CN203866215U - Composite structural, three-dimensional and environment-friendly fermenting system - Google Patents
Composite structural, three-dimensional and environment-friendly fermenting system Download PDFInfo
- Publication number
- CN203866215U CN203866215U CN201420233716.1U CN201420233716U CN203866215U CN 203866215 U CN203866215 U CN 203866215U CN 201420233716 U CN201420233716 U CN 201420233716U CN 203866215 U CN203866215 U CN 203866215U
- Authority
- CN
- China
- Prior art keywords
- proving room
- environmental protection
- fermentation system
- mixed structure
- dimensional environmental
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/40—Bio-organic fraction processing; Production of fertilisers from the organic fraction of waste or refuse
Abstract
The utility model relates to a composite structural, three-dimensional and environment-friendly fermenting system which comprises a plurality of conveyors used for conveying fermentation materials, a ventilating device, dust removing devices, an odor removing device, a fermenting chamber, a feeding device and fermented material conveyors; the fermenting system further comprises a three-dimensional layered concrete structural framework, wherein the concrete structural framework is built in an enclosed fermenting chamber or the periphery of the concrete structural framework is directly sealed to form an integration with the fermenting chamber; the concrete structural framework comprises a plurality of rows of vertical upright posts and a plurality of cross beams; a mounting passage is formed between every two rows of vertical upright posts; the cross beams are arranged between every two front and rear vertical upright posts; the conveyors are mounted in the mounting passages and racks of the conveyors are supported by the cross beams. The composite structure, three-dimensional and environment-friendly fermenting system provided by the utility model has the advantages that the manufacturing cost is lower, the service life is longer, the operation stability is higher and the use is safer.
Description
Technical field
The utility model belongs to organic fertilizer fermentation apparatus field, particularly relates to the three-dimensional environmental protection fermentation system of a kind of mixed structure.
Background technology
Data presentation according to statistics, the organic waste total amount of the annual society of China discharge is at present over 4,000,000,000 tons.These organic waste great majority do not obtain good environmental protection treatment and recycling, but discharge and exist with the form of pollutent, and the ecotope that we are depended on for existence has formed serious threat.For eliminating above-mentioned organic waste pollution threat, realize the harmonious development of man and nature environment, in society to the environmental protection treatment of organic waste and recycling pay attention to day by day, wherein the topmost mode of utilizing is manure resources utilization, and organic waste industrial fermentation is processed and process change becomes the ratio of organic fertilizer also in quick increase.Organic waste process change becomes organic fertilizer, and its most key and important process procedure is that organic waste is carried out to biodynamic aerobic fermentation, to realize material Nutrient Transformation and dehydration and drying.By traditional zymotechnique technology, normally adopt trough type fermentation or the fermentation of bar buttress formula of plane open type, but these zymotechniques all need there is large-area fermentation plant,
Take a large amount of soils, more than 40 hundred million tons of organic wastes of the annual discharge of the complete state of fermentative processing, approximately need 1,600,000 mu of soils, account for 2% left and right of China's cultivated area.Current, China's land resources worsening shortages, does not provide so many soil environmental protection treatment and recycling for organic waste, cannot preserve the ecological environment well; Provide and certainly will affect production and other economic construction lands used of grain, other development of restriction society.Therefore, this becomes the double-barreled question that government is difficult to choice.
For addressing this problem, should handle so many organic waste, take again the least possible soil, have only and adopt three-dimensional fermentation installation.For this reason, people's innovation three-dimensional layout, the fermentation equipment of multiple-layer stacked or fermentation system, as the < < multi-deck mesh-belt type solid fermentation apparatus > > patent of invention that can carry out pipeline system production of disclosed Qiu Junda on July 6th, 2005, the yellow phoenix flood of disclosed Inst. of Oil Crops, Chinese Academy of Agriculture on January 24th, 2012 waits people's < < Cascade combination type solid state fermentation method and system > > patent of invention thereof, in June, 2013 disclosed my company < < organic materials environment-friendly automatic fermentation system > > patent of invention.Above technological innovation all adopts stereo multilayer fermentation, realized increasing substantially of fermentation of organic wastes utilization of area rate, can fine solution slot type from main know-why and direction or the large problem of plane open type fermentation occupied ground area such as bar buttress formula, be the main flow direction of organic waste environmental protection treatment and manure resources utilization fermentation equipment and zymotechnique technical development in the future.
