CN203916375U - Construction scope of operation spray dust heat sink - Google Patents
Construction scope of operation spray dust heat sink Download PDFInfo
- Publication number
- CN203916375U CN203916375U CN201420375214.2U CN201420375214U CN203916375U CN 203916375 U CN203916375 U CN 203916375U CN 201420375214 U CN201420375214 U CN 201420375214U CN 203916375 U CN203916375 U CN 203916375U
- Authority
- CN
- China
- Prior art keywords
- clamp
- construction
- spray
- shower
- heat sink
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of construction scope of operation spray dust heat sink, comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump of spray pipeline, described spray pipeline comprises level supervisor, vertical standpipe and for the shower to building construction layer spray; During for building engineering construction, building engineering construction scope of operation spray is formed to water smoke, reduce temperature and the dust of the building engineering construction scope of operation, reach the object of cooling depositing dust, while having solved existing construction, because the scope of operation is without sunshade measure, under direct sunlight, temperature is relatively high, the problem that is unfavorable for construction operation, meanwhile, while also having overcome construction operation, the defect that the relative dust of the scope of operation is larger.
Description
Technical field
The utility model relates to building engineering field, particularly a kind of construction scope of operation spray dust heat sink.
Background technology
During architectural engineering main structure construction, the scope of operation is exposed under burning sun more, torridity summer, operation side temperature is very high, even surpasses 40 ℃, and causing constructs has to stagger high-temperature time section, nonetheless, during construction operation because the problems such as high temperature causes that workman's heatstroke is fallen in a swoon also happen occasionally.Therefore, reduce construction operation surface temperature, improve operation side hot environment, the green construction that becomes that people-oriented, improves the key factor of building engineering construction efficiency.
Utility model content
In view of this, the utility model provides a kind of construction scope of operation spray dust heat sink, for architectural engineering, when torridity summer is constructed, building engineering construction scope of operation spray is formed to water smoke, reduce temperature and the dust of the building engineering construction scope of operation, reach the object of cooling depositing dust.
Construction scope of operation spray dust heat sink of the present utility model, comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump of spray pipeline, spray pipeline comprises level supervisor, vertical standpipe and the shower for building construction layer is sprayed, vertical standpipe is communicated with horizontal standpipe, vertical standpipe and shower are communicated with also correspondence one by one and arrange at least one group, shower comprises inverted L-shaped structure shower body, inclined support bar and spray nozzle, setting position according to spray nozzle on shower, shower has two kinds of structures: be a kind ofly arranged on the sidewall of shower body for spray nozzle, another kind of be arranged on shower body end for spray nozzle, two kinds of spacing structure settings.
Further, vertical standpipe is connected pipe clamp with shower by one detachably to be fixed with building external scaffolding, connect pipe clamp and comprise clamp I, clamp II, pressure shell fragment and securing member, clamp I and clamp II are oppositely arranged, identical one end of clamp I and clamp II is formed for being fixed on the scaffold clip portion of scaffold jointly, the other end is formed for the fixedly water pipe clip portion of water pipe jointly, pressure shell fragment is for dividing and be located at clamp I and clamp II outside two scaffold clip portion and water pipe clip portion being produced to the mode of clip pretightning force, the middle part correspondence position of clamp I and clamp II forms fixed part, securing member carries out fastening setting through pressure shell fragment and fixed part successively.
Further, scaffold clip portion is formed by the corresponding minor segment arranging in identical one end in clamp I and clamp II, and water pipe clip portion is formed jointly by the major arc section of clamp I other end setting and the clamp II plate section of correspondence position.
Further, pressure shell fragment end is against being arranged on the lateral surface of minor segment and major arc section.
Further, the arranged outside that water pipe clip portion is positioned at major arc section is useful on the opening-closing plate of folding major arc section arrival end.
Further, level supervisor, for split-type structural, consists of at least two main pipes, between adjacent main pipe and corresponding vertical standpipe, by three-way connection, connects.
Further, booster pump is arranged at lower one deck of building engineering construction work layer, level supervisor be arranged at the building external scaffolding of booster pump with layer on, shower is positioned in the peripheral retaining frame of construction layer.
