CN203891511U - Tubular pile foundation beam storage pedestal shared by multiple beam types - Google Patents

Tubular pile foundation beam storage pedestal shared by multiple beam types Download PDF

Info

Publication number
CN203891511U
CN203891511U CN201320852143.6U CN201320852143U CN203891511U CN 203891511 U CN203891511 U CN 203891511U CN 201320852143 U CN201320852143 U CN 201320852143U CN 203891511 U CN203891511 U CN 203891511U
Authority
CN
China
Prior art keywords
pile foundation
pedestal
types
cushion cap
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320852143.6U
Other languages
Chinese (zh)
Inventor
苟祖宽
廖勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Guizhou Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Guizhou Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Guizhou Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201320852143.6U priority Critical patent/CN203891511U/en
Application granted granted Critical
Publication of CN203891511U publication Critical patent/CN203891511U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Abstract

The utility model discloses a tubular pile foundation beam storage pedestal shared by multiple beam types used in a precast beam field. The pile foundation beam storage pedestal shared by multiple beam types is of a two-supporting-point beam storage structure in the transverse direction; a plurality of tubular piles are arranged at the foundation of each beam storage supporting point; an inverted T-shaped bearing platform (2) is arranged on each tubular pile (1); a supporting seat plate (3) is transversely placed on the bearing platform (2); a precast beam (4) is placed on the upper surface of the supporting seat plate (3). According to the pile foundation beam storage pedestal shared by multiple beam types, the technical problems that the beams are cast and erected in an intertwined order and the beam storage time for a single beam type is short because of various of beam types in the precast beam field are successfully solved, and the beam storage place and the investment cost of the beam storage pedestal are effectively reduced.

Description

A kind of many beams type shares pipe pile foundation and deposits beam pedestal
Technical field
The utility model relates to the shared pipe pile foundation of a kind of many beams type adopting in precast beam field and deposits beam pedestal.
Background technology
Beam abutment design is deposited in precast beam field, and conventional method is deposited under beam fulcrum one or more stake is set for each, and beam body weight directly vertically passes to bottom pile foundation.General precast beam field, the Prefabricated bar type of bearing is fewer, and the beam pedestal of depositing of every kind of beam type is all independent design.When the Prefabricated bar type that precast beam field is born more, it is inconsistent that various beam types are deposited beam fulcrum horizontal spacing, and it is interlaced to make the order of setting a roof beam in place, and single beam type is deposited the beam time in short-term, adopt conventional method to increase and deposit beam pedestal quantity, increase beam field land area, cost is higher.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of many beams type adopting in precast beam field to share pipe pile foundation and deposit beam pedestal, to adapt in precast beam field due to the more demand of beam type, overcome depositing that conventional method exists beam pedestal quantity be many, floor space greatly, the deficiency of high in cost of production.
The utility model is by the following technical solutions: laterally adopt two fulcrums to deposit girder construction, each deposits beam fulcrum place basis instrument is many root canal piles, and inverted T shape cushion cap is set on pile tube, laterally places support plate on cushion cap, places precast beam above support plate.
Each cushion cap of depositing under beam fulcrum place support plate is absolute construction.
Support plate is packaged type; According to the size of placed precast beam, move.Every precast beam is placed respectively 2 support plates under two terminations, and each support plate separately correspondence is placed on independently on cushion cap.
Pipe pile top embeds composition rigid structures in cushion cap.
Cushion cap laterally adopts inverted T-shaped cross section along pedestal, and bottom is wider to meet the requirement of many root canal piles pile spacing, and top is narrower to reserve the space of before erection of precast beams, permanent bearing being installed.
The utility model has successfully solved in precast beam field because beam type is more, and the system order of setting a roof beam in place is interlaced, and single beam type is deposited short technical barrier of beam time, has effectively saved and deposited beam place, deposited beam pedestal cost investment.
Accompanying drawing explanation
Fig. 1 is 3 dimensional drawing of the present utility model;
Fig. 2 is the elevation of Fig. 1;
Fig. 3 is the lateral view of Fig. 1;
Fig. 4 is the top view of Fig. 1;
Fig. 5 is that the two chambers of single case double line box girder individual layer is deposited beam end schematic diagram;
Fig. 6 is that single box single chamber double line box girder individual layer is deposited beam end schematic diagram;
Fig. 7 is that single box single chamber single line case beam individual layer is deposited beam end schematic diagram.
The specific embodiment
With reference to accompanying drawing 1,2,3,4, the utility model provides a kind of many beams type adopting in precast beam field to share pipe pile foundation and deposits beam pedestal, laterally adopt two fulcrums to deposit girder construction, each deposits beam fulcrum place basis instrument is many root canal piles 1, inverted T shape cushion cap 2 is set on pile tube 1, on cushion cap 2, laterally place support plate 3, support plate 3 is placed precast beam 4 above.
Embodiment of the present utility model: the parameters such as the feature of the multiple beam type precast beam 4 of bearing according to precast beam place and geologic information, calculate and select each deposit parameter and the quantity of required pile tube 1 under beam fulcrum and carry out reasonable Arrangement.
According to suitable inverted T-shaped cushion cap 2 sizes of design such as pile tube 1 arrangement pitch, precast beam 4 support positions, cushion cap 2 force requests.
Precast beam 4 adopts four fulcrums to deposit, and deposits the longitudinal two-end structure of beam pedestal the same, and longitudinal pitch requires to arrange according to the beam span of depositing of precast beam 4.
According to the difference of the precast beam 4 bearing horizontal spacings of different beam types, on cushion cap 2, place respectively support plate 3 and carry out various Liang Xingxiangliang and deposit.
As shown in Fig. 5, Fig. 6, Fig. 7, be that three kinds of different beam type individual layers on the utility model of bearing horizontal spacing are deposited schematic diagram.