But above-mentioned several invention technical scheme does not all also provide several systems that equipment will will solve in industrialization, mass-producing fermentative processing and the recycling production practice of organic waste and the technical problem of reality:
The one, the so many organic waste of fermentative processing; stereo multilayer fermentation equipment is only designed and manufactured into trivial one group of eight to ten layers far away independent problem that also solve a large amount of soils of saving; realize real industrialization, mass-producing processing; a set of equipment at least needs to be designed and manufactured into tens groups; every group has 20 layers, 30 layers even more much type fermentation system; if adopt routinely ferrous materials manufacture; its cost is quite high; in society, most enterprises may be difficult to bear, and this directly can cause it to be difficult to obtain promoteing the wider application fast and on a large scale.
The 2nd, the organic waste of the layer stereo formula fermentation system institute fermentative processing of designed manufacture, there is considerable part to there is severe corrosive, employing ferrous materials is manufactured, and certainly will cause equipment in fermentation production process can be subject to serious corrosion, and will be subject to serious impact the work-ing life of equipment.
The 3rd, adopt ferrous materials manufacture, along with being constantly corroded of structure, the intensity of its structure is also constantly weakening thereupon, and this can cause occurring in equipment use procedure serious potential safety hazard.
The 4th, adopt iron structure manufacture, build up the high level of twenty or thirty layer, control manufacturing cost, material specification is restricted, structure rigidity is difficult to assurance, and this will certainly cause rocking in equipment running process, is difficult to the operating stability of assurance equipment and security.
Therefore, make three-dimensional fermentation equipment or fermentation system in production practice, really play one's part to the full and to be applied widely, for social environmental protection and resource utilization cause are made contributions, with regard to the anticorrosion of manufacturing cost problem that must solution equipment, equipment and work-ing life problem, equipment safety problem and stability problem.But not yet find that there is at present technical solution targetedly.
Summary of the invention
The purpose of this utility model is to solve the technical deficiency that existing stacked multilayer fermentation system device exists, and provides that a kind of manufacturing cost is lower, longer service life, operation stability are higher, use the safer three-dimensional environmental protection fermentation system of mixed structure.
The purpose of this utility model and solve its technical problem and realize by the following technical solutions.According to the three-dimensional environmental protection fermentation system of mixed structure the utility model proposes, comprise a plurality of transfer rollers for delivery of fermentation materials, ventilation plant, cleaning apparatus, odor removal, proving room, feeding unit, clinker conveyor machine, it also comprises the concrete structure framework of chpn, this concrete structure framework is built in an airtight proving room, or this concrete structure framework surrounding directly seals and proving room formation one; This concrete structure framework comprises the longitudinal column of many rows and many crossbeams, between the longitudinal column of every two row, be formed with installation passage, between forward and backward two longitudinal columns of every two rows, be provided with this crossbeam, those transfer rollers are installed on those and install in passage, and its frame support is on those crossbeams.
The purpose of this utility model and solve its technical problem and also can be applied to the following technical measures to achieve further.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, wherein said concrete structure framework arranges 2~30 layers, every layer height is 1~20m, distance between adjacent two longitudinal columns is 1~20m, and the transverse section of those longitudinal columns is square or rectangular, is of a size of 150~800mm * 150mm~1200mm, those longitudinal columns arrange 2~30 rows, 2~30 of every rows.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, every layer of wherein said concrete structure framework is upper arranges 1~5 layer of described transfer roller, this installs in passage transfer roller described in 1~5 group of parallel installation.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, every 2~15 layers of a set of feeding unit of connection of wherein said transfer roller and a clinker conveyor machine, this feeding unit connects the feed end in high-order transfer roller, this clinker conveyor machine connects the discharge end of the transfer roller in low level, this feeding unit rear end of every cover connect 1~15 group described in transfer roller, every clinker conveyor machine front end be connected with 2~30 groups described in transfer roller.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, the one or both sides of this installation passage of every one deck of wherein said concrete structure framework are provided with the wide installation and maintenance platform of 1~3m, every pedestrian stairway and elevator are installed between two-layer, between the locular wall of described longitudinal column and this proving room, are provided with the wide circular channel of 1~6m being connected with described installation passage, pedestrian stairway and escalator.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, wherein said ventilation plant, cleaning apparatus and odor removal are installed on the top of this proving room, described ventilation plant by airduct at the top of this proving room multiple spot from exhausting in proving room, described ventilation plant is centrifugal blower or aerofoil fan, a Fans connect one or more airduct at this proving room top from exhausting in proving room.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, wherein some connected " people " character form structures are arranged on this proving room top, the airduct of described ventilation plant is opened on " people " character form structure top, should " people " character form structure be concrete structure or steel construction, or its two mixed structure.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, wherein this proving room is formed by brick mix structure or steel construction or the airtight surrounding of the mixed structure of the two, evenly offers light transmission ventilation window on surrounding facade, and the blast inlet that several communicate with outside atmosphere is set on baseplane.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, 1~2 layer of the bottom of wherein said concrete structure framework is for arranging fertiliser production processing units and/or for starting material, semifinished or finished goods storage facilities.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, is wherein divided into the sub-proving room of several individual vents in this proving room.
Preferably, the three-dimensional environmental protection fermentation system of aforesaid mixed structure, the top of wherein said this proving room is provided with at least one for the moving type crane with maintenance maintenance internal unit is installed.
By technique scheme, the utility model at least has following advantages and beneficial effect:
1. innovatively fermentation system is designed to concrete structure framework, transfer roller is installed in concrete structure framework, can meet well stereo multilayer fermentation equipment and be designed and manufactured into tens groups, every group has 20 layers, the large-scale fermentation system of 30 layers of even more multi-layered transfer roller or fermentation bed, with adopt routinely ferrous materials manufacture and compare, laid down cost can reduce more than 50%, enterprise can be increased substantially by tolerances, can greatly promote the Rapid Popularization application of equipment, make social organic waste really obtain comprehensive environmental protection treatment and recycling, be conducive to the harmonious development of society and ecotope.
2. adopt the Design of Main Structure of concrete structure framework, can effectively resist the corrosion with severe corrosive organic waste, in the situation that laid down cost significantly reduces by 50%, can improve more than 5 times the work-ing life of equipment.
3. adopt concrete material to replace ferrous materials manufacture, main body load larrying member can not be corroded, long-time its physical strength and the weight capacity used can not change, and there will not be the intensity because of its structure constantly to weaken the serious potential safety hazard that causes equipment in use to occur.
4. adopt concrete material to replace ferrous materials manufacture, although it is even more high-rise to be built to twenty or thirty layer, it also can effectively avoid rocking in equipment running process, and structural strength is better, can effectively guarantee the operating stability of equipment.
Therefore, the innovation technical scheme has real practice significance, can really play a role for environmental protection treatment and the recycling of organic waste, can really promote environmental protection treatment and the recycling level of social organic waste, be conducive to the harmonious development of the mankind and ecotope.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand technique means of the present utility model, and can be implemented according to the content of specification sheets, and for above and other object of the present utility model, feature and advantage can be become apparent, below especially exemplified by preferred embodiment, and coordinate accompanying drawing, be described in detail as follows.
Accompanying drawing explanation
Fig. 1 is that the structure master of the three-dimensional environmental protection fermentation system of mixed structure of the utility model one embodiment looks schematic diagram.
Fig. 2 is that schematic diagram is looked on a structure left side for the three-dimensional environmental protection fermentation system of mixed structure of the utility model one embodiment.