Further, water storage container is water storage barrel, and water storage barrel is arranged on the building floor face having completed.
The beneficial effects of the utility model: construction scope of operation spraying cooling device for reducing dust of the present utility model, during for building engineering construction, building engineering construction scope of operation spray is formed to water smoke, reduce temperature and the dust of the building engineering construction scope of operation, reach the object of cooling depositing dust, while having solved existing construction, because the scope of operation is without sunshade measure, under direct sunlight, temperature is relatively high, is unfavorable for the problem of construction operation, simultaneously, while also having overcome construction operation, the defect that the relative dust of the scope of operation is larger.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is construction scope of operation spraying cooling device for reducing dust structural representation of the present utility model;
Fig. 2 is the tube connector card structure schematic diagram of construction scope of operation spraying cooling device for reducing dust of the present utility model;
Fig. 3 is a kind of structural representation of the shower of construction scope of operation spraying cooling device for reducing dust of the present utility model;
Fig. 4 is the another kind of structural representation of the shower of construction scope of operation spraying cooling device for reducing dust of the present utility model.
The specific embodiment
As shown in the figure: the construction scope of operation spraying cooling device for reducing dust of the present embodiment, comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump 1 of spray pipeline, spray pipeline comprises level supervisor 2, vertical standpipe 3 and the shower 4 for building construction layer is sprayed, vertical standpipe 3 is communicated with horizontal standpipe, vertical standpipe 3 and shower 4 are communicated with also correspondence one by one and arrange at least one group, shower 4 comprises inverted L-shaped structure shower body 41, inclined support bar 42 and spray nozzle 43, setting position according to spray nozzle 43 on shower 4, shower 4 has two kinds of structures: as shown in Figure 3, a kind ofly for spray nozzle 43, be arranged on the sidewall of shower body 41, as shown in Figure 4, another kind is arranged on shower body 41 ends for spray nozzle 43, two kinds of spacing structure settings, wherein, spray nozzle 43 is arranged on shower 4 body terminations can have spray range far away, be arranged on shower 4 body sidewalls the scope of operation is nearby had to good spraying effect, two kinds of spacing structure settings can realize to far and nearer operation side all can spray, spray scope is wide, and result of use is good.
In the present embodiment, vertical standpipe 3 is connected pipe clamp with shower 4 by one detachably to be fixed with building external scaffolding, connect pipe clamp and comprise clamp I 5, clamp II 6, pressure shell fragment 7 and securing member 8, clamp I 5 and clamp II 6 are oppositely arranged, identical one end of clamp I 5 and clamp II 6 is formed for being fixed on the scaffold clip portion 9 of scaffold jointly, the other end is formed for the fixedly water pipe clip portion 10 of water pipe jointly, pressure shell fragment 7 is located at clamp I 5 and clamp II 6 outsides two for dividing in the mode that scaffold clip portion 9 and water pipe clip portion 10 are produced to clip pretightning forces, the middle part correspondence position of clamp I 5 and clamp II 6 forms fixed part, securing member 8 carries out fastening setting through pressure shell fragment 7 and fixed part successively, wherein, securing member 8 is for to wearing bolt, and is two, after connecting pipe clamp and being arranged on outrigger scaffold tubes, tight a bolt, and fixing pipe clamp, the setting of pressure shell fragment 7 is convenient to compress two ends clip portion, and outrigger scaffold tubes and water pipe are clamped, the connection pipe clamp of this structure, easy to use, rely on 7 pairs of bodys of pressure shell fragment to clamp, implementation is simple and reliable, and fixes and dismantle all very convenient.
In the present embodiment, scaffold clip portion 9 is formed by the corresponding minor segment 11 arranging in identical one end in clamp I 5 and clamp II 6, and water pipe clip portion 10 is formed with the clamp II 6 plate sections of correspondence position jointly by the major arc section 12 of clamp I 5 other end settings; As shown in the figure, one section of minor segment 11 is respectively set in clamp I 5 and clamp II 6, be oppositely arranged, scaffold tube is clamped in the space forming between two minor segments 11 fixedly time, shower 4 and vertical standpipe 3 water pipes such as grade are clamped in the space of the major arc section 12 of clamp I 5 and the 6 plate sections formation of the clamp II of correspondence position, segmental arc design has adaptivity, has good fixed effect.
