CN203855934U - Dam with silt filled geotextile bags - Google Patents

Dam with silt filled geotextile bags Download PDF

Info

Publication number
CN203855934U
CN203855934U CN201420092390.5U CN201420092390U CN203855934U CN 203855934 U CN203855934 U CN 203855934U CN 201420092390 U CN201420092390 U CN 201420092390U CN 203855934 U CN203855934 U CN 203855934U
Authority
CN
China
Prior art keywords
silt
dam
dams
filling
geotextile bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420092390.5U
Other languages
Chinese (zh)
Inventor
胡殿才
马兴华
盛懿洁
詹田进
任强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waterway Engineering Design and Consulting Co Ltd
Original Assignee
Shanghai Waterway Engineering Design and Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waterway Engineering Design and Consulting Co Ltd filed Critical Shanghai Waterway Engineering Design and Consulting Co Ltd
Priority to CN201420092390.5U priority Critical patent/CN203855934U/en
Application granted granted Critical
Publication of CN203855934U publication Critical patent/CN203855934U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a dam with silt filled geotextile bags, and relates to dams. The dam is composed of silt, the geotextile bags, plastic drainage plates and precipitation wells. The dam is characterized in that the content of particles of which the particle size is greater than 0.075mm in the silt does not exceed 50% of the total mass; side faces of the geotextile bags are made of composite geotextiles, and upper and lower surfaces of the geotextile bags are made of woven fabrics; prisms formed by the silt filled geotextile bags are arranged on the two sides of the dam, silt fills the middle of the dam to form a core of the dam, and horizontal drainage channels formed by the horizontal plastic drainage plates are formed among the silt filled geotextile bags; the precipitation wells are distributed in the core of the dam. The dam is suitable for causeway, cofferdam, revetment, approach bank, breakwater, sea wall and embankment construction.

Description

A kind of silt filling geotextile bag dykes and dams
Technical field
The utility model relates to the dykes and dams of harbour, water conservancy, highway.
Background technology
At harbour, water conservancy, ground, municipal administration, highway professional domain, complete at present with ongoing geotextile filling bag embankment and formed in dam construction, current specifications requires casting resin should select sandy soil, the granule content that particle diameter is greater than 0.075mm should be greater than 50%, this is easier to realize for the abundant area ratio in sand source, has good using value.But lack for sandy soil, and the resourceful area of silt, because silt particle is thinner, drainage and soil conservation are poor, and dykes and dams soil solidifying is slow, the domestic successful case that rarely has at present the fill of employing silt filling geotextile bag.
Summary of the invention
The problem that the utility model need to solve is lack and under the resourceful condition of silt, research and develop a kind of silt and substitute the dykes and dams that sandy soil filling geotextile bag is constructed at sandy soil.
Silt, geotextile bag, plastic draining board and dewatering well for the technical solution of the utility model Bian, is characterized in that the granule content that particle diameter in silt is greater than 0.075mm is no more than 50% of gross mass; Geotextile bag side adopts composite earthwork cloth, and top and bottom adopt woven cloth to make, and composite earthwork cloth is by 150 ~ 250g/m 2woven fabric and 100 ~ 250g/m 2non-woven geotextile is composited, and woven cloth specification is 150 ~ 300g/m 2; Dykes and dams two sides are the rib body that geotextile bag filling silt builds up, and in the middle of dykes and dams, are the hydraulic reclamation silt dike heart, between the geotextile bag of filling silt, bury level underground to plastic draining board, connect the hydraulic reclamation silt dike heart and the external side of rib, form transverse drainage passage; Dike is distributed with dewatering well in the heart.
Remarkable technological progress of the present utility model is the restriction that has broken through geotextile filling bag in current specifications and need adopt casting resin sandy soil, by taking effective configuration to solve the technical barriers such as drainage, soil conservation, consolidated compacting that silt fill exists be slow, realize direct employing silt filling geotextile bag fill and formed dykes and dams; The main grain group of composition silt is powder, particle size range is between 0.075 ~ 0.005mm, and the physico-mechanical properties of silt is subject to powder control, and particle is thin, hole is little, viscosity is low, weak~medium water permeability, natural drainage consolidation time is long, is difficult to meet dam construction application demand; Once but silt discharging consolidation is closely knit, there is the feature that intensity is high, compactness is high, bearing capacity is high, it is good banking material; The utility model, by adopting the technical measures such as drainage path, dewatering well, foreshortened to the silt discharging consolidation time about 5 days by 20 days above, and bearing capacity of foundation soil meets dam construction application demand.Geotextile bag side adopts composite earthwork cloth, woven fabric intensity is high, porosity is high, non-woven geotextile has the advantages that soil conservation is good, the two is compound, efficiently solve silt and charge draining, the soil conservation technical barrier that geotextile bag exists, and upper and lower sides adopts woven cloth to be beneficial to draining, reduce cost simultaneously; Plastic draining board is set, utilizes plastic draining board to form drainage channel, shorten drainage path; Dewatering well is set, removes the part Free water in silt, dewatering, realizes good closely knit effect.
Brief description of the drawings
What Fig. 1 represented is to implement the dykes and dams sectional schematic diagram that the fill of silt filling geotextile bag forms.
What Fig. 2 represented is to implement silt filling geotextile bag fill first stage construction schematic diagram.
What Fig. 3 represented is to implement silt filling geotextile bag fill second stage construction schematic diagram.
What Fig. 4 represented is geotextile filling bag structural representation.
Detailed description of the invention
The utility model is silt, geotextile bag, plastic draining board and dewatering well (see figure 1) for Bian, and the granule content that in silt, particle diameter is greater than 0.075mm is no more than 50% of gross mass; Geotextile bag (see figure 4) side adopts composite earthwork cloth 8, and top and bottom adopt woven cloth 9, and composite earthwork cloth is by 150 ~ 250g/m 2woven fabric and 100 ~ 250g/m 2non-woven geotextile is composited, and woven cloth specification is 150 ~ 300g/m 2; Dykes and dams two sides are the rib body 1 that geotextile bag filling silt builds up, in the middle of dykes and dams, it is the hydraulic reclamation silt dike heart 2, the level that is embedded with between the geotextile bag of filling silt is to plastic draining board 3, connect the hydraulic reclamation silt dike heart and the external side of rib, form transverse drainage passage, plastic draining board level interval 1 ~ 5m; Dike is distributed with dewatering well 4 in the heart.The utility model construction adopts the low-lying level dynamic compaction machinery 5 that energy is 800 ~ 1200kJ, can accelerate the discharging consolidation speed of the hydraulic reclamation silt dike heart, improves compactness and the bearing capacity of the dike hydraulic reclamation silt dike heart.After the fill of silt filling geotextile bag completes, construct rigidifying structure 6 and outer slope safeguard structure 7.

