CN203891063U - Leaking stoppage device of hot-blast furnace foundation - Google Patents

Leaking stoppage device of hot-blast furnace foundation Download PDF

Info

Publication number
CN203891063U
CN203891063U CN201420324969.XU CN201420324969U CN203891063U CN 203891063 U CN203891063 U CN 203891063U CN 201420324969 U CN201420324969 U CN 201420324969U CN 203891063 U CN203891063 U CN 203891063U
Authority
CN
China
Prior art keywords
hot
plugging
furnace foundation
plugging plate
blast stove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420324969.XU
Other languages
Chinese (zh)
Inventor
黄晓春
李淼
陈亮
普庆荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd filed Critical Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd
Priority to CN201420324969.XU priority Critical patent/CN203891063U/en
Application granted granted Critical
Publication of CN203891063U publication Critical patent/CN203891063U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a leaking stoppage device of a hot-blast furnace foundation. The leaking stoppage device comprises a plugging plate (1) and grouting holes (2). The plugging plate (1) is arranged between reinforcing ribs (4) of foundation bolts of the furnace foundation (6), and the grouting holes (2) are evenly distributed in the middle of the plugging plate (1). According to the leaking stoppage device of the hot-blast furnace foundation, the plugging plate is arranged at the gap between the reinforcing ribs of the foundation bolts of the hot-blast furnace foundation in a solidifying mode, so that the foundation bolt reinforcing ribs surrounding the periphery of a furnace shell of a hot-blast furnace and the plugging plate are connected into an integral cavity, the grouting holes are evenly distributed in the plugging plate, an external grouting method is used for plugging air leakage of the furnace foundation, the investment is saved, an original structure is not damaged, the working stability of the hot-blast furnace can be effectively maintained, and construction personal safety is facilitated. The leaking stoppage device of the hot-blast furnace foundation is simple in structure, short in days for construction, good in safety, and capable of effectively strengthening the furnace foundation, plugging air leakage of the furnace foundation and protecting the furnace shell, thereby prolonging the service life of equipment.

Description

A kind of hot-blast stove furnace foundation device for plugging
Technical field
The utility model relates to a kind of metallurgical mining technique field, be specifically related to a kind of simple in structure, stable performance, easy to operate hot-blast stove furnace foundation device for plugging.
Background technology
Hot-blast stove is mainly comprised of a large amount of refractory masonries and ancillary service, has sizable loading.This just requires hot-blast stove must have corresponding basis, and this basis, is called furnace foundation.The furnace shell of modern high temperature hot-blast furnace is together with drop-bottom, to be welded into a gastight integral body with the hot-blast stove steel plate that 8~20mm thickness does not wait, and portion serves as a contrast with refractory masonry within it, and with fang bolt, furnace shell is fixed on furnace foundation.Furnace foundation can bear whole loadings, and keeps hot-blast stove stable.Prior art top combustion stove, due to the grout hole of offering on furnace shell base plate in hot-blast stove foundation construction process after grouting during shutoff due to construction Welding Problems, after causing going into operation, hot-blast stove furnace foundation around leaks out, hot-blast stove runout damage furnace shell, reduces service life of equipment and jeopardizes operating personnel's personal safety.For this reason, develop a kind of simple in structure, effectively reinforce furnace foundation, shutoff furnace foundation leaks out, and protection furnace shell, guarantees that the hot-blast stove furnace foundation device for plugging of construction safety is the effective way addressing this problem.
Utility model content
It is a kind of simple in structure that the purpose of this utility model is to provide, and shutoff furnace foundation leaks out, and keeps hot-blast stove working stability be conducive to the to construct hot-blast stove furnace foundation device for plugging of personal safety.
The purpose of this utility model is achieved in that and comprises that plugging plate and grout hole, described plugging plate are arranged between the reinforcing rib of furnace foundation stone bolt, and described grout hole is uniform to be arranged among plugging plate.
The utility model is at the hot-blast stove fixed plugging plate that arranges of the gap location between foot bolt reinforcing rib fundamentally, make to be linked to be a whole cavity around the stone bolt reinforcing rib of hot-air stove shell periphery and plugging plate, and on plugging plate the uniform grout hole that arranges, adopt outside grouting shutoff furnace foundation to leak out, reduced investment, do not destroy original structure, effectively keep hot-blast stove working stability and be conducive to the personal safety of constructing.The utility model is simple in structure, the duration is short, safety is good, effectively reinforce furnace foundation, and shutoff furnace foundation leaks out and protects furnace shell, and then has extended the application life of equipment.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model;
Fig. 2 is that the utility model overall structure is overlooked cross-sectional schematic;
In figure: 1-plugging plate, 2-grout hole, 3-annular slab, 4-reinforcing rib, 5-drop-bottom, 6-furnace foundation.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described, but must not to the utility model, be limited by any way, any change or the improvement based on the utility model training centre, done, all belong to protection domain of the present utility model.
As shown in accompanying drawing 1 ~ 2, the utility model comprises plugging plate 1 and grout hole 2, and described plugging plate 1 is arranged between the reinforcing rib 4 of stone bolt of furnace foundation 6, and described grout hole 2 is uniform to be arranged among plugging plate 1.
Described plugging plate 1 is rectangular configuration, be tightly connected annular slab 3 lower planes of body of heater of its upper limb, its lower edge plane on drop-bottom 5 that is tightly connected.
Between two reinforcing ribs 4 of the width dimensions of described plugging plate 1 and stone bolt, distance adapts.
The cross section of described reinforcing rib 4 is for falling " U " shape structure, and two openends are fixed connection plugging plate 1 respectively.
Described reinforcing rib 4 they " U " shape mouths connect plugging plate 1 from beginning to end, form sealed cavity body structure with annular slab 3, the drop-bottom 5 of top and bottom.
Described grout hole 2 bore size are ¢ 30 ~ 50mm.
On described grout hole 2, orifice tube is set, the fixed grouting valve that arranges in described orifice tube outer end.
Described grout hole 2 end peripheries are filled up Anchor Agent and geotextiles mixed coating are set.
Operating principle of the present utility model and the course of work are as follows:
The utility model is at the hot-blast stove fixed plugging plate that arranges of the gap location between foot bolt reinforcing rib fundamentally, make to be linked to be a whole cavity around the stone bolt reinforcing rib of hot-air stove shell periphery and plugging plate, and on plugging plate the uniform grout hole that arranges, adopt outside grouting shutoff furnace foundation to leak out, reduced investment, do not destroy original structure, effectively keep hot-blast stove working stability and be conducive to the personal safety of constructing.
Yi Kungang new district 3# hot-blast stove furnace foundation around leaks out below, to furnace foundation grouting leak-stopping, is embodiment, further illustrates:
Adopt the steel plate of 10mm, according to hot-blast stove, process Plate Welding plugging plate in scene, the gap between foot bolt reinforcing rib fundamentally, make to be linked to be before a whole cavity is constructed and to need to clean out the foreign material between furnace shell and furnace foundation base plate angle together with annular slab, drop-bottom around the gap between the stone bolt reinforcing rib of hot-blast stove furnace foundation.Uniformly on the plugging plate of a week grout hole of four DN40 is set and loads onto valve being linked to be.Grouting adopts resin polymerization agent high fluidity grouting material, and first toward the grout hole grouting of a direction, other three grout hole valve opens, just can close this valve after seeing which hole pulp.After valve Close All, proceed back-grouting, and observe grouting machine outlet pressure, pressure starts pressurize after getting to suitable requirement, then changes another one grouting mouth until be in the milk.Adopt this outside grouting to block and leak out, reduced investment, do not destroy original structure.
The utlity model has simple in structure, the duration is short, safety is good, effectively reinforce furnace foundation, shutoff furnace foundation leaks out and protects furnace shell, and then the feature in extension device application life.

Claims (8)

