CN203877964U - Up-flow anaerobic sludge blanket reactor - Google Patents

Up-flow anaerobic sludge blanket reactor Download PDF

Info

Publication number
CN203877964U
CN203877964U CN201420188494.6U CN201420188494U CN203877964U CN 203877964 U CN203877964 U CN 203877964U CN 201420188494 U CN201420188494 U CN 201420188494U CN 203877964 U CN203877964 U CN 203877964U
Authority
CN
China
Prior art keywords
water
elastic filler
layer
filler unit
anaerobic sludge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420188494.6U
Other languages
Chinese (zh)
Inventor
孔建成
王江良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd SHAOXING KAIYUAN
Original Assignee
ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd SHAOXING KAIYUAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd SHAOXING KAIYUAN filed Critical ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd SHAOXING KAIYUAN
Priority to CN201420188494.6U priority Critical patent/CN203877964U/en
Application granted granted Critical
Publication of CN203877964U publication Critical patent/CN203877964U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • Y02W10/12

Abstract

The utility model discloses an up-flow anaerobic sludge blanket reactor which comprises one or a plurality of elastic filler units and a mounting frame, wherein each elastic filler unit is in a cuboid frame structure and divided into an upper layer and a lower layer; the upper layer is an elastic filler layer, and the lower layer is a perforated water distributor layer; the mounting frame is provided with one or a plurality of containing frames; each elastic filler unit is mounted in each corresponding containing frame; each elastic filler unit is also provided with a water inlet which is communicated with the lower layer perforated water distributor layer; and the water inlet is connected with an external water distribution pump device. No shutdown or pond cleaning is needed for replacing and overhauling the sewage treatment equipment, thereby saving the mounting time and simplifying the mounting procedure; and when replacing the damaged component, people only need to replace or repair the damaged elastic filler unit instead of replacing or repairing the complete device, thereby saving the repair and maintenance cost and ensuring the production progress.