Claims (2)

1. silt filling geotextile bag dykes and dams, silt, geotextile bag, plastic draining board and dewatering well for Bian, is characterized in that geotextile bag side adopts composite earthwork cloth, and top and bottom adopt woven cloth to make, and woven cloth specification is 150 ~ 300g/m 2; Dykes and dams two sides are the rib body that geotextile bag filling silt builds up, and in the middle of dykes and dams, are the hydraulic reclamation silt dike heart, between the geotextile bag of filling silt, bury level underground to plastic draining board, connect the hydraulic reclamation silt dike heart and the external side of rib, form transverse drainage passage; Dike is distributed with dewatering well in the heart.
2. according to a kind of silt filling geotextile bag dykes and dams described in claim 1, it is characterized in that plastic draining board level interval 1 ~ 5m.
CN201420092390.5U 2014-03-03 2014-03-03 Dam with silt filled geotextile bags Expired - Lifetime CN203855934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420092390.5U CN203855934U (en) 2014-03-03 2014-03-03 Dam with silt filled geotextile bags

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420092390.5U CN203855934U (en) 2014-03-03 2014-03-03 Dam with silt filled geotextile bags

Publications (1)

Publication Number Publication Date
CN203855934U true CN203855934U (en) 2014-10-01

Family

ID=51605800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420092390.5U Expired - Lifetime CN203855934U (en) 2014-03-03 2014-03-03 Dam with silt filled geotextile bags

Country Status (1)

Country Link
CN (1) CN203855934U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652410A (en) * 2014-12-26 2015-05-27 交通运输部科学研究院 Drainage body structure of drainage consolidation method using granular plastic and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652410A (en) * 2014-12-26 2015-05-27 交通运输部科学研究院 Drainage body structure of drainage consolidation method using granular plastic and construction method thereof

Similar Documents

Publication Publication Date Title
CN103821105B (en) Method for building dike by filling geotextile bag with silt
CN102767157B (en) Diking method through filling sludge into mold bags and vacuum preloading
CN109629585B (en) Novel cofferdam structure under weak covering layer and construction method
CN105178245A (en) Large filling bag ecological embankment and revetment building method for river lake channel
CN201485847U (en) Novel synchronous draining leakage and reinforcing device for tailing dams
CN106284205B (en) Method for building dam by hydraulic flushing of tailings of mold bag edge stems
CN101220589B (en) Soil engineering bag and method for dynamically squeezing and synthetically reinforcing soft groundwork
CN106381880B (en) The processing method of the peat soil dam foundation
CN111851505A (en) Construction method and structure of pouring type impervious core earth-rock dam
CN108532581A (en) A kind of modular soil body pressing formation device with integrated treatment function
CN207469269U (en) A kind of hydraulic engineering High strength geogrid structure class ecological revetment
CN209816885U (en) Novel cofferdam structure under soft covering layer
CN104264653A (en) Superhigh energy level dynamic compaction and replacement compatible construction process
CN215669631U (en) Deep overburden foundation structure
CN104846774B (en) Urban catchments river course stores up sustained release sponge bank structure soon
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN203855934U (en) Dam with silt filled geotextile bags
CN203049533U (en) Backfilling and land reclamation structure using waste ballast for mountain valleys
CN108018854A (en) A kind of Ecotype Concrete support pile
CN108532543B (en) Auxiliary anti-seepage layer-paving structure for foundation pit on upstream of dam
CN108277778A (en) A kind of filling mud bag supports compound fill structure and filling mud bag fill construction method
CN109056654A (en) A kind of geotechnical grid encloses low bank between fields and its construction method
CN210712730U (en) Sea wall structure
CN208136830U (en) A kind of compound fill structure of filling mud bag support
CN211113446U (en) Side slope protection structure capable of being constructed underwater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141001