CN203923815U - Broad gage prestressed reinforced concrete tie - Google Patents
Broad gage prestressed reinforced concrete tie Download PDFInfo
- Publication number
- CN203923815U CN203923815U CN201420213490.9U CN201420213490U CN203923815U CN 203923815 U CN203923815 U CN 203923815U CN 201420213490 U CN201420213490 U CN 201420213490U CN 203923815 U CN203923815 U CN 203923815U
- Authority
- CN
- China
- Prior art keywords
- sleeper
- reinforced concrete
- rail support
- prestressed reinforced
- concrete tie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 20
- 241001669679 Eleotris Species 0.000 claims abstract description 42
- 230000002787 reinforcement Effects 0.000 claims description 14
- 239000004567 concrete Substances 0.000 claims description 6
- 210000003141 lower extremity Anatomy 0.000 claims description 5
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 230000009972 noncorrosive effect Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Abstract
A kind of broad gage prestressed reinforced concrete tie, to meet gauge 1676mm, the needs of the traffic conditions such as heavy duty, heavy type or the inferior heavy railway of the heavy 25t of axle.It comprises the sleeper (10) with two rail support grooves (11), the interior interval of each rail support groove (11) arranges two railway spike installing holes (12), described railway spike installing hole (12) is by straight-through sleeper (10) bottom surface, rail support groove (11) surface, railway spike installing hole (12) top is formed by the mesopore that is embedded in advance the threaded sleeve (13) in sleeper (10), and threaded sleeve (13) periphery is embedded with spiral wire (15).
Description
Technical field
The utility model relates to railroad sleeper, particularly a kind of for gauge 1676mm, the prestressed reinforced concrete tie of the traffic conditions such as heavy duty, heavy type or the inferior heavy railway of the heavy 25t of axle.
Background technology
The sleeper that various countries extensively adopt mainly can be divided into three kinds of a meter gauge, standard gauge and broad gages by gauge, can be divided into the types such as concrete crosstie, sleeper, steel sleeper and synthetic resin sleeper by material.Wherein, concrete sleeper has long service life, and stability is high, and cost is relatively low, and the feature such as the little and damage ratio of maintenance work amount and scrappage are low, is therefore worldwide widely adopted.
At present, use in the world the country of broad gage sleeper to mainly contain the states such as Russia, Mongolia, Finland, the domestic railway engineering that does not still adopt broad gage sleeper of China.Existing 1676mm broad gage prestressed reinforced concrete tie structurally comprises two rail support grooves that are arranged at sleeper upper surface, pre-buried two threaded sleeves in each rail support groove, threaded sleeve mesopore is railway spike installing hole, lays prestressed reinforcement in pillow along vertical and horizontal interval, cross section.Have the deficiency of following several aspects, railway spike installing hole is blind hole, and easily ponding causes railway spike to get rusty; Easily fall into foreign material in threaded sleeve, remove very trouble; The pillow end is smooth flat, and sleeper resistance is little, and track stability is poor, is unfavorable for laying gapless track; The eccentric throw of pillow middle section prestressed reinforcement is generally below 10mm, and hogging moment resistivity is lower.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of broad gage prestressed reinforced concrete tie, to meet gauge 1676mm, and the needs of the traffic conditions such as heavy duty, heavy type or the inferior heavy railway of the heavy 25t of axle.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
Broad gage prestressed reinforced concrete tie of the present utility model, comprise the sleeper with two rail support grooves, in each rail support groove, interval arranges two railway spike installing holes, it is characterized in that: described railway spike installing hole is by straight-through sleeper bottom surface, rail support groove surface, railway spike installing hole top is formed by the mesopore that is embedded in advance the threaded sleeve in sleeper, and threaded sleeve periphery is embedded with spiral wire.
The beneficial effects of the utility model are, the straight-through sleeper of railway spike installing hole bottom surface, be convenient to rain drainage and ensure that inside pipe casing is without ponding, ensure the railway spike non-corrosive of fastener, reasonable Arrangement prestressed reinforcement and position of form center, improve sleeper pillow middle section bending bearing capacity, can meet well gauge 1676mm, the needs of the traffic conditions such as heavy duty, heavy type or the inferior heavy railway of the heavy 25t of axle.Sleeper bottom surface along its length interval arranges embossed channel, and the ability of circuit resistance is provided to increase sleeper, and stablizing of track, is conducive to lay gapless track.