Description

A kind of upflow anaerobic sludge blanket reactor
Technical field
The utility model belongs to environmental protection equipment field, relates in particular to a kind of upflow anaerobic sludge blanket reactor.
Background technology
In existing sewage disposal technology, sewage disposal device is all installed in structures, if original biochemical equipment is changed or keeped in repair, needs to stop production and could overhaul in clear pond; More than the fixed aerating apparatus maintenance replacing time is needed to two weeks, impact is produced.
For new construction of structures, the installment and debugging of various device, need to expend a large amount of time and starting material, not only consuming time and also waste resource, economy and ageing all not good.
Utility model content
In order to solve deficiency of the prior art, make the replacing of sewage disposal device and maintenance does not need to stop production and clear pond, not only can be time saving and energy saving while sewage disposal device being installed in new structures but also can also save cost simultaneously.
The utility model provides a kind of upflow anaerobic sludge blanket reactor, comprises elastic filler unit and installation frame, and the quantity of described elastic filler unit is one or more; Elastic filler unit is rectangular parallelepiped skeleton construction, is divided into two-layerly up and down, and upper strata is resilient filler layer, and lower floor is perforation water distributor layer; Described perforation water distributor layer is provided with some perforation water pipes; In described resilient filler layer, be provided with elastic filler; Described installation frame is provided with one or more and holds frame, and elastic filler cellular installation is in holding frame; Described elastic filler is also provided with water-in on unit, and water-in and lower floor perforation water distributor layer communicates; Described water-in is connected with outside cloth pumping plant.
Wherein, the rectangular parallelepiped framework of described elastic filler unit is steel-pipe welding, the inside intercommunication of each pipe.
Also be provided with fixed support, described fixed support is arranged between resilient filler layer and perforation water distributor layer, the rectangle support that fixed support is comprised of four steel pipes; Fixed support is horizontally disposed with; Support bracket fastened four summits of rectangle are fixedly installed on the framework of vertical direction in rectangular parallelepiped elastic filler unit.
Also be provided with nylon rope, nylon rope is arranged in resilient filler layer, and the setting party of nylon rope is to being vertical direction, and nylon rope is for the neighbouring elastic filler on fixing vertical direction.
Wherein, the top layer of the rectangular parallelepiped framework of described elastic filler unit is rectangle top layer frame, is provided with round steel on top layer frame, is also provided with round steel on fixed support, two identical round steel on top layer frame and fixed support, for the fixing two ends up and down of nylon rope.
Water-in: described water-in is arranged on a right angle of top layer frame, and water-in exceeds top layer frame, the pipeline on water-in and top layer frame; The oral area of water-in is provided with rapid-acting coupling seat.This setting makes water-in exceed the height of sewage level, and fast and easy connects.
Also be provided with induction pipe, induction pipe is provided with valve; The oral area of described valve is provided with rapid-acting coupling seat; On induction pipe, be also provided with feed-water end, feed-water end is connected with cloth water pump.Induction pipe the independent dismounting that can realize elastic filler unit is set; Quick coupling seat can be realized refuting and connect fast of induction pipe and elastic filler unit fast.
Connecting water pipe, is wherein also provided with connecting water pipe between water-in and valve, the two ends of connecting water pipe are equipped with rapid-acting coupling, and the rapid-acting coupling seat of the oral area of the rapid-acting coupling of connecting water pipe and the oral area of valve and water-in adapts.Arranging of connecting water pipe with rapid-acting coupling can make to connect fast between induction pipe and elastic filler unit, also guaranteed induction pipe and elastic filler unit independence separately, what guarantee that elastic filler unit can be independent separates whole device and does not affect the operation of whole device simultaneously.
Also comprise feet, support the bottom that is arranged at perforation water distributor layer, the water pipe that prevents from boring a hole is because the tactile end is damaged.
While this equipment being installed in new structures, only need to customize the installation frame of corresponding size according to the size of structures, select the elastic filler unit of respective numbers; During installation, first installation frame is lifted into structures, then installation frame is fixed in structures, each that then one by one elastic filler unit lifting is entered to installation frame holds in frame; In the outside of structures, be installed into the mouth of a river afterwards, water-in is connected with air pump; Finally, with the valve on connecting water pipe connection induction pipe and the water-in on elastic filler unit, valve is controlled the opening and closing that single elastic filler unit send water.
When elastic filler unit need to overhaul and change, only need to close the valve that connects this elastic filler unit, pull down connecting water pipe, hang out elastic filler unit and overhaul or change.
The beneficial effects of the utility model are: make the replacing of sewage disposal device and maintenance does not need to stop production and clear pond, can integral hoisting structures while sewage disposal device being installed in new structures simultaneously, and save the settling time, simplify installation procedure; While changing damaging parts, only need to change or repair for the elastic filler unit damaging, not need whole device to change or keep in repair, save maintenance and maintenance cost; And during maintain and replace, do not need to stop production, guarantee the progress of producing.
Accompanying drawing explanation
1, Fig. 1 is the one-piece construction schematic diagram of the utility model embodiment;
2, Fig. 2 is the structural representation of the utility model embodiment Elastic filler unit;
3, Fig. 3 is the structural representation at another visual angle of the utility model embodiment Elastic filler unit CCTV;
4, Fig. 4 is the structural representation of installation frame in the utility model embodiment;
5, Fig. 5 is the structural representation of induction pipe in the utility model embodiment.
In figure: 1-elastic filler unit, 2-installation frame, 3-induction pipe, 4-connecting water pipe, 11c-top layer frame, 12-resilient filler layer, 12a-round steel, 12b-nylon rope, 12c-fixed support, 12f-elastic filler, 13-water-in, 14-perforation water distributor layer, 14a-perforation water pipe ,-15-feet, 21-hold frame, 31-valve, 32-rapid-acting coupling seat, 33-feed-water end, 41-rapid-acting coupling.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figures 1 to 5, the utility model provides a kind of upflow anaerobic sludge blanket reactor, comprises elastic filler unit 1 and installation frame 2, and wherein the quantity of elastic filler unit 1 is one or more, is 8 in the present embodiment; Elastic filler unit 1 is rectangular parallelepiped skeleton construction, is divided into two-layerly up and down, and upper strata is resilient filler layer 12, and lower floor is perforation water distributor layer 14; On perforation water distributor layer 14, be provided with some perforation water pipe 14a; In described resilient filler layer 12, be provided with elastic filler 12f.
Installation frame 2: installation frame 2 is provided with one or more and holds frame 21, elastic filler unit 1 is installed on and holds in frame 21.
Elastic filler unit 1: elastic filler unit 1 is whole for rectangular parallelepiped framework is steel-pipe welding, the inside intercommunication of each pipe.
Water-in 13: water-in 13 is arranged on a right angle of top layer frame 11c, and water-in 13 exceeds top layer frame 11c, water-in 13 communicates with the pipeline on top layer frame 11c; The oral area of water-in 13 is provided with rapid-acting coupling seat 32; Water-in 13Yu lower floor perforation water distributor layer 14 communicates; Water-in 13 is connected with outside air pump device, and in practical application, the height of water-in 13 even can surpass the height of structures, in use, for convenient, installs, and the height of general water-in 13 can not be lower than the height of sewage level.
Fixed support 12c: fixed support 12c is arranged between resilient filler layer 12 and perforation water distributor layer 14, the rectangle support that fixed support 12c is comprised of four steel pipes; Fixed support 12c is horizontally disposed with; Four summits of rectangle fixed support 12c are fixedly installed on the framework of vertical direction in rectangular parallelepiped elastic filler unit 1.
Nylon rope 12b: nylon rope 12b is arranged in resilient filler layer 12, the setting party of nylon rope 12b is to being vertical direction, and nylon rope 12b is for the neighbouring elastic filler 12f on fixing vertical direction.
Top layer frame 11c: the top layer of the rectangular parallelepiped framework of elastic filler unit 1 is rectangle top layer frame 11c, on top layer frame 11c, be provided with round steel 12a, on fixed support 12c, be also provided with round steel 12a, two identical round steel 12a on top layer frame 11c and fixed support 12c, for the fixing two ends up and down of nylon rope 12b.
Induction pipe 3: induction pipe 3 is provided with valve 31; The oral area of valve 31 is provided with rapid-acting coupling seat 32; On induction pipe 3, be also provided with feed-water end 33, feed-water end 33 is connected with cloth water pump.Induction pipe 3 the independent dismounting that can realize elastic filler unit 1 is set; Quick coupling seat can be realized refuting and connect fast of induction pipe 3 and elastic filler unit 1 fast.
Connecting water pipe 4: be wherein also provided with connecting water pipe 4 between water-in 13 and valve 31, the two ends of connecting water pipe 4 are equipped with rapid-acting coupling 41, the rapid-acting coupling 41 of connecting water pipe 4 adapts with the rapid-acting coupling seat 32 of the oral area of valve 31 and the oral area of water-in 13.Arranging of connecting water pipe 4 with rapid-acting coupling 41 can make to connect fast between induction pipe 3 and elastic filler unit 1, also guaranteed induction pipe 3 and elastic filler unit 1 independence separately, what guarantee that elastic filler unit 1 can be independent separates whole device and does not affect the operation of whole device simultaneously.
Also comprise feet 15, support the bottom that is arranged at perforation water distributor layer 14, the water pipe that prevents from boring a hole is because the tactile end is damaged.
While this equipment being installed in new structures, only need to customize the installation frame 2 of corresponding size according to the size of structures, select the elastic filler unit 1 of respective numbers; During installation, first installation frame 2 is lifted into structures, then installation frame 2 is fixed in structures, each that then one by one elastic filler unit 1 is lifted to installation frame 2 holds in frame 21; In the outside of structures, be installed into the mouth of a river 13 afterwards, water-in 13 is connected with air pump; Finally, with the valve 31 on connecting water pipe 4 connection induction pipes 3 and the water-in 13 on elastic filler unit 1, valve 31 is controlled the opening and closing that single elastic filler unit 1 send water.
When elastic filler unit 1 needs maintenance and changes, only need to close the valve 31 that connects this elastic filler unit 1, pull down connecting water pipe 4, hang out elastic filler unit 1 and overhaul or change.