In the present embodiment, pressure shell fragment 7 ends are against being arranged on the lateral surface of minor segment 11 and major arc section 12; Be beneficial to and provide chucking power to scaffold clip portion 9 and water pipe clip portion 10.
In the present embodiment, the arranged outside that water pipe clip portion 10 is positioned at major arc section 12 is useful on the opening-closing plate 13 of folding major arc section 12 arrival ends; When laying and dismantling water pipe, move opening-closing plate 13, handled easily.
In the present embodiment, level supervisor 2 is split-type structural, at least two main pipes, consists of, and adjacent main pipe and corresponding vertical 3 of standpipes connect by three-way connection 14.
In the present embodiment, booster pump 1 is arranged at lower one deck of building engineering construction work layer, has avoided the impact on construction operation; In addition, level supervisor 2 be arranged at the building external scaffolding of booster pump 1 with layer on, shower 4 is positioned in the peripheral retaining frame of construction layer.
In the present embodiment, water storage container is water storage barrel, and water storage barrel is arranged on the building floor face having completed; Reduced to construction exterior rack bearing capacity significantly increase.
Finally explanation is, above embodiment is only unrestricted in order to the technical solution of the utility model to be described, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement the technical solution of the utility model, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of claim scope of the present utility model.
Claims (8)
1. a construction scope of operation spray dust heat sink, it is characterized in that: comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump of spray pipeline, described spray pipeline comprises level supervisor, vertical standpipe and the shower for building construction layer is sprayed, vertical standpipe is communicated with horizontal standpipe, vertical standpipe and shower are communicated with also correspondence one by one and arrange at least one group, described shower comprises inverted L-shaped structure shower body, inclined support bar and spray nozzle, setting position according to spray nozzle on shower, shower has two kinds of structures: be a kind ofly arranged on the sidewall of shower body for spray nozzle, another kind of be arranged on shower body end for spray nozzle, two kinds of spacing structure settings.
2. the construction scope of operation according to claim 1 spray dust heat sink, it is characterized in that: described vertical standpipe is connected pipe clamp with described shower by one detachably to be fixed with building external scaffolding, described connection pipe clamp comprises clamp I, clamp II, pressure shell fragment and securing member, described clamp I and described clamp II are oppositely arranged, identical one end of clamp I and clamp II is formed for being fixed on the scaffold clip portion of scaffold jointly, the other end is formed for the fixedly water pipe clip portion of water pipe jointly, described pressure shell fragment is for dividing and be located at clamp I and clamp II outside two scaffold clip portion and water pipe clip portion being produced to the mode of clip pretightning force, the middle part correspondence position of clamp I and clamp II forms fixed part, securing member carries out fastening setting through pressure shell fragment and fixed part successively.
3. the construction scope of operation according to claim 2 spray dust heat sink, it is characterized in that: described scaffold clip portion is formed by the corresponding minor segment arranging in identical one end in clamp I and clamp II, described water pipe clip portion is formed jointly by the major arc section of clamp I other end setting and the clamp II plate section of correspondence position.
4. the construction scope of operation according to claim 3 spray dust heat sink, is characterized in that: pressure shell fragment end is against being arranged on the lateral surface of minor segment and major arc section.
5. the construction scope of operation according to claim 4 spray dust heat sink, is characterized in that: the arranged outside that described water pipe clip portion is positioned at major arc section is useful on the opening-closing plate of folding major arc section arrival end.
6. the construction scope of operation according to claim 5 spray dust heat sink, it is characterized in that: described opening-closing plate is tilting, and described level supervisor is set is split-type structural, by at least two main pipes, formed, between adjacent main pipe and corresponding vertical standpipe, by three-way connection, connect.