Brief description of the drawings
This manual comprises following seven width accompanying drawings:
Fig. 1 is the top view of the utility model broad gage prestressed reinforced concrete tie;
Fig. 2 is the front view of the utility model broad gage prestressed reinforced concrete tie;
Fig. 3 is the cross-sectional configuration schematic diagram of the utility model broad gage prestressed reinforced concrete tie;
Fig. 4 is the cross-sectional configuration schematic diagram of the utility model broad gage prestressed reinforced concrete tie;
Fig. 5 is the upward view of the utility model broad gage prestressed reinforced concrete tie;
Fig. 6 is the top view of the utility model broad gage prestressed reinforced concrete tie;
Fig. 7 is the front view of the utility model broad gage prestressed reinforced concrete tie.
Zero member shown in figure, toponym and corresponding mark: sleeper 10, rail support groove 11, railway spike installing hole 12, threaded sleeve 13, embossed channel 14, spiral wire 15, prestressed reinforcement 21, stirrup 22, shear reinforcement 23.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
See figures.1.and.2, broad gage prestressed reinforced concrete tie, comprises the sleeper 10 with two rail support grooves 11, and the interior interval of each rail support groove 11 arranges two railway spike installing holes 12.With reference to Fig. 1 and Fig. 3, described railway spike installing hole 12, by rail support groove 11 straight-through sleeper 10 bottom surfaces, surface, is convenient to rain drainage and is ensured that inside pipe casing, without ponding, ensures the railway spike non-corrosive of fastener.Railway spike installing hole 12 tops are formed by the mesopore that is embedded in advance the threaded sleeve 13 in sleeper 10, are convenient to fastener system and change.Be embedded with spiral wire 15 in threaded sleeve 13 peripheries, strengthened the supporting capacity at this place, ensured the pulling test strength at railway spike installing hole 12 places.
With reference to Fig. 3 and Fig. 4, the design outline size of sleeper 10 is as follows:
Rail support groove cross-sectional shape size: length × bottom width × height: 2800mm × 290mm × 220mm;
Pillow middle section appearance and size: length × bottom width × height: 2800mm × 290mm × 195mm.
Described sleeper 10 is formed by C60 grade filling concrete, lays 10 prestressed reinforcements 21 in it along vertical and horizontal interval, cross section, and prestressed reinforcement 21 adopts Φ 7mm1750Mpa underrelaxation high-strength prestress indented wire conventionally.According to the large feature of moment of flexure in broad gage sleeper pillow, in prestressed reinforcement configuration, suitably improve the distance of the prestressed reinforcement centre of form to sleeper lower limb position according to calculating, strengthen the ability of sleeper pillow middle section opposing hogging moment, the eccentric throw of its pillow middle section prestressed reinforcement is 14.3mm, pillow middle section presstressed reinforcing steel point of resultant force is 107mm to cross section lower limb distance, and the pillow middle section centre of form to cross section lower limb distance is 92.7mm.
With reference to Fig. 6 and Fig. 7, according to sleeper loading characteristic, in described sleeper 10,14 road stirrups 22 are laid at interval along its length, have promoted sleeper integrated carrying and end sleeper concrete resistance to compression anti-crack ability.Shoulder block place in rail support groove 11 outsides lays shear reinforcement 23, to strengthen the shear resistant capacity of sleeper shoulder block.With reference to Fig. 5, described sleeper 10 bottom surfaces arrange embossed channel 14 in interval along its length, and the ability of circuit resistance is provided to increase sleeper, are conducive to the stable of track, meet and lay gapless track.
Some principles of the above the utility model broad gage prestressed reinforced concrete tie that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.
Claims (4)
1. broad gage prestressed reinforced concrete tie, comprise the sleeper (10) with two rail support grooves (11), the interior interval of each rail support groove (11) arranges two railway spike installing holes (12), it is characterized in that: described railway spike installing hole (12) is by straight-through sleeper (10) bottom surface, rail support groove (11) surface, railway spike installing hole (12) top is formed by the mesopore that is embedded in advance the threaded sleeve (13) in sleeper (10), and threaded sleeve (13) periphery is embedded with spiral wire (15).
