CN103669922B - A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method - Google Patents

A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method Download PDF

Info

Publication number
CN103669922B
CN103669922B CN201310715105.0A CN201310715105A CN103669922B CN 103669922 B CN103669922 B CN 103669922B CN 201310715105 A CN201310715105 A CN 201310715105A CN 103669922 B CN103669922 B CN 103669922B
Authority
CN
China
Prior art keywords
deposit
pedestal
support plate
cushion cap
many
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310715105.0A
Other languages
Chinese (zh)
Other versions
CN103669922A (en
Inventor
苟祖宽
廖勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Guizhou Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Guizhou Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Guizhou Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201310715105.0A priority Critical patent/CN103669922B/en
Publication of CN103669922A publication Critical patent/CN103669922A/en
Application granted granted Critical
Publication of CN103669922B publication Critical patent/CN103669922B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of many beam type adopted in precast beam field to share pipe pile foundation and deposit beam pedestal.Its structure is: laterally adopt two fulcrums to deposit girder construction, each beam fulcrum place basis instrument of depositing is many root canal piles (1), pile tube (1) is arranged inverted T shape cushion cap (2), above laterally place support plate (3) at cushion cap (2), support plate (3) places precast beam (4) above.The present invention successfully solves because beam type is more in precast beam field, and system order of setting a roof beam in place is interlaced, and single beam type deposits beam time short technical barrier, has effectively saved and has deposited beam place, deposited beam pedestal cost investment.

Description

A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method
Technical field
The present invention relates to a kind of many beam type adopted in precast beam field to share pipe pile foundation and deposit beam pedestal.
Background technology
Beam abutment design is deposited in precast beam field, conventional method be each deposit beam fulcrum under one or more stake is set, beam body weight directly vertically passes to bottom pile foundation.General precast beam field, the precast beam beam type born is fewer, and the beam pedestal of depositing of often kind of beam type is all independent design.The precast beam beam type born when precast beam field is more, it is inconsistent that various beam type deposits beam fulcrum horizontal spacing, and system is set a roof beam in place, order is interlaced, and single beam type deposits the beam time in short-term, adopt conventional method to increase and deposit beam pedestal quantity, increase beam field land area, cost is higher.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of many beam type adopted in precast beam field to share pipe pile foundation and deposit beam pedestal, to adapt to demand more due to beam type in precast beam field, overcome that conventional method exists deposit that beam pedestal quantity is many, floor space is large, the deficiency of high in cost of production.
The present invention is by the following technical solutions: laterally adopt two fulcrums to deposit girder construction, and each to deposit beam fulcrum place basis instrument be many root canal piles, pile tube arranged inverted T shape cushion cap, cushion cap laterally places support plate, places precast beam above support plate.
Each cushion cap deposited under beam fulcrum place support plate is absolute construction.
Support plate is packaged type; Size according to placed precast beam moves.Every part precast beam places 2 support plates under two terminations respectively, and each support plate separately correspondence is placed on independently on cushion cap.
Pipe pile top embeds composition rigid structures in cushion cap.
Cushion cap laterally adopts inverted T-shaped cross section along pedestal, and bottom is wider with the requirement meeting many root canal piles pile spacing, and top is narrower with the space of installing permanent bearing before reserving erection of precast beams.
The present invention successfully solves because beam type is more in precast beam field, and system order of setting a roof beam in place is interlaced, and single beam type deposits beam time short technical barrier, has effectively saved and has deposited beam place, deposited beam pedestal cost investment.
Accompanying drawing explanation
Fig. 1 is 3 dimensional drawing of the present invention;
Fig. 2 is the elevation of Fig. 1;
Fig. 3 is the lateral view of Fig. 1;
Fig. 4 is the top view of Fig. 1;
Fig. 5 is that single box double room double line box girder individual layer deposits beam end schematic diagram;
Fig. 6 is that single box single chamber double line box girder individual layer deposits beam end schematic diagram;
Fig. 7 is that single box single chamber single line case beam individual layer deposits beam end schematic diagram.
Detailed description of the invention
With reference to accompanying drawing 1,2,3,4, the invention provides a kind of many beam type adopted in precast beam field to share pipe pile foundation and deposit beam pedestal, two fulcrums are laterally adopted to deposit girder construction, each beam fulcrum place basis instrument of depositing is many root canal piles 1, pile tube 1 is arranged inverted T shape cushion cap 2, cushion cap 2 laterally places support plate 3, and support plate 3 places precast beam 4 above.
Embodiments of the invention: the parameters such as the feature of the multiple beam type precast beam 4 born according to precast beam place and geologic information, calculate select each deposit beam fulcrum under the parameter of required pile tube 1 and quantity carry out reasonable Arrangement.
According to inverted T-shaped cushion cap 2 size that the designs such as pile tube 1 arrangement pitch, precast beam 4 support position, cushion cap 2 force request are suitable.
Precast beam 4 adopts four fulcrums to deposit, and deposits the longitudinal two-end structure of beam pedestal the same, and longitudinal pitch requires to arrange according to the beam span of depositing of precast beam 4.
According to the difference of the precast beam 4 bearing horizontal spacing of different beam type, cushion cap 2 is placed support plate 3 respectively and carries out various beam type case beam and deposit.
As shown in Fig. 5, Fig. 6, Fig. 7, be the different beam type of three kinds of bearing horizontal spacings on the invention individual layer deposit schematic diagram.

