CN203866671U - Plastic-grid sand-based water permeable brick pavement system - Google Patents

Plastic-grid sand-based water permeable brick pavement system Download PDF

Info

Publication number
CN203866671U
CN203866671U CN201420291582.9U CN201420291582U CN203866671U CN 203866671 U CN203866671 U CN 203866671U CN 201420291582 U CN201420291582 U CN 201420291582U CN 203866671 U CN203866671 U CN 203866671U
Authority
CN
China
Prior art keywords
permeable
water
permeable brick
plastic grid
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420291582.9U
Other languages
Chinese (zh)
Inventor
王俊岭
张玉玉
张雅君
冯萃敏
李俊奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Civil Engineering and Architecture filed Critical Beijing University of Civil Engineering and Architecture
Priority to CN201420291582.9U priority Critical patent/CN203866671U/en
Application granted granted Critical
Publication of CN203866671U publication Critical patent/CN203866671U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a plastic-grid sand-based water permeable brick pavement system which comprises an earth base layer, a graded aggregate layer and a water permeable face layer which are laid from bottom to top. The water permeable face layer comprises a plastic grid, a pebble layer and water permeable bricks; supporting strips are arranged in the plastic grid, the pebble layer is laid in the plastic grids and located under the supporting strips, and the water permeable bricks are supported on the supporting strips and flush with the top surface of the plastic grid. The plastic-grid sand-based water permeable brick pavement system has high strength and high rainwater permeation speed, and is free of a leveling layer, high in construction speed and capable of being subjected to modular construction; the face layer of the pavement system is even so that the pavement system looks attractive after pavement; with recycled plastics, the pavement system has the advantages of energy and material conservation, environmental friendliness and ecological effect.

Description

A kind of plastic grid sand base water-permeable brick system of mating formation
[technical field]
The utility model relates to a kind of permeable pavement system, is specifically related to a kind of plastic grid sand base water-permeable brick system of mating formation, and its use by the use of water-permeable brick and plastic grid combines, can be used for sidewalk, parking lot, square, view harden zones etc., belong to construction engineering technical field.
[background technology]
Along with the development in city, city Permeable stratum area is increasing, it is more and more less that rainwater infiltration amount accounts for total amount of precipitation, city waterlogging phenomenon is more and more, underground water is difficult to obtain supply, causes hydrologic cycle to be destroyed, and runoff carries pollutant remittance river, surface gathered water problem is all the more serious, in this case, permeable pavement arises at the historic moment.Permeable pavement is as a kind of Ecological basis facility, it can be increased to precipitation leakage rate more than 75% by the 10%-15% in the place of hardening, not only can greatly reduce surface runoff amount, flood peak clipping, promote rain infiltration, recharge of groundwater resource stores rainwater simultaneously, has also avoided a large amount of rainwater pollutions river, eroding channel problem.
Traditional permeable pavement type mainly contains: the forms such as water-permeable brick, pervious concrete, permeable building block, permeable grid.Water-permeable brick mat formation that efficiency of construction is low in general, be difficult for keeping smooth, grown service time and can reduce permeation rate etc., but had a kind of novel sand base brick permeation rate can be improved to five times, have propagable prospect.The maximum of the current use of permeable grid are the porous embedding grass bricks in parking lot, and occasional is seen the permeable grid of tubulose of plastics sometimes.Permeable grid can effectively improve rainwater infiltration speed, and surperficial percent opening is high, and what water storage boulder bed arranged at bottom also can store rainwater.Because plastic grid intensity is not high, thus be generally used in less demanding parking lot, in addition, therefore be not very smooth sidewalk and the nonmotorized vehicle lane of being generally not used in after back-up sand stone in plastic grid.
There is more problem for the water-permeable bricks such as sidewalk, view road, parking lot and square or permeable grid aspect in traditional, as long in the engineering time, construction of leveling blanket is worked repeatedly when comparatively difficulty, water-permeable brick are placed, and it is smooth that surface layer is difficult for, and infiltration efficiency is low etc.
Therefore,, for solving the problems of the technologies described above, necessary a kind of novel plastic grid sand base water-permeable brick system of mating formation that provides, to overcome described defect of the prior art.
[utility model content]
For addressing the above problem, the purpose of this utility model is to provide a kind of structural strength high, keeps the change flat bed, and speed of application is fast, the fireballing plastic grid sand of the rainwater infiltration base water-permeable brick system of mating formation.
For achieving the above object, the technical scheme that the utility model is taked is: a kind of plastic grid sand base water-permeable brick system of mating formation, and it comprises soil matrix layer, graded broken stone layer and the permeable surface layer laid from bottom to top; Wherein, described permeable surface layer comprises plastic grid, ovum macadam and water-permeable brick; In described plastic grid, be provided with support bar, described ovum macadam is laid in plastic grid, and is positioned at the below of support bar; Described water-permeable brick is supported in the top of support bar, and concordant with the end face of plastic grid.
The plastic grid sand base water-permeable brick of the present utility model system of mating formation is further: described permeable surface thickness is 29-34cm, and graded broken stone layer thickness is 25-45cm.
The plastic grid sand base water-permeable brick of the present utility model system of mating formation is further: in the middle of described graded broken stone layer and soil matrix layer, lay Unidirectional water permeable geotechnique layer of cloth.
The plastic grid sand base water-permeable brick of the present utility model system of mating formation is further: in described permeable surface layer, comprise four water-permeable bricks that 2*2 arranges.
The plastic grid sand base water-permeable brick of the present utility model system of mating formation is further: in described permeable surface layer, comprise four side by side or the water-permeable brick of horizontally-arranged.
The plastic grid sand base water-permeable brick of the present utility model system of mating formation is further: the water-permeable brick that comprises eight horizontally-arrangeds or tandem in described permeable surface layer.
The plastic grid sand base water-permeable brick of the present utility model system of mating formation also can be: the water-permeable brick that comprises 16 tandems in described permeable surface layer.
Compared with prior art, the utlity model has following beneficial effect: the plastic grid sand base water-permeable brick of the present utility model system of mating formation has higher intensity, improve the speed of rainwater infiltration, keep the change flat bed, speed of application is fast, realize modular construction, surface layer is very smooth, very attractive in appearance after mating formation, and uses regenerated plastics, energy-saving material-saving, environmental protection is ecological again.
[brief description of the drawings]
Fig. 1 is the mat formation profile of system of plastic grid sand base water-permeable brick of the present utility model.
Fig. 2-1st, the floor map of the permeable surface layer in Fig. 1.
Fig. 2-2nd, the profile of Fig. 2-1.
Fig. 3-1st, four water-permeable bricks of the permeable surface layer in Fig. 1 floor map side by side.
Fig. 3-2nd, the profile of Fig. 3-1.
Fig. 4-1st, the floor map of four water-permeable brick tandems of the permeable surface layer in Fig. 1.
Fig. 4-2nd, the profile of Fig. 4-1.
Fig. 5-1st, the floor map of eight water-permeable brick tandems of the permeable surface layer in Fig. 1.
Fig. 5-2nd, the profile of Fig. 5-1.
Fig. 6-1st, the floor map of eight water-permeable brick horizontally-arrangeds of the permeable surface layer in Fig. 1.
Fig. 6-2nd, the profile of Fig. 6-1.
Fig. 7-1st, the floor map of 16 water-permeable brick tandems of the permeable surface layer in Fig. 1.
Fig. 7-2nd, the profile of Fig. 7-1.
[detailed description of the invention]
Refer to Figure of description 1 to shown in Fig. 7-2, the utility model is a kind of plastic grid sand base water-permeable brick system of mating formation, and it is made up of several parts such as the soil matrix layer 1 of laying from bottom to top, graded broken stone layer 2 and permeable surface layers 3.
Wherein, the compacted density of described soil matrix layer 1 is not less than 93%, and land-based construction is carried out DBJ01-45.
Described graded broken stone layer 2 thickness are 25-45cm.In the middle of described graded broken stone layer 2 and soil matrix layer 1, lay Unidirectional water permeable geotechnique layer of cloth 4.
Described permeable surface layer 3 thickness are 29-34cm, and it comprises plastic grid 5, ovum macadam 6 and water-permeable brick 7.The material of described plastic grid 5 is regenerated plastics, and waste plastics is turned waste into wealth, and modularization is manufactured and formed, and meets energy-saving material-saving theory.In this plastic grid 5, be provided with support bar 8.Described ovum macadam 6 is laid in plastic grid 5, and is positioned at the below of support bar 8.The ovum rubble of ovum macadam 6 adopts the single grating that particle diameter is 5mm-10mm, and maximum particle diameter is no more than 15mm.Described water-permeable brick 7 is supported in the top of support bar 8, and concordant with the end face of plastic grid 5.
Further, described permeable surface layer 3 can adopt six kinds of forms, comprise four water-permeable bricks that 2*2 arranges, four side by side or the water-permeable brick of horizontally-arranged, eight horizontally-arrangeds or the water-permeable brick of tandem, the water-permeable brick of 16 tandems, also the spread pattern of self-defined plastic grid and water-permeable brick as required.
Plastic grid sand base water-permeable brick of the present utility model is mated formation system in the time mating formation, can be according to the width length in road or place, size, selects the specification size that adopts plastic grid, can adopt the grid of disparate modules to carry out composite assembly, use meets design requirement.Because of its specific plastics material mesh structures, in actual pavement construction, porous base course adopts the construction of grouting formula, can make the firm performance of basic unit stronger.Constructor can effectively ignore the construction of leveling layer, accelerating construction progress, and after construction, plastic grid surface and sand base brick can keep same plane, and very smooth, visual effect is fine.In the time of rainfall, the runoff on earth's surface can be penetrated into underground by sand base brick soon, under certain amount of precipitation, ground can not produce ponding, underground cobble stores physical efficiency and stores a large amount of rainwater, outer row's rainwater flow of control band, flood peak clipping, reduces the generation of region waterlogging, be seeped into the broken rainwater of grating simultaneously and can continue to be seeped in underground, thereby can recharge of groundwater.
Above detailed description of the invention is only the preferred embodiment of this creation, not in order to limit this creation, any amendment of making, is equal to replacement, improvement etc., within all should being included in the protection domain of this creation within all spirit in this creation and principle.

Claims (7)

1. the plastic grid sand base water-permeable brick system of mating formation, is characterized in that: comprise soil matrix layer, graded broken stone layer and the permeable surface layer laid from bottom to top; Wherein, described permeable surface layer comprises plastic grid, ovum macadam and water-permeable brick; In described plastic grid, be provided with support bar, described ovum macadam is laid in plastic grid, and is positioned at the below of support bar; Described water-permeable brick is supported in the top of support bar, and concordant with the end face of plastic grid.
2. the plastic grid sand base water-permeable brick as claimed in claim 1 system of mating formation, is characterized in that: described permeable surface thickness is 29-34cm, and graded broken stone layer thickness is 25-45cm.
3. the plastic grid sand base water-permeable brick as claimed in claim 1 system of mating formation, is characterized in that: in the middle of described graded broken stone layer and soil matrix layer, lay Unidirectional water permeable geotechnique layer of cloth.
4. the plastic grid sand base water-permeable brick as claimed in claim 1 system of mating formation, is characterized in that: in described permeable surface layer, comprise four water-permeable bricks that 2*2 arranges.
5. the plastic grid sand base water-permeable brick as claimed in claim 1 system of mating formation, is characterized in that: in described permeable surface layer, comprise four side by side or the water-permeable brick of horizontally-arranged.
6. the plastic grid sand base water-permeable brick as claimed in claim 1 system of mating formation, is characterized in that: the water-permeable brick that comprises eight horizontally-arrangeds or tandem in described permeable surface layer.
7. the plastic grid sand base water-permeable brick as claimed in claim 1 system of mating formation, is characterized in that: the water-permeable brick that comprises 16 tandems in described permeable surface layer.
CN201420291582.9U 2014-05-30 2014-05-30 Plastic-grid sand-based water permeable brick pavement system Expired - Fee Related CN203866671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420291582.9U CN203866671U (en) 2014-05-30 2014-05-30 Plastic-grid sand-based water permeable brick pavement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420291582.9U CN203866671U (en) 2014-05-30 2014-05-30 Plastic-grid sand-based water permeable brick pavement system

Publications (1)

Publication Number Publication Date
CN203866671U true CN203866671U (en) 2014-10-08

Family

ID=51647642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420291582.9U Expired - Fee Related CN203866671U (en) 2014-05-30 2014-05-30 Plastic-grid sand-based water permeable brick pavement system

Country Status (1)

Country Link
CN (1) CN203866671U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993536A (en) * 2014-05-30 2014-08-20 北京建筑大学 Paving system of plastic grid sand-based water permeable bricks

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993536A (en) * 2014-05-30 2014-08-20 北京建筑大学 Paving system of plastic grid sand-based water permeable bricks

Similar Documents

Publication Publication Date Title
CN202031001U (en) Compound water-permeable road structure
CN204875416U (en) Porous pavement structure
CN103352411B (en) Rainwater penetration collection device based on concrete-sand-based water-permeable bricks
CN203295913U (en) Novel ecological permeable road structure
CN204741964U (en) Rainwater garden
CN103669145A (en) Pavement method of permeable pavement structure
CN108301280A (en) A kind of permeable pavement structure
CN205711609U (en) Framed and the multi-functional porous pavement structural system of permeable plantation
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN208533316U (en) A kind of slot type porous pavement Deck pavement
CN202265891U (en) Permeable rainwater drainage pipe
CN204875850U (en) Rainwater garden
CN1644799B (en) Porous brickwalk laying method
CN201080590Y (en) Water seepage floor tile
CN203866671U (en) Plastic-grid sand-based water permeable brick pavement system
CN106013391B (en) A kind of hierarchical composite formula sinking greenery patches and its application based on artificial composite soil
CN202519561U (en) Urban road permeable cement concrete pavement structure
CN203890824U (en) Recycled aggregate based total pervious concrete pavement structure
CN208748462U (en) Can rapid construction high-bearing capacity pervious surface
CN206721596U (en) A kind of pavement structure of permeable road
CN207176431U (en) A kind of permeable pavement structure based on sponge the idea of the city
CN203923835U (en) Ecological rubble terrace structure
CN203866664U (en) Permeable concrete pavement system with permeation and drainage guide pipes
CN207862717U (en) Porous pavement with pervious concrete column
CN207003376U (en) Protective slope structure and river course slope protection with renewable material of building waste

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141008

Termination date: 20150530

EXPY Termination of patent right or utility model