2. broad gage prestressed reinforced concrete tie as claimed in claim 1, it is characterized in that: described sleeper (10) is formed by C60 grade filling concrete, in it, lay 10 prestressed reinforcements (21) along vertical and horizontal interval, cross section, the eccentric throw of its pillow middle section prestressed reinforcement is 14.3mm, pillow middle section presstressed reinforcing steel point of resultant force is 107mm to cross section lower limb distance, and the pillow middle section centre of form to cross section lower limb distance is 92.7mm.
3. broad gage prestressed reinforced concrete tie as claimed in claim 2, it is characterized in that: in described sleeper (10), 14 road stirrups (22) are laid at interval along its length, lay shear reinforcement (23) at the shoulder block place in rail support groove (11) outside.
4. broad gage prestressed reinforced concrete tie as claimed in claim 1 or 2, is characterized in that: described sleeper (10) bottom surface along its length interval arranges embossed channel (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420213490.9U CN203923815U (en) | 2014-04-28 | 2014-04-28 | Broad gage prestressed reinforced concrete tie |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420213490.9U CN203923815U (en) | 2014-04-28 | 2014-04-28 | Broad gage prestressed reinforced concrete tie |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203923815U true CN203923815U (en) | 2014-11-05 |
Family
ID=51819670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420213490.9U Expired - Lifetime CN203923815U (en) | 2014-04-28 | 2014-04-28 | Broad gage prestressed reinforced concrete tie |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203923815U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109183524A (en) * | 2018-08-30 | 2019-01-11 | 广州地铁设计研究院股份有限公司 | A kind of ballastless track long sleeper suitable for urban track traffic |
-
2014
- 2014-04-28 CN CN201420213490.9U patent/CN203923815U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109183524A (en) * | 2018-08-30 | 2019-01-11 | 广州地铁设计研究院股份有限公司 | A kind of ballastless track long sleeper suitable for urban track traffic |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204456162U (en) | A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap | |
CN203699694U (en) | Bearing cable or wind-cable pre-stress anchoring device for cable crane | |
CN203923815U (en) | Broad gage prestressed reinforced concrete tie | |
CN204212024U (en) | A kind of spliced reinforced concrete prefabricated road surface | |
CN201794015U (en) | Reinforced concrete railway level crossing for metallurgical enterprises | |
CN203923804U (en) | Rice gauge prestressed reinforced concrete tie | |
CN202850048U (en) | High cantilever combination retaining wall structure | |
CN202000221U (en) | Ballastless track structure for steep slope subgrade | |
CN204919234U (en) | Storage battery car track sleeper with adjustable a gauge for shield constructs is under construction | |
CN202359507U (en) | Diagonal bracing line type adjustable curve bridge flange plate formwork | |
CN203947468U (en) | A kind of Near Ground place expands the compacted bearing disk pile of section | |
CN203546516U (en) | Longitudinal continuous limit ballastless track on steel truss girder bridge | |
CN203700976U (en) | Prestressed section steel reinforcement system of ferroconcrete arch shell bridge | |
CN202227213U (en) | Abrupt slope roadbed combination structure of high-speed railway | |
CN202830672U (en) | Buttress type U-shaped groove structure | |
CN201660851U (en) | Supporting point conversion beam for jacking large-span skew frame | |
CN203414218U (en) | Lead-in positioning device of pipe shed monitoring steel bar meter | |
CN203924851U (en) | The small-sized steel column of installing for overhead contact line | |
CN202247670U (en) | Anti-shock stopping block for high level bridge | |
CN202359550U (en) | Anti-pulling cast-in-place pile | |
CN203654094U (en) | Sleeper | |
CN208884300U (en) | A kind of subsidence area resistance to deformation express highway pavement structure | |
CN203878566U (en) | Reinforced prefabricated concrete square pile | |
CN202417531U (en) | Netted steel frame for construction of shallow buried-tunneling method | |
CN210481906U (en) | Prestressed concrete sleeper suitable for wide-narrow gauge sleeve rail railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Xiong Wei Inventor after: Wang Yingying Inventor after: Yang Minghui Inventor after: Tian Chunxiang Inventor after: Li Liangyu Inventor before: Xiong Wei Inventor before: Wang Yingying Inventor before: Yang Minghui |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: XIONG WEI WANG YINGYING YANG MINGHUI TO: XIONG WEI WANG YINGYING YANG MINGHUI TIAN CHUNXIANG LI LIANGYU |