7. the construction scope of operation according to claim 6 spray dust heat sink, it is characterized in that: described booster pump is arranged at lower one deck of building engineering construction work layer, described level supervisor be arranged at the building external scaffolding of booster pump with layer on, described shower is positioned in the peripheral retaining frame of construction layer.
8. the construction scope of operation according to claim 7 spray dust heat sink, is characterized in that: described water storage container is water storage barrel, and described water storage barrel is arranged on the building floor face having completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420375214.2U CN203916375U (en) | 2014-07-08 | 2014-07-08 | Construction scope of operation spray dust heat sink |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420375214.2U CN203916375U (en) | 2014-07-08 | 2014-07-08 | Construction scope of operation spray dust heat sink |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203916375U true CN203916375U (en) | 2014-11-05 |
Family
ID=51812258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420375214.2U Expired - Fee Related CN203916375U (en) | 2014-07-08 | 2014-07-08 | Construction scope of operation spray dust heat sink |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203916375U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104324471A (en) * | 2014-11-18 | 2015-02-04 | 广西建工集团联合建设有限公司 | Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system |
CN106731345A (en) * | 2015-11-20 | 2017-05-31 | 中建四局第建筑工程有限公司 | The dust-removing method and equipment therefor in a kind of construction site |
CN107442541A (en) * | 2016-05-31 | 2017-12-08 | 五冶集团上海有限公司 | Continuous casting production tipping table dedusting flusher and its application method |
CN113786692A (en) * | 2021-09-23 | 2021-12-14 | 中交隧道工程局有限公司 | High-altitude rotary dust settling technology |
-
2014
- 2014-07-08 CN CN201420375214.2U patent/CN203916375U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104324471A (en) * | 2014-11-18 | 2015-02-04 | 广西建工集团联合建设有限公司 | Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system |
CN106731345A (en) * | 2015-11-20 | 2017-05-31 | 中建四局第建筑工程有限公司 | The dust-removing method and equipment therefor in a kind of construction site |
CN107442541A (en) * | 2016-05-31 | 2017-12-08 | 五冶集团上海有限公司 | Continuous casting production tipping table dedusting flusher and its application method |
CN113786692A (en) * | 2021-09-23 | 2021-12-14 | 中交隧道工程局有限公司 | High-altitude rotary dust settling technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203916375U (en) | Construction scope of operation spray dust heat sink | |
CN204040439U (en) | A kind of reducing operation platform installed for steel rectangle column | |
CN205077438U (en) | Dust removal heat sink for construction | |
CN205063032U (en) | Wall connection node structure | |
CN204492021U (en) | The windproof fixture of standing seam roof slabs | |
CN208088857U (en) | Shaped steel suspension scaffold exterior protection expanded metal lath connection component | |
CN204492134U (en) | Be convenient to the height scaffolding installed | |
CN206591805U (en) | A kind of self-locking type steel pipe scaffold | |
CN209227950U (en) | A kind of assembling type buildings decorative panel splicing structure | |
CN203867142U (en) | Ground tile structure | |
CN203531345U (en) | Movable cantilever frame | |
CN205356232U (en) | Dismantle convenient solar rack | |
CN208777637U (en) | A kind of three-stage roof vent pipe | |
CN202969280U (en) | Slab arch bridge double-steel-pipe assembling combined type framework supporting device | |
CN210659216U (en) | Connecting structure between prefabricated steel pipes of external scaffold | |
CN202969896U (en) | Scaffold wall-connecting structure | |
CN204979711U (en) | Modular prefabricated wallboard storage rack | |
CN217078339U (en) | Road and bridge construction foundation structure curing means | |
CN204510572U (en) | A kind of disassembly-free heat-insulation floor modules unit | |
CN201908433U (en) | Telescopic angle steel guardrail | |
CN203257086U (en) | Fixing pipe fastener of scaffold | |
CN215354943U (en) | High-flow high-pressure cleaning machine | |
CN203361584U (en) | Internal corner sander | |
CN215520180U (en) | Corrosion-resistant container house | |
CN202031219U (en) | Connecting rod for awning rack in film structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 Termination date: 20170708 |