CN203924751U - Combined type job site escape way - Google Patents
Combined type job site escape way Download PDFInfo
- Publication number
- CN203924751U CN203924751U CN201420317073.9U CN201420317073U CN203924751U CN 203924751 U CN203924751 U CN 203924751U CN 201420317073 U CN201420317073 U CN 201420317073U CN 203924751 U CN203924751 U CN 203924751U
- Authority
- CN
- China
- Prior art keywords
- chassis
- fixed
- under
- shielded frame
- support plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to a kind of combined type job site escape way, comprise by four i iron and be bolted the rectangular under(-)chassis forming, vertically be fixed on the vertical rod of four corners of under(-)chassis and be bolted the rectangular shielded frame forming by four i iron by bolt, the Outside Dimensions of described shielded frame is consistent with the Outside Dimensions of under(-)chassis, the top of described four vertical rods is secured by bolts on four corners of shielded frame bottom, on described under(-)chassis, cover and be fixed with checkered steel plate, on described shielded frame, cover and be fixed with steel plate.Shielded frame can effectively stop falling from high altitude thing by steel plate, prevents that falling from high altitude thing from injuring constructor by a crashing object, improved safety.Owing to being all bolted between under(-)chassis and shielded frame and vertical rod, therefore installing/dismounting simple and fast, has improved efficiency of construction.Constructor stands on checkered steel plate and can walk, safe and reliable.
Description
Technical field
The utility model relates to architectural furniture technical field, is specifically related to a kind of escape way.
Background technology
At present, the escape way at the construction field (site), is substantially all to utilize the attaching materials such as scaffold to set up.Often because specification, human factor etc. are inconsistent, and because the long fastener of placing scaffold etc. can become flexible.Thereby cause potential safety hazard to a certain degree.And set up and need a large amount of time and manpower, not only can cause personnel's waste and also the stage of setting up due to the time length can cause the protection blank of certain hour.
Summary of the invention
The utility model is in order to overcome the deficiency of above technology, the combined type job site escape way that provides a kind of rapid-assembling to build.
The utility model overcomes the technical scheme that its technical problem adopts:
This combined type job site escape way, comprise by four i iron and be bolted the rectangular under(-)chassis that forms, be vertically fixed on the vertical rod of four corners of under(-)chassis and be bolted the rectangular shielded frame forming by four i iron by bolt, the Outside Dimensions of described shielded frame is consistent with the Outside Dimensions of under(-)chassis, the top of described four vertical rods is secured by bolts on four corners of shielded frame bottom, on described under(-)chassis, cover and be fixed with checkered steel plate, on described shielded frame, cover and be fixed with steel plate.
In order further to improve safety, also comprise by four channel-section steels and be bolted the rectangular buffering framework forming, the Outside Dimensions of described buffering framework is consistent with the Outside Dimensions of under(-)chassis, the bottom of described buffering framework is provided with some support plate II, described shielded frame upper end is provided with some support plate I, some vertical beam two ends that are vertical shape are individually fixed in corresponding support plate I and support plate II, some skewed cant beam two ends are individually fixed in adjacent support plate I and support plate II, the upper end of described buffering framework is tied up and is fixed with bamboo frame plate by iron wire.
In order to improve intensity, before and after above-mentioned under(-)chassis and shielded frame, between two i iron that are parallel to each other, be fixed with respectively some tie-beam I and tie-beam II, between every two vertical rods in two ends, described left and right, level is fixed with some tie-beam IV.
In order to improve intensity, before and after above-mentioned buffering framework, between two channel-section steels that are parallel to each other, be fixed with some tie-beam III.
The beneficial effects of the utility model are: shielded frame can effectively stop falling from high altitude thing by steel plate, prevent that falling from high altitude thing from injuring constructor by a crashing object, improved safety.Owing to being all bolted between under(-)chassis and shielded frame and vertical rod, therefore installing/dismounting simple and fast, has improved efficiency of construction.Constructor stands on checkered steel plate and can walk, safe and reliable.
Brief description of the drawings
Fig. 1 is main TV structure schematic diagram of the present utility model;
Fig. 2 is plan structure schematic diagram of the present utility model;
Fig. 3 is side-looking structural representation of the present utility model;
In figure, 1. under(-)chassis 2. checkered steel plate 3. tie-beam I 4. vertical rod 5. shielded frame 6. steel plate 7. tie-beam II 8. cushion framework 9. support plate I 10. support plate II 11. vertical beam 12. cant beam 13. tie-beam III 14. tie-beam IV.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, accompanying drawing 2, accompanying drawing 3, the utility model is described further.
This combined type job site escape way, comprise by four i iron and be bolted the rectangular under(-)chassis 1 that forms, be vertically fixed on the vertical rod 4 of 1 four corners of under(-)chassis and be bolted the rectangular shielded frame 5 forming by four i iron by bolt, the Outside Dimensions of shielded frame 5 is consistent with the Outside Dimensions of under(-)chassis 1, the top of four vertical rods 4 is secured by bolts on four corners of shielded frame 5 bottoms, on under(-)chassis 1, cover and be fixed with checkered steel plate 2, on shielded frame 5, cover and be fixed with steel plate 6.Shielded frame 5 can effectively stop falling from high altitude thing by steel plate 6, prevents that falling from high altitude thing from injuring constructor by a crashing object, improved safety.Owing to being all bolted between under(-)chassis 1 and shielded frame 5 and vertical rod 4, therefore installing/dismounting simple and fast, has improved efficiency of construction.Constructor stands on checkered steel plate 2 and can walk, safe and reliable.
As shown in Figure 1, can also comprise by four channel-section steels and be bolted the rectangular buffering framework 8 forming, the Outside Dimensions of buffering framework 8 is consistent with the Outside Dimensions of under(-)chassis 1, the bottom of buffering framework 8 is provided with some support plate II 10, shielded frame 5 upper ends are provided with some support plate I 9, some vertical beam 11 two ends that are vertical shape are individually fixed in corresponding support plate I 9 and support plate II 10, some skewed cant beam 12 two ends are individually fixed in adjacent support plate I 9 and support plate II 10, the upper end of buffering framework 8 is tied up and is fixed with bamboo frame plate by iron wire.Can play the effect of better buffering falling from high altitude thing by the bamboo frame plate on buffering framework 8, utilize the toughness of bamboo to absorb energy, form the effect of 2 protections together with shielded frame 5, further improve security performance.
As shown in Figure 2, between the i iron that under(-)chassis 1 and shielded frame 5 front and back two are parallel to each other, be fixed with respectively some tie-beam I 3 and tie-beam II 7, between every two vertical rods 4 in two ends, left and right, level is fixed with some tie-beam IV 14.As shown in Figure 3, between the channel-section steel that above-mentioned buffering framework 8 front and back two are parallel to each other, be fixed with some tie-beam III 13.The rigidity that has improved under(-)chassis 1, shielded frame 5 and buffering framework 8 by tie-beam I 3, tie-beam II 7 and tie-beam III 13 are set, prevents from when it is stressed deforming, and has improved the reliability using.
Claims (4)
1. a combined type job site escape way, it is characterized in that: comprise by four i iron and be bolted the rectangular under(-)chassis (1) forming, vertically be fixed on the vertical rod (4) of (1) four corner of under(-)chassis and be bolted the rectangular shielded frame (5) forming by four i iron by bolt, the Outside Dimensions of described shielded frame (5) is consistent with the Outside Dimensions of under(-)chassis (1), the top of described four vertical rods (4) is secured by bolts on four corners of shielded frame (5) bottom, the upper covering of described under(-)chassis (1) is fixed with checkered steel plate (2), the upper covering of described shielded frame (5) is fixed with steel plate (6).
2. combined type according to claim 1 job site escape way, it is characterized in that: also comprise by four channel-section steels and be bolted the rectangular buffering framework (8) forming, the Outside Dimensions of described buffering framework (8) is consistent with the Outside Dimensions of under(-)chassis (1), the bottom of described buffering framework (8) is provided with some support plate II (10), described shielded frame (5) upper end is provided with some support plate I (9), some vertical beam (11) two ends that are vertical shape are individually fixed in corresponding support plate I (9) and support plate II (10), some skewed cant beams (12) two ends are individually fixed in adjacent support plate I (9) and support plate II (10), the upper end of described buffering framework (8) is tied up and is fixed with bamboo frame plate by iron wire.
3. combined type according to claim 1 and 2 job site escape way, it is characterized in that: before and after described under(-)chassis (1) and shielded frame (5), between two i iron that are parallel to each other, be fixed with respectively some tie-beam I (3) and tie-beam II (7), between every two vertical rods in two ends, described left and right (4), level is fixed with some tie-beam IV (14).
4. combined type according to claim 2 job site escape way, is characterized in that: before and after described buffering framework (8), between two channel-section steels that are parallel to each other, be fixed with some tie-beam III (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420317073.9U CN203924751U (en) | 2014-06-16 | 2014-06-16 | Combined type job site escape way |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420317073.9U CN203924751U (en) | 2014-06-16 | 2014-06-16 | Combined type job site escape way |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203924751U true CN203924751U (en) | 2014-11-05 |
Family
ID=51820601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420317073.9U Active CN203924751U (en) | 2014-06-16 | 2014-06-16 | Combined type job site escape way |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203924751U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104018687A (en) * | 2014-06-16 | 2014-09-03 | 山东电力建设第一工程公司 | Combined type construction site exit passageway |
-
2014
- 2014-06-16 CN CN201420317073.9U patent/CN203924751U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104018687A (en) * | 2014-06-16 | 2014-09-03 | 山东电力建设第一工程公司 | Combined type construction site exit passageway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967166A (en) | Low-yield-point steel plate shear wall with two connected edges | |
CN203924751U (en) | Combined type job site escape way | |
CN104018687A (en) | Combined type construction site exit passageway | |
CN204152231U (en) | Socket type safety guard rail | |
CN204040556U (en) | A telescopic graduation two electronic box protection canopy | |
CN203821630U (en) | Two-sided connection type low yield point steel plate shear wall | |
CN207829505U (en) | A kind of pin-connected panel floor edge protective fence | |
CN202705909U (en) | Protective and electric shock prevention shed frame | |
CN207568333U (en) | A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component | |
CN203701878U (en) | Split-type bearing connection mechanism for vertical columns of platform screen door | |
CN106869515A (en) | The dismountable top plate supporting device of regularization | |
CN202530734U (en) | Outside-overhanging scaffold | |
CN206310196U (en) | A kind of fixation kit for car inflating pump | |
CN202324187U (en) | Large-volume square bin | |
CN205217862U (en) | Can have enough to meet need bar straightener protection frame of use | |
CN202969973U (en) | Overhanging type vertical protective shed | |
CN203742190U (en) | Standard protective frame for constructing elevator | |
CN205070892U (en) | Photovoltaic support | |
CN204645788U (en) | Novel earthquake-proof protective construction structure | |
CN205296823U (en) | Early form removal bearing leg hand frame | |
CN204139719U (en) | A kind of regularization guard rail | |
CN204252505U (en) | A kind of Simple support frame | |
CN204826282U (en) | Compound isolation bearing | |
CN203896262U (en) | Ground screen type photovoltaic bracket fixed by cable-stayed lock | |
CN202299365U (en) | Vertical main framework structure of attached elevating scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |