CN203890855U - Sea floating bridge - Google Patents
Sea floating bridge Download PDFInfo
- Publication number
- CN203890855U CN203890855U CN201420307851.6U CN201420307851U CN203890855U CN 203890855 U CN203890855 U CN 203890855U CN 201420307851 U CN201420307851 U CN 201420307851U CN 203890855 U CN203890855 U CN 203890855U
- Authority
- CN
- China
- Prior art keywords
- bridge
- float
- sea
- floating
- floater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a sea floating bridge which is characterized by being formed by a bridge floor assembly, floater cabins, floaters, bridge floating piers, sleeper beams, floater cabin support, gravity bridge piers, balance weight towing cables and balance weight hammers. The bridge floor assembly is arranged on the sleeper beams, the bridge floating piers are arranged under the sleeper piers, the bridge floating piers are fixed to the floater cabins through the floater cabin supports, the gravity bridge piers are connected under the floater cabin supports, the floater cabin supports are connected with the balance weight hammers through the balance weight towing cables, the floaters are arranged in the floater cabins, the sleeper beams are arranged on the bridge floating piers in a cross mode, and the bridge floor assembly is arranged on the sleeper beams in a sleeping mode. The sea floating bridge can be widely applied to highway bridges, railway bridges, highway and railway bridges, bridge tower suspension bridges and arch sling bridges. The sea floating bridge can be also used for building sea docks, sea land, sea airports and other sea and water-based facilities. The sea floating bridge has the advantages of being reasonable in design, convenient to construct, capable of achieving factory manufacturing and in-site construction, capable of reducing construction cost, safe and reliable.
Description
Technical field
The utility model belongs to bridge design technology field, relates to a kind of marine pontoon bridge.
Background technology
At present, domestic relevant bridge design in the prior art, mainly contains beam bridge, slab bridge, arch bridge, steel structural bridge, suspension bridge, combined system birdge as cable stayed bridge and suspension bridge, pontoon bridge etc.Above-mentioned various beam bridge, slab bridge, arch bridge, its crossbeam of steel structural bridge and bridge floor mainly with simply supported beam mechanics form land on the sleeper beam of bridge pier, for strengthening stress and the amount of deflection of its rigidity, minimizing beam, certainly will to add the structure of crossbeam, bridge self static load is strengthened, also make bridge pier load increase the weight of, bridge pier certainly will want overstriking to strengthen, and increases construction cost and difficulty of construction.Suspension bridge and combined system birdge need to be built very high bridge tower, and its basis, bridge pier engineering cost are high, and difficulty of construction is large.Pontoon bridge is mainly used in inland river now, and does not also apply at present at sea, and the fatal shortcoming that current pontoon bridge exists is that bridge floor fluctuates along with the fluctuation of the water surface.
Summary of the invention
The utility model has overcome the defect of above-mentioned existence, object be for bridge construction provides one can factory process, site operation economical and practical, build little, the safe and reliable marine pontoon bridge of difficulty.
The marine pontoon bridge content Description of the utility model:
The marine pontoon bridge of the utility model, it is characterized in that: be to be formed by bridge floor assembly, float storehouse, float, the floating pier of bridge, sleeper beam, float bin bracket, gravity bridge pier, counterweight guy rope and counter weight, bridge floor assembly is arranged on sleeper beam, below sleeper beam, be provided with the floating pier of bridge, the floating pier of bridge is fixed on float storehouse by float bin bracket, at float bin bracket second line of a couplet gravity bridge pier, float bin bracket is connected with counter weight by counterweight guy rope, in float storehouse, be provided with float, on the floating pier of bridge, cross-arm is provided with sleeper beam, and bridge floor assembly pillow drops on sleeper beam.
The marine pontoon bridge of the utility model, can be widely applicable for road bridge, railway bridge, highway rail bridge, bridge tower suspension bridge and hunchbacked cable-suspended bridge, application the utility model also can be built sea harbour, marine land, seadrome and other marine and facility waterborne, has reasonable in design, easy construction, can realize factory process, site operation, minimizing cost, safe and reliable feature.
Brief description of the drawings
Fig. 1 is marine pontoon bridge side structure schematic diagram.
