CN203866819U - Steel pipe pile lock mouth structure - Google Patents
Steel pipe pile lock mouth structure Download PDFInfo
- Publication number
- CN203866819U CN203866819U CN201420232826.6U CN201420232826U CN203866819U CN 203866819 U CN203866819 U CN 203866819U CN 201420232826 U CN201420232826 U CN 201420232826U CN 203866819 U CN203866819 U CN 203866819U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe
- locking notch
- fore shaft
- lock mouth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a steel pipe pile lock mouth structure, which is firm in mouth locking, good in water plugging effect and convenient to construct. The steel pipe pile lock mouth structure comprises a steel pipe, a lock mouth pipe and a lock mouth, wherein the lock mouth pipe and the lock mouth are arranged on the outer wall of the steel pipe, parallel to the steel pipe and have the same length as the steel pipe; a lock mouth groove is formed in the lock mouth pipe; the lock mouth pipe and the lock mouth form the angle of 180 degrees by using the axial line of the steel pipe as a center; the lock mouth groove is positioned on the extending line of the connecting line of the center of the lock mouth pipe and the center of the steel pipe; the lock mouth is composed of a stop plate and a pair of barrier plates; the barrier plates are symmetrically arranged between the stop plate and the steep pipe and are trumpet-shaped; the width of the outer side of the joint of each barrier plate and the steel pipe is less than that of the lock mouth groove; the width of the outer side of the joint of each barrier plate and the stop plate is larger than that of the lock mouth groove. The steel pipe pile lock mouth structure is convenient to construct, good in water plugging effect and firm in mouth locking.
Description
Technical field
The utility model relates to the steel pipe pile using in civil engineering cofferdam construction, relates in particular to a kind of locking notch structure of steel pipe pile.
Background technology
Along with bridge construction is to the development of large span direction, the construction method in large-scale underwater support table cofferdam is comparatively various, conventional is mainly precast reinforced concrete pile, prestressed reinforced concrete stake, bored pile, manually digging hole filling pile and steel pipe pile etc. at present, and often there is the phenomenon that connection is insecure or water plugging effect is poor in the syndeton of steel pipe pile of the prior art, be subject to the active force of external water pressure or inner transverse support bar, there is easily loosening risk in steel pipe pile, affects construction safety.
Utility model content
The utility model, for above problem, provides a kind of fore shaft firm, and water plugging effect is good, the steel pipe pile locking notch structure of constructability.
The technical scheme of utility model is: comprise steel pipe, locking notch pipe and fore shaft, described locking notch pipe and described fore shaft are all located on described outer wall of steel pipe and are parallel with described steel pipe, isometric, described locking notch pipe is provided with fore shaft groove, and described locking notch pipe and described fore shaft are 180 ° centered by the axis of described steel pipe;
Described fore shaft groove is positioned on the extended line of connecting line at the center of described locking notch pipe and the center of described steel pipe;
Described fore shaft is made up of check plate and a pair of barrier plate, described a pair of barrier plate is symmetrically set between described check plate and described steel pipe and is horn-like, the outside width of described a pair of barrier plate and described steel pipe junction is less than the width of described fore shaft groove, and the outside width of described a pair of barrier plate and described check plate junction is greater than the width of described fore shaft groove.
Described stiffener is all laid between described steel pipe and described locking notch pipe.
Described fore shaft forms a cavity after inserting described locking notch pipe, in described cavity, is provided with waterproof bag, in described waterproof bag, injects inserts.
Described locking notch pipe and described fore shaft are 90 ° centered by the axis of described steel pipe.
The utility model is located at fore shaft and locking notch pipe on outer wall of steel pipe, and fore shaft is inserted in locking notch pipe by the fore shaft groove on locking notch pipe, thereby two steel pipes are coupled together, constructability.After fore shaft is connected with locking notch pipe, a cavity of inner formation, is provided with waterproof bag in cavity, again inserts is injected in waterproof bag, can strengthen connection power and the water plugging effect of two steel pipes, directly not contact steel pipe because the existence of waterproof bag makes packing material, can ensure smooth pile pulling of later stage simultaneously.In the time injecting inserts, fore shaft is subject to the extruding force of inserts, outwards moves, and because the barrier plate on fore shaft is horn-like, the large opening of loudspeaker is towards check plate, and fore shaft and locking notch pipe block tighter and tighter, make to clamp effect better, and fore shaft is firm.