Claims (3)

1. beam type more than a kind shares pipe pile foundation and deposits beam pedestal, it is characterized in that: laterally adopt two fulcrums to deposit girder construction, each beam fulcrum place basis instrument of depositing is many root canal piles (1), pile tube (1) is arranged inverted T shape cushion cap (2), above laterally support plate (3) is placed at cushion cap (2), support plate (3) places precast beam (4) above, and support plate (3) is packaged type.
2. many beam type according to claim 1 share pipe pile foundation and deposit beam pedestal, it is characterized in that: each cushion cap (2) deposited under beam fulcrum place support plate (3) is absolute construction.
3. many beam type according to claim 1 share pipe pile foundation and deposit beam pedestal, it is characterized in that: pile tube (1) stake top embeds in cushion cap (2).
CN201310715105.0A 2013-12-23 2013-12-23 A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method Active CN103669922B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310715105.0A CN103669922B (en) 2013-12-23 2013-12-23 A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310715105.0A CN103669922B (en) 2013-12-23 2013-12-23 A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method

Publications (2)

Publication Number Publication Date
CN103669922A CN103669922A (en) 2014-03-26
CN103669922B true CN103669922B (en) 2016-03-23

Family

ID=50308631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310715105.0A Active CN103669922B (en) 2013-12-23 2013-12-23 A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method

Country Status (1)

Country Link
CN (1) CN103669922B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951705A (en) * 2018-07-10 2018-12-07 中铁十局集团第二工程有限公司 One kind depositing beam Precasting Pedestal Construction method
CN114541241A (en) * 2022-01-11 2022-05-27 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for box girder in girder storage period

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006045793A (en) * 2004-07-30 2006-02-16 Sekkeishitsu Soil:Kk Structure of foundation
CN101363229A (en) * 2008-05-30 2009-02-11 温州东瓯建设集团有限公司 Rigid and flexible pile composite foundation
CN201553990U (en) * 2009-11-23 2010-08-18 中国建筑二局第三建筑公司 Mobile beam-storing pedestal of unballasted track of post-tensioned pre-stressed simply supported box girder
CN202202337U (en) * 2011-08-08 2012-04-25 中国电力工程顾问集团西南电力设计院 Anti- liquefying bucket wheel machine foundation
CN203891511U (en) * 2013-12-23 2014-10-22 中铁五局集团贵州工程有限公司 Tubular pile foundation beam storage pedestal shared by multiple beam types

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006045793A (en) * 2004-07-30 2006-02-16 Sekkeishitsu Soil:Kk Structure of foundation
CN101363229A (en) * 2008-05-30 2009-02-11 温州东瓯建设集团有限公司 Rigid and flexible pile composite foundation
CN201553990U (en) * 2009-11-23 2010-08-18 中国建筑二局第三建筑公司 Mobile beam-storing pedestal of unballasted track of post-tensioned pre-stressed simply supported box girder
CN202202337U (en) * 2011-08-08 2012-04-25 中国电力工程顾问集团西南电力设计院 Anti- liquefying bucket wheel machine foundation
CN203891511U (en) * 2013-12-23 2014-10-22 中铁五局集团贵州工程有限公司 Tubular pile foundation beam storage pedestal shared by multiple beam types

Also Published As

Publication number Publication date
CN103669922A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN203891511U (en) Tubular pile foundation beam storage pedestal shared by multiple beam types
WO2011084989A3 (en) Splice for a soil reinforcing element or connector
US20090067933A1 (en) Compressible Mechanically Stabilized Earth Retaining Wall System and Method for Installation Thereof
CN103669922B (en) A kind of many beam type share pipe pile foundation and deposit beam pedestal and mounting method
CN202936798U (en) Double-row pile structure with prestress vertical anchor cables
CN203334664U (en) Ultra-long cantilever truss structure high formwork supporting system
CN203593337U (en) Three-dimensional storage rack structure and three-dimensional storage rack
CN203654815U (en) Multi-beam-typed shared hole pile foundation simply support structure deposit beam pedestal
CN210684718U (en) Combined foundation pit supporting structure
CN102720269B (en) Multilayer cantilever rigid cylindrical structure system
CN202000687U (en) Existing earth building earth wall body reinforcing device through wooden columns and wooden beams
CN203403366U (en) Three-way positioning device for base steel anchor box
CN203295957U (en) Continuous beam and arch combination bridge
CN210976179U (en) Keel system rammed earth wall
CN202139603U (en) Storage-type tower crane foundation
CN204826620U (en) Construction roof beam structure
CN203755323U (en) Wall plate lattice type steel boxed cofferdam
CN202595759U (en) Independent pile foundation platform basic mechanism
CN203256744U (en) Device for correcting perpendicularity of concrete-filled steel tubular column through reverse construction method
CN103669923A (en) Hole pile foundation simply-supported structure beam storage platform base shared by various beams and installing method
CN207376812U (en) A kind of steel-structure factory building cantilevered structure
CN219407666U (en) Double-deck roof beam structure of depositing of simply supported U roof beam
CN213869136U (en) Independent bracket structure of underground factory building rack
CN203795453U (en) Novel high-rise building compensation-type foundation structure
CN220301350U (en) Earthing backfill structure in mountain region building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant