CN203904392U - Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously - Google Patents

Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously Download PDF

Info

Publication number
CN203904392U
CN203904392U CN201420262802.5U CN201420262802U CN203904392U CN 203904392 U CN203904392 U CN 203904392U CN 201420262802 U CN201420262802 U CN 201420262802U CN 203904392 U CN203904392 U CN 203904392U
Authority
CN
China
Prior art keywords
argon blowing
cover
impregnating cover
argon
lance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420262802.5U
Other languages
Chinese (zh)
Inventor
朱海亮
安连志
黄彩云
张达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangsteel International Engineering Technology Co ltd
Original Assignee
Tangshan Iron & Steel International Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Iron & Steel International Engineering Technology Co Ltd filed Critical Tangshan Iron & Steel International Engineering Technology Co Ltd
Priority to CN201420262802.5U priority Critical patent/CN203904392U/en
Application granted granted Critical
Publication of CN203904392U publication Critical patent/CN203904392U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)

Abstract

An impregnation cover capable of being inserted into an argon blowing top lance and an oxygen lance simultaneously belongs to the technical field of steel ladle equipment and is used for argon blowing and oxygen blowing operations by being inserted into the argon blowing top lance and the oxygen lance simultaneously. The impregnation cover adopts the technical scheme that the impregnation cover comprises an upper part impregnation cover and a lower part impregnation cover, the lower end of the upper part impregnation cover is connected with the upper end of the lower part impregnation cover through bolts, the upper end surface of the upper part impregnation cover is elliptical, two insertion holes in parallel are formed in the elliptical upper end surface, the central connecting line of the two insertion holes is positioned on the axis of an elliptical long axis, and the argon blowing top lance and the oxygen lance are inserted into the insertion holes respectively. According to the impregnation cover provided by the utility model, the round upper end surface of the upper part impregnation cover is changed to the elliptical upper end surface, so that the oxygen lance and the argon blowing top lance can be inserted simultaneously, oxygen blowing operation and argon blowing operation can be performed simultaneously, and the normal argon blowing operation can be ensured in case of a bottom argon blowing accident, therefore, the stopping of continuous casting is avoided, the constant casting speed of continuous casting and the stable production of a continuous caster are ensured, the product quality is enabled to be stable, and remarkable economic benefits are realized.

