CN203916375U - Construction scope of operation spray dust heat sink - Google Patents

Construction scope of operation spray dust heat sink Download PDF

Info

Publication number
CN203916375U
CN203916375U CN201420375214.2U CN201420375214U CN203916375U CN 203916375 U CN203916375 U CN 203916375U CN 201420375214 U CN201420375214 U CN 201420375214U CN 203916375 U CN203916375 U CN 203916375U
Authority
CN
China
Prior art keywords
clamp
construction
spray
shower
heat sink
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420375214.2U
Other languages
Chinese (zh)
Inventor
王清江
王悦
沈铁松
胡奇
刘进
粟兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201420375214.2U priority Critical patent/CN203916375U/en
Application granted granted Critical
Publication of CN203916375U publication Critical patent/CN203916375U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction scope of operation spray dust heat sink, comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump of spray pipeline, described spray pipeline comprises level supervisor, vertical standpipe and for the shower to building construction layer spray; During for building engineering construction, building engineering construction scope of operation spray is formed to water smoke, reduce temperature and the dust of the building engineering construction scope of operation, reach the object of cooling depositing dust, while having solved existing construction, because the scope of operation is without sunshade measure, under direct sunlight, temperature is relatively high, the problem that is unfavorable for construction operation, meanwhile, while also having overcome construction operation, the defect that the relative dust of the scope of operation is larger.

Description

Construction scope of operation spray dust heat sink
Technical field
The utility model relates to building engineering field, particularly a kind of construction scope of operation spray dust heat sink.
Background technology
During architectural engineering main structure construction, the scope of operation is exposed under burning sun more, torridity summer, operation side temperature is very high, even surpasses 40 ℃, and causing constructs has to stagger high-temperature time section, nonetheless, during construction operation because the problems such as high temperature causes that workman's heatstroke is fallen in a swoon also happen occasionally.Therefore, reduce construction operation surface temperature, improve operation side hot environment, the green construction that becomes that people-oriented, improves the key factor of building engineering construction efficiency.
Utility model content
In view of this, the utility model provides a kind of construction scope of operation spray dust heat sink, for architectural engineering, when torridity summer is constructed, building engineering construction scope of operation spray is formed to water smoke, reduce temperature and the dust of the building engineering construction scope of operation, reach the object of cooling depositing dust.
Construction scope of operation spray dust heat sink of the present utility model, comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump of spray pipeline, spray pipeline comprises level supervisor, vertical standpipe and the shower for building construction layer is sprayed, vertical standpipe is communicated with horizontal standpipe, vertical standpipe and shower are communicated with also correspondence one by one and arrange at least one group, shower comprises inverted L-shaped structure shower body, inclined support bar and spray nozzle, setting position according to spray nozzle on shower, shower has two kinds of structures: be a kind ofly arranged on the sidewall of shower body for spray nozzle, another kind of be arranged on shower body end for spray nozzle, two kinds of spacing structure settings.
Further, vertical standpipe is connected pipe clamp with shower by one detachably to be fixed with building external scaffolding, connect pipe clamp and comprise clamp I, clamp II, pressure shell fragment and securing member, clamp I and clamp II are oppositely arranged, identical one end of clamp I and clamp II is formed for being fixed on the scaffold clip portion of scaffold jointly, the other end is formed for the fixedly water pipe clip portion of water pipe jointly, pressure shell fragment is for dividing and be located at clamp I and clamp II outside two scaffold clip portion and water pipe clip portion being produced to the mode of clip pretightning force, the middle part correspondence position of clamp I and clamp II forms fixed part, securing member carries out fastening setting through pressure shell fragment and fixed part successively.
Further, scaffold clip portion is formed by the corresponding minor segment arranging in identical one end in clamp I and clamp II, and water pipe clip portion is formed jointly by the major arc section of clamp I other end setting and the clamp II plate section of correspondence position.
Further, pressure shell fragment end is against being arranged on the lateral surface of minor segment and major arc section.
Further, the arranged outside that water pipe clip portion is positioned at major arc section is useful on the opening-closing plate of folding major arc section arrival end.
Further, level supervisor, for split-type structural, consists of at least two main pipes, between adjacent main pipe and corresponding vertical standpipe, by three-way connection, connects.
Further, booster pump is arranged at lower one deck of building engineering construction work layer, level supervisor be arranged at the building external scaffolding of booster pump with layer on, shower is positioned in the peripheral retaining frame of construction layer.
Further, water storage container is water storage barrel, and water storage barrel is arranged on the building floor face having completed.
The beneficial effects of the utility model: construction scope of operation spraying cooling device for reducing dust of the present utility model, during for building engineering construction, building engineering construction scope of operation spray is formed to water smoke, reduce temperature and the dust of the building engineering construction scope of operation, reach the object of cooling depositing dust, while having solved existing construction, because the scope of operation is without sunshade measure, under direct sunlight, temperature is relatively high, is unfavorable for the problem of construction operation, simultaneously, while also having overcome construction operation, the defect that the relative dust of the scope of operation is larger.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is construction scope of operation spraying cooling device for reducing dust structural representation of the present utility model;
Fig. 2 is the tube connector card structure schematic diagram of construction scope of operation spraying cooling device for reducing dust of the present utility model;
Fig. 3 is a kind of structural representation of the shower of construction scope of operation spraying cooling device for reducing dust of the present utility model;
Fig. 4 is the another kind of structural representation of the shower of construction scope of operation spraying cooling device for reducing dust of the present utility model.
The specific embodiment
As shown in the figure: the construction scope of operation spraying cooling device for reducing dust of the present embodiment, comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump 1 of spray pipeline, spray pipeline comprises level supervisor 2, vertical standpipe 3 and the shower 4 for building construction layer is sprayed, vertical standpipe 3 is communicated with horizontal standpipe, vertical standpipe 3 and shower 4 are communicated with also correspondence one by one and arrange at least one group, shower 4 comprises inverted L-shaped structure shower body 41, inclined support bar 42 and spray nozzle 43, setting position according to spray nozzle 43 on shower 4, shower 4 has two kinds of structures: as shown in Figure 3, a kind ofly for spray nozzle 43, be arranged on the sidewall of shower body 41, as shown in Figure 4, another kind is arranged on shower body 41 ends for spray nozzle 43, two kinds of spacing structure settings, wherein, spray nozzle 43 is arranged on shower 4 body terminations can have spray range far away, be arranged on shower 4 body sidewalls the scope of operation is nearby had to good spraying effect, two kinds of spacing structure settings can realize to far and nearer operation side all can spray, spray scope is wide, and result of use is good.
In the present embodiment, vertical standpipe 3 is connected pipe clamp with shower 4 by one detachably to be fixed with building external scaffolding, connect pipe clamp and comprise clamp I 5, clamp II 6, pressure shell fragment 7 and securing member 8, clamp I 5 and clamp II 6 are oppositely arranged, identical one end of clamp I 5 and clamp II 6 is formed for being fixed on the scaffold clip portion 9 of scaffold jointly, the other end is formed for the fixedly water pipe clip portion 10 of water pipe jointly, pressure shell fragment 7 is located at clamp I 5 and clamp II 6 outsides two for dividing in the mode that scaffold clip portion 9 and water pipe clip portion 10 are produced to clip pretightning forces, the middle part correspondence position of clamp I 5 and clamp II 6 forms fixed part, securing member 8 carries out fastening setting through pressure shell fragment 7 and fixed part successively, wherein, securing member 8 is for to wearing bolt, and is two, after connecting pipe clamp and being arranged on outrigger scaffold tubes, tight a bolt, and fixing pipe clamp, the setting of pressure shell fragment 7 is convenient to compress two ends clip portion, and outrigger scaffold tubes and water pipe are clamped, the connection pipe clamp of this structure, easy to use, rely on 7 pairs of bodys of pressure shell fragment to clamp, implementation is simple and reliable, and fixes and dismantle all very convenient.
In the present embodiment, scaffold clip portion 9 is formed by the corresponding minor segment 11 arranging in identical one end in clamp I 5 and clamp II 6, and water pipe clip portion 10 is formed with the clamp II 6 plate sections of correspondence position jointly by the major arc section 12 of clamp I 5 other end settings; As shown in the figure, one section of minor segment 11 is respectively set in clamp I 5 and clamp II 6, be oppositely arranged, scaffold tube is clamped in the space forming between two minor segments 11 fixedly time, shower 4 and vertical standpipe 3 water pipes such as grade are clamped in the space of the major arc section 12 of clamp I 5 and the 6 plate sections formation of the clamp II of correspondence position, segmental arc design has adaptivity, has good fixed effect.
In the present embodiment, pressure shell fragment 7 ends are against being arranged on the lateral surface of minor segment 11 and major arc section 12; Be beneficial to and provide chucking power to scaffold clip portion 9 and water pipe clip portion 10.
In the present embodiment, the arranged outside that water pipe clip portion 10 is positioned at major arc section 12 is useful on the opening-closing plate 13 of folding major arc section 12 arrival ends; When laying and dismantling water pipe, move opening-closing plate 13, handled easily.
In the present embodiment, level supervisor 2 is split-type structural, at least two main pipes, consists of, and adjacent main pipe and corresponding vertical 3 of standpipes connect by three-way connection 14.
In the present embodiment, booster pump 1 is arranged at lower one deck of building engineering construction work layer, has avoided the impact on construction operation; In addition, level supervisor 2 be arranged at the building external scaffolding of booster pump 1 with layer on, shower 4 is positioned in the peripheral retaining frame of construction layer.
In the present embodiment, water storage container is water storage barrel, and water storage barrel is arranged on the building floor face having completed; Reduced to construction exterior rack bearing capacity significantly increase.
Finally explanation is, above embodiment is only unrestricted in order to the technical solution of the utility model to be described, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement the technical solution of the utility model, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of claim scope of the present utility model.

