CN203924848U - For overhead contact line, integral post is installed - Google Patents

For overhead contact line, integral post is installed Download PDF

Info

Publication number
CN203924848U
CN203924848U CN201420330739.4U CN201420330739U CN203924848U CN 203924848 U CN203924848 U CN 203924848U CN 201420330739 U CN201420330739 U CN 201420330739U CN 203924848 U CN203924848 U CN 203924848U
Authority
CN
China
Prior art keywords
mobile jib
tapered strut
strut mobile
base plate
bend pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420330739.4U
Other languages
Chinese (zh)
Inventor
范荣鑫
李朝阳
潘英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201420330739.4U priority Critical patent/CN203924848U/en
Application granted granted Critical
Publication of CN203924848U publication Critical patent/CN203924848U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

For overhead contact line, integral post is installed, to simplify the mounting structure of contact network cantilever, additive wire, and improves the reliability and stability of its installation.It comprises: base plate, is laid with installing hole on plate face; Tapered strut mobile jib, lower end is fixedly connected with base plate; Bend pipe, front end stretches out to tapered strut mobile jib axis one side, and rear end is fixedly connected with tapered strut mobile jib upper end; Additive wire link plate, is fixedly welded on the front portion of bend pipe.

Description

For overhead contact line, integral post is installed
Technical field
The utility model relates to subway or electric railway, particularly a kind of integral post that hangs installation for subway, electrification railway contact net bracket, additive wire.
Background technology
Along with the develop rapidly of China's electric railway, the application such as contact net H steel column, round steel post, angle steel laced of battened compression member is more and more extensive.
At present, on electrification railway contact net roadbed, box girder bridge, mostly adopt H steel column, T beam bridge adopts angle steel laced of battened compression member mostly, all there is the large and larger deficiency of contact net basic floor space of steel column steel using amount, and mostly adopt anchor ear or angle steel that additive wire is takeed on to frame to be fixed on pillar, such structural shape certainly will cause loaded down with trivial details installation and larger investment.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of for overhead contact line installation integral post, to simplify the mounting structure of contact network cantilever, additive wire, and improves the reliability and stability of its installation.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
Of the present utility model for overhead contact line installation integral post, it is characterized in that it comprises: base plate, is laid with installing hole on plate face; Tapered strut mobile jib, lower end is fixedly connected with base plate; Bend pipe, front end stretches out to tapered strut mobile jib axis one side, and rear end is fixedly connected with tapered strut mobile jib upper end; Additive wire link plate, is fixedly welded on the front portion of bend pipe.
The beneficial effects of the utility model are, rational in infrastructure, have improved contact network cantilever and additive wire and have hung the reliability and stability of installing, and easy construction, can effectively reduce costs, and can be widely used in during subway, electric railway build.
Accompanying drawing explanation
This manual comprises following four width accompanying drawings:
Fig. 1 is that the utility model is installed the front view of integral post for overhead contact line;
Fig. 2 is that the utility model is installed the sectional view of integral post bend pipe and tapered strut mobile jib connecting portion for overhead contact line;
Fig. 3 is that the utility model is installed the sectional view of integral post base plate and tapered strut mobile jib connecting portion for overhead contact line;
Fig. 4 is that the utility model is installed the plan view of integral post base plate for overhead contact line.
The title of member shown in figure and corresponding mark: tapered strut mobile jib 10, bend pipe 20, adpting flange 21, connect cover 22, additive wire link plate 23, hush panel 24, base plate 30, stiffener 31, installing hole 32.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further illustrated.
With reference to Fig. 1, the utility model is installed integral post for overhead contact line and is comprised: base plate 30, is laid with installing hole 32 on plate face; Tapered strut mobile jib 10, lower end is fixedly connected with base plate 30; Bend pipe 20, front end stretches out to tapered strut mobile jib 10 axis one sides, and rear end is fixedly connected with tapered strut mobile jib 10 upper ends; Additive wire link plate 23, is fixedly welded on the front portion of bend pipe 20.By installing hole 32 and bolt assembly, realize and being connected of contact net basic.
With at present general H steel column, T beam bridge adopts angle steel laced of battened compression member etc. to compare mostly, the utility model saves to be takeed on frame by additive wire and is fixed on anchor ear or angle steel on pillar, simplify the mounting structure of contact network cantilever, additive wire, improve the reliability and stability of installing, and be conducive to save engineering cost.
With reference to Fig. 2, for strengthening structural stability, the rear end of described bend pipe 20 is welded with adpting flange 21, this adpting flange 21 is welded to connect with tapered strut mobile jib 10 in tapered strut mobile jib 10 front aperture, and be provided with its front port, rear port respectively with the 10 front ports welding of bend pipe 20 tube walls, tapered strut mobile jib be connected cover 22.
With reference to Fig. 1, the front port of described bend pipe 20 is welded with hush panel 24.
With reference to Fig. 3 and Fig. 4, strengthen structural stability, on described base plate 30, along tapered strut mobile jib 10 hoop intervals, stiffener 31 is set, each stiffener 31 and base plate 30 plate faces, the 10 outer wall welding of tapered strut mobile jib.The lower port of tapered strut mobile jib 10 and base plate 30 welding.
The above the utility model that just explains through diagrams is installed some principles of integral post for overhead contact line, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (4)