Description

A kind of impregnating cover that can simultaneously insert Argon top rifle and oxygen rifle
Technical field
The utility model relates to a kind of steel production enterprise CAS refining station and can insert simultaneously the impregnating cover of Argon top rifle and oxygen rifle, belongs to ladle equipment technical field.
Background technology
CAS refining station is a kind of low cost ladle refining technique, principle is to utilize oxygen gun blowing, carrying out the heat temperature raising of thermopositive reaction realization to molten steel with the aluminium adding, add various iron alloys to finely tune molten steel composition simultaneously, is a kind of economy refinery practice fast.From the technological process of CAS, steel ladle bottom argon blowing plays a part even molten steel composition, temperature, if air brick of steel ladle stops up and cannot carry out Argon stirring, will have following problem:
(1) damage the resistance to material of impregnating cover.Adding in the oxygen blown pressure temperature-rise period of aluminium, conversion zone liquid steel temperature will reach 2500 ~ 3000 DEG C, if not in time Argon stir carry out molten steel evenly, what high-temperature molten steel can be very fast burns impregnating cover, and the impregnating cover life-span is reduced to 3 ~ 5 stoves by 80 stoves left and right.
(2) inclusion cannot fully float and upgrading.In refining process, add after slag material, realize fully reacting of slag material and inclusion content in melting steel by sufficient stirring, realize the upgrading to inclusion.Meanwhile, by stirring, impel inclusion constantly to assemble, float, enter slag blanket.If do not stirred, cannot realize removal and upgrading to inclusion.
(3) alloying constituent is adjusted inaccurate.Alloy enters after molten steel by four-way elephant trunk, if stir not in time to realize the even of molten steel composition, the alloying element adding will be gathered in the region of impregnating cover, carries out thermometric sampling by can't detect the iron alloy composition adding in impregnating cover outside, cannot judge alloying constituent.
(4) stably manufactured of continuous caster is impacted.If steel ladle bottom argon blowing blows not open, for the company that ensures continuous caster waters, the molten steel in ladle can only be poured in another preheated ladle, seat bag carries out refining again.This process is the time about 10 minutes by needs.In this time period, continuous caster can only reduce pulling rate or stop watering, and is unfavorable for the stably manufactured of continuous caster.
Current domestic steel ladle bottom argon blowing success ratio is 85 ~ 99.9%, the improvement of gas permeable brick, the measure such as adjustment, the improvement of management of bottom blowing technical parameter all cannot ensure 100% Argon success ratio, therefore be necessary to arrange accident Argon top gun apparatus, in the time that Bottom Argon Blowing Device lost efficacy, carry out Argon operation with Argon top rifle.But traditional CAS impregnating cover is suitable for reading and end opening is circular configuration, accident Argon Argon top rifle cannot insert.If by the enlarged-diameter of suitable for reading and end opening, excessive back cut diameter is unfavorable for dedusting in order to ensure the insertion of accident top rifle, excessive end opening can shroud part slag blanket in impregnating cover, and the alloy adding is reacted with slag blanket, reduces yield of alloy.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of impregnating cover that can simultaneously insert Argon top rifle and oxygen rifle, and this impregnating cover can ensure to carry out Argon operation with Argon top rifle in the time that Bottom Argon Blowing Device loses efficacy.
The technical scheme solving the problems of the technologies described above is:
A kind of impregnating cover that can simultaneously insert Argon top rifle and oxygen rifle, it is made up of top impregnating cover and bottom impregnating cover, the circumference of bottom impregnating cover is circular, the lower end of top impregnating cover is circular, the upper end of the lower end of top impregnating cover and bottom impregnating cover is bolted, its improvements are, the upper surface of top impregnating cover is oval, on oval upper surface, there are two jacks arranged side by side, the line at two jack centers is positioned on oval-shaped long axis ray, and Argon top rifle and oxygen rifle are inserted in respectively in jack.
The above-mentioned impregnating cover that can simultaneously insert Argon top rifle and oxygen rifle, the upper end of sidewall and the edge of oval upper surface of described top impregnating cover are connected, the lower end of sidewall is connected with the circular upper end circumferential edges of bottom impregnating cover, and sidewall is from suitable for reading to circular end opening smooth transition from ellipse from top to bottom.
The beneficial effects of the utility model are:
The utility model changes the circular upper surface of top impregnating cover into oval upper surface, can make oxygen rifle and Argon top rifle insert simultaneously, can carry out the operation of oxygen blast and Argon simultaneously, in the time there is BOTTOM ARGON BLOWING accident, can ensure normally carrying out of Argon operation, thereby avoid continuous casting to stop watering, ensure the permanent pulling rate of continuous casting and the stably manufactured of continuous caster, made constant product quality, there is significant economic benefit.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1.
Figure acceptance of the bid is as follows: top impregnating cover 1, bottom impregnating cover 2, Argon top rifle 3, oxygen rifle 4, molten steel 5, ladle 6.
Embodiment
The utility model is made up of top impregnating cover 1, bottom impregnating cover 2.
In figure, show, the lower end of top impregnating cover 1 is circular, and the circumference of bottom impregnating cover 2 is circular, and the upper end of the lower end of top impregnating cover 1 and bottom impregnating cover 2 is bolted.
In figure, show, the upper surface of top impregnating cover 1 changes ellipse into by original circle, has two jacks arranged side by side on oval upper surface, and the line at two jack centers is positioned on oval-shaped long axis ray, and Argon top rifle 3 and oxygen rifle 4 are inserted in respectively in jack.
In figure, show, the upper end of the sidewall of top impregnating cover 1 is connected with the edge of oval upper surface, and the lower end of sidewall is connected with the circular upper end circumferential edges of bottom impregnating cover 2, and sidewall is from suitable for reading to circular end opening smooth transition from ellipse from top to bottom.
The utility model is in the time carrying out refining treatment, and bottom impregnating cover 2 inserts ladle 6.In the time of bottom-blown air brick fault, Argon top rifle 3 and oxygen rifle 4 insert oval upper portion impregnating cover 1 and rounded lower portion impregnating cover 2 simultaneously, carry out oxygen blast and nitrogen flushing operation simultaneously, can ensure the Argon operation in the time of BOTTOM ARGON BLOWING accident.
The utility model can bring larger economic benefit, taking certain factory's 2 100 tons of converter of configuration as example, to smelt 80 stoves every day, smelts every year 26000 furnace gauges and calculates, and supposes that its existing steel ladle bottom argon blowing success ratio is 95%, has every year 1300 furnace bottoms to blow unsuccessful.As lost 50 DEG C to roll in packet procedures, the cost of every DEG C is 0.5 yuan of calculating, and the direct economic benefit that can bring is every year: 1300 × 100 tons of bags/× 50 DEG C × 0.5 yuan/DEG C=3,250,000 yuan of bags.

Claims (2)

1. one kind can be inserted the impregnating cover of Argon top rifle and oxygen rifle simultaneously, it is made up of top impregnating cover (1) and bottom impregnating cover (2), the circumference of bottom impregnating cover (2) is circular, the lower end of top impregnating cover (1) is circular, the upper end of the lower end of top impregnating cover (1) and bottom impregnating cover (2) is bolted, it is characterized in that: the upper surface of top impregnating cover (1) is for oval, on oval upper surface, there are two jacks arranged side by side, the line at two jack centers is positioned on oval-shaped long axis ray, Argon top rifle (3) and oxygen rifle (4) are inserted in respectively in jack.
2. the impregnating cover that can simultaneously insert Argon top rifle and oxygen rifle according to claim 1, it is characterized in that: the upper end of sidewall and the edge of oval upper surface of described top impregnating cover (1) are connected, the lower end of sidewall is connected with the circular upper end circumferential edges of bottom impregnating cover (2), and sidewall is from suitable for reading to circular end opening smooth transition from ellipse from top to bottom.
CN201420262802.5U 2014-05-22 2014-05-22 Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously Expired - Fee Related CN203904392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420262802.5U CN203904392U (en) 2014-05-22 2014-05-22 Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420262802.5U CN203904392U (en) 2014-05-22 2014-05-22 Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously

Publications (1)

Publication Number Publication Date
CN203904392U true CN203904392U (en) 2014-10-29

Family

ID=51778683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420262802.5U Expired - Fee Related CN203904392U (en) 2014-05-22 2014-05-22 Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously

Country Status (1)

Country Link
CN (1) CN203904392U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105624367A (en) * 2014-12-01 2016-06-01 鞍钢股份有限公司 Refining device and method for controlling nitrogen content of molten steel
CN105714023A (en) * 2014-12-01 2016-06-29 鞍钢股份有限公司 Low-silicon aluminum killed steel refining device and method
CN106702082A (en) * 2015-11-17 2017-05-24 鞍钢股份有限公司 Method for increasing use times of dipping hood of ANS refining furnace

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105624367A (en) * 2014-12-01 2016-06-01 鞍钢股份有限公司 Refining device and method for controlling nitrogen content of molten steel
CN105714023A (en) * 2014-12-01 2016-06-29 鞍钢股份有限公司 Low-silicon aluminum killed steel refining device and method
CN105624367B (en) * 2014-12-01 2017-07-21 鞍钢股份有限公司 Refining device and method for controlling nitrogen content of molten steel
CN105714023B (en) * 2014-12-01 2017-09-08 鞍钢股份有限公司 Low-silicon aluminum killed steel refining device and method
CN106702082A (en) * 2015-11-17 2017-05-24 鞍钢股份有限公司 Method for increasing use times of dipping hood of ANS refining furnace
CN106702082B (en) * 2015-11-17 2018-06-26 鞍钢股份有限公司 Method for increasing use times of dipping hood of ANS refining furnace

Similar Documents

Publication Publication Date Title
CN202626233U (en) LF refining device with powder injection function
CN203904392U (en) Impregnation cover capable of being inserted into argon blowing top lance and oxygen lance simultaneously
CN102787195B (en) Stainless-steel smelting method
CN103231029B (en) Pouring method for large-section consumable electrode
CN100494849C (en) Top-bottom reblowing vacuum inductive stove
CN103146978B (en) Method for producing high-chromium low-phosphorus electroslag steel for rollers
CN111635977A (en) Full-continuous ultrashort electric arc furnace steelmaking flow production equipment and process
CN105537549A (en) Production method of continuous casting round billet of seamless steel tube steel at low temperature of minus 100 DEG C
CN103614609B (en) A kind of stainless steel smelting desiliconization of hot metal method
CN104531953A (en) Refining argon blowing method applied to SPHC steel grade
CN105002324A (en) Heavy rail steel dotted impurity control method
CN102559998A (en) Technology for online dusting desulfuration of steel ladles
CN207685317U (en) RH-LF technologies produce the production equipment of mild steel
CN106834592B (en) A kind of method that steel treatment is melted down in converter
CN203599517U (en) Molten metal die casting device
CN203923261U (en) Alloy adding device of non-vacuum induction furnace
CN203065557U (en) Nodulizing ladle cover
CN110257587A (en) Double-station LF refining furnace system that is a kind of online and combining offline
CN215481043U (en) Data transmission system for realizing scrap steel adding of ladle
CN114959470A (en) Production process of S32168 high-quality stainless steel continuous casting billet
CN209722207U (en) A kind of miniaturization rectification systems
CN114329939A (en) Method for predicting molten steel temperature of VD furnace
CN104195291B (en) The method of One-step production high manganese and high nitrogen corrosion-resisting steel G6811
CN203393182U (en) Steel ladle aluminum deoxidation compound block for steelmaking
CN106498116A (en) A kind of production technology of circle chain of mine steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 063000 Hebei province Tangshan City Jianhua West Road No. 1

Patentee after: TANGSHAN IRON AND STEEL INTERNATIONAL ENGINEERING TECHNOLOGY CO.,LTD.

Address before: 063000 Hebei province Tangshan City Jianhua West Road No. 1

Patentee before: TANGSHAN IRON & STEEL INTERNATIONAL ENGINEERING TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address

Address after: No. 1 Jianhua Road, North District of Tangshan City Road, Hebei Province, Hebei

Patentee after: TANGSTEEL INTERNATIONAL ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: 063000 Jianhua West Road, Tangshan City, Hebei Province, No. 1

Patentee before: TANGSHAN IRON AND STEEL INTERNATIONAL ENGINEERING TECHNOLOGY CO.,LTD.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141029

CF01 Termination of patent right due to non-payment of annual fee