Claims (8)

1. a construction scope of operation spray dust heat sink, it is characterized in that: comprise water storage container, spray pipeline and for water in water storage container being pumped into the booster pump of spray pipeline, described spray pipeline comprises level supervisor, vertical standpipe and the shower for building construction layer is sprayed, vertical standpipe is communicated with horizontal standpipe, vertical standpipe and shower are communicated with also correspondence one by one and arrange at least one group, described shower comprises inverted L-shaped structure shower body, inclined support bar and spray nozzle, setting position according to spray nozzle on shower, shower has two kinds of structures: be a kind ofly arranged on the sidewall of shower body for spray nozzle, another kind of be arranged on shower body end for spray nozzle, two kinds of spacing structure settings.
2. the construction scope of operation according to claim 1 spray dust heat sink, it is characterized in that: described vertical standpipe is connected pipe clamp with described shower by one detachably to be fixed with building external scaffolding, described connection pipe clamp comprises clamp I, clamp II, pressure shell fragment and securing member, described clamp I and described clamp II are oppositely arranged, identical one end of clamp I and clamp II is formed for being fixed on the scaffold clip portion of scaffold jointly, the other end is formed for the fixedly water pipe clip portion of water pipe jointly, described pressure shell fragment is for dividing and be located at clamp I and clamp II outside two scaffold clip portion and water pipe clip portion being produced to the mode of clip pretightning force, the middle part correspondence position of clamp I and clamp II forms fixed part, securing member carries out fastening setting through pressure shell fragment and fixed part successively.
3. the construction scope of operation according to claim 2 spray dust heat sink, it is characterized in that: described scaffold clip portion is formed by the corresponding minor segment arranging in identical one end in clamp I and clamp II, described water pipe clip portion is formed jointly by the major arc section of clamp I other end setting and the clamp II plate section of correspondence position.
4. the construction scope of operation according to claim 3 spray dust heat sink, is characterized in that: pressure shell fragment end is against being arranged on the lateral surface of minor segment and major arc section.
5. the construction scope of operation according to claim 4 spray dust heat sink, is characterized in that: the arranged outside that described water pipe clip portion is positioned at major arc section is useful on the opening-closing plate of folding major arc section arrival end.
6. the construction scope of operation according to claim 5 spray dust heat sink, it is characterized in that: described opening-closing plate is tilting, and described level supervisor is set is split-type structural, by at least two main pipes, formed, between adjacent main pipe and corresponding vertical standpipe, by three-way connection, connect.
7. the construction scope of operation according to claim 6 spray dust heat sink, it is characterized in that: described booster pump is arranged at lower one deck of building engineering construction work layer, described level supervisor be arranged at the building external scaffolding of booster pump with layer on, described shower is positioned in the peripheral retaining frame of construction layer.
8. the construction scope of operation according to claim 7 spray dust heat sink, is characterized in that: described water storage container is water storage barrel, and described water storage barrel is arranged on the building floor face having completed.
CN201420375214.2U 2014-07-08 2014-07-08 Construction scope of operation spray dust heat sink Expired - Fee Related CN203916375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420375214.2U CN203916375U (en) 2014-07-08 2014-07-08 Construction scope of operation spray dust heat sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420375214.2U CN203916375U (en) 2014-07-08 2014-07-08 Construction scope of operation spray dust heat sink