Brief description of the drawings
Fig. 1 is the utility model the first embodiment structural representation,
Fig. 2 is the top view of Fig. 1,
Fig. 3 is local structure for amplifying schematic diagram in Fig. 2,
Fig. 4 is that the utility model uses status architecture schematic diagram,
Fig. 5 is local structure for amplifying schematic diagram in Fig. 4,
Fig. 6 is the utility model the second embodiment structural representation;
In figure, 1 is steel pipe, the 2nd, and locking notch pipe, the 21st, fore shaft groove, the 3rd, fore shaft, the 31st, check plate, the 32nd, barrier plate, the 4th, stiffener, the 5th, waterproof bag, the 6th, inserts.
Detailed description of the invention
The utility model the first embodiment as Figure 1-5, comprise steel pipe 1, locking notch pipe 2, fore shaft 3 and some stiffeners 4, described locking notch pipe 2 is all located on described steel pipe 1 outer wall with described fore shaft 3, and parallel with described steel pipe 1, isometric, described locking notch pipe 2 is 180 ° with described fore shaft 3 centered by the axis of described steel pipe 1, the diameter of described locking notch pipe 2 is less than the diameter of described steel pipe 1, described locking notch pipe 2 is provided with the fore shaft groove 21 for inserting described fore shaft 3, described fore shaft groove 21 is positioned on the extended line of connecting line at the center of described locking notch pipe 2 and the center of described steel pipe 1,
Described stiffener 4 is all laid between described steel pipe 1 and described locking notch pipe 2, in order to increase the bond strength between described locking notch pipe 2 and described steel pipe 1.
Described fore shaft 3 is made up of check plate 31 and a pair of barrier plate 32, described a pair of barrier plate 32 is symmetrically set between described check plate 31 and described steel pipe 1, and be horn-like, the outside width of described a pair of barrier plate 32 and described steel pipe 1 junction is less than the width of described fore shaft groove 21, the outside width of described a pair of barrier plate 32 and described check plate 31 junctions is greater than the width of described fore shaft groove 21, make after described fore shaft 3 inserts described locking notch pipe 2, while being subject to the External Force Acting of cofferdam inner support pipe, described fore shaft 3 can tightly snap in described fore shaft groove 21, can effectively intercept outside water simultaneously.
Described fore shaft 3 inserts cavity of the rear formation of described locking notch pipe 2, in described cavity, be provided with waterproof bag 5, at the interior injection inserts 6 of described waterproof bag 5, described inserts 6 can be the low strength concrete mortar of certain denseness, can further intercept outside water, adopt described waterproof bag 5 can prevent that described inserts 6 from being broken up under water before solidifying, also between described inserts 6 and described locking notch pipe 2 inwalls, form separation layer simultaneously, facilitate later stage pile pulling, improve the cyclic utilization rate of described steel pipe 1.
As shown in Figure 6, described locking notch pipe 2 is 90 ° with described fore shaft 3 to the utility model the second embodiment centered by the axis of described steel pipe 1, connects the described steel pipe pile of orthogonal two row, thereby form a general frame structure during for cofferdam.
Claims (4)
1. a steel pipe pile locking notch structure, comprise steel pipe, locking notch pipe and fore shaft, described locking notch pipe and described fore shaft are all located on described outer wall of steel pipe and are parallel with described steel pipe, isometric, described locking notch pipe is provided with fore shaft groove, it is characterized in that, described locking notch pipe and described fore shaft are 180 ° centered by the axis of described steel pipe;
Described fore shaft groove is positioned on the extended line of connecting line at the center of described locking notch pipe and the center of described steel pipe;
Described fore shaft is made up of check plate and a pair of barrier plate, described a pair of barrier plate is symmetrically set between described check plate and described steel pipe and is horn-like, the outside width of described a pair of barrier plate and described steel pipe junction is less than the width of described fore shaft groove, and the outside width of described a pair of barrier plate and described check plate junction is greater than the width of described fore shaft groove.
2. a kind of steel pipe pile locking notch structure according to claim 1, is characterized in that, described stiffener is all laid between described steel pipe and described locking notch pipe.
3. a kind of steel pipe pile locking notch structure according to claim 1, is characterized in that, described fore shaft forms a cavity after inserting described locking notch pipe, in described cavity, is provided with waterproof bag, in described waterproof bag, injects inserts.
4. a kind of steel pipe pile locking notch structure according to claim 1, is characterized in that, described locking notch pipe and described fore shaft are 90 ° centered by the axis of described steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420232826.6U CN203866819U (en) | 2014-05-07 | 2014-05-07 | Steel pipe pile lock mouth structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420232826.6U CN203866819U (en) | 2014-05-07 | 2014-05-07 | Steel pipe pile lock mouth structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203866819U true CN203866819U (en) | 2014-10-08 |
Family
ID=51647789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420232826.6U Active CN203866819U (en) | 2014-05-07 | 2014-05-07 | Steel pipe pile lock mouth structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203866819U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442622A (en) * | 2015-12-15 | 2016-03-30 | 中交一公局桥隧工程有限公司 | Water-retaining construction technology for locked steel pipe piles |
CN113404036A (en) * | 2021-06-16 | 2021-09-17 | 五邑大学 | Underground diaphragm wall joint and construction method thereof |
-
2014
- 2014-05-07 CN CN201420232826.6U patent/CN203866819U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442622A (en) * | 2015-12-15 | 2016-03-30 | 中交一公局桥隧工程有限公司 | Water-retaining construction technology for locked steel pipe piles |
CN113404036A (en) * | 2021-06-16 | 2021-09-17 | 五邑大学 | Underground diaphragm wall joint and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203603930U (en) | Device for preventing tunnel secondary lining vault from disengaging | |
CN203113627U (en) | Nodular cast iron grout sleeve for connecting longitudinal steel bars | |
CN201883435U (en) | Preburied pipe pile grouting device | |
CN103410174A (en) | GXJ underground continuous wall rubber waterproof connector tool and construction method thereof | |
CN105155517B (en) | Drilling extruding pressure-bearing type bellows branch pile construction method | |
CN105804102A (en) | Construction method for water cofferdam with double-barrel-shaped buckle piles | |
CN108035337A (en) | For the connector of diaphram wall and the construction method of diaphram wall | |
CN203866819U (en) | Steel pipe pile lock mouth structure | |
CN204475326U (en) | The construction equipment of anti-slub type anti-float anchor rod | |
CN111676954A (en) | Locking type high polymer anti-seepage wall forming groove plate and construction method | |
CN202865845U (en) | 'Water knife' structure assisting in inserting and piling steel sheet pile | |
CN204475311U (en) | The occlusion structure of box-shaped steel plate occlusion diaphragm wall | |
CN204456070U (en) | Diaphragm wall shutoff stopping means | |
CN106480880B (en) | Recoverable soil nailing and the construction method for using recoverable soil nail | |
CN202706043U (en) | Steel pipe pile cofferdam lock | |
CN214944298U (en) | Pipe jacking assembly | |
CN113882360A (en) | Pile connecting structure and method for pouring tubular pile transverse partition plates | |
CN212001300U (en) | Anti-floating anchor rod for basement | |
CN103469766B (en) | Method for connecting rigid body and flexible body of dam foundation of reservoir | |
CN203855971U (en) | Sparse-row pile anchor foundation pit supporting structure | |
CN104018475B (en) | A kind of embedded penstock backfill grouting structure and grouting process thereof | |
CN202124857U (en) | Splitting pile | |
CN207538032U (en) | Perceive anchor pole | |
CN108049524B (en) | Wall reinforcement structure | |
CN206887938U (en) | A kind of pipe pipe combined type fore shaft steel-pipe pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |