper around wire jumper, retreating side strain clamp is drained to advance side strain clamp above from wire cross-arm certainly.On the UHVDC Transmission Lines wire jumper of the utility model embodiment, around formula anchor support, avoid producing not evolution problem or because high slope trees distance being chopped at a tree not because of wire jumper distance to the ground.And, for the anchor support being positioned at compared with steep side slope, limit phase wire jumper adopts upper around arrangement, reduce on the one hand the impact on environment, effectively lower on the other hand shaft tower and exhale height, reduce tower material of iron tower consumption, finally reach and save the circuit comprehensive method of investment, convenient construction, the object of raising circuit operational reliability.

Description

On a kind of UHVDC Transmission Lines around formula anchor support
Technical field
The utility model relates to high voltage power transmission field, relates in particular on a kind of UHVDC Transmission Lines around formula anchor support.
Background technology
At present, domestic ± 800kV direct current single loop anchor support mainly adopts dry font steel tower, continue by hanging over wire jumper scheme under wire cross-arm (under draw wire jumper) in the two poles of the earth, this type of anchor support existing ripe design experiences in ± 800 DC power transmission lines.
Under ± 800kV UHVDC Transmission Lines, draw wire jumper owing to being subject to the impact at jumper string length, wire jumper sag, strain insulator-string angle of slope etc., its live part minimum point is than the low about 11m of tension tower conducting wire cross-arm, thereby may cause because wire jumper distance to the ground is not to ground evolution or rising anchor support, especially in mountain area, anchor support stands in compared with on gradient slope, there will be a Ji compare Ta Wei center ground elevation to uprise, and live part (wire jumper) step-down, the contradiction of wire jumper clearance to ground is more outstanding.
Mountain area transmission line of electricity, while occurring that one pole wire jumper becomes the governing factor of anchor support tower height, when distance to the ground is not or leap forest is inadequate to high slope trees distance, generally take following measure:
1) increasing steel tower exhales title high;
2) wire jumper evolution or because high slope trees distances is caused to forest felling not;
3) relocate or dodge the mode of displacement in part, tower position.
But the shortcoming that existing these technology exist is:
1) increased steel tower and exhaled title height, this will increase tower material consumption undoubtedly, increase body investment;
2) wire jumper evolution or forest felling, do not meet the requirement of Environmental Design;
3) relocate or dodge the mode of displacement in part, easily cause change expense significantly to increase, even under mountain area power transmission line corridor overall situation more and more in short supply, iron tower foundation is inevitably positioned at precipitous landform or crosses over forest zone, adopts the mode of similar avoidance can not positively solve this engineering roadblock.
Utility model content
The utility model embodiment provides on a kind of UHVDC Transmission Lines around formula anchor support, to solve the environmental requirement that do not meet of the prior art, and the large shortcoming of cost.
In order to achieve the above object, the utility model embodiment provides on a kind of UHVDC Transmission Lines around formula anchor support, comprise tower body, tower leg, earth wire support and wire cross-arm, it is characterized in that, around wire jumper support, described upper vertical around the lower plane of wire jumper support and the axis of described earth wire support in described earth wire support outside layout one; By described upper around wire jumper support, upper around wire jumper, retreating side strain clamp is drained to advance side strain clamp above from described wire cross-arm certainly.
Further, in one embodiment, the spacing of the ground wire hanging point on wire jumper hanging point and the described earth wire support of described wire jumper support is 3m-4m.
Further, in one embodiment, described upper on wire jumper support average mark be furnished with three place's wire jumper hanging points.
Further, in one embodiment, described upper around soft the jumping onto around mode of wire jumper support employing suspension 3I string.
Further, in one embodiment, described is above 5m-7m around the one-sided length of wire jumper support.
Further, in one embodiment, the height of exhaling of described anchor support is 39m-48m.
On the UHVDC Transmission Lines wire jumper of the utility model embodiment around formula anchor support, by a utmost point of high slope side from the above drainage of limit wire cross-arm, make high slope upside one utmost point wire jumper not become the governing factor of anchor support tower height, thereby avoid producing not evolution problem or because high slope trees distance being chopped at a tree not because of wire jumper distance to the ground.And, for the anchor support being positioned at compared with steep side slope, limit phase wire jumper adopts upper around arrangement, reduce on the one hand the impact on environment, effectively lower on the other hand shaft tower and exhale height, reduce tower material of iron tower consumption, finally reach and save the circuit comprehensive method of investment, convenient construction, the object of raising circuit operational reliability.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those skilled in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation around formula anchor support on the UHVDC Transmission Lines of the utility model embodiment;
Fig. 2 is the structural representation around formula anchor support on the UHVDC Transmission Lines of the utility model one specific embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
Fig. 1 is the structural representation around formula anchor support on the UHVDC Transmission Lines of the utility model embodiment.As shown in Figure 1, on the UHVDC Transmission Lines of the present embodiment, comprise tower body 1, tower leg 2, earth wire support 3 and wire cross-arm 4 around formula anchor support, around wire jumper support 5, described upper vertical with the axis of described earth wire support 3 around the lower plane of wire jumper support 5 in described earth wire support outside layout one; By described upper around wire jumper support 5, upper around wire jumper, retreating side strain clamp more than 4 is drained to advance side strain clamp from described wire cross-arm certainly.
In the present embodiment, the spacing of described upper ground wire hanging point on wire jumper hanging point and the described earth wire support 3 of wire jumper support 5 is 3m-4m.
In the present embodiment, described upper on wire jumper support 5 average mark be furnished with three place's wire jumper hanging points.
In the present embodiment, described upper around soft the jumping onto around mode of wire jumper support 5 employing suspension 3I string.
In the present embodiment, described is above 5m-7m around the one-sided length of wire jumper support 5.
In the present embodiment, the height of exhaling of described anchor support is 39m-48m.
For different UHV transmission line engineerings, also difference to some extent of gap that transmission pressure forms circle size, need adjust according to concrete extra-high voltage around the each several part size of tower on corresponding wire jumper.
Concrete, the utility model provides the embodiment around anchor support on one ± 800kV UHVDC Transmission Lines wire jumper, with reference to Fig. 2, on described wire jumper, be horizontal dry font steel tower around anchor support, comprising: earth wire support, jumper wire rack, wire cross-arm, tower body and tower leg.Wherein jumper wire rack by conventional dry font anchor support horizontal arrangement at conducting wire hanging point place, be arranged in innovatively earth wire support outside and arrange that an one pole is around jumping jumper wire rack, on one pole, be drained to large size side strain clamp around wire jumper from small size side strain clamp, reach on wire jumper around layout.Iron tower structure is for being all around arranged symmetrically with, and the height of exhaling of described anchor support 1 is 39m~48m.
Earth wire support, is erected at tower body top.On earth wire support, plane is substantially vertical with tower body axis.The vertical height of earth wire support and conducting wire hanging point is 22.5m; Earth wire support cantilever span is 15.9m; Ground wire hanging point and wire jumper hanging point spacing are 3.1m.
Upper around jumper wire rack, be arranged in earth wire support outside, wire jumper support lower plane is substantially vertical with earth wire support axis.By to two I type strings soft jump onto around, 3I type string soft jump onto around and two I type string rigid jumper on around etc. several schemes preferably, adopt and hang soft the jumping onto around mode of 3I string; Above get 6m around the one-sided length of wire jumper support.
Wire cross-arm, is erected at tower body both sides, and cross-arm lower plane is vertical with axis.The space that the tower body of every side cross-arm and cross-arm below surrounds meets the requirement of electric specialty gap.Conducting wire hanging point is 3 to hang together a little, and therefore full tower one has 12 place's conducting wire hanging points, and every place hanging point is bolted hanging wire angle steel, and the one side that also comprises being connected with hanging wire angle steel is close to the structure angle steel on the main material of cross-arm.
Tower leg, tower body extends tower leg top, and tower body axis is vertical with tower body horizontal plane.
In conjunction with concrete engineering actual conditions, the present embodiment ± 800kV UHVDC Transmission Lines wire jumper on around the correlated performance parameter of anchor support in table 1.
Table 1
The design condition of table 1 correspondence is: wind speed 27m/s, icing 15mm, unequal leg design.Designed load return period is 100 years, and coefficient for importance of structure gets 1.1, and wire adopts 6 × JL/G2A-900/75, and ground wire adopts LBGJ-150-20AC.Steel tower is angle steel tower, adopts Q420, Q345 and tri-kinds of materials of Q235.
On extra-high voltage direct-current wire jumper described in the utility model embodiment, around tower, tower head size can meet electric clearance requirement; By rational structure design, make it have enough mechanical strengths, bear because the wire trade mark increases and the raise increase of the various loads that the tower body change in size that causes brings of voltage, make by preferred arrangement that structure is attractive in appearance, reasonable stress, reach the object that reduces tower weight.
On the extra-high voltage direct-current wire jumper of the utility model embodiment around anchor support be by the basis of conventional dry font anchor support on development, there is the typical advantages of conventional dry word tower, simple in structure, stressed clear, busy line corridor is also narrow, and construction and installation and maintenance convenience, accumulate abundant operation and design experiences; Have advantages of on wire jumper around form simultaneously.
Taking small stream Luo Du left bank-Jinhua, Zhejiang ± 800 kilovolt HVDC transmission line engineering as example, in the time of the control of anchor support wire jumper distance to the ground, 0~20 degree corner can adopt down and draw single V string mouse flexible jumper and upper around three I string flexible jumper two schemes.
Change into wire jumper around cloth postpone from the stressed load angle of anchor support, upper around wire jumper anchor support with under high conventional type, draw compared with anchor support with exhaling, wire is vertical, level, longitudinal load do not change, only earth wire support has had more the upper load around wire jumper and 3 string jumper strings, and anchor support load is almost had no significant effect.
Calculate according to full stress calculation Procedure modeling, to drawing the tower material index situation contrast around two kinds of patterns of anchor support JSR27151 on anchor support JC27151 and wire jumper described in the utility model under the conventional jumpers under same design, as shown in table 2.
Table 2
As can be seen from Table 2, on wire jumper around anchor support JSR27151 with under high conventional type, draw compared with anchor support with exhaling, tower material on average increases 3.67t.From single base anchor support, on wire jumper, on average increase 3.67t steel around anchor support, but from anchor support engineering in service condition, especially at high slope alpine terrain, according to " V " type wire jumper insulator string equivalent string, long 9m considers, exhale under the wire jumper that is equivalent to exhale height to be 48m around anchor support JSR27151-39 on the wire jumper of the high 39m of being and draw anchor support JC27151-48, tower material is saved 10.36t.To sum up analogize analysis, for identical service condition and topographic features, adopt on wire jumper and save tower material 8%~10% around anchor support, cancelled hard jumping simultaneously on wire jumper around layout, as considered the price differential of wire jumper insulator string, economy will be more remarkable.
Can find out, on anchor support wire jumper, both meet environmental requirement around arranging, also save circuit cost, avoid the problem of the rising tower height of opening the earthwork or large cost, this has direct effect to environmental protection and reduction construction costs.
In sum, on the UHVDC Transmission Lines wire jumper of the utility model embodiment around formula anchor support, by a utmost point of high slope side from the above drainage of limit wire cross-arm, make high slope upside one utmost point wire jumper not become the governing factor of anchor support tower height, thereby avoid producing not evolution problem or because high slope trees distance being chopped at a tree not because of wire jumper distance to the ground.And, for the anchor support being positioned at compared with steep side slope, limit phase wire jumper adopts upper around arrangement, reduce on the one hand the impact on environment, effectively lower on the other hand shaft tower and exhale height, reduce tower material of iron tower consumption, finally reach and save the circuit comprehensive method of investment, convenient construction, the object of raising circuit operational reliability.
In the utility model, applied specific embodiment principle of the present utility model and embodiment are set forth, the explanation of above embodiment is just for helping to understand method of the present utility model and core concept thereof; , for one of ordinary skill in the art, according to thought of the present utility model, all will change in specific embodiments and applications, in sum, this description should not be construed as restriction of the present utility model meanwhile.

Claims (6)

  1. On a UHVDC Transmission Lines around formula anchor support, comprise tower body, tower leg, earth wire support and wire cross-arm, it is characterized in that, around wire jumper support, described upper vertical around the lower plane of wire jumper support and the axis of described earth wire support in described earth wire support outside layout one;
    By described upper around wire jumper support, upper around wire jumper, retreating side strain clamp is drained to advance side strain clamp above from described wire cross-arm certainly.
  2. On UHVDC Transmission Lines according to claim 1 around formula anchor support, it is characterized in that, the spacing of the ground wire hanging point on wire jumper hanging point and the described earth wire support of described wire jumper support is 3m-4m.
  3. On UHVDC Transmission Lines according to claim 1 around formula anchor support, it is characterized in that, described upper on wire jumper support average mark be furnished with three place's wire jumper hanging points.
  4. On UHVDC Transmission Lines according to claim 1 around formula anchor support, it is characterized in that, describedly upper adopt and hang soft the jumping onto around mode of 3I string around wire jumper support.
  5. On UHVDC Transmission Lines according to claim 1 around formula anchor support, it is characterized in that, described upper be 5m-7m around the one-sided length of wire jumper support.
  6. On UHVDC Transmission Lines according to claim 1 around formula anchor support, it is characterized in that, described anchor support to exhale high be 39m-48m.
CN201320787259.6U 2013-12-03 2013-12-03 On a kind of UHVDC Transmission Lines around formula anchor support Expired - Lifetime CN203924858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320787259.6U CN203924858U (en) 2013-12-03 2013-12-03 On a kind of UHVDC Transmission Lines around formula anchor support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320787259.6U CN203924858U (en) 2013-12-03 2013-12-03 On a kind of UHVDC Transmission Lines around formula anchor support

Publications (1)

Publication Number Publication Date
CN203924858U true CN203924858U (en) 2014-11-05

Family

ID=51820708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320787259.6U Expired - Lifetime CN203924858U (en) 2013-12-03 2013-12-03 On a kind of UHVDC Transmission Lines around formula anchor support

Country Status (1)

Country Link
CN (1) CN203924858U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835567A (en) * 2013-12-03 2014-06-04 国家电网公司 Upward-winding tension-resistant tower on extra-high-voltage direct-current transmission line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835567A (en) * 2013-12-03 2014-06-04 国家电网公司 Upward-winding tension-resistant tower on extra-high-voltage direct-current transmission line

Similar Documents

Publication Publication Date Title
CN203924859U (en) Novel cat-head transmission tower shelf structure
CN202266069U (en) Extra high voltage direct-current single loop strain tower in the shape of Chinese character 'Gan'
CN201486201U (en) Ultra-high voltage tension tower
CN202645101U (en) Four-circuit steel tube tower enabling double-circuit 1000 kV and double-circuit 500 kV alternating current power transmission to be conducted on same tower
CN201953131U (en) 220kV one-tower double-loop straight corner penetrating tower
CN203924858U (en) On a kind of UHVDC Transmission Lines around formula anchor support
CN103835567A (en) Upward-winding tension-resistant tower on extra-high-voltage direct-current transmission line
CN201447897U (en) Long-offset jumper wire corner tower
CN201635469U (en) 500 kV compact type transmission line straight small angle tower
CN203412347U (en) Jumper wire over-wind type Z-shaped side slope power transmission line strain tower
CN204691375U (en) The narrow base steel tube tower of a kind of 220kV tetra-return cable terminal
CN204691370U (en) The novel butterfly in 110kV double loop, high altitude localities bores more tower
CN207260730U (en) A kind of double loop cable termination tower
CN201406865Y (en) 66KV overhead transmission line double-circuit horizontal crossing tower
CN207847235U (en) No ground pole DC transmission line line pole tower
CN203452435U (en) Dual-loop spanning-and-ducking steel pipe rod
CN202672827U (en) Two-circuit vortex inducted vibration (VIV) string drum type straight-line tower
CN203097398U (en) 220kV/110kV four-circuit narrow-base steel tube tower
CN104763208A (en) 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN202012226U (en) Narrow base tower
CN211369746U (en) Winding type double-loop drilling and crossing tower on 500kV jumper wire
CN202672824U (en) Tangent tower for +/- 400 kV direct current transmission line
CN203230214U (en) Double-loop unrelated double-column transposition tower
CN101929264A (en) 1000kV alternating current ultra-high voltage single-column overhung angle tower
CN201953135U (en) Same tower dual loop linear tower for slope-shaped section

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 100031 Beijing, Xicheng District, west of No. 86 national Power Grid Corp,

Patentee after: State Grid Corporation of China

Patentee after: CHINA POWER ENGINEERING CONSULTING (Group) Corp.

Patentee after: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Patentee after: CENTRAL SOUTHERN CHINA ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING Group Corp.

Patentee after: NORTHEAST ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

Patentee after: EAST CHINA ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

Patentee after: NORTHWEST ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

Patentee after: Southwest Electric Power Design Institute CO., Ltd. of China Power Engineering Consulting Group

Patentee after: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: CHINA POWER ENGINEERING CONSULTING Group Corp.

Patentee before: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Patentee before: CENTRAL SOUTHERN CHINA ELECTRIC POWER DESIGN INSTITUTE, CHINA POWER ENGINEERING CONSULTING Group Corp.

Patentee before: NORTHEAST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING Group

Patentee before: CHINA POWER ENGINEERING CONSULTING Group CORPORATION EAST CHINA ELECTRIC POWER DESIGN INSTITUTE

Patentee before: NORTHWEST ELECTRIC POWER DESIGN INST. OF CHINA POWER ENGINEERING CONSULTING Group

Patentee before: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING Group Corp.

Patentee before: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

CX01 Expiry of patent term

Granted publication date: 20141105

CX01 Expiry of patent term