In figure: the 1st, bridge floor assembly, the 2nd, float storehouse, the 3rd, float, the 4th, bridge floats pier, the 5th, sleeper beam, the 6th, float bin bracket, the 7th, gravity bridge pier, the 8th, counterweight guy rope, the 9th, counter weight, A are that the water surface, B are sea bed faces.
Detailed description of the invention
The marine pontoon bridge of the utility model is achieved in that below in conjunction with accompanying drawing and illustrates.
See Fig. 1, the marine pontoon bridge of the utility model, be by: bridge floor assembly 1, float storehouse 2, float 3, the floating pier 4 of bridge, sleeper beam 5, float bin bracket 6, gravity bridge pier 7, counterweight guy rope 8 and counter weight 9 form.
Bridge floor assembly 1 is arranged on sleeper beam 5, is provided with the floating pier 4 of bridge below sleeper beam 5, and the floating pier 4 of bridge is fixed on float storehouse 2 by float bin bracket 6, is provided with float 3 in float storehouse 2.Upwards floating for preventing it, at float bin bracket 6 second line of a couplet gravity bridge piers 7, float bin bracket 6 is connected with counter weight 9 by counterweight guy rope 8.
The buoyancy that designing requirement float storehouse 2 produces will be far longer than the load of its top bridge floor assembly 1, is far smaller than again the gravity of gravity bridge pier 7 simultaneously.In the time that buoyancy is not enough, can in float storehouse 2, install according to setting buoyancy size the float 3 of sufficient amount additional.
On the floating pier 4 of bridge, cross-arm is provided with sleeper beam 5, and bridge floor assembly 1 pillow drops on sleeper beam 5.For anti-bridge floor downwarp, can add and put float storehouse 2 in the bridge floor bottom of bridge floor assembly 1, its buoyancy size and number, depending on the amount of deflection of required rectification bridge floor.
The floating pier 4 of bridge also can arrange suspension cable bridge tower or hoist cable back of a bow frame above.
When enforcement, the float of pontoon bridge 3 and float storehouse 2 are placed in to minimum undersurface lower seat.So, float 3 is not just affected by water level fluctuation.Float is fixed on bridge pier, and the gravity of bridge pier will be far longer than the buoyancy in float and float storehouse, and float and float storehouse can only be fixed in setting height.The bridge floor assembly of bridge and sleeper beam land are on bridge pier.The buoyancy that the float of the marine pontoon bridge of the utility model and float storehouse produce, the gravity that produce much larger than the dynamic loading on bridge floor assembly, sleeper beam and bridge floor.Float and float storehouse will be stabilized in the height of setting like this, and can not produce the phenomenon that descends slowly and lightly.
The marine pontoon bridge of the utility model, bridge pier is buoyancy bridge pier, and can add and put float and float storehouse on bridge pier, to increase the buoyancy of bridge pier.Float and float storehouse are placed under the sea after ebb deeply, bridge pier self buoyancy is the buoyancy in float and float storehouse in addition, be greater than the total load that bridge floor acts on bridge pier, counterweight in addition below float and float storehouse, makes float and float storehouse firmly be fixed on the height of setting under sea.The utility model can be widely applicable for road bridge, railway bridge, highway rail bridge.Also be suitable for bridge crane Sarasota is set thereon.Have reasonable in designly, build difficulty little, can realize factory process, on-the-spot installation.Cost is low, has overcome that existing pontoon bridge rises and falls with the water surface and unsteady shortcoming.Safe and reliable, can realize modularization, modularization, standardization.Application the utility model also can be built sea harbour, marine land, seadrome and other marine and facility waterborne.
