CN203923876U - A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile - Google Patents

A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile Download PDF

Info

Publication number
CN203923876U
CN203923876U CN201420349650.2U CN201420349650U CN203923876U CN 203923876 U CN203923876 U CN 203923876U CN 201420349650 U CN201420349650 U CN 201420349650U CN 203923876 U CN203923876 U CN 203923876U
Authority
CN
China
Prior art keywords
steel pipe
pile
concrete
bridge
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420349650.2U
Other languages
Chinese (zh)
Inventor
庄一舟
王胜智
陈斌
韩裕添
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201420349650.2U priority Critical patent/CN203923876U/en
Application granted granted Critical
Publication of CN203923876U publication Critical patent/CN203923876U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile, comprise body of a bridge girder and insert the concrete filled steel tube pile body in earth's surface, the cross section of described pile body is flat structure, described pile body comprises interior steel pipe and is set in the outer steel pipe of its periphery, in the cavity forming between described interior steel pipe periphery wall and outer steel pipe internal perisporium, built concrete, and the weak direction of principal axis of pile body and described girder length direction perpendicular.The Integral Abutment seamless bridge of this application concrete filled steel tube flexible pile has improved concrete compressive strength and toughness, the cripling of steel pipe can be avoided or delay to concrete simultaneously, when guaranteeing vertical bearing capacity, making side direction, anti-to push away rigidity as far as possible little, reduce lateral rigidity, can absorb well the horizontal length travel of the body of a bridge, improved anti-seismic performance and the energy-dissipating property of stake, also reduced deadweight, improve fire resistance, simplified construction, there is good economic benefit.

Description

A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile
Technical field
The utility model relates to a kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile, belongs to bridge field.
Background technology
Can there is flexible grade for distortion in bridge construction, in order to eliminate distortion to structure influence, shrinkage joint is generally set in structure under the condition of variations in temperature.Steady for Vehicle Driving Cycle, generally stretching device will be set on shrinkage joint, yet stretching device easily occurs under environmental factor destroy or lost efficacy, and has affected the normal use of bridge, has improved maintenance cost.Generally believe that at present adopting the seamless bridge at cancellation shrinkage joint is best solution, and Integral Abutment Bridge is in seamless bridge, to apply maximum class bridge types.
In Integral Abutment Bridge, owing to having cancelled stretching device and bearing, girder and abutment form an integral body, and the dilatation of whole bridge superstructure is mainly born by pile foundation.In order to meet pontic dilatation, improve anti-seismic performance and energy dissipation capacity, usually use flexible pile foundation, with H Section-steel Piles pile foundation, be applied as master abroad, consideration in China due to economic problems, usually use reinforced concrete pile formula abutment Bored Pile of Bridge as a whole, but the horizontal deformation of reinforced concrete pile is starkly lower than piling bar, very easily ftracture and cause the corrosion of reinforcing bar, anti-seismic performance and energy-dissipating property are not good.
There are several deficiencies in concrete pile foundation: one, anti-to push away rigidity large for level, can not absorb well the horizontal distortion that superstructure is produced by variations in temperature and automobile brake; Two, anti-seismic performance and energy-dissipating property are poor; Three, concrete easily ftractures, thereby reinforcing bar is caused to corrosion.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile, ductility is good, economy, easy construction, anti-seismic performance and energy-dissipating property good.
The utility model adopts following scheme to realize: a kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile, comprise body of a bridge girder and insert the concrete filled steel tube pile body in earth's surface, the cross section of described pile body is flat structure, described pile body comprises interior steel pipe and is set in the outer steel pipe of its periphery, in the cavity forming between described interior steel pipe periphery wall and outer steel pipe internal perisporium, built concrete, and the weak direction of principal axis of pile body and described girder length direction perpendicular.
Further, described outer steel pipe and interior steel pipe are nose circle tee section or are elliptic cross-section.
Further, outer steel pipe and interior steel pipe are square-section or outer steel pipe is square-section, and interior steel pipe is elliptic cross-section.
Further, pile cover has been built at the top of described pile body, and described girder is set up on described pile cover and with pile cover and built and be integral.
Further, attachment strap has also been built at the two ends of described girder.
Compared with prior art, the utlity model has following beneficial effect: the Integral Abutment seamless bridge of this application double-layer pipe concrete flexible pile has improved concrete compressive strength and toughness, the cripling of steel pipe can be avoided or delay to concrete simultaneously, when guaranteeing vertical bearing capacity, making side direction, anti-to push away rigidity as far as possible little, reduced lateral rigidity, can absorb well the horizontal length travel of the body of a bridge, improve anti-seismic performance and the energy-dissipating property of stake.Thereby both advantages have been brought into play in concrete and steel pipe acting in conjunction, flat double-layer pipe concrete flexible pile not only has advantages of that general steel tube concrete pile ductility, anti-seismic performance and energy-dissipating property are good, also reduced deadweight, improved fire resistance, simplify construction, there is good economic benefit.
Accompanying drawing explanation
Fig. 1 is the utility model embodiment 1 organigram;
Fig. 2 is the utility model embodiment 1 middle girder and pile cover connection diagram;
Fig. 3 is the utility model embodiment 1 pile body organigram;
Fig. 4 is the utility model embodiment 2 pile body organigrams;
Fig. 5 is the utility model embodiment 3 pile body organigrams;
Fig. 6 is the utility model embodiment 4 pile body organigrams;
Steel pipe, 4-pile body, 5-girder, 6-Integral Abutment, 7-attachment strap, 8-pile cover in the outer steel pipe of number in the figure explanation: 1-, 2-concrete, 3-.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, below will, by specific embodiment and relevant drawings, the utility model be described in further detail.
As shown in Fig. 1 ~ 3, a kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile, comprise body of a bridge girder 5 and insert the concrete filled steel tube pile body 4 in earth's surface, the cross section of described pile body 4 is flat structure, described pile body 4 comprises interior steel pipe 3 and is set in the outer steel pipe 1 of its periphery, in the cavity forming between described interior steel pipe 3 periphery walls and outer steel pipe 1 internal perisporium, built concrete 2, interior steel pipe 3 inner chambers are fill concrete not, interior steel pipe 3 thus, outer steel pipe 1 and concrete 2 play a role jointly, improved the ductility of stake, form double-layer pipe concrete flexible pile, and weak direction of principal axis and described girder 5 length directions of pile body 4 are perpendicular, reduced lateral rigidity, can absorb well the horizontal length travel of the body of a bridge, anti-seismic performance and the energy-dissipating property of pile body have been improved, with solid steel pipe concrete ratio, can reduce deadweight, and for friction pile, can improve the anti-vertical bearing capacity of stake, significant economic benefits have been shown.
In the present embodiment, outer steel pipe 1 and interior steel pipe 3 are square-section, and they can, according to realistic bridges length, geological conditions and temperature difference size etc., adopt corresponding section form.Described interior steel pipe 3 and outer steel pipe 1 can adopt common iron, and described concrete 2 can adopt ordinary concrete or self-compacting concrete, and the concrete section centre of form between interior steel pipe 3, outer steel pipe 1 and outer and inner tube overlaps, and concrete 2 is equal with outer and inner tube end face.
In the present embodiment, pile cover has been built at the top of described pile body, and described girder is set up on described pile cover and with pile cover and built and be integral, the effect of common bearing load.
In the present embodiment, the two ends of described girder have also been built attachment strap and have been carried out banketing after platform, form Integral Abutment Bridge.
Construction method of the present utility model: the steel pipe that unit in charge of construction can select different-diameter, stake long and cross section as required with steel pipe a little less than the direction of principal axis situation vertical with the body of a bridge squeeze in soil, formation cavity fetches earth between inside and outside steel pipe, then penetration concrete 2, then in stake top casting, fill with pile cover 8, girder 5 is set up on pile cover 8, finally pile cover 8 and girder 5 are built to formation integral body, and 8 composition Integral Abutment 6 bridges that banket after building attachment strap 7 and carrying out platform.
Fig. 4 illustrates the utility model embodiment 2 pile body structures, and the difference of all the other embodiment 1 is that described outer steel pipe 1 and interior steel pipe 3 are nose circle tee section.
Fig. 5 illustrates the utility model embodiment 3 pile body structures, and the difference of all the other embodiment 1 is that described outer steel pipe 1 and interior steel pipe 3 are oval tee section.
Fig. 6 illustrates the utility model embodiment 4 pile body structures, and the difference of all the other embodiment 1 is that described outer steel pipe 1 is for square-section, and interior steel pipe 3 is elliptic cross-section.
Above-listed preferred embodiment; the purpose of this utility model, technical scheme and advantage are further described; institute is understood that; the foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (5)