Claims (10)

1. a upflow anaerobic sludge blanket reactor, is characterized in that: comprise elastic filler unit (1) and installation frame (2), the quantity of described elastic filler unit (1) is one or more; Elastic filler unit (1) is rectangular parallelepiped skeleton construction, is divided into two-layerly up and down, and upper strata is resilient filler layer (12), and lower floor is perforation water distributor layer (14); Described perforation water distributor layer (14) is provided with some perforation water pipes (14a); In described resilient filler layer (12), be provided with elastic filler (12f); Described installation frame (2) is provided with one or more and holds frame (21), and elastic filler unit (1) is installed on and holds in frame (21); On described elastic filler unit (1), be also provided with water-in (13), water-in (13) communicates with lower floor's perforation water distributor layer (14); Described water-in (13) is connected with outside cloth pumping plant.
2. a kind of upflow anaerobic sludge blanket reactor according to claim 1, is characterized in that: the rectangular parallelepiped framework of described elastic filler unit (1) is steel-pipe welding the inside intercommunication of each pipe.
3. a kind of upflow anaerobic sludge blanket reactor according to claim 1, is characterized in that: on described perforation water distributor layer (14); The bottom of perforation water distributor layer (14) is provided with feet (15).
4. a kind of upflow anaerobic sludge blanket reactor according to claim 2, it is characterized in that: between described resilient filler layer (12) and perforation water distributor layer (14), be provided with fixed support (12c), the rectangle support that fixed support (12c) is comprised of four steel pipes; Fixed support (12c) is horizontally disposed with; Four summits of rectangle fixed support (12c) are fixedly installed on the framework of vertical direction in rectangular parallelepiped elastic filler unit (1).
5. a kind of upflow anaerobic sludge blanket reactor according to claim 3, it is characterized in that: the perpendicular nylon rope (12b) that is provided with in described resilient filler layer (12), the setting party of nylon rope (12b) is to being vertical direction, and the elastic filler up and down (12f) on vertical direction is fixing by nylon rope (12b).
6. a kind of upflow anaerobic sludge blanket reactor according to claim 4, it is characterized in that: the top layer of the rectangular parallelepiped framework of described elastic filler unit (1) is rectangle top layer frame (11c), on top layer frame (11c), be provided with round steel (12a), on fixed support (12c), be also provided with identical round steel (12a), two the identical round steel (12c) on top layer frame (11c) and fixed support (12c) are in order to the fixing two ends up and down of nylon rope (12b).
7. a kind of upflow anaerobic sludge blanket reactor according to claim 5, is characterized in that: described water-in (13) is arranged on a right angle of top layer frame (11c), and water-in (13) is higher than top layer frame (11c); Top layer frame (11c) inside that water-in (13) is made with steel pipe communicates.
8. a kind of upflow anaerobic sludge blanket reactor according to claim 6, is characterized in that: between described water-in (13) and cloth water pump, be also provided with induction pipe (3), induction pipe (3) is provided with valve (31); The oral area of described valve (31) is provided with rapid-acting coupling seat (32), and induction pipe (3) is provided with feed-water end (33), and feed-water end (33) is connected with cloth water pump.
9. a kind of upflow anaerobic sludge blanket reactor according to claim 7, is characterized in that: the oral area of described water-in (13) is provided with rapid-acting coupling seat (32).
10. a kind of upflow anaerobic sludge blanket reactor according to claim 8, it is characterized in that: between described water-in (13) and valve (31), be also provided with connecting water pipe (4), the two ends of connecting water pipe (4) are equipped with rapid-acting coupling (41), and rapid-acting coupling (41) adapts with rapid-acting coupling seat (32).
CN201420188494.6U 2014-04-18 2014-04-18 Up-flow anaerobic sludge blanket reactor Expired - Fee Related CN203877964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420188494.6U CN203877964U (en) 2014-04-18 2014-04-18 Up-flow anaerobic sludge blanket reactor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420188494.6U CN203877964U (en) 2014-04-18 2014-04-18 Up-flow anaerobic sludge blanket reactor

Publications (1)

Publication Number Publication Date
CN203877964U true CN203877964U (en) 2014-10-15

Family

ID=51678488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420188494.6U Expired - Fee Related CN203877964U (en) 2014-04-18 2014-04-18 Up-flow anaerobic sludge blanket reactor

Country Status (1)

Country Link
CN (1) CN203877964U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044876A (en) * 2016-06-28 2016-10-26 维克·恩格拜 Method for separation/enrichment of sludge
CN108483652A (en) * 2018-05-28 2018-09-04 江苏凌志环保工程有限公司 A kind of improvement purification tank and its A+AO+AO rural sewage treatment process and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044876A (en) * 2016-06-28 2016-10-26 维克·恩格拜 Method for separation/enrichment of sludge
CN106044876B (en) * 2016-06-28 2020-03-17 维克·恩格拜 Sludge separation/enrichment method
CN108483652A (en) * 2018-05-28 2018-09-04 江苏凌志环保工程有限公司 A kind of improvement purification tank and its A+AO+AO rural sewage treatment process and device

Similar Documents

Publication Publication Date Title
CN203877964U (en) Up-flow anaerobic sludge blanket reactor
CN106006944A (en) Ship-mounted black odoriferous water treatment device
CN201865153U (en) Novel sac-type water supply device
CN203938515U (en) A kind of biochemical system liftable integration apparatus
CN202519140U (en) Fiberglass septic tank
CN202170544U (en) Water level monitoring device applied in water tank
CN103074916A (en) Ultra-quiet air-control automatic variable-frequency high-rise building water supply system
CN202945104U (en) Small sewage treater
CN208603823U (en) A kind of sewage treatment unit of pressure controllable
CN207792805U (en) The integrated liftable modular support of sewage disposal
CN206901946U (en) A kind of green constructing tunnel wastewater circulation device
CN205475609U (en) Last pressure relief device of conduit
CN207015548U (en) A kind of removable suction inlet
CN205222895U (en) Environmental protection sewage treatment device
CN204752305U (en) Micropore aeration system
CN204999690U (en) Waste water treatment tank aeration equipment convenient to adjust and maintain
CN211971996U (en) Sewage purification device convenient to clearance
CN203139711U (en) Gas distributing system of filter chamber
US11292736B2 (en) Device and method for installing aerobic three-phase separator without interruption of production
CN204074647U (en) Water supply line deslagging device
CN212102037U (en) Water distribution device and sewage treatment pond
CN204151752U (en) A kind of water filling gate
CN204147612U (en) Domestic water pressure filter
CN101381153B (en) Single film hole aeration filter head
CN202830643U (en) Paper repairing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20180418

CF01 Termination of patent right due to non-payment of annual fee