Claims (1)
1. a marine pontoon bridge, it is characterized in that: be by bridge floor assembly (1), float storehouse (2), float (3), bridge floats pier (4), sleeper beam (5), float bin bracket (6), gravity bridge pier (7), counterweight guy rope (8) and counter weight (9) form, bridge floor assembly (1) is arranged on sleeper beam (5), below sleeper beam (5), be provided with the floating pier (4) of bridge, bridge floats pier (4) and is fixed on float storehouse (2) by float bin bracket (6), at float bin bracket (6) second line of a couplet gravity bridge pier (7), float bin bracket (6) is connected with counter weight (9) by counterweight guy rope (8), in float storehouse (2), be provided with float (3), on the floating pier (4) of bridge, cross-arm is provided with sleeper beam (5), bridge floor assembly (1) pillow drops on sleeper beam (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420307851.6U CN203890855U (en) | 2014-06-11 | 2014-06-11 | Sea floating bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420307851.6U CN203890855U (en) | 2014-06-11 | 2014-06-11 | Sea floating bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203890855U true CN203890855U (en) | 2014-10-22 |
Family
ID=51717277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420307851.6U Expired - Fee Related CN203890855U (en) | 2014-06-11 | 2014-06-11 | Sea floating bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203890855U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386095A (en) * | 2017-08-02 | 2017-11-24 | 中国人民解放军理工大学 | Tied arch pontoon bridge and tied arch pontoon bridge erection method |
CN108086129A (en) * | 2017-12-04 | 2018-05-29 | 中国船舶工业集团公司第七0八研究所 | A kind of structure that very fast can install and dismantle marine highway |
CN108468267A (en) * | 2018-04-26 | 2018-08-31 | 方明俊 | A kind of floating pier bridge spanning the sea |
CN112942064A (en) * | 2021-04-28 | 2021-06-11 | 广东森鲲科技有限公司 | Assembled detachable floating bridge |
-
2014
- 2014-06-11 CN CN201420307851.6U patent/CN203890855U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386095A (en) * | 2017-08-02 | 2017-11-24 | 中国人民解放军理工大学 | Tied arch pontoon bridge and tied arch pontoon bridge erection method |
CN107386095B (en) * | 2017-08-02 | 2023-04-28 | 中国人民解放军理工大学 | Tie arch floating bridge and tie arch floating bridge erection method |
CN108086129A (en) * | 2017-12-04 | 2018-05-29 | 中国船舶工业集团公司第七0八研究所 | A kind of structure that very fast can install and dismantle marine highway |
CN108086129B (en) * | 2017-12-04 | 2019-06-21 | 中国船舶工业集团公司第七0八研究所 | A kind of structure that very fast can install and dismantle marine highway |
CN108468267A (en) * | 2018-04-26 | 2018-08-31 | 方明俊 | A kind of floating pier bridge spanning the sea |
CN108468267B (en) * | 2018-04-26 | 2023-11-03 | 方明俊 | Floating pier sea-crossing bridge |
CN112942064A (en) * | 2021-04-28 | 2021-06-11 | 广东森鲲科技有限公司 | Assembled detachable floating bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203890855U (en) | Sea floating bridge | |
CN102535504B (en) | Seismic isolation foundation for bridge | |
CN204875484U (en) | Oscillating is suitable for landing stage of oceanic tide | |
CN201224866Y (en) | Floating pier steel bridge approach floating type elevating system | |
CN101304916B (en) | Pontoon type floating structure | |
CN103437300A (en) | Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket | |
CN205399220U (en) | Whole system of erectting of large -scale arched bridge over strait | |
CN110382344B (en) | Autonomous floatable gravity base for connection to an offshore facility | |
CN104294749B (en) | A kind of installation method of cylinder foundation trestle work structure | |
CN201605523U (en) | Suspension cable type floating bridge | |
CN203296361U (en) | Long-span steel structure cross assembling hoisting platform | |
CN107539433A (en) | A kind of semi-submersible type fan platform | |
CN208183643U (en) | A kind of dock structure taking into account large ship and heavy mail mast and hanging | |
CN201367553Y (en) | Reinforced concrete floating dock or floating bridge | |
CN102206938A (en) | Novel method for installing upper part block of offshore platform | |
CN203889012U (en) | Marine hydraulic gangplank | |
CN201037231Y (en) | Yacht dock (bateau bridge) | |
CN109112950B (en) | Floating body box bridge pier type mortise-tenon beam connection offshore highway-railway bridge | |
CN203740103U (en) | Water transport system for offshore LNG storage tank | |
CN202298649U (en) | Buttress structure with longitudinal beams | |
CN101487228A (en) | Floating bank apparatus | |
CN201883414U (en) | Bollard structure of lower platform of double-layer dock | |
CN214092145U (en) | Truss inhaul cable type floating offshore wind turbine structure | |
CN205576758U (en) | System is prevent wind in regional large -span cable -stay bridge steel case beam length cantilevered erection construction of strong typhoon | |
CN104386586B (en) | The land installation method of water conservancy project prefabricated components |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141022 Termination date: 20150611 |
|
EXPY | Termination of patent right or utility model |