Claims (4)

1. beam type more than a kind shares pipe pile foundation and deposits beam pedestal, it is characterized in that: laterally adopt two fulcrums to deposit girder construction, each deposits beam fulcrum place basis instrument is many root canal piles (1), inverted T shape cushion cap (2) is set on pile tube (1), at the upper support plate (3) of laterally placing of cushion cap (2), support plate (3) is placed precast beam (4) above.
2. many beams type according to claim 1 shares pipe pile foundation and deposits beam pedestal, it is characterized in that: each cushion cap (2) of depositing under beam fulcrum place support plate (3) is absolute construction.
3. many beams type according to claim 1 shares pipe pile foundation and deposits beam pedestal, it is characterized in that: support plate (3) is packaged type.
4. many beams type according to claim 1 shares pipe pile foundation and deposits beam pedestal, it is characterized in that: pile tube (1) stake top embeds in cushion cap (2).
CN201320852143.6U 2013-12-23 2013-12-23 Tubular pile foundation beam storage pedestal shared by multiple beam types Withdrawn - After Issue CN203891511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320852143.6U CN203891511U (en) 2013-12-23 2013-12-23 Tubular pile foundation beam storage pedestal shared by multiple beam types

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320852143.6U CN203891511U (en) 2013-12-23 2013-12-23 Tubular pile foundation beam storage pedestal shared by multiple beam types

Publications (1)

Publication Number Publication Date
CN203891511U true CN203891511U (en) 2014-10-22

Family

ID=51717927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320852143.6U Withdrawn - After Issue CN203891511U (en) 2013-12-23 2013-12-23 Tubular pile foundation beam storage pedestal shared by multiple beam types

Country Status (1)

Country Link
CN (1) CN203891511U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669922A (en) * 2013-12-23 2014-03-26 中铁五局集团贵州工程有限公司 Pipe pile foundation beam storage platform base shared by various beams and installing method
CN104532868A (en) * 2014-12-11 2015-04-22 西南交通大学 Anchored high bearing platform grouped pile foundation building method for high-steep deformation slope area bridge
CN105178352A (en) * 2015-09-25 2015-12-23 重庆建工市政交通工程有限责任公司 Bench for prefabricating adjustable T-type beams with non-equal spans and different bottom widths and construction method of bench
CN108340331A (en) * 2018-01-16 2018-07-31 石家庄铁道大学 A kind of assembled steel deposits beam pedestal

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669922A (en) * 2013-12-23 2014-03-26 中铁五局集团贵州工程有限公司 Pipe pile foundation beam storage platform base shared by various beams and installing method
CN103669922B (en) * 2013-12-23 2016-03-23 中铁五局集团贵州工程有限公司 A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method
CN104532868A (en) * 2014-12-11 2015-04-22 西南交通大学 Anchored high bearing platform grouped pile foundation building method for high-steep deformation slope area bridge
CN104532868B (en) * 2014-12-11 2016-01-06 西南交通大学 High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN105178352A (en) * 2015-09-25 2015-12-23 重庆建工市政交通工程有限责任公司 Bench for prefabricating adjustable T-type beams with non-equal spans and different bottom widths and construction method of bench
CN108340331A (en) * 2018-01-16 2018-07-31 石家庄铁道大学 A kind of assembled steel deposits beam pedestal

Similar Documents

Publication Publication Date Title
CN203891511U (en) Tubular pile foundation beam storage pedestal shared by multiple beam types
CN105625261A (en) Precast concrete block, system and building method of fast-assembled green vegetation retaining wall
CN202298650U (en) Arched retaining wall
US8696250B2 (en) Backfill system for retaining wall
EP2320122A3 (en) Method of constructing liquefied gas storage tank on land
CN102367653A (en) Support structure for large-span continuous beam construction
CN203334664U (en) Ultra-long cantilever truss structure high formwork supporting system
CN103669922B (en) A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method
CN205801957U (en) Prefabricated panel vertical storage frame
CN203654815U (en) Multi-beam-typed shared hole pile foundation simply support structure deposit beam pedestal
CN201695341U (en) Box girder prefabricated pedestal
CN102720269B (en) Multilayer cantilever rigid cylindrical structure system
CN202672186U (en) Column type reinforced gabion retaining wall
CN201722614U (en) Bridge beam construction support combining military beam support with cuplock scaffold
CN203546618U (en) Splayed supporting frame for bridge cast-in-place concrete formwork
CN202139603U (en) Storage-type tower crane foundation
CN103669923A (en) Hole pile foundation simply-supported structure beam storage platform base shared by various beams and installing method
CN202595759U (en) Independent pile foundation platform basic mechanism
CN209837085U (en) Fill out soil and bury formula step campshed supporting construction
CN203403433U (en) Simple strip foundation arrangement structure of photovoltaic module supports in photovoltaic power station
CN203066097U (en) Piled raft foundation structure of stub-type pile bearing platform structure
CN201512803U (en) Structural layer used for preventing building from sinking and bottom layer structure in transformer substation
CN210827554U (en) Novel compound barricade
CN218947641U (en) Steel reinforcement cage storage rack
CN203795453U (en) Novel high-rise building compensation-type foundation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141022

Effective date of abandoning: 20160323

C25 Abandonment of patent right or utility model to avoid double patenting