Fig. 3 is the structure schematic top plan view of the three-dimensional environmental protection fermentation system of mixed structure of the utility model one embodiment.
Fig. 4 is the structure level cross-sectional schematic of the three-dimensional environmental protection fermentation system of mixed structure of the utility model one embodiment.
Fig. 5 is A portion enlarged view in Fig. 1.
Fig. 6 is B portion enlarged view in Fig. 1.
Description of reference numerals is as follows: concrete structure framework 1, crossbeam 11, longitudinal column 13, installation passage 14, installation and maintenance platform 15, pedestrian stairway 16, circular channel 17, transfer roller 2, transfer roller frame 21, ventilation plant 3, cleaning apparatus 4, odor removal 5, proving room 6, blast inlet 61, light transmission ventilation window 62, elevator 7, airduct 8, feeding unit 9, material elevator 91, horizontal material distributing machine 92, clinker conveyor machine 10.
Embodiment
For further setting forth the utility model, be to reach technique means and the effect that predetermined goal of the invention is taked, below in conjunction with accompanying drawing and preferred embodiment, three-dimensional its embodiment of environmental protection fermentation system of mixed structure, structure, feature and effect thereof to according to the utility model proposes, be described in detail as follows.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, the three-dimensional environmental protection fermentation system of mixed structure of the utility model one embodiment, comprising: concrete structure framework 1, the transfer roller 2 for delivery of fermentation materials, ventilation plant 3, cleaning apparatus 4, odor removal 5, proving room 6, feeding unit 9 and clinker conveyor machine 10; The surrounding of described concrete structure framework 1 directly seals with proving room 6 and forms integral type, and in order to facilitate the efficient utilization in original place, this concrete structure framework 1 can also be built in an independent airtight proving room 6 of having built up; This concrete structure framework 1 comprises the longitudinal column 13 of many rows and a plurality of crossbeam 11, every two 13, longitudinal columns of row are formed with installs passage 14, forward and backward two 13, longitudinal columns of every two rows are provided with this crossbeam 11, those transfer rollers 2 are installed on those and install in passage 14, and its frame support is on those crossbeams 11; Described ventilation plant 3, cleaning apparatus 4, odor removal 5 are installed on the top of proving room 6.
Described concrete structure framework 1 arranges 8 layers, and every layer height is 3m, and the distance that longitudinal column is 13 is 6m, and longitudinally column 13 has 11 rows, and every row has 21.
Described concrete structure framework 1 every layer of upper 3 layers of transfer roller 2,2 groups of transfer roller 2 of the interior parallel installation of installation passage 14 between the longitudinal column 13 of every 2 row arranged.
In order to meet the fermentation period of different fermentations material, fermentation materials is delivered in high-rise transfer roller 2 through feeding unit 9, while being transported to the transfer roller 2 in low layer by certain speed, just complete the clinker conveyor machine 10 that fermentation maturity is conveyed into its rear end, the every 8 layers of a set of feeding unit 9 of connection of described transfer roller 2 and a clinker conveyor machine 10, the feed end that feeding unit 9 connects in high-order transfer roller 2, clinker conveyor machine 10 is connected to the discharge end of the transfer roller 2 in low level; Every cover feeding unit 9 rear ends connect 10 groups of transfer rollers 2, and every clinker conveyor machine 10 front ends are connected with 20 groups of transfer rollers 2; Described feeding unit 9 is comprised of material elevator 91 and horizontal material distributing machine 92, and material elevator 91 is promoted to material the opening for feed of horizontal material distributing machine 92 from low level, is dispensed to transfer roller 2 top fermentations of its rear end by horizontal material distributing machine 92; Described material elevator 91 is belt elevators, and horizontal material distributing machine 92 is Shaftless screw conveyors.
For the ease of the installation of equipment and maintaining at ordinary times, sides of the installation passage 14 between the longitudinal column 13 of two rows of every one deck of described concrete structure framework 1 are provided with and the transverse upright of concrete structure framework and the concrete installation and maintenance platform 15 that longitudinally width of column formed by integrally casting is 1m.
For convenience of management and operation, between described concrete structure framework 1 two-layer, be provided with pedestrian stairway 16, can be optionally every two to three of described pedestrian stairway is installed 14, passages a set of pedestrian stairway 16 is set; If the number of plies of concrete structure framework 1 is more, for handled easily personnel are upper and lower and increase work efficiency, the elevator 7 of every one deck that can also design and installation in proving room can go directly; Described elevator 7 can be according to the size cases of whole system, at one end or two ends some covers are installed respectively; Between longitudinal column 13 of every layer of described concrete structure framework 1 and the locular wall of proving room 6, be provided with and the circular channel 17 of passage 14, pedestrian stairway 16 and elevator 7 being installed being connected.
In order to obtain desirable ventilation effect, the needs that temperature in assurance proving room and temperature meet material fermentation condition, avoid in fermentation production process system to outside environmental emission dust and foul smell simultaneously, realizing clean environment firendly produces, before described ventilation plant 3, be connected with cleaning apparatus 4 and odor removal 5, its annexation is that cleaning apparatus 4 divides multiple spot to be communicated with proving room 6 at the top of proving room 6 by some airducts 8, odor removal 5 is connected to the rear end of cleaning apparatus 4 by airduct 8, ventilation plant 3 is connected to the rear end of odor removal 5 by airduct 8, the fermentation tail gas with dust and stink of proving room 6 interior generations, suction by ventilation plant 3 is introduced into cleaning apparatus 4 dust-filtering is fallen, then by odor removal 5, stink is processed and removed, finally the exhaust outlet by ventilation plant 3 is discharged into outside atmosphere, described ventilation plant 3 be centrifugal blower, the air-vent of a Fans can be connected with some odor removals 5, in order to make blower fan put exhausting exhaust equably from each exhausting, on described airduct 8, be provided with can adjust flux throttling valve, described ventilation plant 3 also can adopt aerofoil fan, and is uniformly distributed, and blower fan is directly communicated with the top of proving room 6 by airduct 8, from the top exhausting of proving room 6, is vented to cleaning apparatus 4 and odor removal 5, the installation quantity of described blower fan and the size of power, need calculative determination by the space size of described proving room 6 and the ventilation of organic materials fermentation.
In order to be more conducive to ventilation plant 3 from the inner exhausting exhaust of proving room 6, some connected " people " character form structures are arranged at the top of described proving room 6, and ventilation plant 3 is opened on " people " character form structure top by airduct 8, with the internal communication of proving room 6; Should " people " character form structure be concrete structure, consider construction difficulty and construction cost, and should can also adopt steel construction to build by " people " character form structure, or the mixed structure of concrete structure and steel construction be built.
For being realized uniformly, the inside of proving room 6 ventilates, there is not the blind area that ventilates, obtain desirable ventilation effect, guarantee that the temperature and humidity in proving room 6 meets the needs of material fermentation condition, the specification blast inlet 61 that evenly setting communicates with outside atmosphere of is set by 2m * 2m on described proving room 6 baseplanes; The dimensions of described blast inlet 61 is 250mm * 350mm, and net defence is installed on it, by trench, is connected with outside atmosphere, also can be connected with outside atmosphere by closed conduit.
If the space of proving room 6 is very large and the number of plies of the transfer roller 2 of its inner installation is also very many, in order to regulate better the temperature and humidity in proving room 6, also described proving room 6 can be separated into some sub-proving rooms by longitudinal or horizontal direction, each sub-proving room is carried out to independent forced ventilation.
In order more to save the area, reduce facility investment, reduce the shipment distance of fermentation maturity organic raw material, reduce production costs, 1~2 layer of the bottom of described concrete structure framework 1 can not arranged transfer roller 2 is installed, and being directly used in the production line of arranging fertiliser production processing, the organic materials that completes fermentation on transfer roller 2 can be delivered directly to the dosing materials device of fertiliser production machining production line; 1~2 layer of the bottom of described concrete structure framework 1 also can also be used as starting material, work in-process, finished product storage facilities.
In order to make, system is more durable in use and structure is more firm, the surrounding of described proving room 6 adopts brick mix structure to build and forms, if the concrete structure framework number of plies is more, for weight reduction and minimizing investment, the surrounding of described proving room 6 also can be used the airtight formation of steel construction; For the ease of ventilating in the employing in proving room 6 and production process to regulating, need, on the surrounding facade of described proving room 6, evenly offer light transmission ventilation window 62; This light transmission ventilation window 62 can as required, be opened in good time and close.
In addition, lifting convenience for maintenance maintenance in equipment installation and use procedure, can also install at the top of this proving room some for the moving type crane with maintenance maintenance internal unit is installed, the overweight capacity of water of crane is determined according to the workpiece weight of needs liftings, the size of the concrete quantity viewing system of installation and determining.
The above, it is only preferred embodiment of the present utility model, not the utility model is done to any pro forma restriction, although the utility model discloses as above with preferred embodiment, yet not in order to limit the utility model, any those skilled in the art, do not departing within the scope of technical solutions of the utility model, when can utilizing the technology contents of above-mentioned announcement to make a little change or being modified to the equivalent embodiment of equivalent variations, in every case be the content that does not depart from technical solutions of the utility model, any simple modification of above embodiment being done according to technical spirit of the present utility model, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.
Claims (11)
1. the three-dimensional environmental protection fermentation system of mixed structure, comprises a plurality of transfer rollers for delivery of fermentation materials, ventilation plant, cleaning apparatus, odor removal, proving room, feeding unit, clinker conveyor machine, it is characterized in that:
The concrete structure framework that also comprises chpn, this concrete structure framework is built in an airtight proving room, or this concrete structure framework surrounding directly seals and proving room formation one; This concrete structure framework comprises the longitudinal column of many rows and many crossbeams, between the longitudinal column of every two row, be formed with installation passage, between forward and backward two longitudinal columns of every two rows, be provided with this crossbeam, those transfer rollers are installed on those and install in passage, and its frame support is on those crossbeams.
2. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1, it is characterized in that described concrete structure framework arranges 2~30 layers, every layer height is 1~20m, distance between adjacent two longitudinal columns is 1~20m, the transverse section of those longitudinal columns is square or rectangular, be of a size of 150~800mm * 150mm~1200mm, those longitudinal columns arrange 2~30 rows, 2~30 of every rows.
3. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1 or 2, is characterized in that every layer of described concrete structure framework is upper to arrange 1~5 layer of described transfer roller, and this installs in passage transfer roller described in 1~5 group of parallel installation.
4. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1 or 2, it is characterized in that every 2~15 layers of described transfer roller connects a set of feeding unit and a clinker conveyor machine, this feeding unit connects the feed end in high-order transfer roller, this clinker conveyor machine connects the discharge end of the transfer roller in low level, this feeding unit rear end of every cover connect 1~15 group described in transfer roller, every clinker conveyor machine front end be connected with 2~30 groups described in transfer roller.
5. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1, the one or both sides of this installation passage of every one deck of the concrete structure framework described in it is characterized in that are provided with the wide installation and maintenance platform of 1~3m, every pedestrian stairway and elevator are installed between two-layer, between the locular wall of described longitudinal column and this proving room, are provided with the wide circular channel of 1~6m being connected with described installation passage, pedestrian stairway and escalator.
6. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1, it is characterized in that described ventilation plant, cleaning apparatus and odor removal are installed on the top of this proving room, described ventilation plant by airduct at the top of this proving room multiple spot from exhausting in proving room, described ventilation plant is centrifugal blower or aerofoil fan, a Fans connect one or more airduct at this proving room top from exhausting in proving room.
7. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 6, it is characterized in that this proving room top is arranged to some connected " people " character form structures, the airduct of described ventilation plant is opened on " people " character form structure top, should " people " character form structure be concrete structure or steel construction, or its two mixed structure.
8. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1, it is characterized in that this proving room is formed by brick mix structure or steel construction or the airtight surrounding of the mixed structure of the two, on surrounding facade, evenly offer light transmission ventilation window, the blast inlet that several communicate with outside atmosphere is set on baseplane.
9. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1 or 2,1~2 layer of the bottom that it is characterized in that described concrete structure framework is for arranging fertiliser production processing units and/or for starting material, semifinished or finished goods storage facilities.
10. the three-dimensional environmental protection fermentation system of mixed structure as claimed in claim 1, is characterized in that being divided in this proving room the proving room of several individual vents.
The three-dimensional environmental protection fermentation system of 11. mixed structure as claimed in claim 1, the top that it is characterized in that this proving room is provided with at least one for the moving type crane with maintenance maintenance internal unit is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420233716.1U CN203866215U (en) | 2014-05-08 | 2014-05-08 | Composite structural, three-dimensional and environment-friendly fermenting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420233716.1U CN203866215U (en) | 2014-05-08 | 2014-05-08 | Composite structural, three-dimensional and environment-friendly fermenting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203866215U true CN203866215U (en) | 2014-10-08 |
Family
ID=51647194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420233716.1U Expired - Fee Related CN203866215U (en) | 2014-05-08 | 2014-05-08 | Composite structural, three-dimensional and environment-friendly fermenting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203866215U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103980022A (en) * | 2014-05-08 | 2014-08-13 | 广西力源宝科技有限公司 | Three-dimensional mixed construction type environmentally-friendly fermentation system |
-
2014
- 2014-05-08 CN CN201420233716.1U patent/CN203866215U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103980022A (en) * | 2014-05-08 | 2014-08-13 | 广西力源宝科技有限公司 | Three-dimensional mixed construction type environmentally-friendly fermentation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103980022B (en) | The three-dimensional environmental protection fermentation system of mixed structure | |
CN105060963B (en) | Organic materials tray-type three-dimensional fermentation system and its fermentation process | |
CN102659457B (en) | All-in and all-out warehousing compost fermentation system and use method thereof | |
CN105060958B (en) | Pellet type organic materials stereoscopic fermentation system and its fermentation process | |
WO2015085738A1 (en) | Material storage device of material storage plant, and enclosed material storage plant | |
CN103980021A (en) | Three-dimensional environmentally-friendly fermentation system | |
CN103288506A (en) | Automatic environmental protection fermentation system of organic material | |
CN203866215U (en) | Composite structural, three-dimensional and environment-friendly fermenting system | |
CN207614639U (en) | A kind of multi-functional organic waste gas treatment device | |
CN202576271U (en) | All-in-all-out storage compost fermentation system | |
CN204138549U (en) | A kind of fertilizer solid materials fermentation tower | |
CN105585234A (en) | Vertical type no-layering sludge aerobic fermentation system and treatment method | |
CN201657644U (en) | Multilayer ventilation drying granary | |
CN203393049U (en) | High-temperature aerobic fermentation composting device for biogas residues | |
CN105175043A (en) | Bi-directional ventilation superficial-layer static composting device and method for composting by utilizing same | |
CN105350806A (en) | Multi-point multi-gallery energy-saving environmental-protection storage device and discharging method thereof | |
CN205313518U (en) | High -efficient continuous good oxygen bioreactor system | |
CN205100629U (en) | Flat silo | |
CN203820654U (en) | Three-dimensional environment-friendly fermentation system | |
CN203307246U (en) | Automatic environment-friendly fermenting system for organic materials | |
CN208470690U (en) | A kind of workpiece products storage circulation system | |
CN112339098A (en) | Steam curing device for prefabricated part | |
CN105060964A (en) | Fermentation tray stack conveying system | |
CN106701529A (en) | Efficient and continuousaerobic bioreactor system | |
CN204958748U (en) | Fermentation tray dish buttress conveying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141008 Termination date: 20160508 |
|
CF01 | Termination of patent right due to non-payment of annual fee |