1. an Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile, it is characterized in that: comprise body of a bridge girder and insert the concrete filled steel tube pile body in earth's surface, the cross section of described pile body is flat structure, described pile body comprises interior steel pipe and is set in the outer steel pipe of its periphery, in the cavity forming between described interior steel pipe periphery wall and outer steel pipe internal perisporium, built concrete, and the weak direction of principal axis of pile body and described girder length direction perpendicular.
2. the Integral Abutment seamless bridge of application double-layer pipe concrete flexible pile according to claim 1, is characterized in that: described outer steel pipe and interior steel pipe are nose circle tee section or are elliptic cross-section.
3. the Integral Abutment seamless bridge of application double-layer pipe concrete flexible pile according to claim 1, is characterized in that: outer steel pipe and interior steel pipe are square-section or outer steel pipe is square-section, and interior steel pipe is elliptic cross-section.
4. the Integral Abutment seamless bridge of application double-layer pipe concrete flexible pile according to claim 1, is characterized in that: pile cover has been built at the top of described pile body, and described girder is set up on described pile cover and with pile cover and built and be integral.
5. the Integral Abutment seamless bridge of application double-layer pipe concrete flexible pile according to claim 1, is characterized in that: attachment strap has also been built at the two ends of described girder.
CN201420349650.2U 2014-06-28 2014-06-28 A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile Expired - Fee Related CN203923876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420349650.2U CN203923876U (en) 2014-06-28 2014-06-28 A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420349650.2U CN203923876U (en) 2014-06-28 2014-06-28 A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile

Publications (1)

Publication Number Publication Date
CN203923876U true CN203923876U (en) 2014-11-05

Family

ID=51819730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420349650.2U Expired - Fee Related CN203923876U (en) 2014-06-28 2014-06-28 A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile

Country Status (1)

Country Link
CN (1) CN203923876U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060522A (en) * 2014-06-28 2014-09-24 福州大学 Integrated seamless abutment bridge applying double-layer flexible concrete-filled steel tube pile
CN104562923A (en) * 2015-01-17 2015-04-29 福州大学 Semi-rigid-joint integral type abutment bridge supported by concrete pile and construction method
CN105067212A (en) * 2015-09-19 2015-11-18 福州大学 Pile head fixed end pile-soil dynamic interaction vibration table test device and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060522A (en) * 2014-06-28 2014-09-24 福州大学 Integrated seamless abutment bridge applying double-layer flexible concrete-filled steel tube pile
CN104060522B (en) * 2014-06-28 2016-03-09 福州大学 A kind of Integral Abutment seamless bridge applying double-layer pipe concrete flexible pile
CN104562923A (en) * 2015-01-17 2015-04-29 福州大学 Semi-rigid-joint integral type abutment bridge supported by concrete pile and construction method
CN104562923B (en) * 2015-01-17 2016-06-29 福州大学 A kind of construction method of the semi-rigid joint Integral Abutment Bridge of concrete-pile supporting
CN105067212A (en) * 2015-09-19 2015-11-18 福州大学 Pile head fixed end pile-soil dynamic interaction vibration table test device and construction method thereof

Similar Documents

Publication Publication Date Title
CN104060522B (en) A kind of Integral Abutment seamless bridge applying double-layer pipe concrete flexible pile
CN104264899B (en) Embedded outsourcing U-shaped steel-concrete composite beam
CN203923876U (en) A kind of Integral Abutment seamless bridge of applying double-layer pipe concrete flexible pile
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN103437346A (en) Steel pipe pile with burrs and construction method
CN208346567U (en) A kind of full-prefabricated assembled concrete shipping suspension type monorail structure
CN205604290U (en) Frame energy dissipation formula of turning up utility tunnel structure
CN203699694U (en) Bearing cable or wind-cable pre-stress anchoring device for cable crane
CN205501843U (en) Consolidate rigid framed arch bridge
CN202850048U (en) High cantilever combination retaining wall structure
CN205875200U (en) Barricade formwork support platform truck
CN217630662U (en) External and internal pressure type steel plate confined recycled concrete shear wall with frame
CN207211139U (en) A kind of prestressed concrete pipe pile
CN203394092U (en) Concrete hollow block masonry structure reinforced by adopting internal prestressing force
CN204435209U (en) A kind of semi-rigid joint Integral Abutment Bridge of concrete pile supporting
CN204000856U (en) The anti-side changeable ridigity pile of inner support grouting formula level base
CN105200984B (en) A kind of novel sea engineering pile foundation reducing pile body displacement and preparation method thereof
CN211645946U (en) Structure suitable for large-span bridge abutment rigid frame bridge
CN204000562U (en) The compound rigid frame bridge of a kind of vertical prestressing steel-concrete
CN204401829U (en) RPC compound shear wall is filled out in a kind of encased steel plate
CN113638361A (en) Connection structure of port and pier PHC tubular pile and superstructure
CN207314181U (en) A kind of sound barrier applied to existing railway line
CN205804278U (en) A kind of assembled long piled wharf superstructure system
CN204626231U (en) A kind of concrete filled steel tube box bridge for the distortion of the Chinese People's Anti-Japanese Military and Political College of high roadbed district
CN203334277U (en) Pre-stressed concrete-filled steel pipe end bearing pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105