1. for overhead contact line, integral post is installed, it is characterized in that it comprises: base plate (30), is laid with installing hole (32) on plate face; Tapered strut mobile jib (10), lower end is fixedly connected with base plate (30); Bend pipe (20), front end stretches out to tapered strut mobile jib (10) axis one side, and rear end is fixedly connected with tapered strut mobile jib (10) upper end; Additive wire link plate (23), is fixedly welded on the front portion of bend pipe (20).
2. as claimed in claim 1 for overhead contact line installation integral post, it is characterized in that: the rear end of described bend pipe (20) is welded with adpting flange (21), this adpting flange (21) is welded to connect with tapered strut mobile jib (10) in tapered strut mobile jib (10) front aperture, and be provided with its front port, rear port respectively with bend pipe (20) tube wall, the welding of tapered strut mobile jib (10) front port be connected cover (22).
3. as claimed in claim 2 for overhead contact line installation integral post, it is characterized in that: the front port of described bend pipe (20) is welded with hush panel (24).
4. as claimed in claim 1 for overhead contact line installation integral post, it is characterized in that: described base plate (30) is upper arranges stiffener (31) along tapered strut mobile jib (10) hoop interval each stiffener (31) and base plate (30) plate face, the welding of tapered strut mobile jib (10) outer wall; The lower port of tapered strut mobile jib (10) and base plate (30) welding.
CN201420330739.4U 2014-06-20 2014-06-20 For overhead contact line, integral post is installed Expired - Fee Related CN203924848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420330739.4U CN203924848U (en) 2014-06-20 2014-06-20 For overhead contact line, integral post is installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420330739.4U CN203924848U (en) 2014-06-20 2014-06-20 For overhead contact line, integral post is installed

Publications (1)

Publication Number Publication Date
CN203924848U true CN203924848U (en) 2014-11-05

Family

ID=51820698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420330739.4U Expired - Fee Related CN203924848U (en) 2014-06-20 2014-06-20 For overhead contact line, integral post is installed

Country Status (1)

Country Link
CN (1) CN203924848U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110626214A (en) * 2018-06-22 2019-12-31 中铁第五勘察设计院集团有限公司 High-speed railway traction power supply additional line suspension system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110626214A (en) * 2018-06-22 2019-12-31 中铁第五勘察设计院集团有限公司 High-speed railway traction power supply additional line suspension system
CN110626214B (en) * 2018-06-22 2024-09-13 中铁第五勘察设计院集团有限公司 High-speed railway traction power supply additional line suspension system

Similar Documents

Publication Publication Date Title
CN201850795U (en) Hinge center support frame steel structure
CN204898706U (en) Steel pipe pile foundation communication tower structure
CN201310072Y (en) Supporting bracket of bridge construction
CN203199913U (en) Assembling and disassembling type hoisting truss
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN207633226U (en) Easy-to-mount high stability supporting bridge fixed frame
CN202359665U (en) Stay-cable steel-beam and steel-pipe column mixed node
CN214575056U (en) Pull rod supporting ceiling conversion layer structure
CN203924848U (en) For overhead contact line, integral post is installed
CN204387488U (en) A kind of combined composite material cable support
CN203334679U (en) Steel reinforced concrete beam suspending and supporting structure
CN203517003U (en) Cable hanging rack
CN204960324U (en) Suspension type floor formwork support device
CN103628727A (en) Electric power supporting frame
CN204139323U (en) A kind of punching block shell mounting structures
CN103104035A (en) Bolt connection node of rectangular tubular column splicing externally-sleeved connection piece
CN203081019U (en) Universal installation base of wire pole or lamp pole
CN202945540U (en) Aluminum alloy structural member for pedestrian overcrossing
CN204681017U (en) A kind of joist steel upright base
CN203377560U (en) A cable branch box support
CN203924851U (en) The small-sized steel column of installing for overhead contact line
CN207110068U (en) A kind of connecting node of i-shape steel beam and steel box column
CN205205644U (en) Stride river bridge cable steel frame construction
CN205706236U (en) Monoblock type shoulder frame in tunnel
CN203684777U (en) 220 kV substation framework

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105