Publications (1)

Publication Number Publication Date
CN203916375U true CN203916375U (en) 2014-11-05

Family

ID=51812258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420375214.2U Expired - Fee Related CN203916375U (en) 2014-07-08 2014-07-08 Construction scope of operation spray dust heat sink

Country Status (1)

Country Link
CN (1) CN203916375U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104324471A (en) * 2014-11-18 2015-02-04 广西建工集团联合建设有限公司 Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system
CN106731345A (en) * 2015-11-20 2017-05-31 中建四局第建筑工程有限公司 The dust-removing method and equipment therefor in a kind of construction site
CN107442541A (en) * 2016-05-31 2017-12-08 五冶集团上海有限公司 Continuous casting production tipping table dedusting flusher and its application method
CN113786692A (en) * 2021-09-23 2021-12-14 中交隧道工程局有限公司 High-altitude rotary dust settling technology

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104324471A (en) * 2014-11-18 2015-02-04 广西建工集团联合建设有限公司 Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system
CN106731345A (en) * 2015-11-20 2017-05-31 中建四局第建筑工程有限公司 The dust-removing method and equipment therefor in a kind of construction site
CN107442541A (en) * 2016-05-31 2017-12-08 五冶集团上海有限公司 Continuous casting production tipping table dedusting flusher and its application method
CN113786692A (en) * 2021-09-23 2021-12-14 中交隧道工程局有限公司 High-altitude rotary dust settling technology

Similar Documents

Publication Publication Date Title
CN203916375U (en) Construction scope of operation spray dust heat sink
CN204040439U (en) A kind of reducing operation platform installed for steel rectangle column
CN205077438U (en) Dust removal heat sink for construction
CN205063032U (en) Wall connection node structure
CN204492021U (en) The windproof fixture of standing seam roof slabs
CN208088857U (en) Shaped steel suspension scaffold exterior protection expanded metal lath connection component
CN204492134U (en) Be convenient to the height scaffolding installed
CN206591805U (en) A kind of self-locking type steel pipe scaffold
CN209227950U (en) A kind of assembling type buildings decorative panel splicing structure
CN203867142U (en) Ground tile structure
CN203531345U (en) Movable cantilever frame
CN205356232U (en) Dismantle convenient solar rack
CN208777637U (en) A kind of three-stage roof vent pipe
CN202969280U (en) Slab arch bridge double-steel-pipe assembling combined type framework supporting device
CN210659216U (en) Connecting structure between prefabricated steel pipes of external scaffold
CN202969896U (en) Scaffold wall-connecting structure
CN204979711U (en) Modular prefabricated wallboard storage rack
CN217078339U (en) Road and bridge construction foundation structure curing means
CN204510572U (en) A kind of disassembly-free heat-insulation floor modules unit
CN201908433U (en) Telescopic angle steel guardrail
CN203257086U (en) Fixing pipe fastener of scaffold
CN215354943U (en) High-flow high-pressure cleaning machine
CN203361584U (en) Internal corner sander
CN215520180U (en) Corrosion-resistant container house
CN202031219U (en) Connecting rod for awning rack in film structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20170708