1. a hot-blast stove furnace foundation device for plugging, comprise plugging plate (1) and grout hole (2), it is characterized in that: described plugging plate (1) is arranged between the reinforcing rib (4) of stone bolt of furnace foundation (6), and described grout hole (2) is uniform to be arranged among plugging plate (1).
2. hot-blast stove furnace foundation device for plugging according to claim 1, is characterized in that: described plugging plate (1) is rectangular configuration, be tightly connected annular slab (3) lower plane of body of heater of its upper limb, its lower edge plane on drop-bottom (5) that is tightly connected.
3. hot-blast stove furnace foundation device for plugging according to claim 1 and 2, is characterized in that: between two reinforcing ribs (4) of the width dimensions of described plugging plate (1) and stone bolt, distance adapts.
4. hot-blast stove furnace foundation device for plugging according to claim 1, is characterized in that: the cross section of described reinforcing rib (4) is for falling " U " shape structure, and two openends are fixed connection plugging plate (1) respectively.
5. according to the hot-blast stove furnace foundation device for plugging described in claim 1 or 4, it is characterized in that: it " U " shape mouth of described reinforcing rib (4) connects plugging plate (1) from beginning to end, form sealed cavity body structure with annular slab (3), the drop-bottom (5) of top and bottom.
6. hot-blast stove furnace foundation device for plugging according to claim 1, is characterized in that: described grout hole (2) bore size is ¢ 30 ~ 50mm.
7. according to the hot-blast stove furnace foundation device for plugging described in claim 1 or 6, it is characterized in that: described grout hole arranges orifice tube on (2) the fixed grouting valve that arranges in described orifice tube outer end.
8. according to the hot-blast stove furnace foundation device for plugging described in claim 1 or 6, grout hole (2) the end periphery described in it is characterized in that is filled up Anchor Agent and geotextiles mixed coating is set.
CN201420324969.XU 2014-06-18 2014-06-18 Leaking stoppage device of hot-blast furnace foundation Expired - Fee Related CN203891063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420324969.XU CN203891063U (en) 2014-06-18 2014-06-18 Leaking stoppage device of hot-blast furnace foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420324969.XU CN203891063U (en) 2014-06-18 2014-06-18 Leaking stoppage device of hot-blast furnace foundation

Publications (1)

Publication Number Publication Date
CN203891063U true CN203891063U (en) 2014-10-22

Family

ID=51717484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420324969.XU Expired - Fee Related CN203891063U (en) 2014-06-18 2014-06-18 Leaking stoppage device of hot-blast furnace foundation

Country Status (1)

Country Link
CN (1) CN203891063U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988260A (en) * 2015-07-13 2015-10-21 山东钢铁股份有限公司 A method for sealing gas leakage of furnace foundation of blast furnace
CN109825658A (en) * 2019-02-28 2019-05-31 中国十九冶集团有限公司 Method for treating air leakage of hot blast stove bottom plate
CN114774607A (en) * 2022-04-24 2022-07-22 北京首钢建设集团有限公司 Hot blast stove bottom structure and welding method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988260A (en) * 2015-07-13 2015-10-21 山东钢铁股份有限公司 A method for sealing gas leakage of furnace foundation of blast furnace
CN109825658A (en) * 2019-02-28 2019-05-31 中国十九冶集团有限公司 Method for treating air leakage of hot blast stove bottom plate
CN114774607A (en) * 2022-04-24 2022-07-22 北京首钢建设集团有限公司 Hot blast stove bottom structure and welding method thereof
CN114774607B (en) * 2022-04-24 2023-09-15 北京首钢建设集团有限公司 Furnace bottom structure of hot blast furnace and welding method thereof

Similar Documents

Publication Publication Date Title
CN203891063U (en) Leaking stoppage device of hot-blast furnace foundation
CN102206722B (en) Quick repair method for fallen hot air pipeline refractory
CN104847984A (en) Pipeline bell-and-spigot joint technology
CN206409246U (en) A kind of Water slop injector
CN202131618U (en) Seepage-prevention joint device for underground diaphragm wall
CN205118438U (en) Nodular cast iron top tube
CN203363529U (en) Concrete pipe repairing device of water supply prestress steel cylinder
CN104674817B (en) The method of the sealing of falling pressure type slip casting closure reserving hole
CN104695980A (en) Hydropower diversion tunnel lining structure applied to rock burst regions with high burial depth, high ground temperature and high ground stress
CN205532657U (en) Blow and compress anchor rod grout device
CN109825658A (en) Method for treating air leakage of hot blast stove bottom plate
CN203784513U (en) Connection device of grouting pipe and sleeve
CN112062483B (en) Structure for preventing air leakage at upper part of unloading platform of Maerz kiln
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall
CN205046659U (en) Prosthetic devices is consolidated to drainage pipe inspection shaft
CN208168878U (en) A kind of slurry shield originates transition ring structure
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN204212153U (en) Assembled steel guard cylinder
CN209397572U (en) A kind of reparation structure of rectangular canal
CN105238896B (en) Pressing system restraining blast furnace hearth plate from warping upwards and application thereof
CN206555629U (en) A kind of gas pipeline leakage point sealing device
CN204476427U (en) For the Lining of Power Tunnel structure in high buried depth, High-geotemperature, high stress rock burst area
CN207034482U (en) Pincers, riveting, capping tools on the outside of welder's elbow
CN209195460U (en) A kind of tunnel anchor pole lengthens the protective device of welding position
CN204589217U (en) The device that a kind of bell-less furnace top blast furnace process trunnion gets stuck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20180618

CF01 Termination of patent right due to non-payment of annual fee